Home / IAG / Determination 770538

Determination 770538

Water leak claim partly declined; cash settlement at 50% of repair quotes

FirmIAG
Decided2022-03-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$182,093
Non-financial loss$2,000
Amount claimed$711,518
SourceAFCA PDF

Summary

The complainants claimed under their home buildings policy for water leak damage, and the insurer had offered 50% of their repair quotes. AFCA ordered the insurer to pay $182,093.40 for repairs, $2,400 for removing and storing contents, $2,000 non-financial loss, and $4,989 for expert reports plus interest, but declined further temporary accommodation and legal costs.

Under the policy, the complainants must prove the claimed loss was caused by an insured event, and on the evidence the leak was not the dominant cause of most damage, so a 50% cash settlement plus 20% contingency uplift was fair.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 770538 Financial firm Insurance Manufacturers of Australia Pty Ltd Determination | Case number: 770538 Page 1 of 27 Case number: 770538 25 January 2022 1 Determination overview 1.1 Complaint The complainants lodged a claim under their home insurance policy with the financial firm (insurer) on 30 September 2019 for damage caused by a water pipe leak. The insurer conducted inspections and informed the complainants the claim was accepted however, a 6-month drying period was required. The insurer reviewed the claim between April and May 2020 and informed the complainants that the extent of damage caused by the leak is 30% of damage to two bedrooms and a bathroom. It says available information shows other damage sustained across the building was mainly „due to soil and foundation movement and ineffective civil draining‟ and other factors excluded from cover. The complainants disagree with the insurer‟s decision. They say:  the insurer‟s initial advice was that the claim was c overed  reports from their plumber, engineer, builder, underpinning contractor and geotechnical engineer show the leak caused building foundations to destabilise, resulting in substantial structural damage  the $151,744.50 cash settlement proposed by the insurer is insufficient  the insurer should indemnify them in full for all damage. Additionally, they suggest the insurer delayed and mishandled their claim and should compensate them for indirect and non-financial loss consequently. 1.2 Issues and key findings Did the insurer mislead the complainants? No. While the insurer advised the complainants of its acceptance of the claim in or around November 2019, this does not constitute a blanket admission of its liability for any and all damage to the property. It was always entitled to assess its liability in line with the policy terms and available expert information. Is the insurer required to increase its settlement offer? Yes, to $182,093.4 0. The panel considers the proposed cash settlement of 50% of costs based on the complainants‟ builder and under - pinner‟s quotes is fair and reasonable. However, the insurer is to pay an additional uplift of 20% to take into account contingencies/variations which may occur once repairs commence. Should the insurer pay indirect financial loss claimed? For the reasons set out under section 2.3 the insurer is not required to cover any further temporary accommodation costs as indirect financial loss but is to pay 50% of costs to remove and store contents. Determination | Case number: 770538 Page 2 of 27 Should the insurer compensate the complainants? Overall, the insurer did not unreasonably delay or mishandle the claim. However, the insurer did not take adequate steps to address safety concerns raised by the complainants earlier in the claims process. This is likely to have caused the complainants stress, and inconvenience. It is fair that the insurer pays the complainants $2,000 non-financial loss compensation. Should the insurer cover any other costs? The insurer is not required to cover any legal costs as the complainants have not shown they were incurred, or that legal assistance was necessary in these circumstances. The complainants‟ reports have assisted their claim/complaint. The insurer is to pay the cost of the reports ($4,989) plus interest. 1.3 Determination This determination is partly in favour of the complainants. If the complainants accept this determination, then within seven days of notification of acceptance the insurer is to make the following payments to the complainants:  $182,093.4 0 for the cost of repairs  $2,400 to remove and store contents  $2,000 compensation for non-financial loss  $4,989 for expert reports  interest on $4,989 pursuant to section 57 of the Insurance Contracts Act 1984 (Cth) from the date of payment of the reports until settlement. Otherwise, the insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 770538 Page 3 of 27 2 Reasons for determination 2.1 Did the insurer mislead the complainants? Complainants say insurer led them to believe claim was accepted in full The complainants say the insurer cannot decline the claim (wholly or in part) because it informed them the claim was accepted during a telephone call in November 2019. The complainants consider the claim acceptance unequivocal and say the insurer‟s subsequent correspondence supports their position. Insurer’s liability for claimed loss/damage determined by policy General insurance policies do not cover all eventualities. The terms, conditions and exclusions which apply to cover are contained in the Certificate of Insurance (COI) and Product Disclosure Statement (PDS) which together form the contract of insurance. The panel has considered the legal doctrine referred to by the complainants and is familiar with the caselaw relied on by the complainants. The panel does not agree this issue provides a remedy to the complainants in all the circumstances of this claim. Acceptance of any claim is subject to the contract of insurance. The complainants are aware of this; in their own submissions they say they seek payment/indemnity as per the policy terms and conditions. Material does not show complainants were misled The panel has reviewed the available information particularly the insurer‟s claim file notes and correspondence referred to by the complainants. The information shows an acceptance of the claim; this not in dispute. The file notes show the male complainant contacted the insurer on 27 November 2019 to follow up the claim. During that conversation he was informed the insurer‟s engineer‟s report had been received which confirms damage had occurred due to several factors including the leaking pipe. The insurer‟s notes say: „[a]s the pipe has been a main cause of damage we would therefore cover the claim‟. The claim file notes the leaking pipe has been repaired by the complainant and that the insurer would return the engi neer‟s report to its assessor to complete a scope of works. The insurer also advised the complainant the engineer recommended repairs commence after a six-month drying out period. Having considered the available information and the submissions of the parties, the panel does not consider this to be an acceptance or an election that any and all damage to the building irrespective of the cause or the policy terms would be covered. The panel does not consider the available information establishes the insurer made an election to not exercise the rights it has under the policy to rely on policy exclusions (if applicable) or to argue the proximate cause of all the damage was not the leaking pipe. Even if the complainants could establish they were misled, the available information does not show they incurred loss as a direct result of reliance on the alleged misleading information, prior to (or after) being informed of the extent of damage the insurer considers it is liable for. Determination | Case number: 770538 Page 4 of 27 The complainants say they suffered detriment in reliance on the alleged misleading information by remaining in an unsafe home. Even if this was accepted, the panel does not accept the remedy is that the claim is paid in full. 2.2 Is the insurer required to increase its settlement offer? Policy coverage The complainants‟ policy documents show their policy covers insured events including „water and oil leaks‟. Accidental damage cover is also available where an insured selects this option. The complainants‟ COI shows they did not select the accidental damage option. Cover is subject to conditions and exclusions in the PDS. Extracts from the relevant policy wording is provided in section 3.2 of this determination. Onus on complainant to establish valid claim The complainant must show on the balance of probabilities (i.e., that it is more likely than not), the loss or damage claimed occurred in circumstances for which the policy provides cover. This is known as establishing a valid claim. It is only if the complainant establishes a valid claim, that the burden shifts to the insurer to show it is entitled to rely on a policy exclusion or is otherwise entitled to decline cover for the loss/damage. The insurer accepts there was a leak as reported and that the leak caused some damage to the buildi ng. However, the complainants‟ onus to establish a valid claim extends to showing all loss or damage claimed was caused by an insured event. Evidence of pre-existing cracking and movement and other causes The complainants do not dispute there were pre-existing cracks to the home. Their initial complaint submission to AFCA includes that they:  purchased the home in 2005 and that at the time of purchase, there were minor cracks in the main section of the home which was consistent with the age of that section (over 100 years old).  appointed a structural engineer to inspect the cracks in 2008. The engineer provided verbal advice that the type of cracks all through the home was common in the area and changed with the season. They say the engineer also advised them to ensure the local Council installed a tree root barrier at the front of the property; this occurred in 2010. However, they say there were no significant changes to the cracks in the main section of the home until around August/September 2019 and new cracks also started to appear in the annex (a 50-year-old building addition). They say previously minor cracks in the main section of the home “widened substantially” and structural changes became evident. The complainants also say:  the plumber they appointed when the cracking appeared found and repaired a leak to the east side of the property believed to have caused water damage to the footing/foundations  engineering and other expert opinion they subsequently obtained confirmed among other things that recent cracks in the eastern wall was due to movement caused by the leak. The panel notes a photograph taken of the office in 2018. Otherwise, the panel notes the complainants have not provided any information such as pre-purchase reports or any Determination | Case number: 770538 Page 5 of 27 statement from the engineer from 2008 to show the condition of cracks within the home at the time (or at any time prior to the leak event which is the subject of this complaint). Insurer says damage is not largely due to leak event The insurer says expert evidence obtained shows there was existing cracking to the insured building caused by several factors. It says it is entitled to limit its liability under the claim as proposed because there was existing major masonry/structural damage to the western and eastern walls of the building and the leak only caused some additional movement. Among other things the insurer says the reports show:  the building was in a general deteriorated condition  the building had damage consistent with aged foundation movement  there was poor drainage at the premises  the pipe had likely been leaking for an extended period. The insurer says its engineer (RC) confirms 70% of damage to the accepted rooms was due to poor civil drainage and other stated causes with the leak contributing to about 30% of the damage. The insurer says the available information does not establish the remaining damage was caused by the leak, rather it argues one or more excluded factors caused the damage. Parties provided expert opinions on cause and extent of damage The parties obtained and provided numerous reports from experts/trades/assessors on the claimed damage, which are summarised in section 3.4 of this determination. The complainants provided a report from builder (TD). TD‟s report shows it inspec ted the premises on 23 September 2019 and found evidence of a recent leak as soil was still wet and mushy around the leak. TD also noted bowing/settlement of brickwork on the north side of the eastern wall of the building as well as sharp edged cracks which TD says shows the cracking was recent. Reports from the insurer‟s builder (UB), leak detection expert (TB) and engineer (RC) following their attendance in early October 2019 confirm some damage has occurred which is likely due to the reported leak. However:  UB‟s report includes that masonry and structural damage, and pre -existing cracks were observed which were consistent with aged foundation movement.  TB reported inadequate drainage at the premises and estimated the damage it observed at the premises had mostly occurred over time and the cause of water entry to the family room is also from age and the deteriorated roofing. Although RC did not conduct soil testing at the premises, it assumed the soil profile/class at the insured premises was likely H1 with free swelly values ranging between 40mm and 60mm based on his knowledge of the area. In conjunction with the level of survey it completed, RC concluded issues (movement and cracking) at the premises relate not only to the leaking pipe but to ineffective civil drainage, natural soil movement and tree drying effects. In reaching this conclusion RC points out (and is supported by photographs and Google Street view):  subsidence has been occurring adjacent to the south-eastern most bedroom for an extended period. This area is where the pipe was reportedly replaced  stormwater ingress into the footings of the building (due to drainage issues), as well as the effect tree roots on moisture levels are “causing subsidence along the western external wall” where the masters‟ and l iving/dining rooms are located  considering the age of the building and other observations, natural soil movement has occurred and contributed to uneven floor level, resulting in damage across the building. Determination | Case number: 770538 Page 6 of 27 RC said the percentage of damage from the leak is approximately 30% to 2 bedrooms and bathroom; the remaining damage across the building was the result of general soil movement, poor drainage, effects of tree roots and general deterioration (to varying degrees). RC recommended a 6- month drying period and noted that „[t]he ceiling plaster does not appear to currently be at risk of falling; however, the cornices should be removed immediately to prevent the risk of them falling‟. Following the drying period, UB reattended the premises. Its report of 8 April 2020 includes that it found visible evidence of severe structural damage which was causing cracking and collapse to ceiling in kitchen, dining and family room, a bay window and east elevation wall. UB noted the „extremely poor‟ overall condition of the home however, recommended that engineering opinion be obtained about the cause. UB also noted there was „high OH&S issue and risks‟ and recommended the property be vacated. RC re-attended the property twice in May 2020. Following its reattendances, it provided a report including a level survey. RC says the survey showed little to no movement since its initial attendance including in areas near the reported leak. RC also noted that other than a bulkhead above the office space, there was also no change to cracking it previously saw. RC concluded that movement which occurred was within the expected limit for the home on H1 soil and considered minimal movement it observed meant the founding soil under the dwelling was stable. RC did not consider the eastern masonry wall to be at risk of immediate collapse but said the rotation may worsen over time and recommended its reconstruction. In relation to the western wall/side of the building, RC maintained that ineffective civil drainage, the cycle of stormwater ingress into the soil and then drying (including the effec t of tree root on moisture) caused the damage. Further, it says the drainage issues have caused movement in roof members and other damage observed. RC maintained the leak had not contributed to any damage beyond the two bedrooms, bathroom, and adjacent external wall. The complainants disagreed with the fin ding and the insurer‟s proposed settlement based on 30% of the estimated cost of repairs to the rooms identified. They provided a letter from their engineer addressing the findings in RC‟s report. Notably, their engineer (TD) utilised the floor level completed by RC and says this along with other information obtained as well as observed shows a major portion of damage, assessed at approximately 75%, was due to the leak contrary to the 30% of damage to limited areas in RC‟s report. In reaching its conclusions TD says:  floor level drop of 30mm at eastern wall bedroom (water leak was on east side of building)  water will “seek the lowest point to flow to” with the “trench dug for the strip footing” being a perfect channel  water has “run along/under the strip fo oting that supports the south wall of the master bedroom and bedroom and spreading under the west side of the wall” (where there is a 66mm drop below the datum point) “indicating that water has ponded under the north -west corner of the living room.  because of the size of the tree, tree roots unlikely to account for enough shrinkage to 66mm drop recorded in floor level  leak caused reduction in bearing capacity of the soil and resulted in footing subsiding and rotating The complainants obtained further input from under pinner (PP) and geo-technical engineer (DM). They say these opinions along with previous reports sufficiently shows that the Determination | Case number: 770538 Page 7 of 27 insurer‟s liability exceeds what it agreed to and that it should indemnify them fully in line with the policy terms. The panel reviewed the additional information from PP. It notes that PP provided a quote for underpinning in which it says the east wall had significantly moved and was in danger of collapsing upon further drying of underlying soil. PP does not address the cause of damage to the walls, however, says underpinning was required due to age of property and the fact that existing foundation was likely of poor quality. The scope of DM‟s report included investigating the cause o f distress to the building. DM conducted soil testing and confirmed the soil profile at the premises was „very wet silty clay‟. It found the home was on „blue strip footings founded at a depth of approximately 600mm‟. DM says the bearing capacity of the clay soil was compromised by the reported leak in the area (east) and caused moderate to severe cracking. DM concluded the recent distress was due to:  differential heave of reactive clay soil in the middle section of the east wall (original section of the building) from increased moisture due to leak  horizontal cracking on brick on eastern wall is characteristic of heave in footing area and “when a section of a footing is subject to localised heave, it causes that section of the footing to move upward, which results in the brick work on either side going into tension, which often causes horizon tal cracking in the brick work”  soil beneath north-eastern section of building is still very wet (due to leak incident) and reduction in bearing capacity in the east section has likely caused some distress to the building and accounts for recent cracks over entire building  movement likely transferred via roof structures to the west side of the building and service trenches adjacent to east side of house has likely compounded this  „ While most of the water damage to the ceilings is likely to have been caused by the recent movement of the footings as outlined above, it is also likely that some of the water ingress is partly a function of age-related degradation and a lack of ongoing, effective maintenance ‟  level of distress also partially influenced by „relatively brittle nature of solid brick/solid plaster type construction‟ and lack of adequate brickwork articulation in brick cours e above windows and doors which means the visible distress is higher than what would occur with more flexible construction types. Insufficient evidence to show majority of damage caused by leak It is not in dispute the water pipe leak resulted in damage to the building as discussed above. The issue in dispute is to what extent the leak caused the claimed damage. The panel accepts the experts relied on by both parties are suitably qualified to report on the cause and extent of damage to the building and that the reports have followed their own observation and testing as well as consideration of available information or input from other experts. The panel has carefully reviewed the reports with particular attention to those completed by the engineers and DM. While the reports address issues with the building, their possible causes and seek to reach conclusions about the extent of damage attributable to the leak, the panel consider they do not sufficiently show all/majority of damage to the home was a result of the leak. Further, these reports do not support the complainants‟ submission that the home cannot be repaired and requires a complete rebuild due to damage caused by the leak. Determination | Case number: 770538 Page 8 of 27 Notably:  the available evidence (including photographs) confirms the home was in an aged condition, and had suffered long-term ongoing issues, separate to the leak  while DM says the damage was caused by leak, it reported following its inspection several months after the leak, that soil beneath north-eastern section of building is still very wet due to leak incident. This does not support a conclusion that wetness reported was due to the leak. DM does not explain why the soil would still be very wet after the time that had elapsed since the reported pipe leaked and had been repaired  while DM suggests movement of soil/footing where leak occurred likely transferred via roof structures to the west side of the building, the panel considers there is insufficient evidence or analysis of how this has occurred  DM confirms ongoing degradation, age, and lack of ongoing effective maintenance have contributed to ceiling damage, while also saying movement due to the leak had mostly caused the damage. Even if the panel accepted DM has sufficiently shown how the conclusions about the cause of damage in all areas of the home was reached (and it does not) the preponderance of the evidence does not show the leak rather than the other factors were the proximate (or the dominant or effective) cause of most damage to the property as claimed. Further, the panel does not find the 75% attribution by TD sufficiently convincing. TD does not sufficiently consider the fact all the western side of the house‟s levels are low and the influence of the ineffective civil drainage on the western side of the house referred to by RD. Additionally, the methodology adopted by TD to arrive at 75% is insufficiently persuasive. In view of all the other issues, to simply assert that 75% be attributed to the leaking pressure pipe (i.e., 66-17 = 49mm of the 66mm approximately) lacks compelling analysis. As explained ab ove, the complainants‟ onus extends to showing all damage/loss claimed was caused by the claimed event. The panel accepts it is reasonable that the complainants provide sufficient evidence of the condition of the home prior to the leak in support of their position about the extent of pre-existing cracks and movement. This is particularly crucial given the information available suggests movement and damage across areas of the home (other than the two bedrooms and a bathroom on the eastern end) probably pre-dates the claimed leak and were caused by the other factors such as inadequate drainage as described in the insurer‟s reports. In all the circumstances, based on the available information, the panel considers an offer based on a 50% contribution by the insurer is fair. Policy allows insurer to decide how to settle claim Under the terms of the policy, if the insurer agrees to pay a claim, it will decide whether to repair/rebuild the part of the home that was damaged or pay the complainants the reasonable cost to repair/rebuild the home. The panel accepts the insurer is entitled to exercise this discretion under the policy terms however, it is required to exercise such discretion fairly, reasonably, and consistent with utmost good faith. Having carefully considered the available information, the panel is satisfied the application of the insurer‟s discretion to propose to cash settle was reasonable, given:  not all the damage was caused by the leaking pipe Determination | Case number: 770538 Page 9 of 27  the insurer‟s builder indicated it would not be abl e to warrant any repairs due to ongoing issues and condition of the property  there is a history of complaints made by the complainants through the claim process. The complaints include claim handling and conduct issues and the complainants‟ have clearly expressed loss of trust in the insurer  while expressing concern that they are not out of pocket with a cash settlement, the complainants do not appear to be explicitly seeking for the insurer to complete repairs but seek “indemnity under the policy”. Complainants say settlement amount is insufficient Following the 6- month drying period and after further review by the insurer‟s builder and engineer, the insurer decided only 30% of damage to 2 bedrooms and a bathroom was attributable to the leak in or around September 2019. It initially offered 30% of a quote provided by the complainants from their builder MB. The complainants have explained that this quote was for make-safe and not repairs. The insurer subsequently offered to pay 50% of repair estimates which the complainants provided from MB and PP in a total amount of $151,744.50. The complainants maintain this offer is insufficient, does not cover damage which their experts say was due to the leak, or make allowance for MB‟s quote being subject to changes during repair works. Relying on their builder, the complainants say the house should be knocked over because the cost of works to replace remedial actions on the house are significant. The complainants rely on a quotation from MB in the sum of $711,518.14 but say they will accept the maximum sum AFCA can award ($500,000). The panel notes the insurer offered further investigation by experts (including any which the complainants may wish to have in attendance) as an alternative to its proposed settlement and the complainants have declined this option. The complai nants rejected the insurer‟s proposal for reinspection to determine scope of works required due to leak saying:  the insurer‟s engineer had opportunities to assess the premises over about a year  they un derstood the engineer‟s assessment to be independent and now question this given the insurer‟s suggestion that further „independent‟ assessments occur  they have lost trust in the insurer and/or its experts to properly deal with the claim  there are reports from three engineers, two plumbers and two builders. These should be sufficient for the insurer to properly assess its liability. The panel has considered the complainants ‟ reasons for declining both the settlement offer and reassessment. The complainants also say the insurer has not adequately established what the cost of repairing the damage is, but the panel notes the insurer based its proposed cash settlement on the complainants‟ own quotes. Other than the possibility of variation, the panel is satisfie d it is fair to base the settlement offer on the complainants‟ own material. Insurer’s proposed settlement plus 20% uplift is fair in the circumstances Under section 13 of the Act, parties to a contract of insurance (the complainants and insurer) are required to act towards one another with utmost good faith. The insurer does not consider the available reports which it says includes conflicting opinions about the percentage/proportion of damage from the leak, sufficient. To settle the Determination | Case number: 770538 Page 10 of 27 claim/complaint, it proposed reassessment of the premises to definitively establish apportionment of damage or pay 50% (or $151,744.50) of the complainants‟ total repair quotes. It offered this negotiated amount although it considered the quotes included maintenance items which are excluded from cover. The panel notes the amounts in the repair quotes include all the make safe works action, long-term remedial building work without the need for variation and the cost to underpin both the east and west walls. As discussed above, t he panel does not agree that the insurer‟s proposal is unsubstantiated given it is based on quotations obtained by the complainants themselves. It is not uncommon for unexpected/unforeseen work to become evident during repairs; this is always a consideration irrespective of whether the insurer or complainants appointed the builder and does not render the quote invalid. In view of the above, the panel considers the insurer‟s reliance on the complainants‟ available repair quotations fair and reasonable. The panel has carefully considered all the available information. Save for MB, none of the expert opinion support the contention the house is a total loss which must be demolished and rebuilt because of damage from the leaking pipe. Insurer to pay the complainants a total amount of $182,093.4 0 The panel acknowledges the complainants‟ concern that a cash settlement transfers risk of the repair process to the complainants. Where an insurer chooses to cash settle a claim then the panel accepts it is fair the insurer makes an allowance for contingencies/variations which may occur in the repair process. In all the circumstances, the panel is satisfied it is fair the insurer pays an additional $30,348.9 0 (being 20% of $151,744.50 ) in addition to the $151,744.50 offered to take account of contingencies/variations which may occur once repairs commence. In short, the insurer is to pay to the complainants a total payment of $182,093.4 0 to settle the claim and the complaint. The panel has made no allowance for statutory interest in the settlement sum because it has allowed a 20% uplift. Further, the panel is not satisfied the insurer has unreasonably withheld payment in view of its offer being open for acceptance since 29 June 2020. 2.3 Should the insurer pay indirect financial loss claimed? Insurer paid policy entitlement for temporary accommodation The complainants are seeking further payment for indirect loss for further rental costs they say they have incurred due to the time this matter has taken to resolve. They say the insurer should pay the maximum indirect loss which AFCA can award ($5,000) because of its handling of the claim which they consider has been poor. The insurer arranged for and/or covered the complainants‟ temporary accommodation costs from April 2020. The insurer continued to cover temporary accommodation for the remaining period of policy entitlement (12 months) while attempting to negotiate settlement of the claim. The insurer communicated its final decision to the complainants in June 2020. While the complainants are entitled to dispute its decision, it is unreasonable to conclude the insurer is Determination | Case number: 770538 Page 11 of 27 responsible for any further accommodation costs while the complainants continued to pursue the claim/complaint but refused reasonable options which were put forward to try to resolve the claim/complaint. As will be explained below, the panel does not consider there has been overall poor claims handling by the insurer. Consequently, the insurer is not required to cover any indirect financial loss (for temporary accommodation) claimed by the complainants. Insurer to pay complainants $2,400 for removal and storage of contents The panel notes the relevant policy benefit for temporary accommodation allows not only for temporary accommodation costs under buildings insurance but also allows for the cost to remove and store contents and then return them to the home. The parties have not addressed this policy benefit. Item 1 of MB‟s quote allowed for “ All of clients‟ belongings to be moved out, packed and stored for a 4-month period. Estimated cost $4, 000 including GST” The panel considers it is fair for the insurer to indemnify the complainants for this policy benefit. Adopting its earlier analysis, the panel is satisfied it is fair the insurer pays to the complainants $2,400 for this policy benefit (calculated as 50% of $4,000 +20% uplift). 2.4 Should the insurer compensate the complainants? AFCA can award compensation for insurer’s conduct in some circumstances Where a complainant raises issues with the insurer‟s handling of a claim/complaint or its conduct, AFCA will consider whether the insurer acted in accordance with its obligation under the Act or General Insurance Code of Practice (Code). For our purposes compliance with the Act/Code are not distinct issues to be considered separately in relation to claims handling; they are appropriately addressed by answering the question whether the insurer mishandled the claim or caused unreasonable delay. Where AFCA finds an insurer has not conducted the claim appropriately or failed to act in accordance with relevant Act/Code we consider whether an award of non-financial loss compensation is appropriate. Under its Rules, AFCA may award compensation (capped at $5,000) for non-financial loss where complainants have suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the complainants‟ expecta tion of enjoyment or peace of mind. Insurer did not unreasonably delay in making claims decision The complainants say the insurer failed to act towards them with utmost good faith as required under section 13 of the Act, mishandled the claim, and did not meet obligations under the Code. The Code allows an insurer to correct any errors made during a claim if it informs the insured of the error or change as soon as possible. As such, any changes in the insurer‟s position through the course of the claim (which the panel notes have occurred based on additional information) does not of itself constitute a breach under the Act or Code. Determination | Case number: 770538 Page 12 of 27 The insurer formally communicated its claims decision to the complainants by letter dated 15 May 2020. This was approximately 8 months after the claim was lodged on 30 September 2019; however, a 6-months drying period (approximately until 30 March 2020) needed to be allowed following the pipe leak. There is no dispute the insurer clearly informed the complainants of the drying period requirement. Following the drying period, UB reviewed RC‟s report and provided variations and a report in April 2020. The insurer subsequently made its claims decision. Other than the recommended drying period, there is no evidence of extended periods of inaction by the insurer. The panel has carefully reviewed the available information and does not accept there was unreasonable delay. The time taken was reasonably to be expected given the circumstances of the loss and drying period required (there was not much the insurer could have done until the drying period elapsed). The panel also notes that the complainants maintain the insurer did not act in good faith because it kept changing its position with no real evidence to back the change. The insurer made a claims decision in May 2020. It subsequently made amendments to its assessed cash settlement offer in June 2020 to negotiate resolution of the claim. The panel is not satisfied on the information provided if the insurer‟s conduct breache d the Act or the Code. Fair the insurer pays $2,000 non-financial compensation The panel notes the time taken to review and address the concerns about the home‟s safety was not optimum. The insurer did not investigate safety concerns earlier in the claim although it appears to have been first raised by UB in October 2019. While it arranged for this to be investigated after prompting by the complainants, this did not happen until UB‟s re -attendance in early April 2020. The complainants say the uncertainty and concerns about safety impacted on them negatively particularly given the location of their son‟s room in the damaged area. The panel accepts this would have caused the complainants stress, inconvenience and would have interfered with their expectation of enjoyment or peace of mind. The panel notes the insurer accepts a level of inconvenience to the complainants due to the time in which the matter remained outstanding. In March 2021, the insurer offered $2,000 outside of policy entitlements in acknowledgement of delays and inconvenience which offer was to remain open for 21 days. The panel acknowledges the 21 days has long expired since the offer was made. Nonetheless, taking all matters into account, and, the failure to investigate the safety concerns sufficiently and promptly, the panel considers it fair that the insurer pays the complainants $2,000 non-financial loss compensation. 2.5 Should the insurer cover any other costs? Under its Rules, AFCA can require insurers to reimburse complainants for costs incurred in making a complaint. This may include legal costs, expert report fees, or travel expenses. If a complainant asks the insurer to contribute to these costs, we will consider whether they were reasonable and whether they helped resolve the complaint. Determination | Case number: 770538 Page 13 of 27 We try to make our service accessible and understandable, without any need for legal representation. If a complainant chooses to be legally represented, AFCA will generally require a complainant pay for these costs. However, we may still require the insurer to contribute to legal costs if the complaint raises complex legal issues, or if the complainant could not have reasonably handled the complaint without getting legal advice. Legal assistance not required/necessary to pursue claim and complaint While the claim presented some complexity in relation to the technical issues surrounding the cause of damage, the panel does not consider the complainants‟ claim and complaint presented complex legal issues. The reports and the documents (including the PDS) are reasonably clear and would not reasonably require legal input. Further, while the complainants seek payment for legal advice they say was obtained in relation to the claim and/or complaint, they have not provided any material showing:  they obtained legal advice  any costs incurred in doing so. In any case, available information shows the complainants were familiar with the issues and were reasonably able to deal with the claim and complaint themselves. Consequently, the panel does not consider any legal costs (if incurred) were reasonably and necessarily incurred to pursue the claim or complaint. While it was always open to the complainants to engage a solicitor or obtain legal advice, the panel is not satisfied the available material establishes legal advice was necessary nor that it has been shown to have assisted the claim/complaint. The insurer is therefore not required to contribute to any legal costs. Insurer to pay $4,989 and interest for the complainants’ expert reports The complainants‟ geo -technical report includes soil testing result which have been considered by the insurer in its assessment. AFCA considers this report and other reports relied on by the complainants were useful and provided some assistance in making this determination. Further, the panel considers it is fair for the insurer to pay the complainants‟ expert report costs in view of the expert reports obtained by it and in view of the technical nature of the issues surrounding causation. The complainants claim $4,989 for the cost of expert and consultant fees. The panel is satisfied it is fair the insurer meets this claim. In addition, assuming the complainants paid for the reports, the insurer is to pay interest pursuant to section 57 of the Act, from the date of payment until the date of settlement on $4,989. Should the complainants accept this determination then within seven days of acceptance the complainants are to provide the insurer with relevant proof of payment of the reports (tax invoice/receipt) so the interest component can be calculated. Determination | Case number: 770538 Page 14 of 27 3 Supporting information 3.1 The AFCA process AFCA’s approach to this complaint This complaint has been determined based on what is fair in all the circumstances, having regard to the legal principles, applicable industry codes or guidance, good industry practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. This complaint was determined by a panel Due to the nature of this dispute, it has been referred to a panel for determination. The panel comprises the ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive experience in the insurance industry. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Caselaw and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common-sense approach is taken to determine proximate cause. Determination | Case number: 770538 Page 15 of 27 3.2 Policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer‟s Notice of Response. Both th e policy document and the Notice have been exchanged with the complainants. Document/page Wording PDS/ page 33 Water and oil leaks  Buildings Insurance  Cont ents Insurance If loss or damage is caused by water or oil leaking or escaping from an item shown here. Covered • water leaking or escaping from: –– house gutters, drainpipes or pipes –– sanitary fixtures – for ex ample, baths or toilets –– appliances – for example, washing mac hines or dishwashers –– waterbeds –– aquariums –– water tanks –– swimming pools –– oil leaking from a fixed heating system or sealed portable heater –– costs to locate the cause of damage (if we agree to pay these costs before you make any arrangements). Not covered • water leaking or escaping from a shower rec ess or shower base • co sts to repair or replace the item that the water or oil leaked or escaped from PDS/Page 45 Temporary accommodation for homeowners  Buildings Insurance … If a listed event causes loss or damage to your home and we agree you can‟t live in it and you need to move out so it can be repaired or rebuilt. We pay this benefit on top of your Buildings sum insured. Covered under Buildings Insurance • costs for temporary accommodation that we agree are reasonable and appropriate for you, your family and your pets that you normally keep at your site • any additional living expenses that we agree are appropriate • costs to remove and store your contents and then re turn them to your home. Conditions • you must have lived in your home permanently before the listed event took place • we must agree to pay the costs before you make any arrangements • we won‟t cover costs caused by unreasonable delays in repairing or rebu ilding your home. Determination | Case number: 770538 Page 16 of 27 PDS/ Pages 62 - General exclusions and your re sponsibilities There are certain situations when we won‟t provide cover under your policy. This section outlines the general exclusions that apply to all cover we provide under your policy. …. This section also outlines your responsibilities. You may put your insurance claim or cover at risk if you do not meet your responsibilities to us. … General exclusions for all cover The exclusions set out in this section apply to all cover under your p olicy. What we don’t cover Loss, damage, injury or death arising from: … tree roots the settling, shrinkage or ex pansion in buildings, foundations, walls or pavements … Maintaining and occupying your home We don't cover loss, damage, injury or deat h arising from: • faulty design or workmanship • previous damage that has not been repaired • ….. • you not maintaining your home in good repair and condition. This means your home must be watertight, structurally sound, secure and well maintained • you not maintaining your site in good repair and condition • ,,,,, • you not taking reas onable care to protect your home or contents against loss or damage. Your re sponsibilities … Co - operate You must: … • co - operate fully with us, even if we have already paid your claim which includes: –– providing us with all the information, documents and help we need to deal with your claim … –– giving us access to your home for a repairer or other specialist we choose so Determination | Case number: 770538 Page 17 of 27 they can assess your home. Prevent further loss or da mage You must do everything reasonable to prevent further loss or damage to your home or contents. Inspections and quote s If we ask you, you must: • let us or our representative inspect your home or contents. 3.3 Extracts from expert reports Record Key points Insurer’s expert (UB) Scope of works Undated  a ttended to make safe cracking bedroom walls and buckling bedroom ceiling  e astern side copper pipe repaired  u nrelated work – engage specialist to carry out roof repairs Complainant’s plumber (TE) 13 - 09 - 2019  carried out leak detection service and replaced section of cold - water supply pipe  cause for the water plumbing to leak below ground is inconclusive but it has caused substantial damage to the footings/foundation to the left - hand side including t he left - hand front section which has resulted the brick wall/ façade to crack and have a lean making it unsafe.  recommended an engineer is engaged Complainant’s expert (TD) Engineer consultant letter 23 - 09 - 2019  attended premises on 19 September 2019 to report on cracking and movement and provided annot ated photographs of east wall.  reportedly, „copper water supply main had been found to be leaking recently and has now been by - passed with a new above ground main‟.  „soil base was soft and mus hy and readil y able to be penetrat ed by a piece of timber. Water immediately appeared in the hole‟  noted settlement bowing out of east side brickwork, at the northern (front ) end of the house‟  affected walls have „sharp crack edged indicating recent movement‟  wall move ment is „quite large for new cracking, and it is our opinion that the water leaking from the mains pressure pipe is the cause of the localised damage to the house‟  unknown „how far or how deep the leaking water has penetrated the soil profile, however this should become apparent during the works‟  repair works will include stabilisation of foundation soils and underpinning of existing house footing. Outer skin of brick wall needs to be removed and re - set wit h new brick ties fitted across the wall cavity. Cos t estimate $35,000 to $50, 000 plus extra cosmetic works about six months after repairs are completed.  soil test recommended in the first instance, to reveal the soil condition on the east, west and north sides of the building. Determination | Case number: 770538 Page 18 of 27 Record Key points  large gum tree in front nature strip should be removed or install a root barrier Insurer’s expert (UB) Building report 02 - 10 - 2019  attended and photographed premises 2 October 2019  complainant reported cracks in 100 - year - old house widened mostly in front (older) part of the building. There were some cracks to the rear extension (1970s addition) but not as much as the front  complainant had repaired leaking pipe located at the front (east side) of building two week prior  observed: > building generally „quite deteriorated however the major masonry/structural damage was to bot h eastern and western walls from around halfway back towards the front (north)‟. > damage consistent with aged foundation movement and possible additional movement related to leaking pipe > lea k appears to have added to existing cracks - the extent of which needs to be established by a specialist > Annotated photograph 10 notes damage from aged movement to the western elevation Insurer’s expert (TB) Leak detection report 16 - 10 - 2019  conducted pres sure test, CCTV inspection of stormwater and wastewater systems and inspected roof/gutters for leaks  pressure test passed  no leak detected  CCTV (s ewer) unable to gain access  CCTV (stormwater pipe): > no evidence of subsoil drainage, adequate surface catchment, tree root entry > evidence of broken pipework and drain run on grade  location and extent of damage – front left side elevation (from plumber cutting up concret e slab), family room ceiling, estimated the damage is „long term gradual‟  general proper ty condition – aged  cause of damage: previous burst pipe, roof leaks, no sign of subsoil drainage or surface catchments  roof aged and deteriorated  cause of water entry to family room is from age, deterioration of roofing  visual inspection of perimeter of dwelling confirmed insufficient surface catchments and subsoil drainage Insurer’s expert (RC) Civil engineering report 06 - 11 - 2019  inspection occurred on 4 October 2019 to provide causation report and scope of works (SOW)  photographed damage and undertook level survey  describes the damage (see Figure 2) and state of building saying overall the house was in very poor condition for its age  reviewed reports provided  six months drying out period is required following plumbin g repairs Determination | Case number: 770538 Page 19 of 27 Record Key points and civil drainage upgrade  recommended repair identified plumbing leaks in stormwater system and fill in the missing sections of the paving and without civil drainage upgrade an appointed builder may not be able to warrant repairs  plumbing repai rs report edly completed two weeks prior following a leak. Complainant also advised flas hing above the western side extension had buckled, allowing water into the ceiling cavity but water ingress stopped after he weighed the flashing down.  soil classificati on testing not conducted but geological maps for the property suggest „it is in an area of Sandstone, siltstone, minor shaley siltstone; thinly and regularly bedded altered to horntels in vicinity of South Yarra intrusion‟, therefore underlying soil expect ed to be „class H1m with free swelly values ranging between 40 and 60mm‟  undertook a floor level survey, measured the finished floor levels throughout the dwelling to identify the gene ral movement of the foundations  „general finished floor level fell towar ds the middle of the structure, both in the eastern and western edges. The highest point was near the eastern edge of the bathroom and low points near the north - eastern corner o f the south - eastern bedroom and at the north - western corner of the living area. ‟  „The floor level varied bet ween 18 mm and - 66 mm ac ross the dwelling, relative to the arbitrary zero. The total variance in floor level was 84 mm. These levels have been appropriately adjusted to account for steps and changes in the floor finis hes‟  noted from inspection that subfloor ventilation, maintenance, material deterioration, watertightness and construction method/issues were acceptable  civil drainage was not as „effective civil drainage did not surround the entire perimeter of the dwelling‟. Concl usion  no evidence of a leak sighted now but „subsidence appears to have been occurring adjacent to the southeasternmost bedroom for an extended period of time. Paragraph 13 annotated “ Timber has been placed under the window frame of the south - eastern bedro om, indicating the subsidence has occurred over an extended period of time”. This area also contains part of the pressurised system that was replaced without being exposed. Based on the information provided by the Insured and the location of damage, a leak appears to have been present in the section of pipe that was replaced. This section was not exposed during the works; therefore, the only way to confirm this would be to remove the concrete along the eastern wall, expose the disused pressurised pipe and e xamine it for leaks‟.  „Stormwater appears to be ingressing through the uncapped soil along the western wall of the dwelling and migrating below the nearby footings, causing subsidence along the western external Determination | Case number: 770538 Page 20 of 27 Record Key points wall. The roots of the trees in the western n eighbouring property appear to be sucking moisture out of the soil below the master bedroom and living area, contributing to the damage in these rooms.‟  „Due to the age of the structure and the pattern of the level survey, natural seasonal soil movement ap pears to have contributed to the uneven floor levels and resulting damage across the dwelling‟.  „The ceiling plaster does not appear to currently be at risk of falling; however, the cornices should be removed immediately to prevent the risk of them falling ‟.  Caus e of damage including based on area & % caused by leak > master bedroom, the living area, and the adjac ent external wall: ineffective civil drainage (60%) > natural soil movement (20% ) > tree - drying effects (20%) > bedroom 1, bedroom 2, the bat hroom and the adjacent external wall natural soil movement (70% ) > a possible leak in the pressurised system (30%) > dining area and office and the adjacent external walls ineffective civil drainage (65%) > natural soil movement (35% ) > kitchen, hallway, and adjacent external walls natural soil movement (100%) > recommended neighbour to remove tree near the northeast corner of the property and the tree midway along the eastern boundary > provided scope of works and a percent age of damage allocated to each cause was defined in the s ummary Insurer’s expert (UB) Variation notes 07 - 04 - 2020  Reviewed engineers report provided by insurer and recommended: „ - The cornices affected should be removed to prevent risk from them falling. - Seal the cuts to the stormwater pipe to prevent the stormwater from escaping. - The holes along the western wall should be filled in and covered with concret e. - The defective roof sheets should be replaced. - Contact the body corporate of … and request measures be taken, by removing the 2 trees drawing water away from the foundations of the property. Once these steps have been taken, a six - mont h drying out period is to commence. - After the drying out period is complete, these steps are to follow - - Engage a qualified trade to relevel the dwelling. A hatch may n eed to be cut in the floor for access. Allow a 30 - day settling period after releveling. - Inspect the roof and determine where the rafters are located, prop with timber props as per engineer‟s Determination | Case number: 770538 Page 21 of 27 Record Key points report. - Demolish and rebuild the brickwork to strengthen its su pporting capabilities. Then paint to match existing. - Patch all plaster, render, and cornice to the affected areas. Causation Report . The engineer has allocat ed different degrees of cause for each area of the house…‟ As a result of these findings by the en gineer we have det ermined that the only aspect covered by the leak is 30% to bedrooms 1 and 2 and the adjacent wall. To confirm additional causation by removing concrete along the eastern wall and exposing the pipe and examine it for leaks and without this additional testing the true measure of causation cannot be confirmed Insurer’s expert (UB) Attendance report and photographs 08 - 04 - 2020  visible evidence: > of severe structural damage causing cracking and areas to collapse in the kitchen din ing and family‟s room ceiling and full glass bay window. > of severe structural damage causing cracking and collapse to east elevation wall. > the main roof has severe maint enance issues e.g., deterioration to external flashing and roof sheets, deterioration to flashi ng in and around roof mounted sky light.  Conclusion > „overall condition of the home is in extremely poor, and the structural damage is severe, and it is not possible for me to determine what has caused the damage, therefore is recommended an engineer be app ointed to determine the best course of action‟. > „Due to the severity of damage and the present condition of the home it is my expert‟ opinion there is a high OH&S issue and risks, it is recommended the owners vacate the property. Insurer’s expert (UB) Variation notes 04 - 05 - 2020  review of engineer‟s report shows cause of damage: > „Bed 1, bed 2 and bathroom - 70% soil movement / (30% possible leak from water pipe) > Dining room - 65% civil drainage / 35% soil movement > Dining room - 65% civil drainage / 35% s oil > Kitchen - hall way - 100% soil movement > Master bedroom - living room - 60% civil drainage / 20% soil movement /20% tree drying roots‟  based on above: > „damaged areas of bedroom 1 / bedroom 2 and bat hroom have been allocated 30% coverage due to an insurabl e event of an escape of water‟. > „All other areas have no coverage as the damage has been attributed to soil movement, civil drainage and tree root issues along with general deterioration of the building‟ Determination | Case number: 770538 Page 22 of 27 Record Key points > Cannot carry out prescribed works because of pre - ev ent condition of the building and recommend settlement of the claim. Essential that stormwater and civil drainage issues are rectified along with the tree roots from the western side. > Prepared a total scope of works (total $22,925.83) but damages due to leaking pipe are $2,214. 84 including GST and builder‟s margin. Complainant’s expert (TD) Engineer consultant letter 29 - 05 - 2020  commented on RC‟s report  reviewed relative floor level in RC‟s report and says that combined with other information in the report gives a “whole - of - house picture…of the existing structural condition of the building”  water supply pipe leaked along east side of building where floor level dropped 30mm at the eastern wall of bedroom 2 and water will “seek the lowest point to flow to” with the “t rench dug for the strip footing” being a perfect channel  in present case water has “run along/under the strip footing that supports the south wall of the master bedroom and bedroom w and spreading under the west side of the wall” (where ther e is a 66mm drop below the datum point) “indicating that water has ponded under the north - west corner of the living room.  tree shown in neighbouring property is no higher than that property‟s roof and is unlikely to “account for drying shrinkage of the und erlying clay to equate to a 66mm drop”  says in relation to bearing capacity of soil reducing and “allowing footing to subside and rotate” that: > it considers this is what happened at the insured premises “especially given the localized large drop in floor l evels near the leaking pressure pipe” > as there is a “large 66mm drop, the pressure on the house framing is very large, causing cracking and movement throughout the ceiling structure and walls”.  contrary to various percentages of movement due to leak assigned to specified areas in RC‟s report, it “estimates that 75% be attributed to the leaking pressure pipe i.e., 66 - 17 = 49mm of the 66mm approximately”  Leakage from stormwater pipe can be discounted  In summary, its view is that “the major portion of d amage to the property has been caused by the leaking water pipe, which has now been repaired” and the major portions has been assessed at approximately 75%. Insurer’s expert (RC) Civil engineering report 04 - 06 - 2020  re - attendances occurred 15 & 27 May 2020 „to determine if the dwelling is currently safe to live in, and if not, what impact the leak has had. Signs of possible rotting prompted a second reattendance with a builder to inspect the ceiling plaster‟.  on 15 May 2020 > floor - level survey was conducted, and measurements taken at Determination | Case number: 770538 Page 23 of 27 Record Key points approximately the same location as previous attendance. Res ult is that there has been little to no movement of the building (including in areas near the reported leak) since previous inspection. > Also, aesthetic damage around the dwelling did not appear to have changed however one crack (western end of the bulkhead above the office space) noticeably widened > at the external southwestern corner of the dwelling, noted half of incorrectly graded gutter had detac hed from wall (western h alf of the south wall), a timber beam protruding from the end of the southern wall, vines growing inside roof cavity and staining (and possible rotting) in roof cavity timber.  on 27 May 2020 > met with complainant and carpenter onsite > hole cut in ceiling wh ere plaster has dropped, and roof cavity visually inspected. > found plaster fixings still in place but ceiling plaster had fallen away. > also, stains observed in previous inspection identified as tannins upon closer inspection (tannins occur due to moistur e in treated timber surfac es over time and is not indicative of damage). > complainant provided letter from engineer (TD) dated 23 September 2019 and photo of ceiling plaster (near office) dated 15 July 2018 showing no damage at the time. > reviewed letter fr om TD which shows the pipes which report edly leaked had been bypassed prior to TD‟s attendanc e, however TD says soil near pipe could be penetrated wit h timber and that the leak caused localised damage. Conclusion  level survey shows „little - to - no movement h as occurred across the dwelling‟ Based on location and assumed soil type (H1 class) which is highly reactive „the movement that has occurred in the dwelling is within the ex pected limits of a dwelling built on H1 class soil. The minimal movement indicat es that founding soil below the dwelling‟s interior is stable‟.  damages parts of eastern masonry wall not at risk of collapse at the time, but it does have a slight lean. „The rotation may continue to get worse over the following years‟ therefore recommended that the wall is deconstructed from the top down and rebuilt‟  civil drainage along the western wall of the dwelling is ineffective and there is a „medium - sized tree was present adjacent to the southwestern corner‟; these are allowing damage from > large vo lume of stormwater ingress to the soil at the southwestern corner of the dwelling, and > tree pulling out moisture from the founding soil resulting in „cyclic wetting and drying of the soil below the western wall, especially near the sout hwestern corner‟ > „masonry wall is not currently at risk of collapsing; however, the Determination | Case number: 770538 Page 24 of 27 Record Key points rotation may continue to worsen over subsequent years. It is recommended that the masonry wall is deconstructed from the top down and rebuilt‟.  „Although the lean in the western wall is mi ld, it has caused the roof members to move. This slight movement has caused the ceiling fixings to move relative to the plaster, causing the fixings to punc h through and the plaster sheets to sag‟  The leak has not contributed to the damage beyond bedroom 1 , bedroom 2, the bathroom and the adjacent external wall.  provided Google Street view and said the crack in the eastern masonry wall can be seen as far back as 2009. Complainants’ expert (PP) Report 15 - 06 - 2020  attended site on 10 June 2020 and quot ed to install 50 underpins 2m deep to exterior walls in the total sum of $137,148  to underpin east wall only with 16 underpins cost $43,180 plus GST which does not include brickwork or plasterwork  foundation to all exterior walls have moved. This has resulted in cracking to brickwork  due to age of property existing foundation likely of poor quality and underpinning will be required to resolve issue  east wall has most significant movement and needs urgent attention as the wall is in danger of collapsing if “clay in the ground dry out further, (long periods with no rain)”. Complainants’ expert (DM) Geotechnical distress report 28 - 08 - 2020  appointed to investigate soil profile, carry out soil testing and moisture analysis, report on site features, nature, and level of distress and if possible, cause of distress, recommend remedial action  complainants owned the house for about 15 years. They report some cracking was evident in some sections soon after they bought. Confirm by our recent site inspection whic h revealed various stages of previous crack repairs which indicat es some distress had been occurring in the house over considerable period .  previous distress includes large internal masonry crack that is still present in the north - western bedroom because of significa nt gumtree in the nature strip  A different stage of movement and damage developed in the home and extension in 2019 including water damage in the ceiling and recent cracking along the eastern and northern eastern section of the building – edges of crack a re sharp which confirms recent damage  soil in the area of the leaking pipe is still abnormally wet which confirms this is the predominant cause of the more recent movement and distress  based on the natural soil profile encountered at this site, from previous experience and after considering the appropriate geological map it is evident that thi s site is located in an area of Silurian Siltstones. Determination | Case number: 770538 Page 25 of 27 Record Key points  borehole undertaken - no water table encountered  soil samples analysed for moisture and show „silty clay take n from borehole one are wet‟ and significantly wetter than what would normally be expected for the period of the year when the sample was taken  from bore taken around outer edge of home‟s footing “it is evident that the original section of this building is supported on bluestone strip footings founded at a dept h of approximat ely 600 mm. At the location investigated, the strip footing was obs erved to be founded on very wet silty clay. It is evident that the bearing capacity of this clay has been compromised by the reported water service leak in this area”.  distress to building based on classification under AS 2870 2011 is moderate to severe with thes e classifications described as: moderate: “Cracks can be repaired and possibly a small amount of wall will need to be replaced. Doors and windows stick. Service pipes can fracture. Weather tightness often Impaired.” Severe: “Extensive repair work involving breaking out and replacing sections of walls, especially over doors and windows. Window frames and door frames distort. Walls lean or bulge noticeably, some loss of bearing in beams. Service pipes disrupt ed.” Findings  recent distress in the building a res ult of:  “Differential heave of the reactive clay soil beneath the middle section of the east wall of the origin al building” due to heave in reactive clay soil from increased moisture in the following the reported leak. Horizontal cracking of brick on east side of building is characteristic of heave in footing area and “when a section of a footing is subject to loca lised heave, it causes that section of the footing to move upward, which results in the brick work on either side going into tension, which often causes horizontal cracking in the brick work”.  “the foundation soils benea th the north - eastern section of the original building was still very wet, due to the previous water service leak in this area” and in this case reduction in bearing capacity of the foundation soil along the east side of the building is likely to have caused some of the distress in the buildi ng and explains the more recent movement and distress evident in various sections of the building  Further, some of the movement is “likely to have been transferred via the roof structure to the west side of the house. This issue is likely to have been comp ounded by the presence of service trenches adjacent to the east side of the house.”  “While most of the water damage to the ceilings is likely to have been caused by the recent movement of the footings as outlined above, it is also likely that some of the w at er ingress is partly a function of age - related degradation and a lack of ongoing, effective maintenance” Determination | Case number: 770538 Page 26 of 27 Record Key points  “the level of visible distress in this building has also been partially influenced by the relatively brittle nature of the solid brick/solid plaster type construction, in conjunction with the lack of adequate articulation, particularly in the brick courses above and below window and door openings. As this type of building is less able to tolerate even minor footing movements the level of visible distre ss tends to be higher than would normally be expected in a more flexib le type of construction.” Recommendations include  permanent repairs to water service line to be completed ASAP  entire roof drainage system be thoroughly investigated  root barrier at the front of the building effective and no further works required  “strong consideration should be given to re - supporting the eastern side of the building on a system of engineer designed underpins” Prior to underpinning, important to note likely issues will be encountered under the original sections of the building as it “appears to be of discontinuous bluestone strip system which has little spanning capabilities”. Following underpinning, plumbing work need to be checked to ensure in good order and concrete p aving along east side removed and replaced.  after underpinning, time needs to be allowed for moisture content to reach a relative equilibrium/stability, any short - term stabilisation work required carried out, and flooring re - aligned. Brickworks cracks also need to be repaired/reappointed and replacement may be required for areas where rot ation has occurred. Further window opening should be adjusted, and internal cracking plastered (or in some severe instances, sheeting replaced).  “It should be noted that mi nor soil movements due to seasonal fluctuations are likely to continue to occur beneath this building in the fut ure. The distress associated with these movements is only likely to be slight to moderate but can be expected to continue to occur over the life of the building. Although such movements are virtually impossible to prevent, footing performance will be enhanced if all of the guidelines listed in the following Construction and Landscaping Recommendations sections are followed over the life of the bui lding.” Complainants’ builder (MB) 26 February 2020  Met complainants 26/2/20 to discuss remedial building works  Masonry crack to bed one/ bed two and bat hroom require urgent stitch and prop. Wall dangerous and needs to be addressed as soon as possible  Roof needs to be propped to take roof load in the event the wall does go over  Living and dining ceiling need to be battened to the underside  Masonry crack in master bed appears to be forming from overall ground movement from the water leak. As a result, y ou can view large caps in roofing and flashing Determination | Case number: 770538 Page 27 of 27 Record Key points  Perform reinforcing to brick wall in kitchen area  Advise occupants to vacate property budget permitting  Variations may occur to remedial building works as there are a lot of variables in repairing a structu re: make safe works action immediat ely $17,480 including GST long - term remedial building work without need for variation det ermined at strip out phase 1 of quote $148,8861 including GST excluding pack and storage of contents.,  Subject to final inspection depending on timing more damage may arise/movement and may need to reconsider . Complainants’ builder (MB) 29 July 2020  house should be knocked over bec ause the cost of works to replace remedial actions on the house are significant  cost projections of the works are provi sional. This means our proposals in the form of a contract would be allowances only. Due to the nature of the works, it is highly likely that these methods would cost more to make the dwelling safe and liveable and al so protect us as the builder from a warranty perspective. This means ensuring the building work is to a standard at whic h we can provide our warranty and are satisfied it will last beyond warranty period. With the recommendations by engineer we think this is highly unlikely that the project will run on budget and also be to a satisfactory standard . Complainants’ builder (MB) undated specifications and draft quote 23 February 21  Building work quoted as per specification document subject to formal plans en gineering and supporting documentation total including GST $711,518.40. 3.4 Other relevant material considered and relied on  Parties‟ submissions/emails and all attachments to all submissions/emails .  Parties‟ expert reports .  Photographs and video.  Claim notes.  Scopes of work and quotations.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.