Home / Suncorp Group / Determination 766177

Determination 766177

claim_denial

FirmSuncorp Group
Decided2021-06-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$51,559
Non-financial loss$1,000
Amount claimed$85,384
SourceAFCA PDF

Summary

After a storm, the insurer offered $10,096.08 and denied the roof and subsidence damage. AFCA upheld the roof and subsidence denial but ordered a cash settlement of $48,479 plus interest, $3,080 towards expert reports, ongoing temporary accommodation, and $1,000 for non-financial loss.

Policy exclusions for rust, deterioration and subsidence apply unless a storm caused the damage within 72 hours, and the insurer's offer was insufficient to cover the reasonable cost of repairs and mould remediation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 766177 Financial firm AAI Limited Determination | Case number: 766177 Page 2 of 10 Case number: 766177 3 June 2021 1 Determination overview 1.1 Complaint The complainant holds home and contents insurance with the financial firm (the insurer) and lodged a claim after a storm damaged her property. The insurer accepted the claim and offered $10,096.08 to fix the storm related damage and mould. The complainant rejected the offer and says it is insufficient to fix all the damage. The complainant seeks a cash settle of $64,130 in repair costs and $21,254.00 for mould remediation. The complainant also seeks non-financial loss for delays and poor claims experience. 1.2 Issues and key findings Is the insurer’s offer fair and reasonable? I am satisfied the insurer is entitled to limit its liability to four rooms, it is to increase the offer of settlement to:  $27,225.00 plus interest from 11 December 2020 for internal repairs  $21,254.00 plus interest from 11 December 2020 for mould remediation  $3080 as reimbursement for expert reports  the cost of ongoing temporary accommodation in line with policy terms and conditions until the mould is remediated and repairs completed. Is the complainant entitled to non-financial loss? The insurer is required to pay the complainant $1,000 non-financial loss for delays surrounding the provision of expert reports resulting in the complainant residing in a mould infected property for a prolonged period. Why is the outcome fair? The outcome is fair because the insurer has not fulfilled its obligations under the policy and has disadvantaged the complainant. 1.3 Determination This determination is partially in favour of the complainant. The insurer is cash settle the claim for the damage for $48479.00 plus interest pursuant to section 57 Insurance Contracts Act 1984 (Cth) from 11 December 2020 and $3080 as contribution to the complainant’s professional costs. Further the insurer is to pay the complainant $1,000 compensation for non-financial loss. Determination | Case number: 766177 Page 3 of 10 2 Reasons for determination 2.1 Is the insurer’s offer fair and reasonable? No. The insurer should increase its offer for the internal repairs, mould remediation and reimburse the complainant for the expert reports obtained. In addition, the insurer should cover the cost of ongoing temporary accommodation in line with policy terms and conditions until the mould is remediated and repairs completed. Complainant has established a valid claim The complai nant’s policy provides cover for insured events, including storm and rainwater and lodged a claim on 21 February 2020 for damage from a storm two days earlier. The insurer accepts there was some storm related damage. The insurer accepted there was some internal damage. It offered the complainant $4467.38 for the removal and replacement of insulation bats and the preparation and painting of bedroom 1, loungeroom, bedroom 2 and hallway. In addition, it offered $5,628.70 for mould remediation. The complainant wants the insurer to cash settle all damage identified based on the report from her engineer SRC and seeks $51,953 based on a quote from CRS plus $21,254 for mould remediation. The dispute relates to the extent of the damage with the insurer saying most of the damage claimed is due to a combination of excluded factors. Experts differ as to cause of damage Both parties obtained expert reports on the cause of damage. The insurer relied upon reports from builder RPF and engineer CRD. The complainant relied on a report from engineer SRC dated 9 June 2020 and hygienist PP. Summaries of the expert reports are set out in Section 3 of this Determination. The complainant seeks cover for damage to the roof, guttering, roof valley, timber flooring, cracked walls and underpinning as well as the ceiling in bedroom 1, bedroom 2, hallway and loungeroom. The complainant’s engineer SRC considered the rain event caused the valley section on the roof to fail resulting in water ingress. It noted the valley is retaining water and rusting and recommended replacement. SRC also noted the flashing around the chimney should be replaced, the guttering should be realigned and ridge capping repointed. SRC also identified large cracks identified in wall separating dining and living room (the wall with the fireplace) attributing the damage to subsidence in the subfloor space. SRC believes this was caused by large amounts of water causing clay to expand and contract in the subfloor area. The insurer’s engineer CRD stated that rusting in valleys and misaligned gutters is not a result of a storm event, but long-term deterioration. CRD inspected the roof space and noted no sarking was present to the underside of the roof tiles and daylight was visible through the tiles above hip and valley beams which would allow water ingress. CRD noted the significant cracking, however, did not consider the cracking to be caused by ground movement from heavy rainfall during a single storm event. This is because the fireplace is located internally away from eternal walls. The external walls did not show any cracking and CRD considered, if the damage was caused water inundation, it would affect the permitter walls and the damage would not be localised to the fireplace. CRD considered the cracking was caused by long- term settlement of the fireplace structure. CRD also identified from inside the roof cavity the chimney stack was not vertically plumb and there was evidence of long term water ingress. Determination | Case number: 766177 Page 4 of 10 Insurer is entitled to decline claim for roof damage Having reviewed the expert evidence, I am not satisfied the complainant established the storm damaged the roof. There is insufficient evidence linking the storm to the roof damage. SRC report does not provide compelling reasoning as how the storm caused the guttering to misalign or why the ridge capping requires repointing. There is no evidence of hail and I am not satisfied significant rainfall itself would result damage to the guttering or ridge capping. SRC also identified rust in the valley which is form of deterioration. Given the nature of rust, it is unlikely it developed in the months since the rain event. Further, given SRC identified the deterioration enabled water ingress, this indicates the deterioration predated the storm event. I am not satisfied the complainant established an insured event damaged the roof. The policy also excludes damage because of rust and deterioration, it follows the insurer is entitled to deny the claim for damage to the roof. Insurer entitled to deny claim for damage caused by subsidence The complainant seeks for the insurer to accept liability for damage to the subfloor which caused significant cracking and structural damage in the dining room. The policy excludes damage caused by ground movement unless it occurred within 72 hours and can be directly attributed to a storm event. Therefore, to be successful, the complainant must show any ground movement was caused by the storm and occurred within 72 hours of the event. The complainant argues CRD did not inspect the subfloor and has insufficient material to discount the findings of SRC. However, the report from SRC has not provided detailed reasoning as to how the storm or rainfall runoff caused such localised ground movement inside the property. While both parties believe the property is built on reactive clay, there has been no soil testing to confirm this, notwithstanding this, there is no evidence of storm runoff or exposure of the footings to the elements which would cause heaving or settling of the clay I am not satisfied the complainant has established the storm is the proximate cause of damage to the subfloor and fireplace wall. On balance, it is more likely the cracking is caused by the localised subsidence of the fireplace which occurred over a period. Given the policy only responds if a storm caused subsidence within 72 hours, I am satisfied the insurer is entitled to deny the claim for subsidence and subsequent cracking. Insurer’s offer for internal repairs is insufficient I am satisfied the insurer is entitled to limit its liability to damage to the rooms where moisture damage was detected being bedroom 1, loungeroom, bedroom 2 and the hallway. However, it must increase its offer to settle the claim for the damage. I appreciate the insurer is entitled to obtain quotes for the amount it would cost them and have access to industry pricing, however, AFCA must be satisfied the complainant would be able to have the work completed for the amount offered by the insurer. The insurer relied upon the CRD who identified the moisture stained rooms and recommended all moisture and mould affected ceilings, cornices and ceiling insulation shall be removed and replaced to match existing. The insurers quote from RPF includes the preparation and painting of ceiling and cornices and replacement of insulation bats. A generic item is listed for cleaning and sanitisation. Determination | Case number: 766177 Page 5 of 10 The complainant provided two quotes for repairs, one from SRC and one from CRS. Both quotes provide detailed works for repairs. The reports are not itemised into work items but into areas of the home. The quotes are more comprehensive and list auxiliary items which would be required such as floor protection, removal and disposal of ceiling, equipment for high ceilings and a contingency if the mould spread into the framework. The insurer has not provided any valid reason as to why the complainant’s quotes are not acceptable but considers them excessive. It is also clear bedroom 1 suffered significantly more damage whi ch has not been considered in the insurer’s quote. Given this, I am not satisfied the complainant could have the work completed for the amount offered by the insurer. The insurer should increase its cash settlement based on the quotes available from the complainant. The complainant advised she is happy to accept her lower quote being the quote from CRS. CRS quoted $7,250 ($7,975 including GST) to repair/repaint the main bedroom. CRS also quoted $17,500 ($19,250) including GST) to repair all water damaged walls and ceilings. I consider it fair based on these quotes that the insurer pays the complainant $27,225 to cover the moisture damage to the main bedroom, loungeroom, bedroom 2 and the hallway. Interest is payable as per section 57 of the Insurance Contracts Act 1984 from 11 December 2020. Insurer required to increase its offer for mould remediation I consider it fair and reasonable the insurer cash settle the complainant the cost of mould remediation as quoted by PP on 26 November 2020 of $21,254.00. Interest is also payable as per section 57 of the Act from 11 December 2020. The insurer accepted mould remediation cost for master bedroom offering the complainant $5,628.70. It did not quote for the other areas. The complainant says the offer is not sufficient to remediate the mould damage throughout the house. The complainant’s report from PP identified elevated levels of mould in bedroom 1, bedroom 2 and living room which aligns with the accepted water damaged rooms of bedroom 1, bedroom 2 and living room. The insurers report only references the main bedroom. Having reviewed the expert evidence from both parties, it is clear there is mould growth in the rooms which have been accepted by the insurer. I consider it reasonable to expect mould growth in rooms damaged by water ingress. The insurer disputes its liable for mould in all rooms however, there is no evidence the insurer assessed the other water affected rooms for mould. It also has not provided an alternative opinion to that of PP. Complainant entitled to temporary accommodation The complainant seeks for the insurer to cover the cost of temporary accommodation while the mould is remediated. The insurer denied the costs because it says the mould did not make the property uninhabitable and the property could have been remediated in a timely manner if the complainant accepted works. The insurer’s mould remediator R confirmed only the master bedroom is uninhabitable and shutting the door and not entering is sufficient in containing and preventing cross contamination. R did not comment on the mould in other rooms. The complainant’s expert P P considers the high and very high mould counts a potential health hazard to the complainant cautions against occupancy until remediation can be conducted. Determination | Case number: 766177 Page 6 of 10 Given I consider the insurer is liable for the remediation of mould in bedroom 1, bedroom 2 and living room, I am satisfied a sufficient number of rooms are impacted to deem the property uninhabitable. I note the complainant has not incurred temporary accommodation costs. The complainant says she lived in the property until mid-2020, however, since then has lived with family and friends due to the cost of temporary accommodation. Given the extent of mould, it is appropriate the insurer cover the cost of ongoing temporary accommodation in line with policy terms and conditions until the mould is remediated and repairs completed. Insurer required to cover the cost of complainant’s expert reports The complainant seeks for the insurer to reimburse her the cost of expert reports she obtained in support of her position. The complainant seeks $1760 for the report of SRC and $1320 for the report of PP. AFCA can determine an insurer contribute to a complainant’s profess ional costs incurred during a claim if it considers the reports assisted and progressed the complainant’s position. Given both the insurer and AFCA relied upon these reports in consideration of the complainant, it is appropriate the insurer reimburse the complainant the cost of the reports being $3080. 2.2 Is the complainant entitled to non-financial loss? Insurer handled claim reasonably well overall The complainant says the claims process has caused an inordinate amount of inconvenience resulting in significant financial loss and emotional distress. The complainant the insurer sought to decline the claim and failed to progress the claim in a timely manner. The insurer says it approach to the assessment of the insured repairs and the maintenance required to be undertaken and has not otherwise unduly delayed the claim. AFCA will only award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant ’s expectation of enjoyment or peace of mind. The maximum amount AFCA can award for non-financial loss is $5,000 per claim. AFCA may also decide a non-financial remedy, such as a letter of apology, is appropriate. I considered the submissions made by the complainant and the insurer. I also reviewed the claims file and timeline of events. I also considered the relevant Insurance code of conduct. The insurer maintained appropriate contact and progressed the claim in timely manner as required by the code. I appreciate this was not as rapidly as the complainant would have liked. The claim notes indicate there were delays around the provision of expert reports. The turnaround period for reports took some time. The complainant obtaining her own quotes and reports have extended the claim period due to the insurer’s entitlement to review any additional evidence. However, I accept the complainant was living in a house with serious mould and therefore delays would have caused additional stress and health concerns. As a result, it is appropriate the insurer pay the complainant $1,000 non-financial loss. Determination | Case number: 766177 Page 7 of 10 2.3 Why is the outcome fair? The outcome is fair based on the information exchanged. Consideration has been to the submissions from both parties and opportunity has been provided to respond to those submissions. It is consistent with the relevant terms of the policy and good industry practice. Determination | Case number: 766177 Page 8 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. 3.2 Relevant policy terms What you are covered for – Insured events Storm We cover Loss or damage caused by a storm We do not cover loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, a storm and not becaus e of erosion over time, structural fault or design fault;” Exclusions Ground movement  erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events:  ‘Storm’ (see page 22); … Wear, tear and gradual deterioration wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as but not limited to:  tiles and their adhesive or grouting breaking down;  weathering of roof tiles or roof ridge capping;  gradual weathering and breakdown of bricks, mortar or concrete. How we settle your claim We choose how we settle home claims Determination | Case number: 766177 Page 9 of 10 If we agree to pay a claim for loss, theft or damage to your home, we will decide if we will:  repair damage to your home;  rebuild your home;  pay you what it would cost us to repair or rebuild your home;  pay you the sum insured for your home;  give you a voucher, store credit or stored value card for the amount it would cost us to repair or rebuild an item. If we rebuild (or pay you what it would cost us to rebuild), we will do so on a ‘new for old’ basis. Record Key points Complainant’s expert ( SRC ) Report 09 - 06 - 2020  As a result of storm damage, we have identified multiple cracks across areas of ceilings, walls, cornices and arches. Much of the identified items require remediation via helifix bar installations and repairs or replacement of existing elements.  Also identified as an area of great concern was the level of mould growth identified in the bedroom ceiling adjacent to the dining/living rooms. Such a level of growth is dangerous and is recommended that ceiling is cut out as soon a s possible following above roof & gutter repairs.  Images of sub floor area in vicinity of wall in dining area suffering from significant cracking.  No obvious signs of cracking in supporting walls although at least once supporting pier was identified to b e out of level indicating minor subsidenc e as a result of changing ground conditions believed to be as a result of February storms.  It is believed that as a result of the deluge experienced during the February storms that the gutter in the indicated area s has been damaged and is no longer aligned correctly resulting in water being retained within gutter. As a direct result of this large amounts of mould has begun to spread within the bedroom internally as seen in figures 11 - 13. It is recommended that the gutter is repaired and realigned and ridge capping repointed followed by extensive remedial works internally. Insurer’s expert ( CRD ) Report 01 - 09 - 2020  The SRC Report has identified rusting in valleys and mis - aligned gutters. This is not a result of the storm event; rather are the result of deterioration of flashings and gutter supports over time.  The most signific ant instance of cracking is above the d ining room fireplace. The fire place is located internally, approximately 3 meters away from the closest external wall. The external walls were generally free from any significant cracking. If the fireplace cracking was a result of ground movement from hea vy rainfall during a single storm event, it would be ex pected that the ground and footings below the perimeter walls be greater affected than the those of the internal chimney/fireplace, however this was not observed. Thus, we do not believe that the crac king to the fireplace/chimney is the result of the storm. The cracking is a result of long - term settlement of the fireplace structure. It is noted that there is evidence of previous crack repair to the wall of the western side ent ry, an indication of previ ous ground movement.  The majority of the cracking throughout the rest of the house was observed to be above the line of the picture rail approximately 2 Determination | Case number: 766177 Page 10 of 10 Record Key points meters above the floor. The plaster to the walls above the picture rail was typically cracked and drum my. Cracking due to the settlement typically presents itself as diagonal cracking to walls across the height of the wall. As the majority of cracking was limited to the top of the wall, it is unlikely that the cracking is the result of settlement; rather the cracking and drumminess of the plaster is more likely a result of deterioration and the aging of the property. Similarly, the cracking of the ceilings and cornices are the result of the age of the property, not the res ult of the storm event. Complai nant’s expert ( PP ) Report 01 - 11 - 2020  The total mould per m3 recorded in the Fathers’ room was 5,813 spores per m3 which is rated as Very High Mould Ecology. The dominant genera of mould found in the sample were Aspergillus / Penicillium - like accounting for 82% of the sample.  The total mould per m3 recorded in the Living room was 4,987 spores per m3 which is rated as Very High Mould Ecology. The dominant genera of mould found in the sample were Aspergillus / Penicillium - like accounting for 73% of the samp le. There were atypical mould found in the living room.  The total mould per m3 recorded in the master bedroom room was 7,133 spores per m3 which is rated as Very High Mould Ecology. The dominant genera of mould found in the sample were Aspergillus /Penicillium - like accounting for 78% of the sample.