Determination 772368
Refusal of storm/flood water damage claim
Summary
The complainant claimed $32,246 of completed repairs for storm/flood water damage, but the invoices showed work from July 2018, before the claimed storm. AFCA found the claim not established and the insurer entitled to refuse payment, with reassessment available if engineering reports are provided.
The insured bears the onus of showing on the balance of probabilities that the loss falls within a listed event, and exclusions for retaining walls and gradual deterioration applied.
Issues
- Claim denial primary · not upheld“I am not satisfied the information provided in the invoicing is sufficient to establish that the loss or damage to the property occurred because of a storm/flood within the terms of the policy.”
Subjects and remedies
no remedy
Related
Text of the determination
Determination
Case number 772368
Financial firm Insurance Australia Limited
Determination | Case number: 772368 Page 1 of 5
Case number: 772368 18 August 2021
1 Determination overview
1.1 Complaint
The complainant held a Home Building & Contents policy with the financial firm (insurer). On
21 February 2019, the complainant lodged a claim for water damage to the ground floor,
skirting boards, rear walls and an outdoor retaining wall due to a storm / flood on or about 1
December 2018. The complainant completed the repairs to the property prior to lodging the
claim.
The insurer says the complainant has failed to establish a valid claim within the terms of the
policy, had prejudiced its ability to assess the claim and likely the damage had occurred over
time due to seepage of water through failed water proofing.
The complainant disputes the insurer’s finding and says he has provided all available
information. The complainant says it was necessary to complete the repairs for the safety of
his family.
This dispute has been subject of a preliminary assessment. The preliminary assessment was
in favour of the insurer. The complainant has rejected the preliminary assessment.
1.2 Issues and key findings
Has the complainant established a valid claim within the terms of the policy?
The complainant has not established a valid claim within the terms of the policy. While the
complainant has indicated that the damage arose from a storm on or about 1 December
2018, information provided indicates that repairs had commenced at the property from at
least 31 July 2018. The complainant has not supplied sufficient information to establish that
the loss or damage arose from an insured event under the terms of the policy.
Is the insurer entitled to refuse payment of the claim?
Yes, the insurer is entitled to refuse payment of the claim as the complainant has not
established a claim within the terms of the policy. T he complainant’s failure to provide
supporting information has prejudiced the ability of the insurer to assess the claim in
accordance with the terms and conditions of the policy.
Why is the outcome fair?
This outcome is fair as the complainant has not established that the loss or damage claimed
occurred because of a listed event within the terms of the policy.
1.3 Determination
This determination is in favour of the insurer. The insurer is entitled to refuse payment of the
claim in accordance with the terms and conditions of the policy. Should the complainant
provide further information as indicated under section 2.1 of this determination, then the
insurer can reassess its liability in accordance with the terms and conditions of the policy.
Determination | Case number: 772368 Page 2 of 5
2 Reasons for determination
2.1 Has the complainant established a claim within the terms
and conditions of the policy?
No, the complainant has not established that the loss or damage occurred in the manner
claimed or in circumstances consistent with the terms and conditions of the policy.
Complainant has the onus to establish a claim within the terms of the policy
It is established insurance law that an insured has the onus to establish on the balance of
probabilities (that is more likely than not) that the loss or damage claimed falls within the
terms of cover under the policy.
The complainant’s policy is a listed events policy that provides cover for a series of insured
events including flood / storm subject to various exclusions and limitations.
According to the claim notes when lodging the claim on 21 February 2019, the complainant
believed that the damage had been sustained to the internal skirting boards, rear walls and
outdoor retaining wall on or about the 1 December 2018. Due to the urgency of the repairs,
the complainant had his own builder complete the repairs.
The insurer requested the complainant send a damage report and quote. The complainant
instead provided the insurer with a series of invoices of the total cost of repairs of $32,246.
Invoices indicate repairs started on 31 July 2018
The invoices supplied by the complainant in support of the claim cover work performed in the
period from 31 July 2018 to 22 December 2018. The invoice from AT Plumbing dated
5 August 2018 refers to work performed on 31 July 2018 to 2 August 2018. The work appears
to involve excavating stumps and dirt from the back of the house to the bottom of the existing
retaining support wall for the deck and to the bottom of the house slab as well as removal of
palm trees.
An invoice dated 12 August 2018 refers to work on 6 August 2018 involving the removal of a
sewer line and replacement of sewer pumps. Other invoices refer to the removal of excess fill
and repairs of the sewer pipes. None of the invoices refer to damage arising from a
storm/flood. All the invoices refer to work performed prior to 1 December 2018.
The complainant has provided a copy of a floor plan dated 20 August 2018. The plan
identifies existing concrete footing and existing water proof membrane. It does not assist in
determining the cause of damage
Complainant has supplied insufficient information to establish a claim with in
the terms of the policy
Based on the available information, I am unable to determine the precise cause of damage. I
accept it is possible the complainant made an innocent error in suggesting that the damage
occurred on 1 December 2018. However, I am not satisfied the information provided in the
invoicing is sufficient to establish that the loss or damage to the property occurred because of
a storm/flood within the terms of the policy.
Determination | Case number: 772368 Page 3 of 5
The insurer had the complainant’s property examined by JLG. JLG considered the damage
as to the residence were the direct result of seepage through the external block work –
deterioration of the existing water proof membrane. JLG considered both will be maintenance
related issues.
Complainant has been unable to provide reports from engineer or builder
The complainant has indicated that he has been unable to obtain a response from his
engineer or builder or a report from either as to the work performed or the cause of the water
ingress into the property.
I spoke with Mr M on 15 July 2021 who confirmed he was an engineering designer and
constructor. He confirmed he had worked closely with an engineer Mr B and worked on the
property. He agreed to provide a report if requested by the complainant. The complainant has
been asked to obtain the report. To date no report has been received.
Should the complainant obtain and supply reports from Mr M and Mr B then it is fair that the
insurer reassesses its liability under the terms of the policy. The insurer is entitled to maintain
its decision to deny the claim until the additional information is supplied.
2.2 Is the insurer entitled to refuse payment of the claim?
Yes, the insurer is entitled to refuse payment of the claim as:
the complainant has not established a valid claim within the terms of the policy
insofar as the damage may be related to seepage through a retaining wall or failed water
proofing, such damage would be excluded under the terms of the policy
the insurer has been prejudiced to the full extent of the claim by the complainant’s
completion of the repairs prior to lodgement of the claim and failure to provide any
supporting information.
Policy excludes damage to the retaining wall
Under the listed event ‘Storm’, the policy specifically excludes damage to a retaining wall by a
storm. Insofar as the complainant claims that an outside retaining wall on the property was
damaged, then such damage would be excluded under the terms of the policy.
It is possible however that the wall referred to by the complainant is a foundation wall. Insofar
as there may have been damage to a foundation wall by a storm, then this would be covered
under the terms of the policy.
Policy excludes damage due to wear and tear, gradual deterioration or lack of
maintenance
The complainant’s policy e xcludes loss or damage arising from wear and tear, gradual
deterioration and lack of maintenance.
The only information as to the possible cause of damage has been provided by JLG. JLG has
identified that the damage most likely occurred because of water seeping through the
foundation wall due to the deterioration of the water proof membrane.
There is no evidence to indicate the deterioration of the water proof membrane was caused
because of an insured event. Insofar as the damage could be said to be related to the
Determination | Case number: 772368 Page 4 of 5
deterioration of the water proof membrane, that would most likely be as a result of gradual
deterioration, wear and tear or lack of maintenance. Such damage would be excluded from
cover.
Insurer has been prejudiced by failure to supply reports
The policy specifically requires an insured must cooperate fully with the investigation of the
claim and provide all information, documents and help needed to deal with the claim.
The insurer says the complainant has failed to cooperate with its investigation of the claim as
the complainant has failed to provide reporting from the engineer and/or repairers to indicate
the proximate cause of damage.
The insurer claims it has attempted to contact the complainant following up the reports as
requested, and that the complainant has advised that he would attempt to obtain report from
his engineer and builder but has been unable to do so. The complainant believes the
engineer may have retired.
AS indicated above, I have as part of the investigation into this claim, spoken with one of the
engineers Mr M. Mr M indicated he was willing to provide a report and willing to speak with Mr
B with whom he worked on the property. I asked the complainant to contact the engineer and
obtain the report. No report has been provided.
Insurer is entitled to refuse payment of the claim
I am satisfied the insurer is entitled to refuse payment of the claim as the complainant has not
established a claim within the terms of the policy. I am also satisfied that the insurer has been
prejudiced by the complainant’s completion of the repair works prior to lodgement of the claim
and subsequent failure to provide reports or other information in support of the claimed cause
of damage.
The insurer has indicated that it will consider the claim in accordance with the terms and
conditions of the policy should the complainant be able to provide reports from the engineer
or other repairers confirming the proximate cause of damage. I consider that the insurer ’s
position in these circumstances to be fair.
2.3 Why is the outcome fair?
There is no dispute that the complainant had work performed on the property or that the
complainant’s property had sustained some level of water damage . However, the available
information does not allow for a determination as to the proximate cause of that damage or
that the damage arose as a result of an insured event within the terms of the policy.
The insurer has indicated a preparedness subject to the complainant providing further
information as to the proximate cause of damage to reconsider its position under the terms of
the policy. I consider that as the complainant has not established a valid claim within the
terms of the policy that it is fair in these circumstances that the insurer be entitled to refuse
payment of the claim.
Determination | Case number: 772368 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.