Complainants said cracks reappeared in a wall the insurer had repaired in 2016 because of defective work, and sought rectification. AFCA found the 2020 cracking resulted from long-term ground movement, not defective repairs, so the insurer was not liable.

An insurer that authorises repairs must guarantee them, but no defect was shown and ground movement is excluded unless it is caused by an insured event within 72 hours.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 770979 Financial firm AAI Limited Determination | Case number: 770979 Page 1 of 7 Case number: 770979 13 August 2021 1 Determination overview 1.1 Complaint The complainants hold a home insurance policy with the financial firm (the insurer). They lodged a claim after cracks appeared in their home in 2016. The insurer accepted the claim and repaired the damage. In 2020, the complainants reported further cracking in the home. They say the home cracked in 2020 because of defective work by the insurer’s builder in 2016. They want the insurer to rectify the work. The insurer says the cracking in 2020 occurred because of long-term ground movement, not because of defective work by its builder. It says it is not liable for the damage. 1.2 Issues and key findings Is the insurer liable for rectification? The available information does not establish that the repairs authorised by the insurer were defective or incomplete. Therefore, the insurer is not liable for rectification. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to this complaint. Determination | Case number: 770979 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer liable for rectification? Policy covers damage caused by insured events The policy is an ‘insured events’ policy, meaning it only covers damage caused by specific events. The insured events include ‘storm’, ‘fire’, and ‘escape of liquid’ (which includes water leaking from pipes). The policy excludes cover for damage caused by ground movement, unless it is caused by (and occurs within 72 hours of) one of the following insured events:  storm  flood  earthquake and tsunami  explosion. Insurer repaired wall in 2016 In February 2016, the complainants noticed cracks in the walls of their home. In March 2016, the complainants lodged a claim for the damage . According to the insurer’s notes, the complainants described the damage as follows: Cracks on outer brick wall caused by earth movement due to dry season, also cracks on inner plaster board. Damage that occurs this way is not covered under the policy, so the insurer was not required to accept the claim. However, the insurer accepted the claim and appointed a builder (PB) to repair the wall. In or about June 2016, PB completed the repairs. The insurer’s notes of 3 June 2016 say the complainants were happy with the repairs. In September 2020, the complainants contacted the insurer and said cracks had appeared in the wall that was repaired by PB in 2016. Insurer must guarantee repairs The General Insurance Code of Practice (to which the insurer subscribes) says that if an insurer ‘selected and directly authorised a repairer’, it must guarantee the ‘quality of the workmanshi p and materials’. The policy says that if the insurer authorises, arranges, and pays for repairs, it will guarantee the repairs ‘for the lifetime of the building’. The insurer says the cracking in 2016 was not cause by an insured event, so it should not have accepted the claim. Nevertheless, it authorised repairs to the wall, so it must guarantee those repairs. If the repairs were defective or incomplete, the insurer is liable for rectification. Insurer says new wall cracks unrelated to previous repairs PB inspected the home on 16 September 2020. PB confirmed the presence of new movement cracks. PB said a leak detection test should be carried out to determine whether a leaking pipe had contributed to the movement. Determination | Case number: 770979 Page 3 of 7 PB appointed a plumber (BG), who conducted a leak detection tests at the home on 21 September 2020. BG did not detect any leaking pipes. BG said the pathway was graded towards the home, which allowed water to pond around the perimeter of the home. PB appointed an engineer (MC), who inspected the home on 25 September 2020. MC produced an interim report dated 7 October 2020 saying the cause of the building movement was undetermined. Another plumber (TB) inspected the home on 19 October 2020. After reviewing TB ’s findings, MC produced a final report dated 6 November 2020. MC concluded the cause of the building movement was as follows: The external ground surface levels graded towards the home has been allowing surface stormwater run-off to flow towards and seep into the underlying soils adjacent to the building footings resulting in long-term building movement and damage. After receiving MC’s final report, PB produced a report dated 10 December 2020 saying the cracking in 2020 was not related to the repairs in 2016. Builder warned complainants in 2016 that more cracks could appear PB’s report of 6 April 2016 says: We have advised the insured that acceptable movement of the property due to climatic change is not unusual for this type of brick and mortar dwelling. We would consider that repair of these cracks may or may not re appear over a long period of time with the insured being re assured of that possibility. The complainants say that when PB completed repairs in 2016, he told them ‘ the issue of brick cracking was resolved ’. The complainants say that in 2016, PB left half a pallet of bricks at the home, to be used if it needed further repairs in the future. This indicates PB thought future repairs might be needed. Based on the available information, I do not think PB told the complainants that the issue of brick cracking was resolved. It is more likely that PB told the complainants the building was susceptible to movement, and more movement cracks might appear in the future. Insurer not obliged to appoint engineer in 2016 The complainants say the cracking in 2020 occurred because the insurer failed to arrange an engineering assessment in 2016. If an engineer had been appointed in 2016, they may have determined (as MC did in 2020) that stormwater runoff was flowing towards the home, and this was contributing to the long- term earth movement damaging the home. If the complainants were advised of this, they may have taken steps to improve the drainage around the home, which may have reduced earth movement and prevented (or delayed) the appearance of cracks. In this way, the complainants may have benefited from an engineering assessment in 2016. However, it was not the insurer’s responsibility to arrange such an assessment. The insurer is responsible for repairing damage to the home caused by an insured event. It is not responsible for the design or maintenance of the home. It is not responsible for appointing an engineer to assess the home’s ability to withstand the elements. It is not responsible for upgrading the home to make it more durable, or advising the complainants how to do so. Determination | Case number: 770979 Page 4 of 7 PB fixed the cracks that appeared in 2016. PB also warned the complainants that the building was susceptible to long-term movement and cracking. I do not think PB was required to do more than this. Insurer’s re pairs not defective It is not clear whether any work could have been performed in 2016 that would have prevented the cracks from appearing in 2020. However, if such work could have been performed, it was not the insurer’s responsibility to perform it. The available information indicates the cracking in 2020 occurred because of long-term ground movement, not because the repairs in 2016 were defective. Therefore, the insurer is not required to repair the cracking as part of the 2016 claim. The available information indicates the cracking in 2020 was not caused by an insured event. Therefore, the insurer is not required to repair the cracking as part of a new claim. Outcome is fair in the circumstances The available information does not estab lish that the insurer’s repairs were defective. Therefore, it would not be fair to hold the insurer liable for rectification. Determination | Case number: 770979 Page 5 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 770979 Page 6 of 7 3.2 Relevant policy terms Product Disclosure Statement What you are covered for - Insured Events (pages 16 – 25) Storm We cover Loss or damage to the building caused by a storm. We do not cover …  loss or damage caus ed by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage to the building caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, a storm and not because of erosion over time, structural fault or design fault; Escape of liquid We cover Loss or damage to the building caused by liquid leaking, overflowing or bursting from any of the following: …  any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage systems; What we do not cover - general exclusions (pages 35 – 40) You are not covered under any section of your policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Defect, structural fault or design fault a defect, structural fault or design fault that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred (e. g. if there are signs that a defect previously caused damage, we will not pay a later claim for further damage from this defe ct). Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other eart h movement, but we will cover landslide or subsidence that is specifically covered under the following insured events:  ‘Storm’;  ‘Flood ’ (but only if you have cover for insured event ‘Flood’);  ‘Earthquake and Tsunami’;  ‘Explosion’. Wear, tear and gradual deterioration wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as, but not limited to:  tiles and their adhesive or grouting breaking down;  weat hering of roof tiles or roof ridge capping;  gradual weathering and breakdown of bricks, mortar or concrete. Determination | Case number: 770979 Page 7 of 7 What do we mean by that? (pages 53 – 55) Event or incident means a single event, accident or occurrence which you did not intend or expect to happen. Insured event means the insured events on pages 16 to 25. In addition, an insured event is always a single event, accident or occurrence which you did not intend or ex pect to happen.