The complainant sought about $18,000 for water damage to an ensuite bathroom after a leak. AFCA upheld the insurer's decline of the ensuite damage but ordered payment of $2,061.71 for the main bathroom damage the insurer had offered.
An insurer relying on a gradual deterioration or faulty workmanship exclusion must prove on the balance of probabilities that the exclusion applies.
Issues
- Claim denial primary · not upheld“The insurer is entitled to decline the claim for damage to the ensuite bathroom; damage occurred through gradual deterioration.”
- Product terms interpretation secondary · not upheld“Gradual deterioration and faulty workmanship exclusions apply; grout needed repair in December 2019 and was not fixed.”
Subjects and remedies
home or building damagepay claim
Related
Text of the determination
Determination
Case number 769437
Financial firm Insurance Australia Limited
Determination | Case number: 769437 Page 1 of 9
Case number: 769437 3 August 2021
1 Determination overview
1.1 Complaint
The complainant holds a private plan home insurance policy (the policy) with the financial firm
(the insurer). He lodged a claim under the policy in August 2020 advising that water was
leaking from the upstairs (ensuite) bathroom to the downstairs (main) bathroom causing
damage.
The insurer agreed to accept water damage to the main bathroom on a goodwill basis, but not
damage to the ensuite bathroom from which the water is escaping. This is because the
insurer considers water had been leaking from the ensuite bathroom from before occupation
by the complainant and before the policy commenced in January 2020.
The insurer also says it is entitled to its position because the leak is a result of gradual
deterioration and defective building works, both of which are excluded under the policy.
The complainant is dissatisfied with this decision. While he acknowledges that there was a
previous leak to the ensuite bathroom, he says the leak was not active at the time he moved
in. He says he then used the ensuite shower on a regular basis, during which time it did not
leak, up until the leak became apparent in August 2020 at which time he lodged the claim.
To resolve the complaint, the complainant says the insurer should cash settle him for about
$18,000.
The case manager provided the parties with a preliminary assessment on the issues in
dispute. The preliminary assessment was in favour of the insurer.
As the complainant has not acccepted the preliminary assessment , the complaint has been
referred to me for determination .
1.2 Issues and key findings
Is the insurer entitled to decline the claim for damage to the ensuite bathroom?
The available information establishes on the balance of probabilities the damage to the
ensuite bathroom was directly or indirectly caused by or arose out of gradual deterioration. As
this cause of damage is excluded from cover, the insurer is entitled to decline the claim.
Furthermore, the grout in the ensuite shower required repair in December 2019, and the
complainant knew about this and failed to fix it or arrange to have it fixed before the damage
occurred after the policy commenced.
Why is the outcome fair?
The outcome is fair as the insurer is entitled to rely on its expert opinion and its policy terms
to decline the claim for the ensuite bathroom. Further it has offered to pay for damage to the
main bathroom.
Determination | Case number: 769437 Page 2 of 9
1.3 Determination
This determination is substantially in favour of the insurer.
Should the complainant accept this determination then within seven days of acceptance, the
insurer is to pay to the complainant $2,061.71.
Otherwise, the insurer is not required to take any further action in relation to the claim or the
complaint.
Determination | Case number: 769437 Page 3 of 9
2 Reasons for determination
I have decided this complaint based on what is fair in all the circumstances, having regard to
legal principles, applicable industry codes or guidance, good industry practice and previous
relevant determinations of AFCA or predecessor schemes (which are not binding). I have
considered all the material submitted by the parties, both before and after the preliminary
assessment. I am satisfied that the documentation I have relied on has been provided to both
parties.
The parties have raised numerous issues in their submissions to AFCA. However,
commentary in this determination is restricted to those issues considered relevant to the
outcome.
After the preliminary assessment was rejected, the complainant sent material which had been
provided earlier and essentially reiterated his position.
2.1 Is the insurer entitled to decline the claim for damage to the
ensuite bathroom?
Material and submissions considered
The complainant must establish on the balance of probabilities he has suffered a loss caused
by an event to which the policy responds. This is known as a prima facie or valid claim.
In the context of this claim he must establish he sustained accidental damage during the
period of insurance. The insurer accepts that a water leak event has occurred, and the
complainant has identified damage following the event.
Once so established, the onus shifts to the insurer to prove on the balance of probabilities
that an exclusion applies if it seeks to deny or limit its liability for the loss.
In the context of this claim the insurer must establish the damage was directly or indirectly
caused by or arose out of faulty workmanship or gradual deterioration.
Extracts from the relevant policy terms are set out in supporting section 3.2 of this
determination.
The insurer says it will accept the claim for resulting damages to the main downstairs
bathroom. It is prepared to cash settle the complainant for this damage less the excess. It
says it is unable to cover the damage to the upstairs ensuite due to pre-existing damage,
gradual deterioration and faulty works.
The insurer submits it does not cover any claim arising directly or indirectly from faulty
workmanship, wear and tear and gradual deterioration. It says it is entitled to rely on expert
reports which show a flood test was conducted on the tiled shower base and the base failed.
It argues there were also issues with the grouting and builders identified damage to the
second-floor bearers, joists, yellow tongue flooring and timber wall framing. It says the
available information establishes damage occurred over time as the timbers show rot.
The complainant has rectified the damage. He asks for partial payment for the upstairs
ensuite bathroom because:
> he does not disclaim pre-existing damage or faulty work from the previous owner
> materials used were acceptable construction materials applicable at the time of building
Determination | Case number: 769437 Page 4 of 9
> once he commenced repairs he found waterproofing membrane in the shower recess
> he fixed the ceiling in the main bathroom in early January 2020
> there was no active leak from the ensuite in January 2020
> the moisture test failed at the time of sale because the shower had been in use
> once he and his family moved in, the ensuite was consistently used for about seven
months and there was no damage despite consistent use for about seven months
> if the leak has been occurring over time the damage downstairs would be much greater
> it is only in August 2020 he was aware of the leak and the video shows strong water
flow through the wall petition upstairs
> there was no indication of an active leak until the claim was lodged in August 2020.
The complainant reviewed the reports relied on by the insurer. He reiterates the ensuite was
used constantly for seven months. He says after he discovered the leak he investigated the
second-floor subfloor and found no extensive damage but minor damage to existing bearers
and joists. He notes the wall frame bottom plate was significantly rotten for about 800 mm
either side.
He agrees the wall linings were plasterboard instead of villa board and there were no signs of
waterproofing but said waterproofing was found between the tile and the plaster as well as
the tiles to the floor. He says these issues could not have been identified when he inspected
the property before purchase.
He agrees water staining has travelled back up the plasterboard wall lining and agrees there
is evidence of a previous leak but where there is evidence of extensive damage he refers to
the August 2020 video which shows extensive water flows.
Extracts from the reports relied on by the parties are set out in supporting section 3.3 of this
determination.
Damage has occurred over time
I carefully considered the submissions by both parties and their expert reports and
photographs and videos provided. I am satisfied the insurer is entitled to rely on the policy
exclusions. This is because:
> in August 2020, the shower base did not pass the flood test
> water leaked from the shower base to the floor below because the grouting between the
floor and wall tiles have moved and cracked
> in December 2019 the complainant’s dilapidation report identified damage to the grout
> in December 2019 moisture tests failed in all showers. This may have been because
they had been used within the previous hour but in view of the damage below, it may
have also been because the ensuite shower was already leaking.
> in December 2019 the ceiling in the main bathroom below the ensuite required patching
and painting.
I am satisfied the damage has occurred over time on the balance of probabilities because of
the opinion of the first builder (IB) engaged by the insurer and his photographs of the timbers
which show rot. While I acknowledge the extent of water shown in the video relied on by the
complainant, the video was taken by IB when he inspected the property in August 2020.
Nonetheless, having taken the video, inspected the damage and the subfloor, IB was still of
the opinion that the damage occurred over time.
I acknowledge the insurer ’s opinion from a second builder (CF) who inspected the damage in
October 2020. He says the water was coming from the ensuite for a period of months rather
Determination | Case number: 769437 Page 5 of 9
than years. However, I do not find this opinion sufficiently compelling in view of the opinion
from IB and the photographs of the timber. Further, there is some ambivalence in the report
as CF admits the exact date of the initial water ingress from the ensuite shower cannot be
determined.
The complainant argues if the leak has been occurring over time the damage downstairs
would be much greater. However, there is conflicting evidence about how much the ensuite
bathroom was used. Although the complainant says it was used twice a day for seven
months, nonetheless he told both IB in August 2020 and CF in October 2020 that when using
the ensuite shower for the first time water went into the bathroom below and the shower was
not used since. I find contemporaneous statements are usually more accurate.
Further, due to the cause of damage and the nature of the damage, I accept the leak became
worse and the damage became apparent over time as the grouting in the ensuite shower and
the timber and materials below and near the ensuite shower continued to deteriorate.
Taking all matters into account I am satisfied the available information establishes on the
balance of probabilities the damage has occurred through gradual deterioration. As this cause
of damage is excluded from cover, the insurer is entitled to decline the claim.
Grouting required repair in December 2019
Further, I am satisfied the insurer is entitled to rely on the other policy exclusion. This is
because it is not in dispute the grout in the ensuite shower required repair in December 2019,
and the complainant knew about this and failed to fix it or arrange to have it fixed before the
damage occurred after the policy commenced.
IB has provided a scope of works. IB costed the repair to the main bathroom at $2,561.71.
The policy excess is $500.
Should the complainant accept this determination then within seven days of acceptance, the
insurer is to pay to the complainant $2,061.71.
Otherwise, the insurer is not required to take any further action in relation to the claim or the
complaint.
2.2 Why is the outcome fair?
The outcome is fair as the insurer is entitled to rely on its expert opinion and its policy terms
to decline the claim. Further it has offered to pay for damage to the main bathroom.
Determination | Case number: 769437 Page 6 of 9
3 Supporting information
3.1 Process
AFCA’s approach to this complaint
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an event to
which the policy responds. This is known as a prima facie or valid claim. Once so established,
the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies
if it seeks to deny or limit its liability for the loss.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence. When we assess complaints, we consider available
documents, the recollections of the parties, and all relevant circumstances. We give more
weight to documents created at the time the events occurred. If there is no relevant
documentation, we will decide what is most likely to have occurred based on the information
provided to us. If there are conflicting recollections and these are evenly weighted, we may
find that a claim cannot be established.
3.2 Relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties and in
the insurer’s Notice of Response. Both the policy document and the Notice of Response have
been exchanged with the complainant.
Product disclosure statement (PDS) page 13:
General definitions
applying to words We use in this Plan
…
Accident means a sudden, unexpected and unintended event which:
you did not intend or expect; and
a reasonable person in your position and with your knowledge and
experience would not have expected.
‘ Accidental ’ and ‘ Accidentally ’ have corresponding meanings
…
PDS page 14:
…
Period of Insurance means the period shown as the ‘Period of Insurance’ on
Your Certificate of Insurance
PDS page 16:
What you are insured against
This policy insures you against accidental damage… occurring during the period
of insurance
Determination | Case number: 769437 Page 7 of 9
…
What is not insured
This policy does not insure You against:
…
2. damage directly or indirectly caused by or arising out of:
…
a structural fault, faulty design or faulty workmanship if You knew, or ought to
have known about the structural fault, faulty design or faulty workmanship and
failed to fix it or arrange to have it fixed before the damage occurred or
commenced to occur
…
PDS page 17:
…
11. wear, tear, rust corrosion or gradual deterioration
…
PDS page 20:
Additional Benefits
The following additional benefits are in addition to any sums insured shown on the
Certificate of Insurance for ‘Building’ and ‘Contents’.
…
Escape of liquid
If liquid overflows, leaks or bursts from a fixed system at your home during the
period of insurance and damages or is likely to damage insured property, we pay
for the reasonable cost to investigate the cause of damage or likely damage.
We pay up to $2,500 for this benefit.
We do not pay to repair or replace a faulty part identified by the investigation, but
we pay the cost to repair damage directly caused by the investigation.
We only pay this benefit if building is shown on the certificate of insurance
3.3 Extracts from material relied on by the parties
Date Action
Dilapidation report (AI)
2 December 2019
Main bat hroom requires patch and paint due to ceiling
damage. Plaster moisture damage not ed due to tastic
not working.
Bedroom 2 ensuite has cracked floor tiles and wall tiles
suggest full replacement.
Bedroom 3 ensuite slight gaps in wall to floor tile
suggest that floor was laid after walls incorrect
process.
Bedroom 3 ensuite minor damage to tile grout. Hard to
determine extent due to grout being black - suggest
Determination | Case number: 769437 Page 8 of 9
regrout as good measure.
Moisture test failed in all showers due to being used
within the previous hour.
Insurer’s plumber (AP)
21 August 2020
Inspected, photographed and tested bathroom/ensuite .
F lood test performed. Shower base did not pass flood
test. Water leak downstairs after about 30 seconds.
Concluded shower leak is from movement to the
shower. The grouting between the floor and wall tiles
has moved and cracked.
B elieve there is no wet seal to the shower of bathroom.
Insurer’s builder (IB)
21 August 2020
Inspected and photographed 21 August 2020.
Complainant advised he purchased property early
2020. While using upstairs shower for the first - time
water leaked into the bathroom ceiling below.
Complainant accessed the second - floor subfloor and
wall frames and found extensive damage to the timber
bearers, wall frames and yellow tongue flooring which
was pre - existing. Wall linings of plasterboard not v illa
board and no signs of waterproof ing .
IB notes and photographs damage to the second - floor
bearers, joists, yellow tongue flooring and timber wall
framing. Says these damages have happened over a
long period of time as the timbers have signs of rot.
Water staining appears to be travelling back up the
plasterboard wall ceiling.
Bathroom ceiling downstairs has signs of water
staining and paint peeling. Timber window architrave
has minor cracking.
Complainant to wat erproof the bathroom which will
require the removal of the existing bat hroom.
Repair estimate $20, 688.75
Concluded due to the long - term shower base leak
property damaged – due to the damages present,
believe this is a pre - existing issue before the insured
purchased a property in early 2020.
Insurer’s building consultant
(CF)
21 October 2020
Inspected and photographed property 12 October
2020 and reviewed parties’ reports .
Comp lainant told him he purchased the property in
March 2020 but had lived there since early January
2020 and when using the shower for the first time he
saw wat er going int o the bat hroom below and has not
used the shower since.
Inspected inside the roof cavity and noted the floor
under the e nsuite is standard particleboard floor.
Timber softwood wall frame and particleboard floor of
the ensuite displayed staining consistent with water
ingress.
Determination | Case number: 769437 Page 9 of 9
Says standard particleboard should not be used when
there is risk of contact with water.
Used digi tal moisture meter and materials in a dry
state.
Says the use of standard core plasterboard wall linings
within the ensuite is defective building work.
Noted staining to the wall frames, deep floor joist and
backing of the plasterboard wall linings of the ensuite
but saw no advanced deterioration of these materials
which would indicate long - term water ingress.
Grout between all floor tiles in the shower enclosure is
deteriorated and displaced with separation bet ween
the wall / floor tiles indicating movement of the deep
floor joist which is typical with this type of construction.
The deteriorated grout is a maintenanc e related item.
Removed the gr a t e from the floor waste of the shower
enclosure but could not locate a waterproofing
membrane which is defective building work .
E xact date of the initial water ingress from the ens uite
shower will not be able to be determined but in the
absence of advanced deterioration of materials
particularly the plasterboard wall linings of the ens uite
and the plasterboard ceili ng linings of the bathroom
below indicat es short - term wat er ingress ( months ) from
the ensuite shower as opposed to damage that has
been occurring for an extended period ( years ).
3.4 Other relevant material considered and relied on
Parties’ submissions /emails and all attachments to all submissions/emails.
Parties’ expert reports and quotations.
Photographs and videos.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.