Home / Suncorp Group / Determination 768156

Determination 768156

Claim balance declined and policy non-renewal

FirmSuncorp Group
Decided2021-06-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowners sought the balance of a water leak and subfloor damage claim after the insurer cash settled $15,276.92 and declined renewal. AFCA found the insurer's settlement and non-renewal fair and ordered no action.

Excavation works undertaken before notifying the insurer prejudiced its ability to assess the damage, and the non-renewal complied with section 58 of the Insurance Contracts Act.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 768156 Financial firm AAI Limited Determination | Case number: 768156 Page 2 of 11 Case number: 768156 29 June 2021 1 Determination overview 1.1 Complaint The complainants (K and P) held building and contents insurance with the financial firm (insurer). They lodged a claim on 16 August 2019 for major cracking damage to their house, advising the insurer the damage could be the result of a number of causes. The insurer accepted the claim on a without prejudice basis and arranged for an assessment of the house. During the assessment, there was evidence of a long-term leak in the subfloor. There also appeared to be extensive excavation works to the subfloor. The complainants had carried this out themselves the month before. The insurer then appointed an engineer (D), who said the excavation works were a major cause of the cracking, not the escape of water. The insurer said its liability was limited to the resultant damage from the leak and cash settled the complainants $15,276.92 ($1,000 excess deducted). The insurer declined the balance saying this was caused by excessive excavation works carried out by the complainants. The insurer also declined to offer a renewal for the property, citing concerns over its condition. The complainants disagree with this decision. They say the cause of loss was a long-term water leak, and this should be covered. 1.2 Issues and key findings Is the insurer’s settlement fair ? Yes. This is because:  the excavation works undertaken by the complainants have prejudiced the insurer’s ability to fairly assess the claim  the available information shows the excavation works could have caused most of the damage  the available information does not show the excavation works were reasonable and necessary  the policy would not respond to damage resulting from excavation works. Is the insurer required to reinstate the policy? No. This is because:  the insurer is not obliged to insure a property that is an unacceptable risk  the insurer notified the complainants in writing of the decision not to renew the policy in compliance with its obligations 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action. Determination | Case number: 768156 Page 3 of 11 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? The house has been subject to long term water ingress The subject house was built in 1919. The complainants bought the property in April 2011 and say there was no pre-purchase property report. They did do renovations around the purchase date until around May 2012. This may have involved the subfloor area. The complainants say the cause of the damage was long term water ingress. Their engineer (A) provided a report dated 30 September 2019 which said there were severe water leaks from an old service pipe underneath the kitchen area. The insurer’s leak detection report identified water from a down pipe and floor waste drain are running into the sewer line and surcharging from the exposed line into the subfloor area. A’s opinion was that the pipe leaked water for more than fifty years (pre -dating both the purchase and insurance policy) and: … overtime the water and moisture gradually weekend [sic] the stability of the sand material under several footings walls which was then displaced and caused the subject damages The insurer does not dispute there has been water ingress at the property. However, it notes A‘s report was submitted post the excavation works being carried out. There was no pre- inspection report available to confirm the presence of water in the subfloor. No photographs have been provided to show the state of the subfloor before the excavation works were conducted. It is likely water ingress has been present at the property for an extended period of time. However, it is not clear how this leak remained undetected, and not resulted in any movement or cracking damage, for such an extended period of time. Particularly when it seems extensive renovations were conducted shortly after 2011 that appeared to have involved the subfloor. Nothing to substantiate the state of the subfloor before the excavation works The complainants say the excavation works carried out were emergency works. These have been approved by the local council. The insurer provided a copy of the first page of the council’s letter dated 16 August 2019. This warned the house was so dilapidated it was a danger to the public. The letter was the same day the claim was lodged. There is nothing to show the council inspected the property before the excavations works were done. The insurer’s policy disclosure statement (PDS) says: Contact us as soon as possible if you suffer loss or damage, or if there is an incident that could result in a claim. … If you delay reporting your claim, we may not pay for any additional loss or damage caused by your delay. Determination | Case number: 768156 Page 4 of 11 The available information shows the complainants were aware of the significant damage to the property for at least one month before lodging a claim. In this time, the complainants undertook extensive excavations which the insurer says was responsible for much of the damage. The panel further notes the complainant undertook these works without formal structural engineering advice or approval from the council by way of a building permit. This is concerning, given P’s experience in building and construction. The panel acknowledges the complainants’ argument that the repairs were urgent and were required to save the house. P also says he was forced to resign from his job, as no builder would price or carry out such high risk works in a confined space with loose asbestos fibres in-between the collapsed internal subfloor sandstone footings. P also says he is licensed to carry out high risk works and he knew nobody else would care more about saving his home than him, a builder for 27 years. However, the panel considers that by not lodging a claim, obtaining formal structural engineering advice or council approval prior to commencing the works is an oversight or misjudgement. Further, as an experienced builder, P should have known that these were the appropriate protocols to follow when conducting such extensive works to the property. The complainants say they commenced emergency works on A’s advice. This advice included removal of all saturated asbestos contaminated fill. However, A’s report was provided after the excavation works were done. There is nothing in A’s reports to confirm A provided this advice before the excavation works commenced. Further, it appears A has not inspected the site before the excavation works were completed. The pictures in A’s report shows the excavation works had already been done. None of the pictures show the state of the subfloor before the excavation works. The panel notes the complainants say the emergency works had been approved by council. However, the only correspondence provided from the council is an emergency works order issued on the same day the claim was lodged. This was after the area was excavated by the complainants. Information does not show the excavation works were reasonable or necessary The complainants’ main argument is that these excavations works were necessary to save the house. This was based on the state of the subfloor due to the leaks. However, the complainants’ position is not substantiated. As discussed, they have undertaken extensive excavations works to the property without any formal engineering documentation or council approval. No photos were provided of the state of the subfloor. There is therefore no documentation, or other evidence, to support their position. The first time the council was involved was when it issued an emergency order due to the state of the premises. This was one month after they commenced the excavation works. Whilst the complainants say they reli ed on A’s advice, A’s reports do not confirm this was given before the excavation works began. Further, there is nothing to show A inspected the property before the excavation works began. It is therefore unclear how A could have advised them on such a course of action when he did not inspect the property. According to A and the complainant, this leak has been ongoing for 50 years. This is a long time for it to be leaking yet remain completely undetected and not manifest into any damage. Particularly given it appears the complainants undertook renovations that involved the subfloor. Further, there is no evidence of a recent event that would result in such a large Determination | Case number: 768156 Page 5 of 11 scale of damage happening in such a short space of time. For instance, there was no evidence of heavy rainfall. The insurer provided rain records showing there was no such evidence of high rainfall. Whilst the complainants dispute the records referred to by the insurer are accurate, they have not provided any evidence to show the area was subject to any unusual weather conditions leading up to the claim. The insurer’s engineer, D, says these excavations works were excessive and the cause of much of the damage claimed. The complainants dispute this as they say it was necessary to save the house. Howev er, the complainants’ decision to substantively excavate the area without any photos or formal documentation, and before notifying the insurer, have completely prejudiced the insurer’s ability to verify this. That is, there is no way for the insurer to con firm that the complainant’s actions were reasonable and necessary. Insurer’s offer is fair After careful consideration of all the available information, the panel finds the following. The works undertaken by the complainants have substantively prejudiced the insurer’s ability to fairly assess the damage attributable to an insured event. Given this, the panel is satisfied the cash settlement of $15,276.92 is fair. This is because:  the insurer had no legitimate and reliable way to determine what damage was caused by the leak as opposed to the excavation works  the insurer cannot verify that the extensive excavation works done by the complainants were reasonable and necessary  the available information shows the extensive excavation works could be the main cause of the damage  if the extensive works were the main cause of damage, and they were neither reasonable or necessary, then the insurer would not be liable for this claim at all 2.2 Should the insurer reinstate the policy? Insurer not obliged to accept an unacceptable risk The complainants say the insurer revoked their policy. They want it re-instated, with any record of revocation removed from the insurer’s records. The insurer did not revoke the policy. Instead, it declined to offer renewal based on the p roperty’s condition. The insurer can refuse to renew a policy provided it complies with section 58 of the Insurance Contracts Act 1984. This requires the insurer to send notice of its decision at least 14 days before the current policy is due to expire The insurer sent the complainants notice of its decision not to offer renewal on 26 November 2020. The policy was due to expire on 4 January 2021. This was more than 14 days prior to the scheduled renewal. This complies with section 58. Further, the panel n otes the insurer’s decision was based on the property’s condition. This is reasonable given the property is subject to an emergency order by the council. Given this, the panel does not accept there is any basis to reverse the insurer’s decision or to amend any records of this decision. Determination | Case number: 768156 Page 6 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Supporting information Policy wording (exclusions) Escape of liquid We do not cover • wear and tear, or loss or damage by the escape of liquid occurring as a result of a gradual process of leaking, splashing, dripping or overflowing over a period of time when you could reasonably be expected to be aware of this condition; Determination | Case number: 768156 Page 7 of 11 • the cost of r epairing or replacing the item from which the liquid escaped; • costs if you repair or renovate a damaged area of the building before we can inspect it and find the cause. What we do not cover - general exclusions You are not covered under any section of your policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Building extensions, alterations or renovations other than the cover available under ‘Legal Liability’, building ex tensions, alterations or renovations to the building, including: • damage caused by cracking, collapse, subsidence or damage to the building caused fully or partially by the building work; Consequential losses or extra costs following an incident covered by your policy consequential loss (financial and non-financial loss) or extra costs following an incident covered by your policy, such as: • loss of income or wages; • loss or costs, including the cost of your time (e.g. inconvenience), to prove your loss or to help us with your claim (e.g. telephone calls, postage); Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events: • ‘Storm’; • ‘Flood’ (but only if you have cover for insured event ‘Flood’); • ‘Explosion’. 3.3 Key documentation Record Key points Insurer’s a sse ssor (BC ) Report 23 August 2019  Complainant advised BC they noticed hairline cracks approximately 12 months prior  complainants advised BC they were away las month, returned home to discover wall crack in lounge room had opened up significantly, and further movement to other parts of the house  complainant P decided to commence shoring up and support works to the subfloor  neighbours called the council  council gave complainant two weeks to appoint an engineer  there is extensive structural movement  footing in two locations of the subfloor have shifted and dropped  timbe r floor has dropped in bathroom, hallway, lounge and rear dining areas  complainant believes water has either leaked from a terracotta pipe or access water from nest door is draining into subfloor  says it is likely a number of factors have contributed to th e movement  recommends leak detection test and engineer report Determination | Case number: 768156 Page 8 of 11 Record Key points Complainant’s local council Emergency order letter 16 August 2019  Considers subject premises to be so dilapidated / damaged as to be or likely to become a danger to the public or persons in the immediat e area and is considered to be unsafe  gives complainant seven days to provide a written report from a suitably qualified professional structural engineer, assessing structural adequacy and providing recommendations to make safe  gives complainan t 14 days to carry out works specified in the report (upon written approval from council), to the satisfaction of the engineer and council  gives complainant 14 days to provide engineer’s written conformation to council that the required works have been com pleted and the property made safe. Insurer’s leak detection (R ) Report 30 August 2019  Tested flood waste drain, water flooded out from an earthenware exposed collar from the subfloor  upon rainfall conditions water from a downpipe and floor waste drain are running into the sewer line and surcharging from the expose line into the subfloor area  water is washing sand away from the footings to the western side of the property  recommends sewer blockage is cleared and exposed line sealed Insurer’s engineer (D ) Report 16 September 2019  Visual (non - invasive) inspection only  says subfloor space beneath western (side) and sout hern (rear) lean - to extensions has been extensively excavated, making assessment to event related damages very difficult  says approximat e area of existing / proposed excavation measured 11.7 x 2.9 + 2.4 x 5.3 metres (total in excess of 50 metres3)  says it was immediately obvious the extent of subfloor excavation far exceeded typical requirements for footi ng stabilisation remedial works  says Comp lainant had excavated up to 1.2 met res below existing footing level and this was not necessary  typical of constructions this age, no articulation joints were present in the masonry walls, and original engineering plans were not available, but it is unlikel y that footings comply with Australian Standards  considers it possible that foundation movement has occurred due to moisture from plumbing leaks  says t he build - up of moisture within the subfloor space would have likely saturated the soil profile. At the po int of saturation, the foundation material reac hes its liquid limit and begins to behave like a viscous mud. This causes foundations to lose bearing strength, leading to footing movement, subsidence and rotation.  says i n this case however it was very diffi cult to conclusively determine whet her the identified subsidence and cracking was directly related to latent plumbing defects. Over - excavation of the subfloor by the Owner has ultimately result ed in cracking and subsidence more severe than would typically be expected.  concludes the overall structural integrity of the dwelling has now been compromised, but not as a direct re sult of latent plumbing Determination | Case number: 768156 Page 9 of 11 Record Key points defects  says t he works currently being undertaken by the Owner to have far exceeded typical requirements for foo ting stabilisation remedial works. Over-excavation of the subfloor has ultimately res ulted in additional subsidence and cracking, more severe than would have resulted from the liquid escape event alone.  recommends the complainant engage their own structura l engineer to assess make - safe actions taken and to provide Structural Design Certification to complete remedial works  says it would still consider a long term latent plumbing defect of this type to have the potential to cause some localised footing subsid ence and subsequent cracking of brittle construction materials and finishes.  Would normally rec ommend 9 - 12 moths drying time between plumbing repairs and remediation works Complainant’s engineer (A ) Report 30 September 2019  confirms cracking to walls and timber floors, piers and footings in subfloor have collapsed after sand foundation mat erial has been washed away by moisture / leaks in the subfloor  says the s hort period during which the subject cracks occurred indicates a sharp change in the volume of t he foundation material supporting the footings system (sandstone blocks) of the structure. The cracks in the external and internal walls and settlement in timber floor all indicate to a significant movement, disturbance and settlement in the sand foundatio n mat erial supporting the footings walls and piers.  says the disturbance of the sand foundation material could be related to the effects of severe water leaks from an old serv ice pipe under the kitchen area  says the above pipe has leaked water for a long p eriod of time (50+ years) and overtime the water and moisture gradually week end the stability of the sand material under several footings walls which was then displaced and caused the subject damages.  recommends plumbing repairs / replacement of leaking pi pes  recommends extensive remediation works  does not comment on adequacy or appropriat eness of excavation works carried out Insurer’s engineer (D ) Additional r eport / comments 11 October 2019  re - iterates findings from16 Sept ember report  says at least 50% of the observed subsidence / cracking damage has come from loss of bearings / undermining of footing due to over - excavation  proposes cash settlement based on 50% cost or resultant damage repairs (from the plumbing leaks)  Point 3 Insurer’s a sse ssor (BC ) Additional r eport (response to Complainant) 5 November 2019  Desktop report - r esponds to complainant disputing FF engineer findings, SOW and expertise  recommends Com report from A be reviewed by R to provide comment and review SOW  refutes claim insurer’s engineer is not qualified Determination | Case number: 768156 Page 10 of 11 Record Key points Insurer’s engineer (R ) Additional r eport 8 November 2019  responding to complainant’s issued raised  says SOW is correct as it addresses damage covered from insurable event, not the damage caused by over - excavation  says ‘ i n our opinion, the Insured has excavated the sub - floor in order to create more space, unintentionally causing a multitude of structural issues ’  s ays of report from A ‘ The Engineer's report does not actually reveal any new information. The Engineer has proposed r emedial works in order to rectify the observed damage, including that caused by the Insured's over - excavation . The Engineer makes broad recommendations for remedial works similar to those currently being undertaking by the Insured Insurer’s a sse ssor (BC ) Additional r eport 13 November 2019  confirms contents of R’s response to complainant  says b ased on review assessor believes that the only way to satisfactorily move the claim forward i s for a site attendance with R, their engineer D , assessor and one of our BC’s to attend site with the insured so as to address the insureds concerns with limited claims coverage and also to assess areas of the home to where the insured does not believe that this was carrie d out by R and D Complainant’s engineer (A ) Additiona l r eport 12 March 2020  Notes complainant decided to carry out the recommended repair and upgrading works in two stages and therefore he started Stage 1 with upgrading works wit hin a large section (75% approx ) of the subfloor area under the wal ls with sever cracks or damages  says the above Stage 1 repair and upgrading works were inspected and approve d to be in accordanc e with the r ecommendations listed on page 4 of the ab ove - mentioned structural report  says c om plainant advised that Stage 2 of the upgrad ing works will be c ompleted by the end of 2020 and these works include minimum upgrading works in the subfloor area and treatment of existing cracks in all brick walls. Insurer’s engineer (D ) Additional Report 12 May 2020  Comments on works undert aken by complainant, notes the works recommended by A have commenced prior to the site inspection by A  lists rainfall data - 2019 rainfall information shows 22.6mm of recorded rainfall from 4 to 8 July 2019 and a monthly total of 3 9.2mm which is significantly lower than the historical monthly average rainfall of 68.6mm for July 2019  says If a pre - purchase inspection report had been undert aken in 2011, such a report may have highlighted potent ial issues in the subfloor area  say s the renovations completed in May 2012 appear to have included subfloor works such as new waste pipework suspended from the subfloor framing along the western side of the dwelling. Subfloor works at this time may have highlighted potential issues in the s ubfloor area.  says it would appear the Insured has undertaken excavation works in the subfloor area of the dwelling without formal structural Determination | Case number: 768156 Page 11 of 11 Record Key points engineering advice, as the excavation works commenced in July 2019 while A’s report is dated 30 September 2019 and photos contained in the report show significant progress of the subfloor works  concludes the method and extent of excavation works undertaken in the subfloor below the dwelling would have contributed to the level of cracking damage to the dwelling, as the method and extent adopted by the Insured was to excavate a large area (along wit h temporary shoring measures) rather than using the more traditional method of underpinning.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.