Text of the determination
Determination
Case number 769258
Financial firm AAI Limited
Determination | Case number: 769258 Page 1 of 7
Case number: 769258 18 October 2021
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
On 20 June 2020 the complainant lodged a claim after a pipe in the bathroom vanity burst
and caused water damage throughout the home. The insurer accepted the claim and
authorised repairs with its nominated builder.
The complainant says, during the repair process, the insurer’s builder damaged her bathroom
tiles. The complainant says the tiles continue from the bathroom, through to the laundry,
passageway and living area. She also says replacement tiles are no longer commercially
available.
The insurer says it will cover the cost to replace the tiles in the bathroom but not in any other
areas. It says the policy limits its liability to the bathroom flooring.
The complainant disputes this and wants a resolution which will allow the tiled floor to retain
its continuity rather than leaving her with mismatched tiles. The complainant also raises
concerns with the way the insurer handled the claim. She says there were delays with the
commencement of restoration and the insurer was dismissive when she requested updates.
1.2 Issues and key findings
Is the insurer required to replace all the floor tiles?
Yes. The insurer is directly liable to correct any error caused during its repair process, if the
error caused damage to areas that did not require repair or replacement from the insured
event. In this instance, to return the complainant to the position she was in prior to the
insurer’s error, the insurer will need to cover the cost to replace all the tiled area. This is to
ensure continuity and to prevent unreasonable and unfair costs for the complainant.
Is the insurer required to pay compensation?
Yes. The insurer is to compensate the complainant $1,000 for the additional and avoidable
stress caused by its handling of the claim.
Why is the outcome fair?
The insurer’s repair process and claims handling caused further damage and inconvenience
than that reasonably expected in the circumstances. The insurer caused an error that would
give rise to unreasonable and unfair costs for the complainant if not rectified. It is therefore
fair that the insurer takes the appropriate steps to correct this.
1.3 Determination
This determination is in favour of the complainant. Within 14 days of notification of the
complainant’s acceptance, the insurer is to pay the complainant $1,000 compensation . It is
also required to contact the complainant to discuss her preferred settlement for the tiles as
outlined below in section 2.1 of this determination.
Determination | Case number: 769258 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer required to replace all the floor tiles?
Yes. The insurer is directly liable to correct any error caused during its repair process, if the
error caused damage to areas that did not require repair or replacement from the insured
event. In this instance, to return the complainant to the position she was in prior to the
insurer’s error, the insurer will need to cover the cost to replace all t he tiled area. This is to
ensure continuity and to prevent unreasonable and unfair costs for the complainant.
The bathroom tiles were damaged during repairs
The complainant says when the cabinet maker was removing and installing the new vanity,
they damaged a bathroom tile. The complainant provided the spare tiles she had available,
however, these were then broken by the tiler while trying to cut them.
The complainant says this has nothing to do with the damage caused by the water leak. She
says it is t o do with the careless work of the insurer’s trades and the policy terms do not apply
to limit the ins urer’s liability in this instance.
The insurer acknowledges its repairer damaged the tiles. It says:
it was advised a tile had cracked when the new vanity was installed
its builder successfully replaced the broken tile wi th the complainant’s spare tile , however
in doing so, another tile was damaged
its builder could have repaired the tile, but the complainant preferred it to be replaced
when attempting to replace the second broken tile, the last spare tile was damaged while
trying to cut it to size
the builder advised that because matching replacement tiles are no longer available the
entire bathroom floor required re-tiling, but it is not liable beyond that.
The parties dispute the extent of replacement tiles the insurer must cover.
Insurer says its liability is limited by the policy terms
The insurer says it acknowledges the complainant’s argument that the policy terms should not
apply. However, it disagrees because it says the broken tiles were not caused by poor
workmanship or neglect, but during the ordinary course of repairs. It also says the
replacement of the tiles throughout the home is not commensurate with the broken tiles.
The policy terms referred to by the insurer say, if the insurer cannot find new materials to
match the existing undamaged parts, it will use the closest match available. It also outlines
when the insurer will repair undamaged parts. It says, if the insurer cannot match materials
with the undamaged parts, it will pay extra to create a uniform appearance when:
• floor coverings are damaged (including tiles) we will pay extra to replace
continuously joined undamaged floor coverings of the same material in the same
room, stairs, hallway or passageway* where the damage occurred.
Relevant to this complaint, the policy says the ‘same room’ is an area starting and finishi ng at:
it’s nearest walls;
nearest doorway, archway or similar opening of any width;
a change in the floor or wall covering.
Determination | Case number: 769258 Page 3 of 7
It also clarifies that a hallway next to a room is not the same room even if it has the same
floor coverings.
In this instance, there is no dispute the bathroom, hallway, laundry and living area all have the
same continuous tiled covering. However, the insurer says, because the damaged tiles are in
the bathroom, and this is one room separate to the other tiled areas, it is only required to
replace the bathroom tiles.
Policy terms do not apply to damage for which the insurer is directly liable
The policy terms apply to damage caused by an insured event. I do not agree the policy
terms extend to damage which would not otherwise require repair, but for the insurer’s or its
repairer’s error.
The scope of works, evident i n the assessor’s report, does not include costs for removing the
tiles around the vanity to facilitate its removal and replacement. There is insufficient
information to show the tiles would likely be damaged during the replacement of the vanity, or
the repair of another damaged tile, even by a repairer acting with reasonable care and skill.
Given the repairer did not require the removal of the tiles to safely and adequately replace the
vanity, I can only conclude the tiles now need replacement due to an error during the repair
process.
I note the insurer refers to ‘drummy tiles’ and indicates this was from the water leak. I do not
accept this. The available reports confirm the trade chipped the tile during the removal and
replacement of the vanity and broke another one during the repair of the first tile. If the tiles
were drummy before the installation, it is reasonable to expect this would have been picked
up before the vanity installation was attempted.
The claim notes show, prior to the installation of the vanity, the insurer advised the
complainant the tiles do not need replacement, they only needed cleaning. This was because
the tiles had satisfactorily dried and there was no resulting damage. While the assessor says
drummy tiles are consistent with water damage, I am not satisfied there is sufficient
information to establish this occurred from the water leak rather than the installation of the
vanity and damage to the surrounding tiles.
When the insurer or its nominated trades cause damage, the insurer is directly liable for the
additional damage. This means the limitations of the policy do not apply and the insurer has
an obligation to return the complainant to the position she was in before the error occurred.
Insurer is to return the tiled floor to the condition it was in prior to the damage
The repairer sa ys it was, ‘unavoidable damage’. There is, however, no information to show it
was reasonable to expect the tiles would sustain damage in the circumstances. It is also not
clear how it was unavoidable that all three tiles broke given they broke under three different
circumstances. If this was unavoidable it should have been included in the initial repair scope
of works, or at the very least considered as a potential variation. It was not.
In this instance, the claim notes show the repairer:
damaged a tile while replacing the vanity
damaged another tile while repairing the tile that was already damaged
damaged the remaining spare tile while cutting it to size.
The complainant provided the insurer an opportunity to correct its error with spare tiles, only
to have the spare tiles damaged as well. I consider it fair in all the circumstances that the
Determination | Case number: 769258 Page 4 of 7
insurer takes the steps required to return the tiled floor to the condition it was in prior to these
errors.
Available information shows mismatching tiles will affect the property
The available information shows the tiles are all the same and laid in a continuous unbroken
pattern throughout several rooms. The complainant provided a statement from a real estate
agent. This says there will be a financial loss to the complainant if the tiles in the bathroom
mismatch the other tiled area.
The real estate agent says:
the co mplainant’s home is small with a total floor space of 86.3 square metres
the only non-tiled areas are the two bedrooms and study
as the living area is tiled, the use of two different tiles within the same small footprint would
appear to any prospective buyers as an error in planning or workmanship
as it would be so visually obvious to a potential purchaser it is more likely than not they
would need to consider the cost to replace the entire tiled floor into the purchase price
the obvious mismatch of the flooring would have a negative effect on the sales campaign.
The insurer has not provided any information to dispute this. Nor has it provided any
information to show:
the proposed replacement tiles for the bathroom will closely match the rest of the tiled area
to minimise any visual effect
the replacement of the bathroom tiles can be done without affecting or repairing the rest of
the tiled area, or
the replacement of only the bathroom tiles will not have the effect indicated by the real
estate agent.
Given this, I am satisfied it is fair in the circumstances that all the tiled areas are replaced with
a consistent matching tile. This will allow the insurer to meet its obligation to return the
flooring to the position it was in prior to the damage it caused.
Parties to discuss a cash settlement if the complainant prefers this
The complainant says she has lost trust in the insurer and would like to be cash settled for the
tiling cost, so she can organise this herself. The complainant has provided three separate
quotes for:
the removal of all the tiles - $1,750
the supply of new tiles - $1,451.52
laying the new tiles - $2,950.
There is still work required from the insurer once the tiles have been restored to the condition
they were in. When an insurer has commenced repairs, it is generally considered the
insurer’s responsibility to correct any error and to ensure the repairs can be comp leted.
However, I have reviewed the claim notes and it is evident the parties’ relationship has
broken down to a degree that I consider it likely further disputes may arise regarding the re-
tiling.
The insurer has not responded to the above-mentioned quotes or raised any concerns with
them. Therefore, in the interest of bringing finality to this complaint, if the complainant wants
to organise the re-tiling herself then I consider it reasonable for the insurer to cash settle the
complainant this cost. However, this is conditional on:
the insurer is to be provided the opportunity to review the quotes to ensure the
replacement tiles are as close a match as reasonably possible to the current tiles, and
Determination | Case number: 769258 Page 5 of 7
the re-tiling will be organised in a timely manner, so the insurer can attend to the remaining
repairs and rectification work, and
the parties confirming the timeframe for the tile repair and whether temporary
accommodation is required (if so, the insurer is to include this in its cash settlement).
If the complainant elects to be cash settled on the above conditions, the insurer should also
apply statutory interest in accordance with section 57 of the Insurance Contracts Act 1984
(Cth). This is to be applied on the total amount to replace the tiles, from 18 November 2020
(the insurer’s final dispute response) un til the date of payment.
If, however, the complainant would like the insurer to complete the tile replacement, the
insurer should organise this without delay.
I note the complainant still has concerns with the vanity and the ability to open and close
some of the drawers. Once the tiling is complete the insurer should attend to any remaining
issues as soon as possible.
2.2 Is the insurer required to pay compensation?
Yes. The insurer is to compensate the complainant $1,000 for the additional and avoidable
stress caused by its handling of the claim.
Complainant raises several concerns with the insurer’s claims handling
The complainant says the insurer delayed commencement of restoration of the property,
including structural drying, and it was dismissive when she requested updates.
The complainant also provided information to show she suffers from anxiety and the claim
caused her a large degree of additional stress.
AFCA can award compensation for non-financial loss when there has been an unusual
amount of physical inconvenience, time taken to resolve a situation, or interference with the
complainant’s expectations or enjoyment of peace of mind.
However, we also recognise that making a claim can be stressful and time-consuming, even if
the insurer handles the claim correctly. Therefore, we will not award compensation for the
ordinary degree of inconvenience that comes with making a claim, or when a problem arises.
Insurer to compensate the complainant $1,000 for the non-financial loss caused
I have reviewed the available claim notes and can see the insurer initially processed the claim
as contents only. The complainant had, however, advised the house flooded from a burst
pipe. Given the complainant had home and contents cover, and water was throughout the
home, it would have been prudent to organise a building assessment and make-safe as soon
as possible.
While the insurer efficiently organised an assessment of the contents, the insurer did not
organise a building assessment until 2 July 2020. This caused the complainant avoidable
stress and frustration as she was concerned it caused further damage. She was also
concerned she had been staying in a property that had very high moisture levels when earlier
temporary accommodation should have been organised.
The claim notes and reports also show there were various areas of damage not picked up by
the original assessment and further issues arose post repairs. The insurer recognised the
Determination | Case number: 769258 Page 6 of 7
complainant was distressed so organised a dual assessment with its assessor and builder on
4 August 2020. Unfortunately, the builder did not attend.
The claim notes show the complainant was confused about what repairs were to be
completed and the scope of works for the cabinetry was not clear.
Given all of this, I accept the insurer’s handling of the claim, and its repair process, caused
additional yet avoidable stress and frustration for the complainant. I consider it fair in all the
circumstances that the insurer compensates the complainant $1,000 for this.
2.3 Why is the outcome fair?
The insurer’s repair process and claims handling caused further damage and inconvenience
than that reasonably expected in the circumstances. The insurer caused an error that would
give rise to unreasonable and unfair costs for the complainant if not rectified. It is therefore
fair that the insurer takes the appropriate steps to correct this.
It would not be fair to leave the complainant responsible for the error
I appreciate the insurer says the replacement of all the tiled flooring is disproportionate to the
damaged tile. While it is neither party’s fault matching tiles are no longer available, it is the
insurer’s responsibility to rectify the additional damage caused while it was responsible for
safely removing and replacing the vanity.
If the insurer says the tiles were part of the repairs required to address the claim related
damage, there must be sufficient information to support this. There is not. I also note, in an
email to the complainant on 19 October 2020, the insurer advised the complainant:
you are correct the policy does not respond to this situation […] it is not often
there is damage caused by the trades. Your client manager was unaware this
would need to be reviewed differently.
While I appreciate this approach was changed by the insurer, given all the above, the only
conclusion I can reasonably make is:
the insurer’s trades damaged the tile in error
this was not anticipated during the replacement of the vanity
the need to replace the tiles is not causally linked to the insured event but to the insurer ’s
and its trades’ actions.
If the insurer does not take adequate steps to rectify its error, the available information shows
this will have a negative impact on the value of the unit. It will cause further unreasonable
costs which the complainant will have to bear. I do not consider this fair or reasonable in the
circumstances.
Determination | Case number: 769258 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.