Claim declined for water leak damage due to corrosion

FirmXL Insurance Company Se
Decided2021-09-30
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The strata insurer declined a claim for water leak damage to two units, finding the leak was caused by long-term corrosion of a pipe. AFCA determined the corrosion and gradual deterioration exclusions applied and that section 46 of the Insurance Contracts Act did not assist the complainant.

Policy exclusions for corrosion and gradual deterioration applied on expert evidence, and section 46 of the Insurance Contracts Act did not apply to a broad form policy with blanket exclusions.

Issues

Subjects and remedies

home or building damageno remedy

Related

All XL Insurance Company Se determinations · Find similar determinations

Text of the determination

Determination Case number 770266 Financial firm XL Insurance Company Se Determination | Case number: 770266 Page 1 of 9 Case number: 770266 30 September 2021 1 Determination overview 1.1 Complaint The complainant holds a residential strata insurance policy with the financial firm (insurer). In March 2020, a claim was lodged under the policy for damage due to a water leak said to have commenced around December 2019. Damage was reported to the ensuites and bathrooms of units 3 and 4 of the insured property, as well as some damage to an adjacent bedroom. The complainant ’s plumber had experienced difficulty in locating the leak’s source . During the time in which investigations were undertaken units 3 and 4 sustained further damage. It was eventually discovered that the source of the leak was a pin prick hole in the pipe behind the vanity in the bathroom of unit 4. The insurer has declined the claim on the basis the cause of the leak is long-term corrosion of the pipe. The insurer relies on policy exclusions which preclude cover for damage caused by corrosion, gradual corrosion and deterioration; by gradual deterioration or developing flaws; and by defective workmanship. The complainant is disagreeing. It says a sudden and unforeseen leak occurred which a reasonable person could not have been aware of; nor could the pipe have been maintained in any way. The complainant argues the pipe became corroded due to a lack of lagging around the pipe. It considers the lack of lagging to be a pre-existing building defect of which it could not have been reasonably aware. The complainant says section 46 of the Insurance Contracts Act, 1984 (Cth) (the Act) prevents the insurer from denying the claim. To resolve the complaint, the complainant is seeking that the insurer cover the cost of repairing the bathrooms and ensuites, as well as more minor damage to adjoining areas, plus the cost of repairing the extensive exploratory works that were undertaken. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. The available information shows the proximate cause of the water leak was gradual corrosion. A number of policy exclusions have been triggered. I am not persuaded that the lack of lagging to the pipe was a building defect or that section 46 of the Act applies. Why is the outcome fair? The available information and expert opinion establishes the leak arose due to gradual corrosion of the pipe. The policy excludes damage caused in such a way. It would not be fair for the insurer to have to pay the claim, when there is no policy requirement to do so. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action. Determination | Case number: 770266 Page 2 of 9 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Yes. The available information shows the proximate cause of the water leak was gradual corrosion. A number of policy exclusions have been triggered. I am not persuaded that the lack of lagging to the pipe was a building defect or that section 46 of the Act applies. Complainant must establish a valid claim under the policy The complainant is required to show, on the balance of probabilities, it has suffered a loss caused by a risk insured against under the policy. This is known as a valid claim. Once the complainant establishes a valid claim, the insurer is liable for the loss unless it shows an exclusion applies or it is otherwise entitled to deny the claim. The insurer has the onus of proof in establishing this. The policy provides cove r for ‘accidental Loss or Damage’ to the insured property which ‘occurs during the Period of Insurance’. The policy defines ‘Loss or Damage’ to be ‘ direct physical loss of, destruction of, or damage to property from any sudden and accidental cause not otherwise excluded by this Policy .’ The term ‘accidental’ is not defined within the policy but is generally taken to mean something that is unforeseen, unexpected and unintended. Accordingly, to establish a claimable loss (that is, a valid claim), the complainant must show the damage the subject of the claim occurred during the period of insurance and was unforeseen, unintended and not expected or designed. Complainant established valid claim, onus shifts to insurer It is not in dispute there was a water leak and this led to damage to units 3 and 4, as well as further damage as a result of exploratory works undertaken to locate the leak. Given the broad cover for accidental loss or damage provided by the policy, I am satisfied the complainant has established a valid claim under the terms of the policy. Accordingly, the insurer is liable for the loss or damage unless it shows, on balance, it is entitled to:  rely upon a condition or an exclusion contained within the policy to refuse the claim  otherwise deny the claim. In this case, the insurer relies upon general exclusions for damage caused by:  corrosion, gradual corrosion and deterioration  gradual deterioration or developing flaws  defective workmanship. The insurer has the onus of proof to establish the application of these policy exclusions. Experts indicate proximate cause of water leak was corrosion The complainant engaged a plumber, EP, to investigate reports of a water leak in unit 4, with minor damage reported to the main bedroom skirtings outside the ensuite. Despite ongoing Determination | Case number: 770266 Page 3 of 9 investigations, including extensive exploratory work, EP had difficulty identifying the source of the leak. However, ultimately on 8 May 2020, EP ascertained the leak was coming from was a pinhole in the pipe behind the vanity in unit 4. The insurer engaged its loss adjuster M to assist it with its investigations. In its report dated 25 May 2020, M says the water damage was caused by a pin-sized leak in a pipe in the cavity behind the vanity in unit 4. This pipe is located in the adjoining wall of units 3 and 4 M says because the areas of damage that first presented, being to the skirting in the main bedroom of unit 4 and then to the skirting and main bedroom of unit 3, are the furthest from the source of the leak, it is likely that all damage had presented prior to discovery of the leak. M says this is indicative of a long-term leak. M also found the vanities were installed outside of Building Code requirements due to the absence of tiles and waterproofing on the floors below. It says this is likely the reason water has escaped beneath the vanities in between the floor slab and waterproofing. M says as the bathrooms were installed in 1993, the Building Code of 1990 is applicable, with the relevant aspect of the Code detailing that any ‘ vanity’ must have ‘ a floor surface that is impervious and drained to prevent the accumulation of water on it’. Building expert AB was also engaged by the insurer to inspect the damage and provide an opinion on the cause. In a report dated 18 May 2020, AB says the leak is due to corrosion of the water pipe within the concrete wall and would have started slowly, becoming more severe over a period of weeks or months. AB notes ‘numerous’ inspection holes had been m ade in both units 3 and 4 by EP in an effort to locate the source of the leak. AB also notes the leak itself has now been repaired. Building consultants QB were then engaged by the insurer to provide a more detailed opinion on the cause of the damage. In their report dated 1 July 2020, QB observe that the cold-water pipe has been installed into the concrete block work underneath the covering splashback tiles and vanity without having been lagged. As part of its investigations, QB spoke to EP. QB says EP is of the view that the pin hole leak in the copper pipe was most likely a result of corrosion due to a lack of lagging separating the copper pipe from the surrounding concrete, or expansion and contraction m ovement in the ‘T’ junction of the pipe. QB agrees with EP’s opinion and has concluded that the most likely cause of the pin hole leak is corrosion due to the copper pipe being encased in concrete (without lagging), where it is subject to salt impurities. QB also directs the reader’s attention to a photo clearly showing corrosion on the external face of the subject leaking copper pipe. QB says that to separate the copper pipe from concrete, lagging (a thermal insulation covering material) is used. QB notes Australian Standards first released in the year 2000 require lagging on such pipes. However, the building was constructed in 1993 and the 1990 Building Code applicable at this time did not contain any requirement for lagging. QB says that it appears lagging of cold-water copper pipework in the 1990s was not common practice. Insurer has established exclusions apply, so is entitled to decline the claim All of the experts have concluded that corrosion of the water pipe within the concrete wall over time was the cause of the leak. The complainant accepts that is the case (but says that the corrosion was caused by a lack of lagging which was a pre-existing defect and that section 46 of the Act prevents the insurer from denying liability. I discuss this issue in the next Determination | Case number: 770266 Page 4 of 9 sub section of this report). Accordingly, I am satisfied that the cause of the leak was long- term corrosion of the pipe. The expert reports also support a determination that the vanities were installed outside of applicable Building Code requirements due to the absence of tiles and waterproofing on the floors below. The QB report indicates that had the Building Code requirements been met the amount of water damage would have been significantly reduced. In section 3.2 of this determination, I have set out relevant aspects of the policy wording, including the exclusions relied upon by the insurer. Given the available evidence I am satisfied that the damage claimed has been caused by ‘corrosion, gradual corrosion or deterioration’ and ‘gradual deterioration or developing flaws’ , meaning the claim is excluded from cover. Further, I find that to the extent the complainant seeks to recover the cost of rectification associated with the non-Building Code compliant vanities, this would be ‘the cost of rectifying faulty or defective materials or faulty or defective workmanship’ and so is also excluded. The policy provides cover for reasonable exploratory costs necessarily incurred in finding the source of a leak. The complainant says the damage caused by exploratory works was unavoidable as there was no other way to locate the leak. While the insurer disagrees with this, the general consensus of the experts is that the exploratory works were reasonable and necessary. I am satisfied that is correct. However, this becomes irrelevant as the policy does not cover exploratory costs if the leak is caused by faulty workmanship, corrosion, gradual corrosion or gradual deterioration. As a result, I am satisfied the insurer has established the application of a number of policy exclusions. Accordingly, the insurer is entitled to decline the claim. Other issues raised by the complainant do not assist its position The complainant has argued that the lack of lagging to the pipe was the true proximate cause of the damage (as it led to the corrosion) and that this constitutes a building defect of which it could not have been aware. The complainant says that therefore the insurer cannot exclude the claim due to section 46 of the Act (set out in full in section 3.3 of this determination). I do not consider this assists the complainant’s position for two reasons. First, I do not consider that the lack of lagging amounted to a building defect. The applicable Building Code in force that the time the building was constructed in 1993 did not contain any requirement for lagging to be applied to copper water pipes. Additionally, the only expert opinion available in relation to this issue, from QB, indicates the application of lagging to cold- water copper pipework was not common practice in the 1990s. This being the case, I am not persuaded that the lack of lagging can be considered a defect. Secondly, according to section 36(1)(e) of the Insurance Contracts Regulations, 2017 (Cth), section 46 of the Act does not apply to ‘broad form’ accidental loss and damage policies . The policy falls into that category. Finally, the courts have confirmed that section 46 only applies to assist an insured in circumstances where the insurer relies on an exclusion which operates by reference to the time at which the relevant defect arose – that is, for example, where the exclusion expressly refers to the defect having been present before the policy was taken out. In that case, section 46 prevents an insurer from denying a claim where the insured was not aware (and a reasonable person in the circumstances could not be expected to be aware) of the defect at Determination | Case number: 770266 Page 5 of 9 the time the policy was taken out. However, in the current claim the exclusions relied on by the insurer are blanket exclusions without reference to a particular point in time, and so section 46 of the Act would not apply to assist the complainant in any case. 2.2 Why is the outcome fair? The available information and expert opinion establishes the leak arose due to gradual corrosion of the pipe. The policy excludes damage caused in such a way. It would not be fair for the insurer to have to pay the claim, when there is no policy requirement to do so. Determination | Case number: 770266 Page 6 of 9 3 Supporting information 3.1 The AFCA process AFCA’ s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 770266 Page 7 of 9 3.2 Policy wording – relevant extracts Definition Loss or Damage means direct physical loss of, destruction of, or damage to property from any sudden and accidental cause not otherwise excluded by this Policy. Insuring Clause Section 1 – Buildings What is covered We insurer You up to the Sum Insured shown the Schedule for Section 1, against accidental Loss or Damage to Your Insured Property which occurs during the Period of Insurance. … Special Benefits Special Benefits are included in addition to Your Sum Insured for Section 1. Special Benefit 17) Exploratory costs We will pay for the reasonable exploratory costs You necessarily incur in locating the source of the bursting, leaking, discharging or overflowing of tanks, apparatus or pipes used to hold or carry liquid of any kind. We will also pay for the reasonable costs incurred in: repairing the area of Your Insured Property damaged by such exploratory work; Repairing or replacing the defective part or parts of such tanks, apparatus or pipes, to a limit of $1,000; rectifying contamination damage or pollution damage to land at Your Situation caused by the escape of liquid, to a limit of $1,000. Determination | Case number: 770266 Page 8 of 9 We will not pay for any of these costs if the bursting, leaking, discharging or overflowing is caused by a Building defect, Building movement, faulty workmanship, rust, oxidation, corrosion, Wear, Tear, gradual corrosion, gradual deterioration, Earth Movement or by trees, plants or their roots. Exclusions 1. We will not pay for Loss or Damage: … c) caused by moths, termites, or other insects, vermin, mice, rats, rust or oxidisation, mildew mould, contamination or pollution, wet or dry rot, corrosion, gradual corrosion or deterioration, change in colour, dampness of atmosphere or other variations in temperature, evaporation, disease, inherent vice or latent defect, loss of weight, change in texture or finish or pecking, biting, chewing or scratching by birds or animal: d) caused by Wear, Tear, fading, concrete or brick cancer, gradual deterioration or developing flaws; … 2. We will not pay for … b) the cost of rectifying faulty or defective materials or faulty or defective workmanship 3.3 Section 46, Insurance Contracts Act Pre-existing defect or imperfection (1) This section applies where a claim under a contract of insurance (other than a contract of insurance that is included in a class of contracts declared by the regulations to be a class of contracts in relation to which this section does not apply) is made in respect of a loss that occurred as a result, in whole or in part, of a defect or imperfection in a thing. (2) Where, at the time when the contract was entered into, the insured was not aware of, and a reasonable person in the circumstances could not be expected to have been aware of, the defect or imperfection, the insurer may not rely on a provision included in the contract that has the effect of limiting or excluding the Determination | Case number: 770266 Page 9 of 9 insurer's liability under the contract by reference to the condition, at a time before the contract was entered into, of the thing.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.