Determination 767162

Insurer limited storm claim to internal repairs and required roof maintenance before repairs

FirmSuncorp Group
Decided2021-07-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$526
Non-financial loss—
Amount claimed$20,889
SourceAFCA PDF

Summary

The complainant's second storm claim was accepted only for internal repairs, and the insurer required roof maintenance before repairing the roof or offered a cash settlement of $5,263.77 less a $600 excess. AFCA found the roof damage excluded as deterioration, but ordered that a cash settlement be increased by 10 per cent and let her choose between repairs and cash.

Roof deterioration from the lead flashing is excluded as gradual deterioration, but a cash settlement must include a 10 per cent uplift to account for the transfer of risk to the complainant.

Issues

Subjects and remedies

home or building damagepay claimrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 767162 Financial firm AAI Limited Determination | Case number: 767162 Page 1 of 5 Case number: 767162 7 June 2021 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). In February 2017, the complainant lodged a claim with the insurer for storm damage. The insurer accepted the claim and authorised repairs (first claim). In February 2020, the complainant lodged a new claim for storm damage (second claim). The insurer accepted the second claim. However, it says the complainant is required to undertake maintenance repairs to the roof prior to it commencing repairs. It also offered a cash settlement for the accepted repairs in the alternative. The complainant says the insurer did not advise her of maintenance issues following the first claim. The complainant also says the cash settlement offer is inadequate. The complainant wants the insurer to repair all damage claimed on the second claim. 1.2 Issues and key findings Does the insurer’s offer satisfy its obligations under the policy ? The insurer is entitled to limit its liability to the internal repairs on the second claim. However, I consider it fair to allow the complainant the choice of whether to accept a cash settlement or allow the insurer to complete repairs once she has completed required maintenance works. If the complainant accepts a cash settlement, the insurer is to add 10 per cent to the quoted amount. Why is the outcome fair? I do not consider the complainant has provided sufficient information to show the insurer is liable for the roof repairs. I therefore do not consider it fair in all the circumstances for the insurer to pay for these repairs. I also consid er the insurer’s offer to either complete repairs once maintenance works are completed or provide a cash settlement is fair in all the circumstances. 1.3 Determination This determination is mostly in favour of the insurer. The insurer is entitled to limit its liability for the internal repairs. If the complainant accepts this determination, she is entitled to choose whether to allow the insurer to complete accepted repairs once she has completed the maintenance works or accept a cash settlement. If the complainant accepts a cash settlement, the insurer is to add 10 per cent to the amount offered. The complainant is also required to pay an excess on the claim. Determination | Case number: 767162 Page 2 of 5 2 Reasons for determination 2.1 Does the insurer’s offer satisfy its o bligations under the policy? The insurer is entitled to limit its liability to the internal repairs on the second claim. However, I consider it fair to allow the complainant the choice of whether to accept a cash settlement or allow the insurer to complete repairs once she has completed required maintenance works. If the complainant accepts a cash settlement, the insurer is to add 10 per cent to the quoted amount Complainant has established a valid claim for damage The complainant’s policy covers loss or da mage from several insured events, including storm. There is no dispute the complainant has established a valid claim for storm damage to her property. Rather, this dispute concerns whether the insurer is entitled to limit its liability to the internal damage and whether its offer regarding this accepted damage is fair and reasonable. The insurer says the storm damage from the first claim included hail damage to the roof and rainwater damage to the ceiling linings. It engaged its builder to complete repairs, which were completed by August 2017. There is no dispute rainwater entry to the same areas of the garage ceiling caused further damage, which was subject to the second claim. Complainant wants insurer to repair damages claimed The complainant says the insurer failed to inform her of any maintenance issues with the roof following the first claim. She says due to the insurer failing to tell her about these maintenance issues, she has suffered a loss, being the excess of $600 for this claim and the costs to repair the roof. The complainant provided a roof report from her builder (BL) dated 18 March 2021. BL states the lead flashing is failing and needs to be replaced. BL states it is evident previous work has taken place on the lead flashings, including painting and every joint being sealed with silicone. BL states this can cause failure of the lead and can allow water to enter the building from a weak spot in the silicone joint. BL states it believes works carried out by previous trades on the lead work is the leading factor that has caused the failure of the lead. The complainant provided a quote for $15,224.63 for the internal damage claimed. The complainant also provided a quote for $5,664 plus GST for the roof repairs. Insurer says it is only liable for internal damage The insurer says it is only liable for the internal damage on the second claim. It says the complainant is responsible for maintenance issues to the roof prior to it commencing any repairs. The insurer says the damage from the second claim is unrelated to the first claim. The insurer says there were maintenance issues present on the roof during the first claim, which included deteriorated pointing on the roof, but it cannot be satisfied it clearly informed the complainant of these issues. However, it says the damage present on the second claim is unrelated to this deteriorated pointing identified during the first claim. Determination | Case number: 767162 Page 3 of 5 The insurer appointed a builder (HR) to assess the damage from the second claim . HR’s report dated 14 May 2020 states:  water ingress occurred to the garage plasterboard ceiling, consistent with a recent storm event  water has overflowed the roof tiles and flashing, causing water to track into the ceiling  due to the timeframe between the last storm event and the new storm event, the damages are related to a new insurance event, not a previous claim. The insurer then arranged a builder (CSR) to inspect the roof for the second claim. CSR ’s report dated 20 May 2020 states: On inspection we found the internal leaks to be in a square shaped pattern which made it easier for us to find that the lead was deteriorated in sections and was not covering enough of the tile and this was allowing water entry to go up underneath the lead. The leads chase is all deteriorating aswell so this would be contributing to the leak … The ridges also need to be repoint in multiple sections on the lower and main roof where it has been cracked out from wear and tear (sic) The insurer sa ys based on CSR’s report, the cause of rainwater entry for the second claim was the deteriorated lead flashing, and the maintenance issue is replacement of this lead flashing. It says CSR also identified the cracked ridge pointing as wear and tear. However, it says this was not the cause of rainwater entry. The insurer also says it appointed another builder (A) to attend the property. A ’s report dated 11 August 2020 states: the lead flashings have deteriorated, with signs of age and cracking that are allowing water ingress into the garage area. No broken tiles were visible however again, the pointing across the main roof is showing signs of age with minor cracking being noted. The insurer says the experts appointed on the first claim did not identify maintenance issues with the lead flashing and there is no evidence it had already deteriorated in 2017 and should have been identified at that time. The insurer says the policy excludes damage due to wear, tear or gradual deterioration. It says as the lead flashing and pointing is deteriorated due to age, wear and tear, it is not liable for this damage. The insurer refers to the following exclusion in the product disclosure statement (PDS): Wear, tear and gradual deterioration wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as but not limited to:  tiles and their adhesive or grouting breaking down;  weathering of roof tiles or roof ridge capping;  gradual weathering and breakdown of bricks, mortar or concrete. Determination | Case number: 767162 Page 4 of 5 The insurer says its offer for the internal damage is reasonable. It says it is willing to repair the damage if the complainant completes the maintenance repairs. In the alternative, it is willing to offer a cash settlement of $5,263.77, less the excess of $600. It says this is based on HR’s quote. It says it is not required to increase the cash settlement as it remains willing to complete the repairs, subject to the complainant completing the maintenance works. It says the complainant’s quotation does not contain sufficient detail to allow it to make a fair assessment of the costs claimed. Insurer entitled to limit its liability to internal repairs Having reviewed the information provided, I consider the insurer is entitled to limit its liability to the internal repairs only. I am satisfied the cause of the water ingress for the second claim is the deteriorated lead flashing. There is no information to show the lead flashing was damaged due to an insured event as opposed to deterioration in the ordinary course of events. I am therefore satisfied this damage is excluded by the policy. I have also considered whether the insurer should be liable for this damage due to its actions on the first claim. Howeve r, I cannot be satisfied the insurer’s repairers conducted any repairs to the lead flashing under the first claim. There is also no information to show this damage was present during its attendance at the property under the first claim. I therefore cannot find the insurer is liable for this damage based on its initial repairs or assessment of the damage from the first claim. The insurer is therefore entitled to limit its liability to the internal repairs. Insurer’s offer is fair in all the circumstances The insurer has offered to repair the accepted damages, subject to the complainant repairing the maintenance issues with the roof. Given I accept the insurer is only liable for the internal repairs, I consider this offer to be fair and reasonable. The insurer has also offered to cash settle the accepted repairs. Whilst the complainant has provided a quote for the same repairs, given the insurer is ready, willing and able to complete the repairs for the sum offered, I do not consider it fair to require the insurer to pay the complainant’s quoted amount. The insurer’ s offer is fair and reasonable. However, if the insurer cash settles the claim, I consider it fair and reasonable for the insurer to increase this amount by a further 10 per cent to account for the transfer of risk to the complainant. Given the policy requires the payment of an excess in the event of a claim, I am satisfied it is fair for the complainant to pay an excess. I consider it fair to allow the complainant to choose whether to allow the insurer to complete the accepted repairs once maintenance work has been completed or accept a cash settlement. 2.2 Why is the outcome fair? I do not consider the complainant has provided sufficient information to show the insurer is liable for the roof repairs. I therefore do not consider it fair in all the circumstances for the insurer to pay for these repairs. I also consider the insurer’s offer to either complete repairs once maintenance works are completed or provide a cash settlement is fair in all the circumstances. Determination | Case number: 767162 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.