Storm and accidental damage claim declined for collapse of commercial property wall
Text of the determination
Determination
Case number 767327
Financial firm The Hollard Insurance Company Pty Ltd
Determination | Case number: 767327 Page 2 of 13
Case number: 767327 10 May 2021
1 Determination overview
1.1 Complaint
The complainant has a Business Insurance Policy (policy) with the financial firm
(insurer) which provides cover for numerous commercial properties. On 18 January
2020, the complainant lodged a claim after a wall collapsed at S Street, (the property)
which the complainant says occurred during a storm.
The insurer has declined the claim. It says the wall did not collapse because of the
storm but rather it collapsed because of its pre-existing poor condition and previous
alterations that had been made to its roof structure. It says these circumstances are
clearly excluded from cover in line with the policy exclusions specified in the product
disclosure statement (PDS).
The complainant disputes the insurer ‟s declinature and is seeki ng cover for the cost to
repair/reinstate the wall.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
Yes. The available information establishes, on the balance of probabilities, that the
wall collapsed because of the changes made to the building‟s roof structure and
deterioration of the brick mortar over time, which is excluded under the policy.
Accordingly, the insurer is entitled to decline the claim.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to decline the claim and is not required to take any further
action.
Determination | Case number: 767327 Page 3 of 13
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
The complainant bears the onus to establish a valid claim
It is established law that in order to seek cover under the policy the onus first rests on
the claimant to establish, on the balance of probabilities, the loss claimed is covered
by the terms of the policy.
Only once this has been established, will the onus shift to the insurer to establish, on
balance, that it is not responsible to cover the claimant for the loss in line with a
provision or exclusion present in the terms o f the policy.
The policy is an insured events contract of insurance
The policy covers the insured property against loss or damage caused by one or
more the listed insured events, including Storm. It also extends cover for accidental
damage, provided the loss or damage is not already covered by, or able to be insured
by, or is not excluded by any other sections of the policy.
Cover under these benefits is subject to the conditions, limitations and exclusions
specified in the PDS.
The insurer is entitled to rely on the policy provisions to assess its liability
The insurer provided the complainant with the relevant policy documentation including
the PDS and certificate of insurance (COI). Therefore, the panel accepts the insurer is
entitled to rely on the policy provisions to assess its liability under the claim.
Different expert opinions as to cause for the wall collapse
It is not in dispute, an approximately 10m section of a wall of the property collapsed
on 18 January 2020. The complainant says this was during and/or or because of a
storm.
The insurer says the collapse of the was not because of the storm. Rather, it was due
to its compromised existing condition and alterations that had been made to the
property‟s roof structure.
The complainant‟s broker arranged for consultants „S‟ to investigate the cause and
extent of the damage. S found the property to be in poor condition and noted the
original timber roof trusses had been cut away to make room for mezzanine floor
arrangements.
The collapsed wall had broken into individual bricks with the mortar between the
bricks found to be friable. S having reviewed the relevant Bureau of Meteorology
(BoM) weather data, states the recorded wind speeds in the area were not strong
Determination | Case number: 767327 Page 4 of 13
enough to cause such structural damage. The dominant cause for the collapse is the
poor pre-existing poor condition of the wall.
The complainant dissatisfied with S‟s findings appointed engineers „CA‟, which
investigated the cause and extent of the damage and provided a report dated 13 May
2020. CA notes there were severe and abnormal thunderstorm activities in January
2020. It refers to multiple storm events on 4 January, 5 January, 10 January, 11
January, 17 January and 18 January 2020.
CA‟s report significantly focuses on disproving S‟s findings and says S had not taken
all relevant information and data into consideration. CA says it is probable the
damage to the wall was the result of storm activities on or about 18 January 2020.
The report refers to possible stormwater pooling against the wall and probable
expansion of soils around the wall as a contributing factor. CA found that the sections
of the wall that remained standing were in structurally adequate condition with no
signs of prior structural distress, fretting or unacceptable deterioration or aging.
The insurer appointed engineers „SW‟ who completed a site as sessment on 21 July
2020. SW notes the collapsed wall was an external perimeter wall with no abutting
structures. SW inspected the remaining section of the wall, it noted loose and
delaminated brickwork along the top course of the masonry wall consistent with the
removed timber roof joists. Similar delaminated and loose brickwork was noted to the
north west walls shared with a neighbouring commercial unit.
In SW‟s opinion the damage to the walls was consistent with an intrinsic building
issue caused by the alterations that had been made to the roof structure. SW says
because of a removal of the original ceiling joists, over an extended period of time,
the roof rafters had relaxed and spread across the top course of the walls. This has
resulted in a lateral load being placed on the brickwork, leaving the wall in a
structurally precarious state.
SW reviewed the relevant BoM weather data for the dates referred to by CA. SW
notes the storms on these days would not have caused the structural damage and
outwards collapse of the wall. These weather events were not significant enough and
were well below the walls design wind speed. The wind on 18 January 2020, may
have triggered the collapse, however, but for the alterations made to the timber roof
structure and the w all‟s pre -existing inadequate condition, the wall would not have
collapsed.
The wall did not collapse because of the storm
Having carefully considered the available consultants‟ report s and photographic
evidence, the panel finds the evidence from SW to be the more persuasive. The panel
also accepts the evidence from S does, on balance, shows the mortar in the
brickwork was showing signs of deterioration, weakening the structure. This is further
Determination | Case number: 767327 Page 5 of 13
confirmed by SW as it noted loose and delaminated brickwork in remaining sections
of the walls.
The BoM data does not support CA‟s opinion. Rather, the data when considered
having regard to the Beaufort Wind scale, shows that wind speeds similar to the event
in January 2020 were normal and common in the area of the property. As such, the
wind speeds were not abnormal for the area nor so significant to have caused such
structural damage. CA‟s report, although seeks to discount S‟s findings, does not
provide any conclusive findings and opinions provided are quite general in nature.
SW‟s opinions are clear, well -reasoned and supported by persuasive and conclusive
evidence. The panel is satisfied that on balance the wall did not collapse because of
the claimed storm on 18 January 2020.
The policy includes cover for accidental damage
The policy includes cover for accidental damage, provided the loss or damage is not
already covered by, or able to be insured by, or is not excluded by any other sections
of the policy.
As the wall was not damaged because of the storm or any other insured event listed
in the PDS, the issue arises whether the damage triggers cover under the accidental
damage benefit being unexpected and occurred within the period of insurance, this
The panel accepts for the damage was accidental damage. However, cover under
this benefit remains subject to the limitations and exclusions specified in the policy, in
particular:
Our exclusions
Accidental loss or damage caused by or involving:
3. wear and tear, fading, scratching, marring, gradual deterioration, developing
flaws, normal upkeep or making good;
6. error or omission in design, plan or specification or failure of design;
7. faulty materials or faulty workmanship;
9. incorrect siting of buildings as a result of incorrect design or specification;
Given the expert evidence, the panel accepts that the dominant reason for the wall
collapse is deterioration of the brickwork mortar over time and the error made in
making the alterations to the property‟s roof structure to facilitate the mezzanine floor
set-up.
Determination | Case number: 767327 Page 6 of 13
The damage falls within the exclusions under accidental damage cover and
accordingly, the insurer is entitled to decline the claim.
Determination | Case number: 767327 Page 7 of 13
3 Supporting information
3.1 Process
AFCA’s approach to this complaint
This complaint has been determined based on what is fair in all the circumstances,
having regard to the legal principles, applicable industry codes or guidance, good
industry practice and previous decisions of AFCA or its predecessor schemes (which
are not binding).
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised. All the
provided information has been reviewed and considered. The parties have raised
numerous issues in their submissions to AFCA. However, commentary in this
determination is restricted to those issues considered relevant to the outcome.
This matter was determined by a panel
Due to the nature of this dispute, it has been referred to a panel for determination.
The panel comprises the lead ombudsman, a member with significant experience in
consumer and small business advocacy and a member with extensive insurance
industry experience.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on
oath, or to require third parties to give evidence. When we assess complaints, we
consider available documents, the recollections of the parties, and all relevant
circumstances. We give more weight to documents created at the time the events
occurred. If there is no relevant documentation, we will decide what is most likely to
have occurred based on the information provided to us. If there are conflicting
recollections and these are evenly weighted, we may find that a claim cannot be
established.
3.2 Relevant Policy Terms
Page Product Di sclosure Statement
7 – Storm, wind and water Our exclusions
Loss or damage caused:
…
4. by water entering the building due to inadequate maintenance, or
through an opening made for any building renovation or repair, or
because of a structural defect, fault design or faulty workmanship
when the building was constructed
Determination | Case number: 767327 Page 8 of 13
3.3 Relevant Expert Reports
Record Key points
S Loss Adjuster & Structural
Engineer Report
6 February 2020
The northern end of the western external wall has collaps ed
outwards on to an open grassed area. The length of the collapsed
section of external wall was approximately 10m. Note that the
southern end of the western wall was an internal wall between two
com mercial units, but the collapsed section was an external wall.
The collapsed wall was a double brick wall with no cavity,
however, the wall was built as two single skins of brickwork with
the occasional brick bonding the two skins.
The collapsed wall has m ainly broken up into individual bricks with
the mortar bet ween the bricks noted to be friable. In some of the
bricks the mortar has completely detached from the brickwork
indicating poor adhesion bet ween the mortar and the bricks. The
actual bricks were no ted to be in reasonable condition.
A t the northern external wall there was a vertical crack in the
brickwork approximately 2.5m from the north west corner. It was
not possible to get a close view of this crack due to furniture stored
in this area. It was t herefore not possible to determine whether this
crack was pre - existing or new.
The original timber roof trusses had been altered to install the
mezzanine floor. The alterations included raising the bottom tie
chord of the original truss to provide headroom for the mezzanine
floor and the original truss was no longer wholly supported on the
external wall wit h the external wall only providing support to the
rafter ends.
Photographs provided by the Loss Adjuster show large circular
white items leaning on the collapsed wall. At the time of the
inspections these items had been moved.
A wind gust of 48km/hr equates to a wind speed of 13. 3m/s which
is substantially lower than the minimum u ltimate design gust wind
speeds.
The outward collapse of the western externa l wall indicates that
there was negative lateral pressure on the wall that caused the
wall to fall away from the building.
The weather summary in the Australian Government Bureau of
Meteorology (BOM) website confirmed that
was thunderstorm activity between the 16 th and 18 th January 2020.
The actual rainfall data from the local weather station in
Marrick ville recorded 34mm of rainfall on the 17 th January and
18mm of rainfall on the 18 th January 2020. This is a reasonable
volume of rain, however, this volume occurs on a regular basis
and is not considered to be an abnormal rain event. Heavy rainfall
would not result in negative lateral pressure on an external wall
that would cause the wall to collaps e.
Wind gusts cause lateral pressure on external walls. At th e subject
property a leeward (suction) wind pressure would be required to
cause the western external wall to collapse away from the building
Determination | Case number: 767327 Page 9 of 13
Record Key points
i.e. the wind gust would need to act on the eastern side of the
building (windward pressure) and flow over the roof from west to
east to cause leeward pressure on the collapsed wall.
A maximum wind gust of 48km/hr was recorded at the nearest
weat her station at Cant erbury during the thunderstorm activity
between the 16 th and 18 th January 2020. A wind gust of 48km/hr
occ urs on a regular basis in the Summer Hill area and is not
considered to be a destructive wind event that should cause
structures to collapse.
There will be local variations in wind gusts, however, the subject
property is in very sheltered location and ther efore we would not
expect the actual wind gusts at the subject property to be greater
than the wind gusts recorded at Canterbury.
If the western external wall collaps ed as the result of the wind
gusts during the thunderstorm activity then this indicat es that the
external brickwork wall was in very poor condition and this
particular event was the eventual trigger for the wall to collapse.
The construction of the double brick external wall as two single
skin walls with the occasional brick bond bet ween the two skins is
poor. Ideally this wall should have been fully brick bonded with
header bricks in every 5 th course, however, the wall construction
was probably typical of the wall construction at the time.
The friable mortar of the collapsed brickwork and the collapse of
the wall into individual bricks indicate that the mortar adhesion
between the brickwork was very poor.
The proximate caus e of the wall collapse was due to the expected
poor condition of the wall caused by a combination of the original
poorly b onded wall construction and long term deterioration of the
mortar in the brickwork.
Complainant’s Engineer ( CA )
Report
13 May 2020
There were severe and abnormal thunderstorm activities in
Sydney in early January 2020. This and much other relevant
weat he r data including t wo more severe storms which occurred
just before the wall collapsed is not reported nor considered in the
S report.
Also wind directions are not reported, such that discussions of
leeward (suction) pressure effects on the wall discussed in the
report are speculative and not tenable. Also many of the possible
weat her factors which may have contributed to the damage and
collapse of the wall on the18th January 2020 are not presented
nor considered in the report.
Besides the omission of crit ical weather data, much of the relevant
forensic data evident from site obs ervations appear to have been
overlooked in the S report.
The available data and forensic evi denc e overlooked in the S
report is of a structural nature. Its omission is of conc ern as it
indicates the wall was designed and built according to good
building and acceptable structural engineering practice. Further
when considered it serves to provide a more credible engineering
assessment of the wall‟s condition that would go to contrave ne the
c onclusions given in the S report.
Determination | Case number: 767327 Page 10 of 13
Record Key points
The conclusion in the S report that the wall failed on the 18 th
January 2020 because it was not in good structural condition is not
substantiated with any reliable structural engineering analysis.
Based on my observations and considerations of all the relevant
data and forensic evidence the wall was structurally adequate and
had not deteriorated
A summary of the BOM at Observat ory Hill of three storms
activities periods, (4th and 5th January, 10th and 11th January
and 17th and 18t h January) which are considered not eworthy is
given in Table 1 below. The two earlier storms are considered
notewort hy not only because of their greater severity, (Strong
Gales conditions) but also because of their wind dir ections and
hence possible contribution to structural damage to the wall prior
to its collapse. However, while there is ample circumstantial
evidence prior severe thunderstorm activities capable of doing
structural damage to the wall there is no conclusive evidence to
confidently confirm or rebut any prior damage to the wall
The brickwork has collapsed outwards into the enclosed
quadrangle and abnormally scattered some distance from the
base of the wall duri ng the storm.
The condition of the brickwork still standing on either side of the
collapsed section, and at the base of the wall pres ented
structurally adequate and did not show signs of prior structural
distress, fretting or unacceptable deterioration from weathering or
ageing
My inspection was limited t o a visual inspection of the remaining
brick wall and a small pile of bricks still remaining on site. No
exploratory inspection or materials testing was considered
necessary at this point in time. However, mortar attached to some
of the remaining bricks an d in the brick walls still standing was
scratch tested, to gauge its quality. The mortar in the joints has not
deteriorated. It presented in good condition and considered typical
of a lime mo rtar and structurally adequate.
Further the mortar type and its i nherent properties are als o not
disclosed in the report. Based on my on - site scratch test of the
mortar (often made on - site by experts to mitigate laborat ory costs
and time) and my expertise in brick research and construction I am
of the opinion the mortar is a typical Class M1 lime mortar and is
considered structurally adequate. If tested it would probably
comply favourably with current requirements for a Class M1 mortar
in accordance with all the relevant requirements of AS 3700 -
Masonry structures .
CA does not agree with the c onclusions in the S report, particularly
that the wall was not in a good structural condition. The
c onclusions are not bas ed on any reliable evidenc e and not
verified by any structural engineering analysis or assessment of
the wall . The report simply chooses to “ class ” the damage as a
“long term maintenance issue” . It is not clear if the “class” refers to
a criteria or classification for a prescribed or audited maintenanc e
regime required under the Insurance Policy or is an in - house S
maintenance criteria.
Determination | Case number: 767327 Page 11 of 13
Record Key points
Cont rary to the findings in the S report, based on CA‟s
observations and considerations of th e data and forensic
evidence, it was of the opinion the wall was structurally adequate.
While the destructive winds and possibly lightn ing during the
severe thunderstorm activities in early January, including those on
the 4 th and 5 th and on the 10 th and 11 th January 2020 were capable
of causing structural damage to the wall there is no conclusive
evidence to confidently confirm or rebut a ny prior damage to the
wall.
In the circumstance having considered the various viable
contributing factors to cause probable damage to the wall CA is of
the opinion the wall collapsed as a result of storm activities on or
about 18th January 2020.
Insurer ’s Engineer (SW)
Report
29 July 2020
Upon close inspection of the remaining non - collapsed section wall,
we noted loose and delaminated brickwork along the top course of
the masonry walls consistent in location with the removed timber
ceiling joists .
Notwithstanding the above, loos e and delaminated brickwork
along the top course of the north western walls were further
apparent through our inspection of the abutting neighbouring
commercial unit which shares a common party wall.
Furthermore, new sect ions of brickwork were noted to have been
installed correspond to the locations of the aforementioned
observed loose and delaminated masonry.
Considering our finding, in our opinion, the aforementioned
damage noted above to the top course of brickwork is consistent
with an int rinsic building issue as a result of alterations and
additions noted to the roof structure
Further to our inspection, we noted the timber roof construction
methodology is consistent with one of a coupled roof system
through the clear distinct inclusion of collar tie spanning between
the timber rafters.
In ascert aining the adequacy of the existing roof configuration, we
have referred to AS1684.2 – Residential Timber Framed
Construction, which outlies ceiling joist and collar ties must be
fixed to the opposing pair of ra fters.
During our inspection of the roof structure, we not ed the ceiling
joist had been removed in facilitating the installation of the
mezzanine floor.
As a result of the removal of the timber ceiling joist, the timber roof
structure over an extended period of time has relaxed and spread
applying a lateral load to the masonry wall.
Notwithstanding the above, in our opinion, this is consistent within
the observed damage noted along the top course of the masonry
wall as previously mentioned within the obser vation section of this
report.
In our opinion, through the removal of the ceiling joist over an
Determination | Case number: 767327 Page 12 of 13
Record Key points
extended period of time the roof rafters have spread and
subsequently applied a lateral load onto the brickwork leaving th e
subject masonry wall in a structurally precarious state prior to any
claimed storm event
In analysing the failure method of the subject brick wall, we noted
the wall has collapsed away from the property, and as such
Leeward (suction) would be required f or the wall to pull away from
the remaining structure.
In saying this we refer to AS 1170. 2:2010 – Structural Design
Actions, which illustrates for leeward (suction) to occur we would
require the windward direction to be on the corresponding façade
of the building.
In illustrating the aforementioned requirement, we provide the
following excerpt from AS 1170.2:2010 as Figure 5 :
Considering our findings, in our opinion, the observed remaining
applicable wind conditions in the above table from Cantali and
A ssociates should not have caused structural damage and
outwards collapse of the subject wall as they are not significant
enough in magnitude and are well below the design wind speed
outlined in AS 1170.2:2010 – Structural Design Actions
In saying this, wi nd speeds between 50 – 74 Km/Hour are
common wit hin the Summer Hill region and based on the Beaufort
chart attached under Appendix B should not cause structural
damage to structurally adequat e buildings.
Furthermore, we have reviewed the climate data obtained from the
Bureau of Meteorology (BOM) from November 2019 with respect
to the collapsing brick wall on 18 January 2020.
The obtained dat a is taken from the BOM website form the
Cant erbury weather statio n, which is approximately 3km away
from the subject property.
In saying this, a wind gust of 69km/h was recorded on 8t h of
November and is classified as „No.8 – Gale‟ in accordance with
the Beaufort Scale
In our opinion, based on our review of wind data obtained from the
Bureau of Meteorology, if the subject wall collapsing was
attributable to single one - off wind event, the wall would have
collapsed during November 2019 which yielded higher winds
within required windward directions than January 2020.
Not withstanding the above, we advise the building well pre - dates
the inception of the above code and any reference made to above
standard has been used in the explanation of the collapse of the
subject wall.
In our opinion, full brick masonry wall at the sub ject property has
collapsed as a result of the alterations and additions to the timber
portion of the couple roof structure.
Through the installation of the mezzanine storage floor, the roof
ceiling rafters were removed to allow for adequate head height t o
facilitate storage.
As a result, the timber roof has relaxed over an extended period of
time applying lateral loading to the masonry wall which was
Determination | Case number: 767327 Page 13 of 13
Record Key points
consistent with the loose and delaminated brickwork noted along
the top cours e of the non - collapsed secti on of wall.
To end, in our opinion, the wind event on 18 January 2020 may
have triggered the collapse of the subject masonry, however, we
opine, if the timber roof was not altered and the masonry wall was
in a structural adequate condition prior to the wi nd event, the
masonry wall would not have collapsed and as such the collapse
of the masonry wall is not attributable to a single one off insurable
event