Home / AIG Australia Limited / Determination 773153

Determination 773153

Claim denial for storm water/hot water leak related subsidence damage to home

FirmAIG Australia Limited
Decided2021-12-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$5,000
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for cracking and damage to their home after a hot water and storm water pipe leak, and the insurer denied the claim as caused by tree-root subsidence and gradual damage. AFCA found the damage was covered subsidence following the leak repair, ordered the claim settled under the policy, provided temporary accommodation, and ordered a $5,000 contribution to professional costs.

Damage caused by subsidence and heave is covered under the accidental damage policy, the tree root and gradual damage exclusions did not apply on the wording and evidence, so the insurer must settle the claim.

Issues

Subjects and remedies

home or building damagethird party authoritypay claimpay compensation

Related

All AIG Australia Limited determinations · Find similar determinations

Text of the determination

Amended Determination Case number 773153 Financial firm AIG Australia Limited Amended Determination | Case number: 773153 Page 1 of 11 Case number: 773153 17 December 2021 1 Determination overview 1.1 Complaint The complainant held a Home and Contents Mansion policy with the financial firm (Insurer) and lodged a claim on 17 January 2020 for damage caused by an escape of liquid from a storm water pipe attached to a hot water unit. The insurer denied the claim. It says root activity of the nearby trees intensified during the time of the leak and resulted in settlement of the reactive foundation soils. The insurer says this caused the damage to the property following the repair of the leak. The insurer says the damage is not caused by a single insured event and occurred over a period. The complainant disagrees with the insurer‟s decision and says the water leak caused water to pool around the home affecting the soil conditions, resulting in a shift in the house and extensive damage. Accordingly, the complainant wants the insurer to accept the claim. 1.2 Issue and key findings Has the complainant established the damage falls within the terms of the policy? Yes. The policy is an accidental damage policy and there is no dispute the damage is accidental damage that occurred in the period of insurance. Is the insurer entitled to deny the claim? No. The insurer is not entitled to decline the claim. On balance the damage was caused by subsidence following the repair of the leaking pipe. It was not gradual but occurred suddenly after the repairs had been completed. Why is the outcome fair? The outcome is fair as the policy covers accidental damage. The available information supports the complainants claim that the damage was caused by subsidence after the repair of the water leak. Such damage falls within cover under the terms of the policy. 1.3 Determination This determination is in favour of the complainant. The insurer is to settle the claim in accordance with the terms and conditions of the policy as set out in section 2.2 of this determination. In addition, pursuant to AFCA rule D3.5, the insurer is to pay the complainant $5,000 for professional costs incurred in this complaint as set out under section 2.2 of this determination. Amended Determination | Case number: 773153 Page 2 of 11 2 Reasons for determination 2.1 Has the complainant established the damage falls within the terms of the policy? Yes. The policy is an accidental damage policy and there is no dispute the damage is accidental damage that occurred in the period of insurance. Complainant has onus to establish a valid claim It is established insurance law that an insured has the onus to establish on the balance of probabilities (that is more likely than not) that the loss or damage falls within the terms and of the policy. This is commonly known as a prima facie claim. The complainants policy is a Home and Contents Mansions policy that provides cover for accidental loss or damage to the building that occurs in the period of insurance. The policy does not define „accidental loss or damage‟ but this is generally accepted to mean damage that is unintended and unexpected. Complainant says cracking occurred suddenly at location of broken pipe On 17 January 2020, the complainant lodged the claim for cracking to the external and internal walls at his property. He says there was a significant leak from the mains water plumbing outside the kitchen. He says, shortly after the repair of the leak, significant cracks rapidly developed throughout the home on the northern side, near the billiards room. The complainant‟s plumber (AL) attended the property. AL found evidence of movement at the rear left of the property. AL says the copper pipe connected to the hot water unit overflow, penetrates through brick work and is positioned above a PVC stormwater pipe. AL says movement of the brick slab caused moisture from the copper pipe to flow around the PVC pipe and into the gap between the property and the external concrete slab. The insurer‟s loss adjuster (SB) attended the property on 22 January 2020. SB confirmed there is cracking to the internal plaster linings, ceiling and doors in the northern part of the property. Complainant has established a prima facie claim The panel is satisfied the available information establishes the damage was unintended and unexpected. The panel is satisfied the complainant has established the damage falls within the terms of the policy. Accordingly, the onus shift to the insurer to prove on the balance of probabilities the damage was caused by a policy exclusion or it is otherwise entitled to deny the claim. 2.2 Is the insurer entitled to deny the claim? No. The insurer is not entitled to decline the claim. On balance, the damage was caused by subsidence following the repair of the leaking pipe. It was not gradual or due to repeated events but occurred suddenly after the repairs had been completed Insurer says damage caused by subsidence due to drying effects of tree roots The insurer says the water leak from the hot water system was not the primary cause of the damage but an accelerating factor. Amended Determination | Case number: 773153 Page 3 of 11 The insurer says the primary cause of damage was the subsidence movements due to drying effects of the gradually expanding tree root systems located near the property. The insurer says such damage is excluded from cover as the policy excludes damage caused by:  vermin, insects, mildew, atmospheric or climatic conditions (other than storms);  tree roots, but this does not exclude subsequent damage resulting from an ensuing cause which is not otherwise excluded  earth movement unless due to an earthquake, subsidence, heave or landslide  settling, cracking, shrinking, bulging or expansion of the building unless due to an earthquake, subsidence, heave or landslide  subsidence, heave, landslide or earthquake to footpaths, gates, fences, swimming pools, walls, boat houses, garages or outbuildings and other structures even if all such structures so listed form or do not form part of the building.  anything which happens gradually The insurer appointed engineer “ NJ ” says the cause of the subsidence movements in the billiard, dining and lounge room area is the drying effects of the tree roots along the left boundary. NJ says the hot water system overflow leakage is unlikely to have significantly contributed to the subsidence at the front of the dining and lounge room areas. The insurer e ngineer “FM” says the largest amount of settlement was found at the northern end of the billiard room. FM says the floor level survey showed a general pattern of relative settlement (not heave) towards north of the house. FM says the leak event did not cause/contribute to the damage to the property. FM says the tree/shrub roots remove moisture from foundation soils causing them to shrink and result in settlement of nearby buildings and thereby exacerbate the dry season‟s change in soil moisture content. The panel notes the vegetation and tree roots had been present 23 years prior to the leaks, however there is no evidence to suggest there has been any gradual/previous movement issues at the property. Expert reports support view that leaking pipe was a cause of damage NJ says the leak discharge led to the saturation of the founding soils and footings beneath the kitchen area/rear left corner, potentially leading to the upward heaving of the footing system in this section. NJ says the area affected by heaving can expect to gradually increase if the leak persists. The panel is satisfied this statement supports the view that the leak has affected the founding soils and once repaired this has caused subsidence. FM says there is a pattern of relative settlement towards the north west corner of the house. The largest amount of settlement was found at the northern end of the billiard room. This indicates an alternative factor is causing the damage rather than normal seasonal movement. If seasonal movement was the dominant cause of the cracking, damage would be expected in other locations rather than in one isolated area. There is no evidence of any other damage in other parts of the property. The complainant ‟s engineer “ RB ” says the cause of the differential foundation movement, is the plumbing leak from the mains water pipe around the kitchen area. RB says the effects of the trees near this area was likely considered in the design of the foundation. RB says the significant wetting of the soil from the plumbing failure and subsequent drying of the soil after the repairs caused the soil to consolidate and shrink, causing settlement to the Amended Determination | Case number: 773153 Page 4 of 11 foundations in this area. The panel notes there is no history of foundation movement prior to the leak repair. The com plainant‟s engineer “KM” considered the foundation movement was not the result of the long-term effects of the vegetation but primarily due to the hot water system leak and/or the multiple leaks present to the inground pipework. The combination of these leaks resulted in the saturation of the soils under the building which then caused the fill soils under to collapse, in various amounts across the building footprint, but most significantly to the rear. The additional moisture resulted in the roots of the vegetation being attracted to this area. Without the presence of moisture, the roots would have not been attracted to the area under the building but would have migrated towards more moist areas outside of the building footprint. The roots then caused the underlying soils, wet from the leak to dry out in a non- uniform manner which in combination with the fill soil collapse, has led to differential movement and the cracking and other damages now visible. The complainants geotechnical engineer “ PG ” says the leak potentially caused the soil to „collapse‟ following the draining of the upper level fill after remediation of the leak. PG says the tree root that extends under the structure will cause abnormal loss of moisture of the founding soils, adding to the settlement of the structure. Exclusion for damage caused by tree roots does not apply The exclusion relating to tree roots does not apply. The insurer has misrepresented the context of the exclusion by implying it is a stand-alone exclusion. The insurer in the IDR letter and Notice of response has represented the exclusion as follows: “ Unless otherwise stated in the Insurance Schedule, this Policy does not cover: 1. loss of or damage to Your property which is caused by: tree roots, but this does not exclude subsequent damage resulting from an ensuing cause which is not otherwise excluded; ” The correct version of the policy provides Unless otherwise stated in the Insurance Schedule, this Policy does not cover: 1. loss of or damage to Your property which is caused by: c. vermin, insects, mildew, atmospheric or climatic conditions (other than storms); ……. h. tenants or paying guests, arising from or due to: iii. loss or damage caused by tree roots, but this does not exclude subsequent damage resulting from an ensuing cause which is not otherwise excluded; The policy is clear. It only excludes loss or damage caused by tree roots as part of loss or damage caused by tenants or paying guests. It is an unusual exclusion but does not apply to the complainant ‟ s claim. Damage did not occur gradually The insurer also says the damage occurred gradually and the policy excludes such damage. The exclusion needs to be considered in the context of the policy as a whole. The relevant policy wording excludes: 22 . loss or damage caused by anything which happens gradually, including smoke or rising damp; Amended Determination | Case number: 773153 Page 5 of 11 The panel accepts it is arguable that the damage occurred gradually although notes there is no evidence that the property had suffered any damage until after the repair of the leak. The policy covers subsidence and heave. Subsidence is defined in the policy to mean the downward movement of the ground on which the Building stands by a cause other than the weight of the house itself. Heave is defined to mean the upward movement of the ground beneath the Building as a result of the soil expanding. By the very nature of subsidence and heave such damage will arguably occur gradually. It would make a nonsense of the insuring provisions covering subsidence and heave to exclude such damage unless it occurred in a sudden defined event. That, in the panels view cannot be the intention of the policy. The exclusion for anything that happens gradually in the context of the policy as a whole suggests something that slowly builds up overtime and is observable. Damage caused by smoke would become apparent due to a yellowing of the walls, raising damp would become apparent due to the increased blistering of the plaster or paint. In the complainant ‟ s claim the damage did not occur gradually but became apparent on the subsidence. The subsidence occurred shortly after the repair of the leaks. It did not occur gradually. There is no evidence that it occurred slowly, overtime or was observable prior to the repair of the leak. Damage most likely caused by subsidence due to multiple factors The panel is satisfied that the information from the various experts supports a finding that the damage has been caused by subsidence due to multiple factors namely, the water leaks, (including the broken storm water pipes) and the tree roots. The policy covers accidental loss or damage. There is no dispute the damage was accidental. The panel accepts the damage was caused by subsidence. Earth movement caused by subsidence and heave is covered under the terms of the policy. Settling, cracking, shrinking, bulging or expansion of a building is covered if caused by subsidence or heave. Insurer to accept claim Given the above the panel determines the insurer is liable to meet the complainant ‟ s claim in accordance with the terms and conditions of the policy. The policy provides the insurer with the option to, repair, replace or pay the reasonable cost to repair or replace the Building. Further it provides an option for the complainant to choose his own repairer, subject to obtain ing the insurer‟s authorisation for the repairs and quoted cost before those repairs are commenced. As no relevant quotes have been exchanged it is fair that within 14 days of the complainant‟s acceptance of this determination both parties arrange to obtain a scope of works from a suitably qualified engineer/builder with accompanying quotes for the completion of the repairs. The insurer can then determine whether to repair or cash settle the claim. When exercising its discretion, the insurer must do so fairly, reasonably and consistent with the duty of utmost good faith. Any cash settlement should allow a suitable amount for the likely contingencies that may arise in any repair process and should allow for the additional benefits payable under the terms of the policy. Amended Determination | Case number: 773153 Page 6 of 11 Should the parties be unable to agree on a cash settlement then this can be referred back to AFCA to determine. Complainant is entitled to temporary accommodation The complainant seeks temporary relocation from the home whilst the repairs are being undertaken. The policy provides cover for temporary accommodation if loss covered by the policy has occurred. It says the insurer will pay the reasonable cost of alternative accommodation in the event the building becomes uninhabitable. The panel is satisfied the complainant is entitled to temporary accommodation whilst repairs of the property are undertaken. Both parties are to work together to decide the appropriate temporary accommodation required, up to 20% of the building sum insured ($231,000). Insurer is to pay the complainant cost of expert reports Under Rule D3.5 AFCA may determine an insurer contribute to legal or other professional costs incurred by a complainant during a dispute. Unless exceptional circumstances apply, AFCA will not require an insurer to contribute more than $5,000 to these costs. When determining whether an insurer should contribute to the payment of professional fees incurred, AFCA will consider the complexity of the dispute, whether the advice was reasonably needed and whether the costs incurred were because the expert advice was genuinely required. In the panel‟s view, the complainant engineering reports were necessary to assist in establishing his case. The panel is satisfied the insurer should reimburse the complainant for the costs incurred, subject to the complainant providing relevant invoices for the report. The complainant has provided the following invoices:  KM … .. $2,613.60 and $2,178.00  PG……. $1,100  Leak Det…$924 Total………$6,8156 The complainant is yet to provide any invoicing for RB. The panel considers it fair in the circumstances that the insurer contributes $5,000 to the professional costs incurred by the complainant during this complaint. 2.3 Why is the outcome fair? The outcome is fair as the policy covers accidental damage. The available information supports the complainants claim that the damage was caused by subsidence after the repair of the water leak. Such damage falls within cover under the terms of the policy. Amended Determination | Case number: 773153 Page 7 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes an ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive industry experience. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Expert reports Reco rd Key points Complainant’s engineer ( RB ) Report 31 - 01 - 2020  T he significant wetting of the soil in this area d ue to the plumbing failure and now the drying of this soil has caused the soil to consolidate and shrink , causing settlement to the foundations in this area.  The drying of the soil is likely to have been accelerated and exacerbated by the nearby trees and an extended dry period that the Amended Determination | Case number: 773153 Page 8 of 11 Reco rd Key points region has experience d in recent times.  Although the trees are likely to have accelerated the drying in the area, they are not the proximat e cause of the damage.  Had the foundation not have considered the effects of the trees, it would be expected defects would have appeared earlier in the life of the dwelling in previous dry times.  A significant degree of foundation movement has been observe d around the billiard room, dining room and lounge room.  The proximate caus e of the defects and differential foundation movement observed is the significant plum b ing leak to the mains water pipe that was repaired about a year ago around the kitchen area.  M ost of the damage is observed at the northwest areas of the dwelling, being downst r eam from the plumbing leak.  T he effects of the trees near this area are likely to have been considered in the design of the foundation system, given no earlier history of fo undation movements prior to the plumbing leak repair. Insurer ’s engineer (FM ) R eport 14 - 02 - 2020  The largest amount of settlement was found at the northern end of the billiard room.  T he following adverse conditions were observed as contributing to abnormal soil moisture conditions: > t he presence of trees in close proximity to the building > t he absence of a protective paving adjacent to, and sloping away from, the external walls/footings of the building > g arden beds/lawns/unsealed ground immediately adjacent to the building .  H eave due to the reactive foundation soils being saturated was not observed by the owner nor were there any obvious visible signs within the structure .  The floor level survey shows a general pattern of relative settlement (not heave) towards the north of the house.  The observed cracks in and above the billiard room are consistent with settlement towards the north of the house.  T he event did not cause nor contribute to the damage to the subject house.  T he damage has been caused by differential footing movement resulting from ongoing, long - term differential changes in the moisture contents of the reactive foundation soils due to a combination of: > seasonal changes in soil moisture cont ents > tree root drying of the foundation soils by trees/shrubs located in relatively close proximity to the house, and in particular the trees to the north of the house on the neighbouring site , t his is considered to be a significant contributing factor at the subject site > p oor drainage to the perimeter of the house .  T he damage to the building has been caus ed by differential footing movement resulting from ongoing, long - term, differential changes in the moisture contents of the reactive foundation soils due to a combination of seasonal changes in soil moisture content s and tree root drying of Amended Determination | Case number: 773153 Page 9 of 11 Reco rd Key points the foundation soils by trees/shrubs near the hous e.  T ree root activity of the nearby group of trees intensified during the time of the leak which has in turn resulted in the settlement of the reactive foundation soils , causing th e observed damage to the subject house following the repair of the leak. Complainant’s leak detection expert ( AL ) R epo rt 02 - 07 - 2020  E viden ce of movement at the rear left side of the house .  S olar hot water unit is situated on the roof of the house. C opper pipe, connected to the hot water unit TPR/overflow, penetrates through the brickwork at ground level and is positioned above a 50mm PVC pipe.  Movement of the concrete slab allow s moisture from the copper pipe to flow around the PVC pipe, then into th e gap between the hous e and the external concrete slab.  I nspection of the PVC storm water pipes at the rear left side of the property failed. B reak in the connection of a PVC pipe and a corrugat ed PVC pipe loc ated.  Tree roots found in two areas of corrugated PVC pipe near the base of the downpipes .  Sections of the pipework were found to be holding water .  The 50mm PVC pipe for the hot water unit TPR/overflow was inspected. The camera was unable to pass a blockage which was located just after the firs t bend of the upstream section of pip e. Complainant’s engineer ( PG ) R eport 28 - 07 - 2020  The moisture testing indicat es the fill is significantly dry of optimum moisture content . H owever the nat ural soils appear to have a relatively normal or slightly elevat ed moisture level.  The ground surface movements could be due to the moisture variation on site.  It is understood the leaking pipe saturated the fill. As a consequence of the leak and its remediation, it is possible it has the potential to cause s oil „ collapse‟ following the draining of the upper level fill after remediation of the leak .  T he tree root extend ing under the structure will cause abnormal loss of moisture of t he founding soils, adding to the settlement of the structure.  Following the remedi ation of the leak, the existing fill is expected to have dried back. This is indicated by the low moisture content of the fill sample , compared to the natural clays below.  Soil „collapse‟ is a phenomenon where fill mat erial, when saturat ed and subsequently dried back, results in the realignment of soil particles which then propagat e as a significant, one - off settlement of the material.  T he increase in moisture content of the fill during the leak is likely to have provided an inc rease in the growt h of the tr ee roots. When the moisture supply was removed, the tree roots are likely to result in a rapid reduction in the moisture content of the upper level soils.  The movement possibly caused by the above points is reflected through the structure and resulted in the observed cracking. Amended Determination | Case number: 773153 Page 10 of 11 Reco rd Key points Complainant’s engineer ( KM ) Report 31 - 08 - 2020  N o significant changes occurred to the amount or location of vegetation surrounding this house in the 10 years of available aerial evidence.  T he possibility tree root activity occurred as a res ult of the leak is supported by the information included in the PG report .  L on g - term differential changes in the moisture content being present to this property is not support ed by the evidence.  The aerial photographs of this site dating back to 2010 confirm the size and number of the trees surrounding it has not altered in this period .  O ver a 12 - month period , approximately 365,000 litres of water potentially entered the soil.  The insured advised prior to the current damage there was no significant issues with the buildi ng finishes.  It is likely the presence of the trees on the architectural drawings would have been noted by the building engineer.  T his support s the original vegetation is not the c ause of the significant damage, leaving the water leak and the changes which occurred as a result of this to be the only cause .  W ithout the effects of the water leak (s), the trees in the vicinity of this building, after approximately 23 years, would have h ad little to no effect on the foundation performance.  We would consider the vegetational damages are considered resultant damages of the water leak, rather than being the primary cause of the foundation movement.  I t is clear the recent foundation movement is not as a result of the long - term effects of the veget ation but is primarily as a result of the leak to the hot water system and/or the multiple leaks p resent work. Insurer’s engineer (NJ ) R eport 15 - 02 - 2021  The leak age in the hot water system overflow commenced at some time prior to 2017.  The commencement of the leakage discharge led to the saturation of the founding soils beneath the house slab and footings beneat h the kitchen and beneath the rear left corner of the billiard r oom.  This potentially led to some (unknown) degree of upward heaving of the footing system in this section relative to the adjacent areas of the house.  The area of the hous e affected by such heaving can be expected to have gradually increased, as long as the leak persisted.  The dry ing influences of the tree root systems appear not to have been significantly affecting the performance of t he footing system prior to 2015 and have extended toward s the saturated ground around and beneath the areas near the leak during the 2015/2016 dry p eriod.  The overflow leakage was repaired in mid - 2018.  The extended influences of the root systems have resulted in the relatively rapid drying of the founding soils in the leakage area , following the repair of the overflow leakage .  The floor level surveys identified subsidence movements of the left end of the billiard r oom and the front walls of the dining room and lounge areas relative to the cent ral and right areas of the house. Amended Determination | Case number: 773153 Page 11 of 11 Reco rd Key points  NJ do es not concur with PG and KM that soil ‟collapse ‟ is likely to have occurred on this site, contributing to the subsidence movements.  The primary cause of the current subsidence movements in the billiard r oom area of the house is the drying effects of the tree root systems located along the line of and b ey ond the left - hand boundary of the site.  The primary cause of the current subsidence movements in the d ining and l ounge r oom areas of the house is the drying effects of the tree root systems located in the vicinity of and beyond the gaz ebo construction a t the front of the hous e.  The hot water system overflow leakage seems very unlikely to have significantly contributed to the current subsidence problems at the front of the d ining and l ounge room areas.  H owever, we cannot rule out the possibility of prior heaving movements in this area of the house related to the leak age.