Home / Suncorp Group / Determination 772955
Determination 772955
Stormwater ingress damage claim declined for wear, tear and lack of maintenance
Summary
A home insurer initially indicated internal water damage would be covered, then declined the claim as caused by long-term roof deterioration. AFCA upheld the decline and ordered the insurer's offered $500 for non-financial loss.
The damage resulted from wear, tear and lack of maintenance excluded under the policy, and the premature initial advice caused no detriment beyond the $500 offered.
Issues
- Claim denial primary · not upheld“The insurer is entitled to decline cover for the damage to the insured building.”
- Poor communication secondary · upheld“The insurer's initial advice to the complainants was premature and it should have waited until it had completed the assessment process.”
Subjects and remedies
home or building damagepay non financial loss
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 772955
Financial firm AAI Limited
Determination | Case number: 772955 Page 1 of 7
Case number: 772955 25 June 2021
1 Determination overview
1.1 Complaint
The complainants hold a home building and contents policy (policy) with the financial firm
(insurer). On 19 August 2020, a claim was lodged for stormwater ingress damage to the
insured property.
The insurer initially accepted the claim for resultant internal stormwater ingress damage.
However, after having received its appointed expert reports, it has declined the claim. The
complainants are dissatisfied with the insurer’s assessment of its liability . They are of the
opinion it should be required to honour its initial advice that internal damage to the ceilings
and walls will be covered, and preferably the cost to complete the electrical repairs as well.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
Yes. The insurer’s decision to d ecline cover for the damage to the insured property is
consistent with the available expert evidence, the policy provisions and fair in the
circumstances. The policy does not cover loss or damage caused by wear and tear, gradual
deterioration and a lack of maintenance, which has been shown to be the cause for the
damage to the insured property.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to decline cover for the damage to the insured building.
The insurer’s offer to pay the complainants $500 in non-financial loss compensation is fair.
The insurer is to arrange payment of $500 to the complainants within 14 days of receiving this
determination, if not already paid.
Determination | Case number: 772955 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
The policy is an insured events contract of insurance
The policy covers the insured property against loss or damage caused by one or more the
listed insured events, including Storm. Cover under these benefits is subject to the conditions,
limitations and exclusions specified in the product disclosure statement (PDS).
The complainants have established a valid claim
There is no dispute the insured property will have experienced some stormwater ingress
within the relevant policy period resulting in damage to the insured building, which is an
insured event under the policy. I am satisfied this establishes a valid claim.
The onus, therefore, rests with the insurer to show an entitlement to decline or limit its liability
under the complainants ’ claim, in line with the policy provisions.
Insurer is entitled to rely on the policy provisions to assess its liability
The insurer provided the complainants with the relevant policy documentation including the
PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on
the policy provisions to assess its liability under the claim.
Expert evidence supports the insurer’s position
The insurer appointed consultant s ‘P’ to attend th e insured property and complete an
assessment of the cause and extent of the damage. P attended and provided a report dated
20 August 2020, with its findings. P also arranged for a detailed roof inspection to be
completed given concerns which arose during is building assessment.
P’s assessment deemed the dwelling to be in a generally poor condition and noted water
ingress damage to the plaster ceilings and walls in most rooms of the house. P formed the
view the damage was consistent with stormwater ingress into the home caused during
multiple events over several years.
P noted attempts to mask the staining damage to the plaster ceiling by way of painting over
them, however, the paint had begun to peel. P advised the complainants advised that they
had moved out of the house prior to claim lodgement and were planning to demolish the
insured building and rebuild. The insured building had been vacant for several months given
the complainant did not feel safe living there.
An inspection of the external roof found it to be in very poor condition with clear evidence of
significant long-term damage. The consultant noted various potential leaking areas to the roof
with lifted nails, holes in the roof sheeting and previous attempts of silicon patching. P says
the roof was long overdue for and in dire need for complete replacement. The reports are
supported by many clear and compelling photographs.
The insurer appointed consultants ‘S’ who attended the insured property on 31 August 2020,
and provided a report dated 10 September 2020. S inspected the ceiling cavity and found
significant water staining to the top of the ceiling sheets, timber trusses and timber
framework. S also notes the complainants said they were intending on demolishing the
property.
Determination | Case number: 772955 Page 3 of 7
Given concerns raised regarding loss of power at the property, the insurer appointed
consultants ‘AR’ which prepared a report dated 27 August 2020. AR noted the power to the
home had been completely cut by the power company given the complainants had vacated
the property. It confirmed water damage to the electrics. AR recommended, given the extent
of water damage, prior to any electrical works being completed a builder would need to be
appointed to complete necessary repairs to ensure the building was watertight.
The complainant has not provided any expert evidence contrary to the findings noted above.
The insurer is entitled to decline the claim
I have considered all the available information and am satisfied, on balance, it shows the
insured building, especially the external roof, was in a poor condition. The evidence shows
the insured property presented with water ingress in most areas, however, it was not
consistent with being the result of a single recent event. Rather, on balance, the damage
throughout the property was consistent with having occurred over an extended period due to
multiple water ingress events.
The external roof is in a very poor and deteriorated condition. I acknowledge the
complainants say they were unaware of its poor condition, however, the evidence shows its
poor and deteriorated condition was fairly obvious just by looking at it from street level. I
accept the complainants have done some internal maintenance works and upgrades.
However, it is clear no maintenance works were directed to the external roof which was
clearly in need of replacement and at least maintenance to ensure it was water tight.
As noted above, cover under the policy is subject to the conditions and exclusions specified in
the PDS. The complainants, as per the policy, are not covered for loss or damage to the
insured building which occurs because of a failure to take care of the building and ensure it is
maintained and in good condition. The policy provides an explanation as to the meaning of
the term well maintained, which states in part:
Well maintained and in good condition
means the building does not have any faults or defects that might cause loss or
damage to building, loss or damage to property of others or injury to people. This
includes but is not limited to the following:
• the roof does not leak when it rains;
• there are no areas of the roof that are rusted through;
• there is no wood rot, termite or white ant damage to the building;
Further, the policy generally excludes from cover loss or damage that is caused by, arises
from or involves:
Wear, tear and gradual deterioration
Determination | Case number: 772955 Page 4 of 7
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light,
atmospheric or climatic conditions or gradual deterioration such as, but not limited
to:
• tiles and their adhesive or grouting breaking down;
• weathering of roof tiles or roof ridge capping;
• gradual weathering and breakdown of bricks, mortar or concrete.
Having considered the available information, I am satisfied it shows, on balance, the insured
building had been exposed to and suffered stormwater ingress damage because of several
events over an extended period. This was due to a lack of maintenance and resultant gradual
deterioration of the external roof from wear and tear, rust and corrosion over a long period of
time.
Accordingly, I determine the insurer is entitled to decline the c omplainants’ claim in line with
the policy.
The insurer’s initial advice did not cause complainants to act to their detriment
There is no dispute on lodgement of the claim and in its early stages, the complainants were
advised the insurer would consider covering the cost to repair the internal damage to plaster
walls and ceilings. The insurer acknowledges this and has apologised for this error as well as
offered to pay the complainant $500 as a gesture of good will.
The complainants are not satisfied with the insurer’s offer and are of the opinion the insurer
changed its position regarding acceptance of the internal damage only once it became aware
of the cost to repair/replace the damaged electrics. They say the insurer should be required to
honour its initial advice in the circumstances.
I acknowledge the complainants’ position, however, I am not of the same opinion. There is no
evidence supporting the assertion the insurer has changed its decision based on the cost of
repairs. Rather, it is clear the insurer proceeded to offer assurance of cover for the internal
damage without first having finalised its investigation and assessment of the insured property.
Its ultimate decision to decline the claim in its entirety is consistent with the experts’ evidence
and the policy provisions.
I am not satisfied the insurer’s error in informing the complainants it would consider covering
the cost to repair the internal water ingress damage has resulted in the complainants acting to
their detriment nor suffering any financial loss or otherwise. The complainants had vacated
the property prior to lodging the claim and a strong indication they had been considering
demolishing the building.
Therefore, I accept the insurer’s ap ology and offer to payment of $500 to the complainants is
reasonable in the circumstances. The insurer is to arrange payment of the $500 to the
complainants within 14 days of receiving this determination.
Why is the outcome fair?
The available information shows the damage to the insured building is the result of
circumstances clearly excluded from cover under the policy. It is accepted the insurer’s initial
Determination | Case number: 772955 Page 5 of 7
advice to the complainants was premature and it should have waited until it had completed
the assessment process. However, this did not result in the complainants suffering any
prejudice, financial or otherwise. So, it is fair in all the circumstances, that the insurer be
permitted to decline the claim in line with the policy.
Determination | Case number: 772955 Page 6 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed an d
considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
3.2 Relevant policy provisions
What do we mean by that?
Event or incident means a single event, accident or occurrence which you did
not intend or expect to happen.
Insured event means the insured events on pages 16 to 25. In addition, an
insured event is always a single event, accident or occurrence which you did not
intend or expect to happen.
Well maintained and in good condition means the building does not have any
faults or defects that might cause loss or damage to building, loss or damage to
property of others or injury to people. This includes but is not limited to the
following:
• the roof does not leak when it rains;
• there are no areas of the roof that are rusted through;
• there is no wood rot, termite or white ant damage to the building;
What we do not cover - general exclusions
You are not covered under any section of your policy for damage, loss, cost or
legal liability that is caused by, arises from or involves:
Failing to take care of the building or contents
Determination | Case number: 772955 Page 7 of 7
your failure to:
• take reasonable care of the building and contents;
• keep the buildings and contents well maintained and in good condition. For the
meaning of ‘well maintained and in good condition’ see the ‘What do we mean by
that?’ section on pages 53 to 55;
• fix faults and defects as soon as you become aware of them .
…
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light,
atmospheric or climatic conditions or gradual deterioration such as, but not limited
to:
• tiles and their adhesive or groutin g breaking down;
• weathering of roof tiles or roof ridge capping;
• gradual weathering and breakdown of bricks, mortar or concrete.