Home / Suncorp Group / Determination 768156
Determination 768156
Claim balance declined and policy non-renewal
Summary
Homeowners sought the balance of a water leak and subfloor damage claim after the insurer cash settled $15,276.92 and declined renewal. AFCA found the insurer's settlement and non-renewal fair and ordered no action.
Excavation works undertaken before notifying the insurer prejudiced its ability to assess the damage, and the non-renewal complied with section 58 of the Insurance Contracts Act.
Issues
- Claim denial primary · not upheld“the complainants' decision to substantively excavate the area without any photos or formal documentation, and before notifying the insurer, have completely prejudiced the insurer's ability to verify this.”
- Policy cancellation or underwriting secondary · not upheld“the panel does not accept there is any basis to reverse the insurer's decision or to amend any records of this decision.”
Subjects and remedies
home or building damageno remedy
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 768156
Financial firm AAI Limited
Determination | Case number: 768156 Page 2 of 11
Case number: 768156 29 June 2021
1 Determination overview
1.1 Complaint
The complainants (K and P) held building and contents insurance with the financial firm
(insurer). They lodged a claim on 16 August 2019 for major cracking damage to their house,
advising the insurer the damage could be the result of a number of causes.
The insurer accepted the claim on a without prejudice basis and arranged for an assessment
of the house. During the assessment, there was evidence of a long-term leak in the subfloor.
There also appeared to be extensive excavation works to the subfloor. The complainants had
carried this out themselves the month before.
The insurer then appointed an engineer (D), who said the excavation works were a major
cause of the cracking, not the escape of water. The insurer said its liability was limited to the
resultant damage from the leak and cash settled the complainants $15,276.92 ($1,000
excess deducted). The insurer declined the balance saying this was caused by excessive
excavation works carried out by the complainants. The insurer also declined to offer a
renewal for the property, citing concerns over its condition.
The complainants disagree with this decision. They say the cause of loss was a long-term
water leak, and this should be covered.
1.2 Issues and key findings
Is the insurer’s settlement fair ?
Yes. This is because:
the excavation works undertaken by the complainants have prejudiced the insurer’s ability
to fairly assess the claim
the available information shows the excavation works could have caused most of the
damage
the available information does not show the excavation works were reasonable and
necessary
the policy would not respond to damage resulting from excavation works.
Is the insurer required to reinstate the policy?
No. This is because:
the insurer is not obliged to insure a property that is an unacceptable risk
the insurer notified the complainants in writing of the decision not to renew the policy in
compliance with its obligations
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to take any further action.
Determination | Case number: 768156 Page 3 of 11
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
The house has been subject to long term water ingress
The subject house was built in 1919. The complainants bought the property in April 2011 and
say there was no pre-purchase property report. They did do renovations around the purchase
date until around May 2012. This may have involved the subfloor area.
The complainants say the cause of the damage was long term water ingress. Their engineer
(A) provided a report dated 30 September 2019 which said there were severe water leaks
from an old service pipe underneath the kitchen area.
The insurer’s leak detection report identified water from a down pipe and floor waste drain are
running into the sewer line and surcharging from the exposed line into the subfloor area.
A’s opinion was that the pipe leaked water for more than fifty years (pre -dating both the
purchase and insurance policy) and:
… overtime the water and moisture gradually weekend [sic] the stability of the
sand material under several footings walls which was then displaced and caused
the subject damages
The insurer does not dispute there has been water ingress at the property. However, it notes
A‘s report was submitted post the excavation works being carried out. There was no pre-
inspection report available to confirm the presence of water in the subfloor. No photographs
have been provided to show the state of the subfloor before the excavation works were
conducted.
It is likely water ingress has been present at the property for an extended period of time.
However, it is not clear how this leak remained undetected, and not resulted in any movement
or cracking damage, for such an extended period of time. Particularly when it seems
extensive renovations were conducted shortly after 2011 that appeared to have involved the
subfloor.
Nothing to substantiate the state of the subfloor before the excavation works
The complainants say the excavation works carried out were emergency works. These have
been approved by the local council.
The insurer provided a copy of the first page of the council’s letter dated 16 August 2019. This
warned the house was so dilapidated it was a danger to the public. The letter was the same
day the claim was lodged. There is nothing to show the council inspected the property before
the excavations works were done.
The insurer’s policy disclosure statement (PDS) says:
Contact us as soon as possible if you suffer loss or damage, or if there is an
incident that could result in a claim. …
If you delay reporting your claim, we may not pay for any additional loss or
damage caused by your delay.
Determination | Case number: 768156 Page 4 of 11
The available information shows the complainants were aware of the significant damage to
the property for at least one month before lodging a claim. In this time, the complainants
undertook extensive excavations which the insurer says was responsible for much of the
damage.
The panel further notes the complainant undertook these works without formal structural
engineering advice or approval from the council by way of a building permit. This is
concerning, given P’s experience in building and construction.
The panel acknowledges the complainants’ argument that the repairs were urgent and were
required to save the house. P also says he was forced to resign from his job, as no builder
would price or carry out such high risk works in a confined space with loose asbestos fibres
in-between the collapsed internal subfloor sandstone footings.
P also says he is licensed to carry out high risk works and he knew nobody else would care
more about saving his home than him, a builder for 27 years.
However, the panel considers that by not lodging a claim, obtaining formal structural
engineering advice or council approval prior to commencing the works is an oversight or
misjudgement. Further, as an experienced builder, P should have known that these were the
appropriate protocols to follow when conducting such extensive works to the property.
The complainants say they commenced emergency works on A’s advice. This advice
included removal of all saturated asbestos contaminated fill. However, A’s report was
provided after the excavation works were done. There is nothing in A’s reports to confirm A
provided this advice before the excavation works commenced.
Further, it appears A has not inspected the site before the excavation works were completed.
The pictures in A’s report shows the excavation works had already been done. None of the
pictures show the state of the subfloor before the excavation works.
The panel notes the complainants say the emergency works had been approved by council.
However, the only correspondence provided from the council is an emergency works order
issued on the same day the claim was lodged. This was after the area was excavated by the
complainants.
Information does not show the excavation works were reasonable or necessary
The complainants’ main argument is that these excavations works were necessary to save
the house. This was based on the state of the subfloor due to the leaks.
However, the complainants’ position is not substantiated.
As discussed, they have undertaken extensive excavations works to the property without any
formal engineering documentation or council approval. No photos were provided of the state
of the subfloor. There is therefore no documentation, or other evidence, to support their
position.
The first time the council was involved was when it issued an emergency order due to the
state of the premises. This was one month after they commenced the excavation works.
Whilst the complainants say they reli ed on A’s advice, A’s reports do not confirm this was
given before the excavation works began. Further, there is nothing to show A inspected the
property before the excavation works began. It is therefore unclear how A could have advised
them on such a course of action when he did not inspect the property.
According to A and the complainant, this leak has been ongoing for 50 years. This is a long
time for it to be leaking yet remain completely undetected and not manifest into any damage.
Particularly given it appears the complainants undertook renovations that involved the
subfloor. Further, there is no evidence of a recent event that would result in such a large
Determination | Case number: 768156 Page 5 of 11
scale of damage happening in such a short space of time. For instance, there was no
evidence of heavy rainfall. The insurer provided rain records showing there was no such
evidence of high rainfall. Whilst the complainants dispute the records referred to by the
insurer are accurate, they have not provided any evidence to show the area was subject to
any unusual weather conditions leading up to the claim.
The insurer’s engineer, D, says these excavations works were excessive and the cause of
much of the damage claimed. The complainants dispute this as they say it was necessary to
save the house. Howev er, the complainants’ decision to substantively excavate the area
without any photos or formal documentation, and before notifying the insurer, have
completely prejudiced the insurer’s ability to verify this. That is, there is no way for the insurer
to con firm that the complainant’s actions were reasonable and necessary.
Insurer’s offer is fair
After careful consideration of all the available information, the panel finds the following.
The works undertaken by the complainants have substantively prejudiced the insurer’s ability
to fairly assess the damage attributable to an insured event.
Given this, the panel is satisfied the cash settlement of $15,276.92 is fair. This is because:
the insurer had no legitimate and reliable way to determine what damage was caused by
the leak as opposed to the excavation works
the insurer cannot verify that the extensive excavation works done by the complainants
were reasonable and necessary
the available information shows the extensive excavation works could be the main cause
of the damage
if the extensive works were the main cause of damage, and they were neither reasonable
or necessary, then the insurer would not be liable for this claim at all
2.2 Should the insurer reinstate the policy?
Insurer not obliged to accept an unacceptable risk
The complainants say the insurer revoked their policy. They want it re-instated, with any
record of revocation removed from the insurer’s records.
The insurer did not revoke the policy. Instead, it declined to offer renewal based on the
p roperty’s condition.
The insurer can refuse to renew a policy provided it complies with section 58 of the Insurance
Contracts Act 1984. This requires the insurer to send notice of its decision at least 14 days
before the current policy is due to expire
The insurer sent the complainants notice of its decision not to offer renewal on 26 November
2020. The policy was due to expire on 4 January 2021. This was more than 14 days prior to
the scheduled renewal. This complies with section 58.
Further, the panel n otes the insurer’s decision was based on the property’s condition. This is
reasonable given the property is subject to an emergency order by the council.
Given this, the panel does not accept there is any basis to reverse the insurer’s decision or to
amend any records of this decision.
Determination | Case number: 768156 Page 6 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Supporting information
Policy wording (exclusions)
Escape of liquid
We do not cover
• wear and tear, or loss or damage by the escape of liquid occurring as a result of a gradual
process of leaking, splashing, dripping or overflowing over a period of time when you could
reasonably be expected to be aware of this condition;
Determination | Case number: 768156 Page 7 of 11
• the cost of r epairing or replacing the item from which the liquid escaped;
• costs if you repair or renovate a damaged area of the building before we can inspect it and
find the cause.
What we do not cover - general exclusions
You are not covered under any section of your policy for damage, loss, cost or legal liability
that is caused by, arises from or involves:
Building extensions, alterations or renovations
other than the cover available under ‘Legal Liability’, building ex tensions, alterations or
renovations to the building, including:
• damage caused by cracking, collapse, subsidence or damage to the building caused fully or
partially by the building work;
Consequential losses or extra costs following an incident covered by your policy
consequential loss (financial and non-financial loss) or extra costs following an incident
covered by your policy, such as:
• loss of income or wages;
• loss or costs, including the cost of your time (e.g. inconvenience), to prove your loss or to
help us with your claim (e.g. telephone calls, postage);
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other
earth movement, but we will cover landslide or subsidence that is specifically covered under
the following insured events:
• ‘Storm’;
• ‘Flood’ (but only if you have cover for insured event ‘Flood’);
• ‘Explosion’.
3.3 Key documentation
Record Key points
Insurer’s a sse ssor (BC )
Report
23 August 2019
Complainant advised BC they noticed hairline cracks
approximately 12 months prior
complainants advised BC they were away las month, returned
home to discover wall crack in lounge room had opened up
significantly, and further movement to other parts of the house
complainant P decided to commence shoring up and support
works to the subfloor
neighbours called the council
council gave complainant two weeks to appoint an engineer
there is extensive structural movement
footing in two locations of the subfloor have shifted and dropped
timbe r floor has dropped in bathroom, hallway, lounge and rear
dining areas
complainant believes water has either leaked from a terracotta
pipe or access water from nest door is draining into subfloor
says it is likely a number of factors have contributed to th e
movement
recommends leak detection test and engineer report
Determination | Case number: 768156 Page 8 of 11
Record Key points
Complainant’s local council
Emergency order letter
16 August 2019
Considers subject premises to be so dilapidated / damaged as to
be or likely to become a danger to the public or persons in the
immediat e area and is considered to be unsafe
gives complainant seven days to provide a written report from a
suitably qualified professional structural engineer, assessing
structural adequacy and providing recommendations to make safe
gives complainan t 14 days to carry out works specified in the
report (upon written approval from council), to the satisfaction of
the engineer and council
gives complainant 14 days to provide engineer’s written
conformation to council that the required works have been
com pleted and the property made safe.
Insurer’s leak detection (R )
Report
30 August 2019
Tested flood waste drain, water flooded out from an earthenware
exposed collar from the subfloor
upon rainfall conditions water from a downpipe and floor waste
drain are running into the sewer line and surcharging from the
expose line into the subfloor area
water is washing sand away from the footings to the western side
of the property
recommends sewer blockage is cleared and exposed line sealed
Insurer’s engineer (D )
Report
16 September 2019
Visual (non - invasive) inspection only
says subfloor space beneath western (side) and sout hern (rear)
lean - to extensions has been extensively excavated, making
assessment to event related damages very difficult
says approximat e area of existing / proposed excavation
measured 11.7 x 2.9 + 2.4 x 5.3 metres (total in excess of 50
metres3)
says it was immediately obvious the extent of subfloor excavation
far exceeded typical requirements for footi ng stabilisation remedial
works
says Comp lainant had excavated up to 1.2 met res below existing
footing level and this was not necessary
typical of constructions this age, no articulation joints were present
in the masonry walls, and original engineering plans were not
available, but it is unlikel y that footings comply with Australian
Standards
considers it possible that foundation movement has occurred due
to moisture from plumbing leaks
says t he build - up of moisture within the subfloor space would
have likely saturated the soil profile. At the po int of saturation, the
foundation material reac hes its liquid limit and begins to behave
like a viscous mud. This causes foundations to lose bearing
strength, leading to footing movement, subsidence and rotation.
says i n this case however it was very diffi cult to conclusively
determine whet her the identified subsidence and cracking was
directly related to latent plumbing defects. Over - excavation of the
subfloor by the Owner has ultimately result ed in cracking and
subsidence more severe than would typically be expected.
concludes the overall structural integrity of the dwelling has now
been compromised, but not as a direct re sult of latent plumbing
Determination | Case number: 768156 Page 9 of 11
Record Key points
defects
says t he works currently being undertaken by the Owner to have
far exceeded typical requirements for foo ting stabilisation remedial
works. Over-excavation of the subfloor has ultimately res ulted in
additional subsidence and cracking, more severe than would have
resulted from the liquid escape event alone.
recommends the complainant engage their own structura l
engineer to assess make - safe actions taken and to provide
Structural Design Certification to complete remedial works
says it would still consider a long term latent plumbing defect of
this type to have the potential to cause some localised footing
subsid ence and subsequent cracking of brittle construction
materials and finishes.
Would normally rec ommend 9 - 12 moths drying time between
plumbing repairs and remediation works
Complainant’s engineer (A )
Report
30 September 2019
confirms cracking to walls and timber floors, piers and footings in
subfloor have collapsed after sand foundation mat erial has been
washed away by moisture / leaks in the subfloor
says the s hort period during which the subject cracks occurred
indicates a sharp change in the volume of t he foundation material
supporting the footings system (sandstone blocks) of the
structure. The cracks in the external and internal walls and
settlement in timber floor all indicate to a significant movement,
disturbance and settlement in the sand foundatio n mat erial
supporting the footings walls and piers.
says the disturbance of the sand foundation material could be
related to the effects of severe water leaks from an old serv ice
pipe under the kitchen area
says the above pipe has leaked water for a long p eriod of time
(50+ years) and overtime the water and moisture gradually
week end the stability of the sand material under several footings
walls which was then displaced and caused the subject damages.
recommends plumbing repairs / replacement of leaking pi pes
recommends extensive remediation works
does not comment on adequacy or appropriat eness of excavation
works carried out
Insurer’s engineer (D )
Additional r eport / comments
11 October 2019
re - iterates findings from16 Sept ember report
says at least 50% of the observed subsidence / cracking damage
has come from loss of bearings / undermining of footing due to
over - excavation
proposes cash settlement based on 50% cost or resultant damage
repairs (from the plumbing leaks)
Point 3
Insurer’s a sse ssor (BC )
Additional r eport (response to
Complainant)
5 November 2019
Desktop report - r esponds to complainant disputing FF engineer
findings, SOW and expertise
recommends Com report from A be reviewed by R to provide
comment and review SOW
refutes claim insurer’s engineer is not qualified
Determination | Case number: 768156 Page 10 of 11
Record Key points
Insurer’s engineer (R )
Additional r eport
8 November 2019
responding to complainant’s issued raised
says SOW is correct as it addresses damage covered from
insurable event, not the damage caused by over - excavation
says ‘ i n our opinion, the Insured has excavated the sub - floor in
order to create more space, unintentionally causing a multitude of
structural issues ’
s ays of report from A ‘ The Engineer's report does not actually
reveal any new information. The Engineer has proposed r emedial
works in order to rectify the observed damage, including that
caused by the Insured's over - excavation . The Engineer makes
broad recommendations for remedial works similar to those
currently being undertaking by the Insured
Insurer’s a sse ssor (BC )
Additional r eport
13 November 2019
confirms contents of R’s response to complainant
says b ased on review assessor believes that the only way to
satisfactorily move the claim forward i s for a site attendance with
R, their engineer D , assessor and one of our BC’s to attend site
with the insured so as to address the insureds concerns with
limited claims coverage and also to assess areas of the home to
where the insured does not believe that this was carrie d out by R
and D
Complainant’s engineer (A )
Additiona l r eport
12 March 2020
Notes complainant decided to carry out the recommended repair
and upgrading works in two stages and therefore he started Stage
1 with upgrading works wit hin a large section (75% approx ) of the
subfloor area under the wal ls with sever cracks or damages
says the above Stage 1 repair and upgrading works were
inspected and approve d to be in accordanc e with the
r ecommendations listed on page 4 of the ab ove - mentioned
structural report
says c om plainant advised that Stage 2 of the upgrad ing works will
be c ompleted by the end of 2020 and these works include
minimum upgrading works in the subfloor area and treatment of
existing cracks in all brick walls.
Insurer’s engineer (D )
Additional Report
12 May 2020
Comments on works undert aken by complainant, notes the works
recommended by A have commenced prior to the site inspection
by A
lists rainfall data - 2019 rainfall information shows 22.6mm of
recorded rainfall from 4 to 8 July 2019 and a
monthly total of 3 9.2mm which is significantly lower than the
historical monthly average rainfall of 68.6mm for July 2019
says If a pre - purchase inspection report had been undert aken in
2011, such a report may have highlighted potent ial issues in the
subfloor area
say s the renovations completed in May 2012 appear to have
included subfloor works such as new waste pipework suspended
from the subfloor framing along the western side of the dwelling.
Subfloor works at this time may have highlighted potential issues
in the s ubfloor area.
says it would appear the Insured has undertaken excavation
works in the subfloor area of the dwelling without formal structural
Determination | Case number: 768156 Page 11 of 11
Record Key points
engineering advice, as the excavation works
commenced in July 2019 while A’s report is dated
30 September 2019 and photos contained in the report show
significant progress of the subfloor works
concludes the method and extent of excavation works undertaken
in the subfloor below the dwelling would have contributed to the
level of cracking damage to the dwelling,
as the method and extent adopted by the Insured was to
excavate a large area (along wit h temporary shoring measures)
rather than using the more traditional method of underpinning.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.