Home / Auto & General / Determination 766448

Determination 766448

Adequacy of cash settlement offer for storm damage

FirmAuto & General
Decided2021-08-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$45,680
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Insured disputed the insurer's cash settlement of $45,679.92 for storm damage, saying it did not cover all storm-related damage. AFCA found the scope of works fair and ordered cash settlement of that offered amount.

The complainant bears the onus to prove on the balance of probabilities that disputed damage was storm-caused, and the expert evidence supported the insurer's scope of works.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Auto & General determinations · Find similar determinations

Text of the determination

Determination Case number 766448 Financial firm Auto & General Services Pty Ltd Case number: 766448 21 May 2021 Determination | Case number:766448 Page 2 of 10 1 Determination overview 1.1 Complaint The complainant holds building insurance with the financial firm (the insurer). She lodged a claim on 21 January 2020 for damage caused by a storm on 19 January 2020 The insurer accepted a portion of the claim, offering the complainant a cash settlement of $45,679.92. The complainant is dissatisfied with the offer saying it does not cover all storm-related damage. The insurer maintains its offer is reasonable because the complainant has not demonstrated all the claimed damage was caused by the storm. 1.2 Issues and key findings Is the insurer’s offer fair and reasonable? Yes. This is because the available information shows the insurer’s scope of works (SOW) accounts for all the claim related damage. 1.3 Determination This determination is in favour of the insurer. If this determination is accepted by the complainant, the insurer is required to cash settle the complainant $45,679.92 within fourteen days of receiving notification that the determination has been accepted. Determination | Case number:766448 Page 3 of 10 2 Reasons for determination 2.1 Is the insurer’s offer fair and reasonable? Complainant must establish valid claim It is accepted insurance law that the complainant carries the initial onus to establish on the balance of probabilities (that is more likely than not) that the loss is caused by an insured event covered by the terms of the policy. The complainant’s insurance policy provides cover for loss or damage caused by an insured event, including storm during the period of insurance. The policy does not cover accidental damage. This coverage is subject to general exclusions for wear, tear and gradual deterioration. It is undisputed there was a significant storm damage to the property with the insurer accepting the claim and issuing a cash offer. The complainant is dissatisfied with the insurer’s offer. She seeks for the insurer to increase the offer to cover all the damage she says was caused by the storm. The insurer says there is no evidence the storm damaged all the claimed items and says some items are not damaged or were already in poor condition. To be successful, the complainant must prove all the claimed damage was caused by the storm and the insurer’s offer is insufficient. Insurer’s offer for roof and associated fittings is fair and reasonable The complainant says the insurer’s cash offer does not cover all roof damage and is missing required repairs to sheeting, guttering and gutter mesh. I reviewed the expert reports provided by both parties to determine whether all claimed damage is storm related. The insurer relied upon the opinions of roofers SPG and TBP, assessor HA and builder FB. TBP identified hail damage to the blue mountain gutter mesh, a split external spouting and damage to a skylight. It attributed the leaking light fitting to the deteriorated lead dressing of the ridge apex. SPG found hail damage to most roof sheets, ridge capping, skylights and gutter guard. It also noted underlying issues and signs of poor workmanship. SPG provided measurements and photos of the damaged areas. HA and FB assessed the property on two occasions. HA and FB confirmed the measurements for the items to be repaired were correct. The complainant obtained a report from HSB who was unable to assess the roof due to weather. It recommended a roof report. However, having reviewed photos, HSB agreed there was hail damage. Having considered the evidence put forward by both parties, I am not satisfied the complainant established the insurer’s SOW is insufficient or that the meterage of the works is incorrect. In compiling its SOW, the insurer relied upon the measurements taken by its Determination | Case number:766448 Page 4 of 10 experts . The complainant’s builder does not appear to have inspected the roof and has not provided alternative measurements. Further, the insurer’s position is supported by m ultiple experts and is not contradicted by HSB. Accordingly , the insurer’s SOW for the roof repairs is fair and reasonable. Insurer’s offer for building works is fair and reasonable The complainant says the insurer’s cash offer does not cover all damage to the façade of the building and there is unaccounted damage to the external walls, brickwork, timber boards and window frames, chimney and TV antenna and damaged leadlight windows. I reviewed the expert evidence submitted by both parties to determine whe ther the insurer’s SOW was insufficient. FB and HA assessed the property on at least two occasions. It identified the front of the house was showing signs of movement and the brickwork was very brittle. After the complainant expressed dissatisfaction with the SOW, HA and FB reassessed the property to confirm the identified damage was accounted for in the SOW. It confirmed the scope was correct for the replacement brickwork, repainting, lead light windows and downpipes and said there was no storm damage to the chimney or antenna. The light fitting was inspected and was mentioned that it had not sustained damage from the event. Inspections showed the light to be in working order. The insurer also obtained a report from an electrician who tested the TV antenna and did not find any signal or connection problems or any concerns with the wiring. It suggested the poor signal could be because of the age of the analogue antenna or the need for a 4G filter. HSB noted stucco and weatherboard damage seems consistent with impact and believe that it is highly possible that the impact was caused by hail. HSB did not provide any measurements. It recommended the antenna be tested by the electrician. I note there is also no evidence the poor television picture is a result of the storm event and I am satisfied the insurer adequately investigated this issue. The insurer’s builder also noted the timber rafter noggins are dry and have not been compromised by the claimed event. HSB says the timber members look solid but should be v erified by an engineer. This is consistent with the insurer’s assessment that visually, there is no basis to conclude they have been affected or require repairs. Based on the evidence provided, I am not satisfied the complainant established there is unacco unted for storm damage to the property. This is because following the complainant’s initial dissatisfaction with the scope, the property was reassessed and was increased to include damage identified by the complainant. HA and FB reasoned as to why damage was included or excluded in the scope of works. HSB’s report does not assist in increasing the scope. It makes general remarks about the damage with no reasoning provided in support or to explain why the insurer’s assessment is incorrect. It has not provided any measurements or specific comments as to the amount of damage. The photos in HSB’s report does not substantiate the conclusions drawn. T herefore, I am not persuaded the report can used as a basis for amending or increasing the SOW. Determination | Case number:766448 Page 5 of 10 Given all this, I am not satisfied the complainant established the scope of works is lacking and the insurer is not required to increase its offer. Insurer’s offer is fair in the circumstances The complainant maintains the insurer’s SOW is insufficient and does not address all the storm related damage. As stated above, the onus is on the complainant to prove the damage was caused by the storm and the insurer’s offer is insufficient. The SOW submitted by the insurer includes damage identified by its builders and roofers. It also includes a 20% builder ’ s margin and 10% for unforeseen circumstances and contingencies totalling $45,679.92. The complainant has not submitted an alternative quote or scope of works and her builder’s report lacks detailed reasoning. Therefore, I am not satisfied the complainant has shown any of the disputed damage is storm related or that the insurer’s offer is insufficient , particularly given the 10% allowance. If this Determination is accepted by the complainant, the insurer is required to cash settle the complainant $45,679.92 within fourteen days of receiving notification the decision has been accepted. Determination | Case number:766448 Page 6 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. 3.2 Relevant policy terms Insured event We will NOT cover: 6. Storm and rainwater Including loss or damage from: ✓ the escape of rainwater from any water pipe, drain or gutter ✓ surface run-off rainwater from surrounding areas that occurs within 24 hours of a storm event or heavy rain. Including loss or damage caused by erosion, subsidence, landslide, mudslide or any other earth movement that occurs within 72 hours of a storm or heavy rain and as a result of that storm or heavy rain. … or dust due to: ➢ a design fault, structural defect or faulty workmanship ➢ lack of maintenance (a defect that you knew about or should reasonably have known about and did not fix) ➢ an opening that was not created by the storm ➢ building additions, renovation or alteration work. How We Settle Claims If we agree to pay a claim for loss, theft or damage to your home, contents or personal effects, we will decide whether to:  repair the damaged property to the same standard, specification or quality as it was when it was new, or  replace the damaged property with the nearest equivalent property available, or  pay you the amount it would cost us to repair or replace the property to “as new” condition. The cost to us is:  the retail price of an item less any trade discount we are entitled to, or  the cost to us to repair or replace the property, allowing for any trade discount we are entitled to. We reserve the right to choose the repairer or supplier to be used. Determination | Case number:766448 Page 7 of 10 When it is not possible to repair or rebuild your property with original materials, we will use the nearest available equivalent to the original materials. We will pay to repair or replace internal blinds or curtains, carpets or other floor coverings but only in the same room, hallway or passageway (area starting and finishing at its nearest walls, doorway, archway or other opening, including changes to the floor or wall coverings) where the loss or damage occurred. When an item is part of a pair, set, system or collection we will only pay for repair or replacement of the item that has been lost or damaged. The most we will pay is the value that the item has as a proportion of the combined pair, set, system or collection. We will NOT pay: to rebuild or repair undamaged property in order to achieve a match with repaired or replaced property any additional costs to replace materials that are not damaged for any decrease in the value of any pair, set, system or collection. 3.3 Relevant expert evidence Record Key points Financial firm’s expert (BBS) Report 24 - 01 - 2020  Upon inspection of the resultant damage our office has confirmed the cause of damage is a result of hail damage. The insured was home at the time of the hail storm. They have showed us the damages to multiple skylights, however this has not caus ed damage to any internals.  Upon inspection of the resultant damage our office has confirmed the cause of damage is a result of hail damage. We also believe that the cracking to the front of the property would have been occurring over time, therefore this has not been included in our SOW for repairs as this is not related to the event. Financial firm’s expert (LS) Report 27 - 05 - 2020  Brickwork to front porch is very brittle, old and easily damaged.  Front of house is showing signs of movement relating to the hairline crack present at the front of the property.  Carport downpipe flows directly onto the ground which has caused the attached carport post to rot at its base. Financial firm’s expert (TBP) Report 04 - 06 - 2020  Blue mountain mesh is hail damaged  Split external corner of spouting at rear of property  Skylights are damaged  Roof in fair condition although present non - compliant spreaders and aged flashings  Financial firm’s expert (SPB) Report 28 - 08 - 2020  General condition of roof is poor  Storm created opening evidence through skylights  Upon accessing the roof we found there to be large amounts of hail damage to most roof sheets, ridge capping, skylights and gutter guard. It was also noted that there were underlying issues and signs of poor workmanship. Determination | Case number:766448 Page 8 of 10 Record Key points These include the installation of two metals that react causing the acceleration of rust and deterioration of these products, a severe case of inadequate fixings through roof sheets, inadequate sealant on every flashing, and generally poor workmanship in reg ards to penetration flashings that could well cause capillary action leading to water ingress.  It was evident that the hail storm had cosmetically e ff ected most roof sheets (240m2) ridge capping (38lm), gutter guard (76.4lm), parts of the valley gutter (3lm ) and barge capping  (10lm). No external quad gutter has been e ff ected by this event due to the brunt being taken by the gutter guard. Down pipe spreaders have not been e ff ected by this event as it is evident that previous damage has occurred. Main down pipe s were not blocked nor damaged due to this event. Financial firm’s expert (FB) Report 15 - 10 - 2020  What amount of wall surface does the insured want to be painted?  Upon our inspection the insured has raised that they are wanting the entire north, east and west wall to be painted approx. 140sqm however in our professional opinion the damage to these areas are pre - existing and long term deterioration and no t related to the claimed event.  During our attendance, hail damage was only present on x2 leadlight win dows on the north side of the dwelling.  As per our second roof report, our qualified roofing contractor inspected the chimney and confirmed that there were no visible signs of damage to the chimney.  Upon our attendance the light in the family room was wo rking however no electrical report has been obtained.  Financial firm’s expert (HA) Report 13 - 10 - 2020  The quote allows for the bricks that have been affected by impact of hail stones. The picture in the attached document show the affected porch bricks. A small portion of the bricks have been impacted by hail stones chipping the bricks, while the others have only had the paint chipped off them.  15 of the bricks have been quoted to be replaced (line item 2.10 on the quote dated 26/08/20).  The remaining porch bricks have been allocated to be repainted (line item 2.20 on the quote dated 26/08/20) which allows more than the required amount of painting at 5m2.  The quote allows for the painting of the textured wall due to some minor flaking of the paint due t o the storm. The 20m2 was quoted by the attending builder to repaint the textured Determination | Case number:766448 Page 9 of 10 Record Key points wall to the left side of the property up to the nearest architectural break as per the PDS.  Upon site inspection by the builders and the A&G Home Assessor, the windows at the front of the house were noted to have 4 lead light window panels, 2 of which were cracked or damaged. The attached picture document has an image of the windows in question. Starting on the left, panel 1 and 3 were the only windows that presented with an y damage and therefore the only windows allocated to be replaced. The quote does however allow for the whole frame to be painted once the windows are replaced.  The mesh gutter guards sustained hail impact damage and have been quoted to be replaced for 80lm . The roof report uploaded to Symbility on 25/08/20 referenced the mesh gutter guards being affected by the event and measured 76.4lm.  The chimney was inspected and was mentioned that it had not sustained damage from the event. As this was only discussed , a request has been sent to the builder to report further on the matter which may require a site inspection.  The antenna was inspected and was mentioned that it had not sustained damage from the event. As this was only discussed, a request has been sent to the builder to report further on the matter whic h may require a site inspection. Financial firm’s expert (FB) Report 20 - 10 - 2020  No evidence of damage to antenna bracket or antenna element/rods and found that antenna is old analogue unit in poor condition however still intact.  Testing confirmed signal is okay so there should be no issues with the cables or connection in roof space. Complainant’s expert (HSB) Report Undated  Stucco damage seems consistent with impact and therefore we believe that it is highly possible that the impact was caused by hail  Timber weatherboards – as per above  We believe that an electrical test needs to be undertaken immediately to rectify damage to the li ght fitting in the living area (TV room) as well as undertake a thorough roof report to determine cause of ingress. Furthermore, it is imperative that the full scope of damage be identified by the insurer on the roof which was caused by impact with hail.  B ricks have been affected by impact and it is our belief that given the proximity and spread of the damage, it is highly likely that hail was the cause.  We believe that the timber members in the attic should be inspected by an engineer and a written report provided, advising of the condition of the timber members. Whilst visually they look solid, to ease the insured’s concerns, it Determination | Case number:766448 Page 10 of 10 Record Key points would be preferable to have an engineer confirm.  The downpipes seem to have impact damage and this is possible due to hail as wel l (given the shape of the damage, we believe that it is highly likely that hail was the cause).  Roof sheets were difficult to observe due to inclement weather but as mentioned above, we believe that a thorough roof report is undertaken to confirm extent of the damage and to verify the insured’s claim .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.