Claim denial for cracking damage to house attributed to water mains leak

FirmQBE
Decided2021-11-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for house cracking attributed to a mains water leak, and QBE declined it as environmental settlement. AFCA found the leak caused two thirds of the damage, so the insurer must cash settle two thirds of the full repair cost plus 15% and reimburse up to $5,000 of engineering costs.

Escape of liquid is an insured event and the leak was the proximate cause of two thirds of the damage, so the ground movement exclusion and Wayne Tank principle did not defeat the claim.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationprovide documents

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 766253 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 766253 Page 2 of 11 Case number: 766253 16 November 2021 1 Determination overview 1.1 Complaint The complainant and his wife, AM, hold a farm pack insurance policy with the financial firm (the insurer). The policy provides accidental damage and insured events covers for the house on the insured property. The complainant made a claim for cracking damage to the house which he attributes to a mains water leak adjacent to the property, discovered in August 2018. The insurer declined the claim as it says the damage was not caused by an insured event. It said the damage was the result of environmental factors occurring over time, which are not covered by the policy. The complainant disagrees with the insurer‟s decision. He wants the insurer to indemnify him for the loss. A reference to the complainant in this determination includes a reference to AM. 1.2 Issues and key findings Is the insurer entitled to deny the claim? No. The panel is satisfied that two thirds of the cracking in the insured property is attributable to the water leak. It is fair that the insurer covers the complainant ‟s loss to that extent. Should the insurer take further steps to resolve the claim? Yes. As responsibility for repair costs is to be apportioned, the claim is to be cash settled. The insurer is to obtain a scope of works and costing from a quantity surveyor to repair all of the subsidence damage to the property. The insurer is to pay the complainant two thirds of that amount plus a 15% contingency uplift. The insurer is also to reimburse (up to a $5,000 limit) to the complainant the proven costs he paid for engineering reports to establish his case. Why is the outcome fair? The outcome is fair as the evidence supports a finding that two thirds of the damage is attributable to the leak. The policy responds to that extent and the insurer should cover the complainant accordingly. A 15% cash settlement contingency uplift is appropriate. It is also fair and reasonable that the insurer contributes to the proven professional costs incurred by the complainant to establish his case given the complexity of the issues involved. 1.3 Determination This determination is substantially in favour of the complainant. The insurer is to obtain a scope of works and costing from a quantity surveyor to repair all of the subsidence damage to the property. The insurer is to pay the complainant two thirds of those repair costs plus a 15% uplift for contingencies. The insurer is also to reimburse (up to a limit of $5,000) the complainant for the proven costs he incurred in obtaining expert engineering reports from ME, to establish his case. Determination | Case number: 766253 Page 3 of 11 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? No. The panel is satisfied that two thirds of the cracking in the insured property is attributable to the water leak. It is fair that the insurer covers the complainant‟s loss to that extent. Complainant must show a valid claim exists Relevant extracts of the product disclosure statement and policy wording (PDS) are set out in section 3.2 of this determination. Subject to its conditions and exclusions, the policy provides cover for:  loss or damage caused by the insured events listed in the PDS, one of which is escape of liquid, and  accidental damage to the insured property. The complainant is required to show, on the balance of probabilities, he suffered a loss caused by a risk insured against under the policy. This is known as a valid claim. Once the complainant establishes a valid claim, the insurer is liable for the loss unless it shows an exclusion or condition applies. The insurer has the onus of proof in establishing the application of the exclusion. The standard of proof is the balance of probabilities. Proximate cause Proximate cause is the dominant, efficient or operative cause of the loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. It requires a common sense evaluation of the evidence. The complainant says that the damage to the property was due to a substantial water mains leak near the property, which was identified in August 2018. He says this means a valid claim exists as the policy covers as an insured event the bursting, leaking, discharging or overflowing of fixed pipes used to hold or carry liquid (escape of liquid). He also says that the leak has caused accidental damage to the insured property. The insurer disagrees. It says that the damage was caused by differential footing movement resulting from long term drying of the foundation soils and seasonal changes in moisture content. The insurer also says that the damage was not accidental as the evidence suggests the presence of cracking to the property prior to claim lodgement, meaning it could not be considered unforeseen. The insurer says that this means that the complainant has not established that a valid claim exists and, further, that a number of policy exclusions apply to entitle it to deny the claim. Circumstances of the loss The complainant made a claim on 21 August 2018 for cracking damage to the property. The cracking had progressed over the previous year and become more severe in the months before the appearance of a large wet patch of soil (about 6 metres across and as much as 30 cm deep) near the property. This led to the identification of the water mains leak. Determination | Case number: 766253 Page 4 of 11 The water supplier repaired the leak. It is not clear what the volume of water involved was or how long the leak had been present before it was identified. The complainant says the water mains pipe was located 1.5 to 2 metres below the surface. He says that the leak caused movement and cracking damage to the property by saturating the clay level beneath the foundations before the leak became evident on the surface. The cracking has affected the internal and external brick walls around the home, external footpaths have moved and doorjambs have become misaligned. The complainant acknowledges minor cracking within the property occurred previously but says until the leak occurred there had never before been severe cracking in the 60 years since the house was built. The complainant says the severe cracking coincided with the major pipe leak and had never occurred through the various wet and dry years since the house was built. The complainant‟s insurance agent, SL, says he has been visiting the property for over 30 years and noted the cracking in 2018 was far more severe than the fine cracking he had seen in the past and that were typical of buildings of the era. The insurer does not dispute the leak occurred but says it did not cause or contribute to the damage to the home. It says that the cracking is due to other factors such as the lack of adequate drainage, insufficient downpipes and the presence of trees close to the house. Experts disagree on cause of damage The parties have provided a large number of reports, mostly from their respective engineers, whose opinions on the cause of the cracking damage and settlement differ. The engineering experts are FM and IE on behalf of the insurer and ME, retained by the complainant. The insurer retained IE to provide an opinion after FM and ME disagreed about the impact of the water leak. In all, FM has provided two reports (the most recent of which is dated 23 November 2018), ME has provided six reports (most recently, on 18 March 2021) and IE eight reports (the fin al one dated 21 July 2021). Given the respective numbers of reports and when they were prepared, the panel considers more weight should be given the reports of ME and IE. The engineers completed several floor level surveys which show that settlement has occurred to varying degrees around the property, however has remained relatively stable since the claim was lodged. Soil testing arranged by IE confirms the site is extremely reactive. It also shows soils on the southern and eastern sides of the house, closest to the pipe leak, have a significantly higher moisture content. The insurer initially appointed FM, engineer, to provide an expert opinion. FM said the pipe leak was 15 metres away from the property so was too far away to have impacted upon the house and did not cause or contribute to the cracking damage. FM said if the abnormal moisture was from the water main leak, soil heave would have occurred across the entire floor and not just around the perimeter of the home (as indicated by the floor level survey). FM concluded the damage was due to differential footing movement resulting from long term drying of the foundation soils and seasonal changes in moisture content. It said this was particularly around the perimeter of the house due to poor exterior paving and insufficient downpipes. The complainant‟s engineer, ME, says the leaking water main has caused abnormal soil moisture conditions at the site, with dry soils beneath the house and on the northern and western sides and saturated soils on the eastern side of the house. ME considers this has resulted in differential soil movement across the building‟s footprint and increased the magnitude of the cracking. Determination | Case number: 766253 Page 5 of 11 IE says the water mains leak has not contributed to the cracking damage as if this were the case, the cracks would have started closing as the soil dried out, which has not occurred. Rather, the complainant advises that the cracks are continuing to develop. IE also notes the level survey indicates the front of the house closest to the leak has settled relative to the rear of the property. Grain collapse consistent with damage profile IE says the only possible link between the house damage and the leaking pipe is if the foundation beneath the house had the potential to initially subside when inundated (referred to as a “grain collapse” or bearing failure) and still swell and shrink with changes in soil moisture content. This would result in the pattern of cracking that has occurred in the house, with an initial settlement across the front (assumed to have been caused by the pipe leak) and then further settlement (with cracks continuing to open) as deeper reactive clay soil dries out from the leak. However, IE says the soil samples confirm the reactive clay soil profile does not exhibit the potential for subsidence as a result of inundation, therefore the pattern of cracking is not consistent with the pipe leak being influential. ME notes borehole seven at the front of the property has a calcareous clayey silt soil layer with collapsible potential at a depth of 250-700mm. As the footings of the home are likely founded at 400-700mm, ME says the footings at the front of the house are likely interacting with this soil layer. IE says borehole five is more likely to represent the natural soil of the site and beneath the footings but does say why this would be the case. IE confirms the footings are 450mm deep in the drawings of the house and would be founded well within the collapsible soil if it exists beneath the footings. IE says even with a possible 300mm of collapse potential beneath the footing, it would not expect the soil to collapse to the extent suggested. IE acknowledges the collapsible potential of the soil is evident in the location of the leak, causing the area to subside slightly. However, if the leak had caused the required increase in moisture to cause movement beneath the house, IE says subsidence would be evident through the front yard, which is not the case. ME notes IE has not provided an explanation for the boreholes closest to the leaking water main being significantly wetter than other soils around the house. IE said the soils in the front yard may be affected by the leaking pipe or natural water source. However, this does not confirm the soil moisture conditions beneath the footings of the house, which would require sampling beneath the footing. IE notes the soil tested beneath the front lounge room is not consistent with soil impacted by a leaking pipe. The panel notes there is variation in the soil profiles in the areas tested, and testing was not completed beneath the footings to confirm whether or not a grain collapse occurred in this area. This would however explain the settlement damage coinciding with the leak event. Proximate cause of damage to two thirds of the house was the water leak This is a complex case as demonstrated by the volume of expert opinion and the differences between them. Determination | Case number: 766253 Page 6 of 11 However, after weighing up the engineering opinions, soil profile information, appearance and progression of the damage and the slope of the land from the pipe towards the property, the panel is on balance satisfied the water leak was the proximate cause of the damage to the North Eastern part of the house. This aligns with the opinion of ME, who also notes this damaged section of the house is approximately two thirds of the structure. In his final report dated 18 March 2021, ME confirmed that his view was that: approximately two thirds of the cracking in the structure is attributable to the leaking water main. The panel acknowledges the engineers disagree on the impact of the water leak. However, the notable escalation in cracking damage at the property at the time the water leak occurred is supportive of ME‟s view . Further, while the soil profile beneath the footings has not been confirmed, the damage profile is consistent with a grain collapse beneath the footings at the front of the property, and the presence of collapsible soils is confirmed at the site at the level of the footings. FM and IE maintain the damage was due to movement caused by seasonal and environmental factors. However, as the complainant notes, the property withstood nearly 60 years of varied seasonal conditions, including drought and wetter years, with only minor cracking occurring across this time. From 2018, there was a significant increase in the cracking, door jamb movement stopping the doors from closing, and other damage coinciding with the leak event. Abnormal moisture levels were also confirmed in the soils around the relevant area of the house. Ground movement exclusion not established The policy provides cover for earth movement when it is caused directly as a result of specified events, including escaping liquid. The policy otherwise excludes loss or damage resulting from or caused by settling, shrinkage or expansion in buildings, foundations, walls or pavements. The experts agree the damage was caused by differential movement of the property and the floor level surveys confirm varying levels of settlement have occurred around the home. The engineers disagree on whether the movement resulted from the water leak or other factors. The insurer says the damage is due to environmental factors identified by its engineers FM and IE and not the leak from the water main. To the extent the leak contributed to the damage, the insurer relies on the principle in Wayne Tank & Pump Co Ltd v The Employers’ Liability Assurance Corporation Ltd [1974] QB 57 to exclude liability. According to the Wayne Tank principle, where there are two concurrent causes of a loss, where one is subject to cover and the other is not, an insurer is not liable for the loss. However, the judicial authorities have long recognised the causes must be of rough equivalence. The panel is satisfied that the proximate cause of two thirds of the damage to the house was the water leak. Therefore, the insurer has not established the earth movement was only caused by settlement due to seasonal and environmental factors. Nor can it be said that settlement due to seasonal and environmental factors has contributed equally to the loss along with the water mains leak. Determination | Case number: 766253 Page 7 of 11 Accordingly, the panel is not satisfied that the insurer has proven an entitlement to rely on the ground movement exclusion. Further, the Wayne Tank principle does not apply and an unfair outcome would result were it to do so. Insurer to cover two thirds of damage to the insured property The complainant has established a valid claim for two thirds of the damage to the insured property as a result of the escape of liquid insured event. The insurer has not proven an exclusion applies to preclude cover. Therefore, it is not necessary for the panel to reach a determination on the parties‟ submissions on the accidental dama ge coverage section. The insurer is required to indemnify the complainant for two thirds of the damage to the insured property. 2.2 Should the insurer take further steps to resolve the claim? Yes. As responsibility for repair costs is to be apportioned, the claim is to be cash settled. The insurer is to obtain a scope of works and costing from a quantity surveyor to repair all of the subsidence damage to the property. The insurer is to pay the complainant two thirds of that amount plus a 15% contingency uplift. The insurer is also to reimburse (up to a $5,000 limit) to the complainant the proven costs he paid for engineering reports to establish his case. Cost of covered repairs uncertain The insurer provided a desktop estimate of $14,633.52 for cosmetic repairs to the dining room, lounge, hallway, entry, bedroom 1 and building exterior. The estimate is undated but was provided with the assessment report dated 7 January 2021. The estimate was prepared based on IE‟s scope of works f or the repair of damage they believed would have been caused by the leak given the location of the leak. However, the panel has found ME‟s reports to be more persuasive than those of IE. In addition, the insurer‟s assessor has acknowledged the estimate is just that, and not a builder‟s quote. ME has provided a remedial action and cost estimate dated 16 February 2021. In this document ME suggests that the cracking in the North Eastern section of the insured property is „likely attributable to the leaking water main, which is approximately two thirds of the structure.‟ ME estimated costs of $120,000 exclusive of GST to repair this damage. However, ME caveated its costing: The estimated costs of the remedial work have been produced to provide an indication of the magnitude of work involved. The total costs should be treated as a likely minimum cost as with works of this nature, unexpected variations to the scope of works can result in cost increases. Costs are based on the assumption that works are competitively tendered and are estimated costs only as [ME] are not Quantity Surveyors. Insurer to obtain full scope of works and costing Determination | Case number: 766253 Page 8 of 11 In the circumstances, the insurer is to obtain scope of works and costing from a quantity surveyor to repair all of the subsidence damage to the property. The insurer is responsible for two thirds of those costs. As responsibility for the damage is to be split between the insurer and the complainant, it is appropriate that the claim be cash settled. This means that the insurer to pay the complainant two thirds of the total cost of repairing the subsidence damage. The insurer is also to pay a 15% uplift on the two thirds figure. The uplift is to allow for contingencies (including by reference to the complainant‟s rural location) and the transfer of risk to the complainant. As the likely cost will reflect current rates, the panel is not satisfied that the insurer should be obliged to pay interest. Insurer to contribute to professional costs incurred by complainant AFCA Rule D.5.1 enables AFCA to require the insurer to contribute to the professional costs incurred by the complainant. AFCA Rule D.5.2 caps such a contribution to $5,000, unless special circumstances apply. When considering whether to require a financial firm to make a costs contribution, AFCA takes into account the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim. The panel is satisfied that this complaint has involved complex issues that required specialist engineering input. The complainant was obliged to obtain reports from ME to establish a valid claim and to respond to the insurer‟ s expert reports. In the circumstances, the panel considers that it is fair that the insurer reimburses the complainant for the costs he incurred in obtaining ME‟s reports, capped at a maximum amount of $5,000. The complainant must submit to the insurer invoices that verify the costs incurred before the insurer is required to pay the reimbursement. 2.3 Why is the outcome fair? The outcome is fair as the evidence supports a finding that two thirds of the damage is attributable to the leak. The policy responds to that extent and the insurer should cover the complainant accordingly. A 15% cash settlement contingency uplift is appropriate. It is also fair and reasonable that the insurer contributes to the proven professional costs incurred by the complainant to establish his case given the complexity of the issues involved. Determination | Case number: 766253 Page 9 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 766253 Page 10 of 11 3.2 Relevant policy provisions Words with special meaning (PDS pages 6-10) Accident An incident that is unforeseen and unintended and that causes loss or damage. This includes a series of accidents arising out of the one event. Accidental damage Physical loss of or damage to your home, contents, or both, at the address, directly caused by any of the events listed in Section 1 – Home – Accidental damage cover, which we will insure you against, subject to the Policy conditions and exclusions. Occurrence An event during the period of insurance (including continuous or repeated exposure to substantially the same general conditions ), which results in personal injury or damage to property which you neither expected nor int ended to happen. All personal injury or damage to property resulting from one original cause will be treated as being caused by the one occurrence. What you are covered for (PDS pages 12, 15 -16) Accidental damage If you have accidental damage cover you are insured against accidental loss or damage to your home, contents, or both at the address during the period of insurance. This includes cover for any of the insured events. Your Policy Schedule will show if you have selected accidental damage cover for your home, contents or both. Insured events You are insured against loss or damage at the address caused directly by the fol lowing insured events: … 8. bursting, leaking, discharging or overflowing of fixed basins, shower bas es, or other fixed apparatus, fixed tanks or fix ed pipes used to hold or carry liquid of any kind. … 12. erosion, subsidence, landslide or earth movement, but only if it is directly as a result of one of the following insured events: Determination | Case number: 766253 Page 11 of 11 (a) explosion; (b) storm; (c) earthquake or tsunami; (d) escaping liquid; and it occurs no more than 72 hours aft er the insured event. We will not pay for loss or damage caused by any other erosion, subsidence, landslide or earth movement event. Accidental damage cover (PDS page 16) We will pay for accident al loss of or damage to your home or contents at the address other than the occurrences or items referred to in „What we will not pay for‟. What we will not pay for Under accidental damage cover, we will not pay for 6. erosion, subsidence, landslide or earth movement, but only as covered by insured event 12. Erosion, subsidence, landslide or earth movement; Specific exclusions applying to sub-section 1 – Home and contents (PDS pages 23-24) We will not pay for loss or damage: 2. resulting from or caused by: (f) settling, shrinkage or expansion in buildings, foundations, walls or pavements; … (n) tree roots; However, this exclusion applies only to damage caused directly by tree roots …

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.