Denial of commercial building damage claim (slab collapse) on basis damage occurred before policy inception
Text of the determination
Determination
Case number 768750
Financial firm Insurance Australia Limited
Determination | Case number: 768750 Page 2 of 11
Case number: 768750 7 October 2021
1 Determination overview
1.1 Complaint
The complainants hold a commercial investment property policy with the financial firm
(insurer), which provides cover for damage to the property.
The complaint concerns the denial of the complainants’ claim for damage sustained to their
commercial building when the first-floor cement slab collapsed in May 2020. The slab was
damaged from salt water leaking gradually from a fish-tank.
The complainants say the damage to the property commenced after the original inception of
the policy in 2016. The insurer relies on its engineers in disputing this issue, and concludes
the damage occurred prior to policy inception.
1.2 Issues and key findings
Have the complainants established a prima facie claim?
Yes. The insurer is on risk for damage occurring in the period from 31 January 2016 to 14
May 2020.
What amount is payable by the Insurer?
The insurer is liable for 80% for the damage to property being a reasonable apportionment for
its period on risk. The total damage payable including loss of rent is $64,691.31.
Is there an entitlement to compensation for non-financial loss?
Yes, there was undue delay in appointing an engineer and the reasons given for denying the
claim provided no basis for a complete denial of coverage. An amount of $2,500 is awarded.
Does section 46 of the Insurance Contracts Act 1984 (the Act) assist?
No. The section has no application.
Why is the outcome fair?
Damage was initially gradual and continued for the 4.5 years the insurer was on risk and 80%
represents a fair apportionment of the total damage.
1.3 Determination
This determination is substantially in favour of the Complainant.
The Insurer is to pay the amount of $64,691.31 and interest under section 57 of the Insurance
Contracts Act 1984 (Cth) from 31 July 2020 to date of payment
The Insurer is to pay the amount of $2,500 as compensation for non-financial loss.
Determination | Case number: 768750 Page 3 of 11
2 Reasons for determination
2.1 Have the complainants established a prima facie claim?
Yes. The insurer is not entitled to deny the claim. The complainants have established that
damage or a major part of the damage occurred during the period that the Insurer was on
risk, namely from 31 January 2016 to 14 May 2020.
Onus on complainant to establish valid claim
When lodging a claim with the insurer, the onus first lies with the complainants to establish on
the balance of probabilities (that is more likely than not) a valid claim under the policy,
otherwise known as a prima facie claim. In this circumstance, the onus is on the complainants
to establish the damage occurred during the period of cover.
Once the complainants have established a prima facie claim then the onus shifts to the
insurer to establish a reason the policy may not apply.
Policy covers damage occurring during period of insurance
The policy provides cover for loss, destruction or damage to the property that occurs at the
insured address during the period that the insurer is on risk.
The policy was first incepted on 30 January 2016 and then renewed annually including on 30
January 2020. The collapse of the first floor occurred on or about 14 May 2020 but the
evidence is clear that ongoing damage to the slab had been occurring for some time.
Damage caused by leaking fish tanks
There is no argument from either party or the experts that the damage was caused by the
leaking saltwater fish tanks on the floor above where the ceiling collapsed.
However, the parties disagree on the timeframe as to when damage occurred, and the
method used to reach this timeframe.
Expert Evidence as to when damage occurred
The insurer, relying on its engineers F and V, concludes the leak likely commenced no later
than 2013. This is based on deterministic chloride diffusion modelling completed by the
engineers.
V confirms its results to the modelling were based on the following assumptions:
the saltwater tanks were installed in the restaurant in 2008
the concrete grade is Fe 25MPa
the concrete is a general purpose (GP) cement-based concrete
the concrete has design cover to top (12mm 0) reinforcing steel = 25mm.
It says, based on this information, the corrosion of the top reinforcement slab would be within
5 years (the tanks were installed in 2008). Further, the delamination and spalling of the slab
would likely occur between 2-4 years after the corrosion initiation.
The complainant’s engineer (P) d iscussed its concerns with the accuracy of the modelling as
it was based on assumptions rather than any site-specific data.
Determination | Case number: 768750 Page 4 of 11
P concludes “there is insufficient site -specific data and far too many unknown variables
involved to support the current corrosion modelling results.”
The expert evidence does rely on assumptions. Neither the reports of the complainant nor the
insurer give an accurate determination made on characteristics, such as the grade of cement
or size of the slab or extent of the steel reinforcement. One assumption of the Insurer expert
which is difficult to accept is that leaking commenced immediately upon installation of the
saltwater tanks in 2008. There seems no reason why the process of leaking could not have
started at any time in the period between 2008 and 2020. In fact, by implication of the
Insurer’s expert the damage started at the latest by about 2013 (2020 minus 7 years). If so
then a 4 year period of corrosion would mean damage was still occurring when the Insurer
came on risk in 2016.
V’s model may be reasonable but the results are dictated by the data input and assumptions
uploaded. I agree with P’s concerns regarding the modelling results , but the complainant s
ha ve not provided any information to establish a different timefram e. P itself is unable to
provide a more definitive timeframe and recommends more testing be completed to obtain
accurate data for the modelling.
When did damage occur
The Insurer submits:
“ any further damage caused by the ongoing leak after policy inception in 2016 was
negligible compared to the damage that had already occurred prior to that time. Even if the
leak had been stopped in 2016 at the time the CGU policy was taken up, the first floor slab
was already so significantly damaged that significant excavation works would have been
required to rectify the damage caused by the leaking fish tank”.
This submission is not supported by the expert evidence. The damage in 2015/16 may well
have been substantially latent but it was certainly not even noticed by th e Complainant’s pre -
purchase building inspection expert. It seems plain that further damage occurred and some 4
years later the ceiling collapsed. It is simply not feasible to assert that all the damage had
occurred before policy inception in January 2016 and that the floor was then stable but
mysteriously collapsed 4 years later. Furthermore, the leaking of saltwater by itself is not
damage. Nor is corrosion by itself necessarily damage. Damage commenced at some point
when delamination and spalling occurred and there was a weakening of the concrete slab.
The evidence viewed objectively is persuasive that we are unable to be certain when damage
actually began but that the damage was ongoing until the ceiling collapse. The insurer is
liable for the whole of the damage or alternatively for the proportion of damage that occurred
in the period from 30 January 2016 to 14 May 2020. There is also a reasonable basis to
submit that the moment of the collapse during the 2020 policy period was the major part of
the damage especially as there was consequential damage to the whole ceiling and the floor
below. Further it seems likely that the overall repair costs were likely increased by the
collapse.
2.2 What amount is payable by the Insurer?
The Insurer has based its denial of indemnity on the argument that the damage had occurred
before it came on risk. The Insurer has not sought to rely on any exclusions in the policy such
as corrosion and or gradual deterioration. I am unable to speculate on the reasons for this. I
deal below with the issue as to the timing and apportionment of damage.
The Complainant has held the policy for approximately four and a half years. It does seem
reasonable that some part of the damage may have occurred before 31 January 2016.
However, it is unreasonable for an Insurer to suggest it is not on risk for any part of the
damage and not on risk for the actual collapse of the slab which could well have caused loss
Determination | Case number: 768750 Page 5 of 11
of life. In my assessment I consider a fair apportionment to the Insurer for that four and a half
year period is for 80% of the total damage.
By email dated 30 September 2021 the Insurer confirmed its understanding of the quantum of
the loss as follows:
Repairs to Chinese restaurant (main claim) = $38,343.75 (80% is $30,675)
Repairs to Aluminium business (secondary claim) = $23,625.80 (80 % is $18,900.64)
Loss of rent = $15,115.67
The 80% total of the first two items is $49,575.64. The loss of rent component is presumably
covered by virtue of the section 2, loss of income section in the policy. Page 22 of the policy
says “ we will cover you if the business is interrupted or interfered with as a result of a physical
loss…occurring during the period of insurance”. The Insurer does not dispute the calculation.
I propose to allow the Complainant 80% of the repair costs on the basis as explained above,
that 20% of the damage occurred before the insurance commenced. However, the loss of
income was triggered by the physical collapse which occurred in 2020. Accordingly, I see no
reason to discount the loss of rent component. The loss of rent was confined to the period of
insurance. Accordingly, the total loss payable for the damage and loss of rent is $64,691.31.
The Insurer should pay interest under the Insurance Contracts Act on the amount of
$64,691.31 for the period from 31 July 2020 to date of payment.
The Complainant may well have rights against whichever insurer was on risk in 2015, being
the first year in which the Complainant became the owner of the property.
2.3 Is compensation payable for non-financial loss
Under AFCA rule D3.3 AFCA can award compensation of up to $5400 for non-financial loss
where there is an unusual degree of physical inconvenience or time taken to resolve a
situation. The complainant here is not an individual but a unit trust.
In light of the above findings the position taken by the Insurer on indemnity was unreasonable
and undoubtedly caused additional expense to the Complainant. Further the Insurer failed to
have its own engineer attend the site until several weeks after the collapse of the slab. The
Complainant was required to proceed with urgent repairs without any assurance as to
indemnity. This made subsequent investigation and examination of the site more difficult. The
Insurer is to pay the amount of $2,5000 as compensation for non-financial loss.
2.4 Does section 46 of the Act assist the complainants?
Section 46 of the Act does not apply in the circumstances
The complainants raised whether section 46 of the Act applies in the circumstances as the
complainant was not aware of the damage prior to May 2020.
Section 46(2) of the Act says:
Where, at the time when the contract was entered into, the insured was not aware
of, and a reasonable person in the circumstances could not be expected to have
been aware of, the defect or imperfection, the insurer may not rely on a provision
included in the contract that has the effect of limiting or excluding the insurer's
liability under the contract by reference to the condition, at a time before the
contract was entered into, of the thing.
Determination | Case number: 768750 Page 6 of 11
The insurer is not relying on a policy provision or exclusion to deny the claim. Rather the
insurer is relying on the argument that damage commenced prior to when the complainant
first took out insurance with it. In these circumstances, section 46(2) of the Act does not
apply.
2.5 Why is the outcome fair?
The outcome provided is fair in the circumstances
Damage was initially gradual and continued for the 4.5 years the insurer was on risk and 80%
represents a fair apportionment of the total damage.
Determination | Case number: 768750 Page 7 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Report summary
Record Key points
Complainants’ expert (N)
Engineering report
15 May 2020
t he slab in the store - room area behind the saltwater tanks is
broken out and shows heavily corroded steel reinforcement
and a hole where the slab spalled away during the break - out
t he area of spalling is immediately adjacent to a metal framed
structure that contains several saltwat er tan ks
t he timber flooring and metal frame along the floor is damaged
from the leaking tanks above
suspended reinforced concrete slabs are constructed with
concrete encapsulating steel bars
the size of the compound known as rust is approximat ely six
(6) times larger than steel; this means that when corrosion of
steel occurs, it imparts an expansive pressure on the concrete
when this pressure exceeds the concrete’s resistance to the
Determination | Case number: 768750 Page 8 of 11
pressure; lifting (drumminess), cracking and spalling may occur
in this instance , the presence of saltwater from the leaking of
the tanks has exposed the slab to chloride in the form of salt in
the water; the corrosion of the steel and spalling is a direct
result of this exposure.
Insurer’s expert (F)
Engineering report
19 August 20 20
it is suspected the cause of the damage to the concrete slab is
due to a leaking saltwater tank in the Chinese Restaurant on
the first floor of the subject building, however it is unknown
when the leak occurred and how long it has been occurring
the lea k is estimated to have occurred sometime between 2008
(when the building and the restaurant were refurbished), and
early 2020 (when the spalling was first discovered)
at the time of the ins pection, however, the damaged section of
the concrete floor had bee n already reinstated with new
concrete and steel reinforcement bars
the observed corrosion to the reinforcing steel in the first - floor
slab is located beneath the saltwater tanks of the restaurant
the observed damage to the concrete slab is in the form of
delamination and spalling
it is highly unusual for a concrete slab within an enclosed
building to exhibit spalling, as expected design period of
carbonation induced deterioration of the concrete under normal
condition is 40 - 60 years
in this case, however, the spalling was located adjacent to
tanks holding saltwater, which cont ains chloride ions
chloride ions from the leaking saltwater have penetrated the
concrete surface of the first - floor slab in sufficient concentration
to initiate and propagate corrosion to the reinforcing steel
the process of the reinforcing steel corrosion has led to the
expansion of the steel causing the cracking, delamination and
spalling of the concrete slab surrounding the corroding steel
bars
d eterministic chloride diffusion modell ing for a general purpose
(GP) cement based 25MPa concret e with 2Smm cover and
reinforcing steel indicates that expected corrosion initiation of
the top reinforcement would occur within 5 years
g iven the information that the saltwater tanks were installed in
2008, it is estimated that the steel corrosion would have begun
around 2013
c racks, delamination and spalling of the concrete induced by
the corrosion and subsequent expansion of the steel
reinforcing bars are expected to occur within 2 - 4 years of
corro sion initiation
a s such the observed damage to the concrete slab to the
subject building is expected to have begun to occur in around
2015 – 2017
in conclusion, based on the site observations and review of the
supplied information, the observed damage to t he concrete
slab of the subject building is directly caused by the corrosion
initiation of the top reinforcement resulting from the leaking
saltwater tanks
Determination | Case number: 768750 Page 9 of 11
the steel corrosion would have begun around 2013 and caused
the observed damage to the concrete slab starting in around
2015 - 2017.
Insurer’s expert (V)
Engineering report
10 Aug 2020
t he photographs supplied by others show corrosion to the
reinforcing steel In the first - floor slab section beneath the
saltwater tanks of the restaurant
t he visible damage to the first - floor slab section at the Property
was understood to be of the form of delamination and spalling
i t is highly unusual that concrete within an enclosed building
will exhibit spalling; design standards, such as AS3600, provide
appropriate cover to accommodate expected carbonation -
induced deterioration for a design period of 40•60 years
h owever. in this case the spalling was located adjacent to tanks
holding saltwater
s altwater contains chloride ions, which. as discussed above.
can result i n corrosion of embedded reinforcing steel
c hloride ions from the saltwater of the restaurant tanks have
penetrated (predominantly by diffusion) the concrete of the
first - floor slab section in sufficient concentration to Initiate (and
propagate) corrosion t o the reinforcing steel
during the lifetime of a reinforced conc rete structure two basic
periods with respect to corrosion and corrosion protection of
reinforcement can be defined - the initiation period (to). when
critical or threshold amounts of chloride s have not reached the
reinforcement and/or when carbonation has not progressed to
reinforcement depth so that the reinforcement remains passive.
and the propagation period (t,) when reinforcement corrosion
proceeds
the time to chloride induced reinforceme nt corrosion initiation
can be estimated using deterministic chloride diffusion
modelling; it is then understood that the following assumptions
apply to the first - floor slab and Its exposure to saltwat er from
the restaurant tanks namely
the saltwater tanks were installed in the Brook vale
Chinese Restaurant In 2008
Fe 25MPa concrete grade
general purpose (GP) cement based concrete
design cover to top (12mm 0) reinforcing steel= 25mm
deterministic chloride diffusion modelling, for a GP cement
based 25MPa conc rete and (top) reinforcing steel cover of
25mm, indicates corrosion initiation of top slab reinforcement
would occur within 5 years (i.e. In - 2013 given that the
saltwater tanks are understood to have been installed in 2008
many factors affect the corrosi on rate of steel in concrete (e. g.
availability of oxygen, anodic process polarisation, pit chemical
conditions, resistance between anodic and cathodic sites,
potential difference bet ween anodic and cathodic sites,
Determination | Case number: 768750 Page 10 of 11
environment conditions, concrete quality, concrete cover,
reinforcement type and diamet er, etc) and consequently the
time to reinforcement corrosion propagation and the evidence
of visible concrete damage
for the assumed GP cement based 25MPa concrete, 12mm
diameter reinforcing bars of cover 25 m m, cracking,
delamination and spalling of the top reinforcement in the first
floor slab beneath the saltwater tanks is likely to have occurred
within 2 - 4 years after corrosion initiation (i.e. 2015 - 2017).
Complainant’s expert (P)
Structural report
24 Sep 2020
we have reviewed your insurance claim decision/ determination
and the reports attached and are concerned that the
assessment has not been based on site specific data but
instead on estimates/averages provided by your original
inspecting engineer (who was not engaged in a forensic
capacity), and as such, may not accurately represent the actual
conditions on site
we must also not e that we generally agree with the method of
analysis used to predict or backdate the damage and/or the
process to date, howeve r, the lack of site specific dat a used in
the modelling of both the initiation and propagation phase
means that the results are somewhat erroneous and are
potentially misleading
as identified in a number of the reports provided to date,
corrosion initiatio n is dependent on a number of factors
including the cover to the steel (depth), the surfac e
concentration of chlorides and the diffusion rate through the
concrete, and if we break this down furt her, surfac e
concentration is directly related to the flow rat e and/or chloride
content of the water on top of the slab and the diffusion rat e is
directly related to the water/cement ratio and density of the
concrete mat rix, so as you can see by the number of factors
influencing the time to first corrosion, if we don ’t use input dat a
that reflects the conditions on site then the out puts will be
largely inaccurat e
similarly, the propagation of cracking is influenced by
numerous factors including but not limited to:
t he concrete cover
t he concrete strength (t ensile resi stance to cracking)
the steel reinforcement size, material composition and
layout (including any additional shrinkage mesh)
the oxygen available to react with
the electrical resistivity of the concrete material (and
availability of electrons etc.)
the humidity
the pH level of the concrete, and
Determination | Case number: 768750 Page 11 of 11
t he temperature over time
we understand that it is quite difficult to measure and/ or
retros pectively assess things like the leakage rate of the tanks,
salt content of tank water, temperature, oxygen/humidity level s
etc. and that these items would need to be assumed based
upon historic data etc., however, a lot of the site specific
geometric and material properties of the slab could have been,
and could still be, determined using any number of non -
invasive investiga tion techniques and would have reduced the
potential margin of error in the modelling
for example, the concret e strength and composition of the
surrounding slabs could have been assessed/tested to
determine the density of the material and to verify the or iginal
assumption of 25MPa, and the cover, spacing and
arrangement of steel reinforcement could also have been
determined using a number of conc rete scanning tools that are
readily available for hire
further to the above, and to cast further doubt on the a ccuracy
of the model, we not e that there was additional reinforcement
(mesh) in the slab observed by Mr DH at the time of the repairs
this does not feature in the assumptions outlined in the report
prepared by V and/or has been overlooked, however, it is
e ntirely possible that the additional steel reinforcement
(depending on the depth/location) may have contribut ed to a
shorter corrosion initiation phase and/or could have
accelerat ed the corrosion of the underlying bars by providing
larger connectivity to t he surrounding slab zones (completing
the electrochemical circuit)
once again, there are a number of factors that influence the
time from initiation of the corrosion to cracking or spalling, and
as such, the wrong input data can sometimes have significant
impacts on the final res ults/conclusions. This is also further
reinforced by the upper/l ower bound results used by V in their
report for their assessment of time until spalling (2 - 4 years)
in summary, and in light of the above concerns regarding th e
data u sed/relied upon by V & FMG, we are of the opinion that
there is insufficient site - specific dat a and far too many unknown
variables involved to support the current corrosion modelling
results (and subsequent predicted timelines) in their current
format.