Landlords claimed about $400,000 for storm-water flood repairs and mould remediation, plus loss of rent and non-financial loss, and the insurer had paid $24,314.28 in lost rent. AFCA declined the increased settlement and extra rent, ordered the insurer to reassess the claim within a set period, and to reimburse expert reports it had agreed to pay.

Under the policy the insurer chooses the settlement method, and an insured who limits the insurer's inspection cannot require a cash settlement on its own quotes until access is provided.

Issues

Subjects and remedies

home or building damagepay compensationreassess claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 766162 Financial firm Insurance Australia Limited Determination | Case number: «reference_id» Page 2 of 13 Case number: 766162 5 August 2021 1 Determination overview 1.1 Complaint The complainants hold a landlord insurance policy with the financial firm (the insurer). They lodged a claim for their investment property after the lower levels were inundated following a rain event. The insurer accepted liability for damage to the lower levels. However, a dispute has arisen over the settlement amount. The complainants say the offer is insufficient to complete the works. They seek for the insurer to honour their quote, accept the resultant structural damage, pay loss of rent until the clam is finalised and pay non-financial loss for a poor claims experience. The insurer says its offer is fair and reasonable and the complainants are not entitled to compensation. The insurer also says it has been unable to assess all of the items being claimed because the complainants are not complying with their policy obligations. Issues and key findings Should the insurer increase its offer? No. The complainants have not provided reasonable access to the property to enable the insurer to properly assess all of the repairs sought. Therefore, the insurer is not required to increase or reconsider its settlement unless the parties agree to proceed in the manner set out in section 2.1. Are the complainants entitled to additional loss of rent? No. The insurer has already paid for almost six months of lost rent. The delays that have occurred has been mainly due to the complainants’ failure to provide the insurer with reasonable access and seeking a cash settlement. Are the complainants entitled to non-financial loss? No. The available information does not show the insurer has mismanaged the claim to the extent it warrants an award for non-financial loss. Is the insurer liable for the cost of expert reports? To the extent the insurer has agreed to pay for any reports, it should reimburse these costs. Beyond this, the insurer is not required to reimburse these costs at this time. 1.2 Determination This determination is mostly in favour of the insurer. The insurer is not required to increase its cash settlement offer at this time. Instead, the claim should proceed in the manner set out in section 2.1. The insurer is not liable to pay for any more lost rent or for non-financial loss. The insurer is to reimburse the cost of experts reports to the extent it agreed to do so. Determination | Case number: «reference_id» Page 3 of 13 2 Reasons for determination 2.1 Should the insurer increase its offer? Complainants are seeking almost $400,000 for repairs The complainants want the insurer to increase its cash settlement for repairs because it does not address movement of the building’s frames, studs or bottom plates. The complainants also say the insurer’s allowance for the accepted repairs are too low. The complainants are seeking just under $400,000 for repairs and mould remediation. The complainants say this is all related to the clai m. This is significantly higher than the insurer’s initial assessments. The insurer says it was prepared to do the repairs but the complainants insisted on a cash settlement. Further, the insurer says the complainants have not provided it with reasonable access so that it can fully assess all of the claimed damage. This includes additional issues the complainants identified during the course of the dispute, one of which is the structural movement the complainants say was caused by the claimed event. The complainants provided two engineering reports confirming the claimed event caused the structural movement. The insurer engaged an engineer, RCE, to review this issue. However, RCE was provided with limited opportunity to inspect the damage. RCE’s report acknowledged this several times. Complainants have not complied with their obligations The insurer maintains it has been prejudiced by the complainants’ failure to allow it to adequately assess the damage. RCE was not able to do a complete inspection. The insurer has been unable to inspect the property to assess all of the items the complainant is wanting to be paid. The complainants say the insurer has sent at least four of its various consultants or experts to inspect the damage. This included the insurer’s assessor, RCE and builder J. The complainants say they have sent many photos, reports and quotes to substantiate the claim. As stated previously, the complainants are seeking a significant quantum. This does not include loss of rent. The panel does not accept it is reasonable to expect the insurer to pay for quotes without having an opportunity to engage its own experts to review all of the damage. Further, the insurer has stated it is prepared to do the claim related repairs. However, the complainants are seeking a cash settlement. The policy provides the insurer, not the complainants, with the discretion as to how to settle the claim. The available information shows the complainants did interfere with RCE’s ability to inspect and review the damage. The com plainants raised concerns about RCE’s qualifications and the fact they wanted to reconsider the cause of damage. However, the structural damage being claimed was new. The insurer was entitled to consider whether this damage was caused by the claimed event or by other factors. Further, it is clear an engineer was required to assess this. However, the only engineer engaged by the insurer to inspect this was provided limited access by the complainants. This issue is also a significant aspect of the claim. The insurer was entitled to fully assess this. Whilst the complainants had concerns about RCE’s qualifications, this could have been raised when challenging the report. It was not consistent with the complainants’ policy obligations to limit RCE’s inspection in the manner they did. Determination | Case number: «reference_id» Page 4 of 13 Further, the insurer is entitled to obtain its own quotes for the repairs. This is because the insurer is entitled to base a cash settlement on its own competitive rates given it was prepared to authorise the repairs but the complainants are seeking a cash settlement. However, the insurer has not been able to do so given there has been limited access provided and it cannot confirm the full scope of works. The panel is also not persuaded the complainants’ engineer reports conclusively show the structural damage is all claim related. Their reports were focused on the claimed event and how this could have led to the damage. However, RCE noted there could be site drainage issues that could have caused the structural movement. This could not be fully investigated given the limited access provided and the complainants’ interference with the inspection. Insurer not required to increase cash settlement until complainants co-operate Given all this, the panel does not accept the complainants are entitled to the amount being sought. The complainants are seeking a significant amount. This includes structural damage they say is related to the claim. Limited opportunity has been provided to the insurer to investigate this issue as well as the other additional items the complainants are seeking. Photos and reports obtained by the complainants are not enough for the insurer to fairly assess the claim. Instead, the insurer was entitled to engage its own experts and builders to review the items and determine:  which areas it accepts is related to the claim, and  determine what the likely cost is to repair those items. Therefore, until the complainants co- operate with the insurer’s request to undertake these activities, the panel is not satisfied it is fair for the insurer to increase or reconsider its settlement. This is because the complainants’ failure to comply with their policy obligations prejudiced the insurer’s ability to fairly assess all aspects of the claim. Claim should be resolved in this way Given this, the panel considers it fair in all the circumstances for the claim to be resolved in the following way. The insurer should be given an opportunity to fully assess all aspects of the complainants’ claim. This will require the complainants providing access to the insurer and its contractors to access the property. Such contractors would likely include an engineer, any builders to quote for the claim related damage and its assessors. Once this is done, the insurer must make a decision as to a fair cash settlement amount. As the insurer would have conducted the claim related repairs, it is entitled to rely on quotes that would have been available to it in making this assessment. Given the nature of the works are complicated, it should also add a 15% contingency for the possibility of additional variations. All of this should be done no less than 8 weeks after this determination is accepted. This timeframe is subject to the complainants providing timely and full access to the property. Whilst this timeframe is short, this is an investment property with a loss of rent component attached to it that warrants this tight timeframe. If the parties are unable to agree on the quantum, the complainants can lodge a dispute with AFCA for a decision on this point. If the complainants do not agree to this method, then the insurer is not required to increase its cash settlement for this claim or take the matter any further. Determination | Case number: «reference_id» Page 5 of 13 2.2 Loss of rent Complainants not entitled to further loss of rent The complainants want the insurer to extend its loss of rent payments from 6 January 2021 until the property is repaired. The insurer has paid $24,314.28 for lost rent. This is for the period 5 July 2020 to 6 January 2021. This is almost six months. The policy covers the rent you lose during the reasonable time it should take to repair or rebuild your rental property, for up to 12 months from when the listed event took place. The insurer says the policy benefit does not cover indefinite loss of rent. It only covers the loss of rent incurred during the time it should take to repair or rebuild the property. The insurer also says the complainants failed to mitigate their loss by not commencing repairs, preventing the insurer from assessing the damage and insisting on cash settlement when the insurer was willing to cover repairs. The panel accepts the insurer’s position. The insurer has not been able to properly assess the claim or been given the opportunity to repair the claim related damage. This is due to the complainants providing restricted access to the property and seeking a cash settlement. Further, these actions have delayed the claim and at this point, there is insufficient basis to decide on a fair cash settlement. Therefore, the panel does not accept the insurer is required to pay for any lost rent to date. 2.3 Is the complainant entitled to non-financial loss? Compensation for non-financial loss payable in certain circumstances The complainants seek compensation for stress and inconvenience (non-financial loss) due to the way the insurer handled their claim. We will only award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant’s expectation of enjoymen t or peace of mind. Insurer is not required to pay non-financial loss The complainants seek $5,000 non-financial loss for the poor claims experience. This includes claims delays, the insurer’s failure to offer a reasonable cash settlement and the insurer’ s failure to consider expert building reports submitted by the complainants at the cost of the insurer. The insurer says claim delays were caused by the complainants requesting a cash settlement and not being satisfied with the settlement figures. The panel has reviewed the claim file notes and submissions from both parties. The claim notes indicate the insurer maintained contact and followed up assessment reports in a timely manner. Most of the delays was due to the complainants seeking a cash settlement and restricting access to the insurer’s contractors. This is not the insurer’s fault. Given this, the panel is not satisfied there is any basis to award non-financial loss. Determination | Case number: «reference_id» Page 6 of 13 2.4 Is the insurer liable for the cost of expert reports? The complainants incurred professional costs Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs incurred by a complainant in the course of a complaint. These costs can be awarded if the complainant needed an expert to understand or establish their claim. These costs are normally capped at $5,000 unless exceptional circumstances apply. Insurer to pay for the invoices it agreed to The complainants seek for the insurer to cash settle it the cost of quotes and expert reports obtained to support their position. It appears the insurer has agreed to pay for some of these costs. To the extent the insurer has agreed to pay for these costs, it should do so. The complainants have set out the costs they are seeking in their submission dated 30 March 2021. To the extent the insurer has not agreed to the costs and quotes sought, the panel is not persuaded it is fair for the insurer to reimburse them at this time. This is because the evidence is unclear if these were reasonably incurred or assisted the complainants to establish their case. Determination | Case number: «reference_id» Page 7 of 13 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy terms What we pay for – Buildings Insurance If we agree to cover your claim under Buildings Insurance, then we will:  pay the cost to repair or rebuild the part of your rental property that was damaged (whichever is lower)  pay for any extra costs we cover under ‘other benefits’ – see below. The most we pay The most we will pay for your rental property buildings is the Buildings sum insured. Other benefits We may also pay some costs on top of the Buildings sum insured under ‘other benefits’ for: Loss of rent during repairs, see page 39 Mortgagee discharge costs, see page 41. Determination | Case number: «reference_id» Page 8 of 13 How we settle your buildings claim We will choose to settle your claim for loss or damage to your rental property and any ‘other benefits’ in one of the following ways: 1. Arrange for repairers, builders or suppliers to repair or rebuild your rental property If you agree, we can arrange for our preferred repairers, suppliers or builders to repair or rebuild your rental property. We may enter into any contract with our selected repairer, builder and/or supplier on your behalf. 2. Pay you the reasonable cost to repair or rebuild your rental property We can choose to: pay you pay your nominated repairer, supplier or builder, or provide you with store credits from one of our nominated suppliers. For example, we may pay you directly when: you decide not to repair or rebuild your rental property, or you don’t start repairi ng or rebuilding your rental property within 6 months from when the loss or damage takes place, or within any longer period we agreed to in writing. 3. Pay you the Buildings sum insured We may pay you the Buildings sum insured when we consider your rental property to be a total loss or when we choose to do so. If we pay you the Buildings sum insured, then your policy ends and you don’t get a refund of your premium. We will continue your liability cover (see pages 45 to 47) for up to 6 months from when the listed event took place. However, liability cover will end during this period if: construction starts at your site, or you sell the site or any portion of it, or you take out a new Buildings Insurance policy for your site. 4. Pay for other benefits Loss of rent during repairs If a listed event causes loss or damage to your rental property and we agree your tenants can’t live in it and need to move out so it can be repaired or rebuilt. Covered under Buildings Insurance the rent you lose during the reasonable time it should take to repair or rebuild your rental property, for up to 12 months from when the listed event took place. We pay this benefit on top of your Buildings sum insured. Not covered loss of rent during any time you live in the building if you also make a claim for rent default and we pay your claim loss of rent as a direct result of a claim under these listed events:theft or attempted theft by a tenant or their guest, or vandalism or a malicious or intentional act by a tenant or their guest. Conditions Determination | Case number: «reference_id» Page 9 of 13 you must have a rental agreement that states the:term of the rental period, and amount of rent and bond your tenant needs to pay. 3.3 Relevant Law INSURANCE CONTRACTS ACT 1984 - SECT 57 Interest on claims (1) Where an insurer is liable to pay to a person an amount under a contract of insurance or under this Act in relation to a contract of insurance, the insurer is also liable to pay interest on the amount to that person in accordance with this section. (2) The period in respect of which interest is payable is the period commencing on the day as from which it was unreasonable for the insurer to have withheld payment of the amount and ending on whichever is the earlier of the following days: (a) the day on which the payment is made; (b) the day on which the payment is sent by post to the person to whom it is payable. (3) The rate at which interest is payable in respect of a day included in the period referred to in subsection (2) is the rate applicable in respect of that day that is prescribed by, or worked out in a manner prescribed by, the regulations. (4) This section applies to the exclusion of any other law that would otherwise apply. Determination | Case number: «reference_id» Page 10 of 13 3.4 Relevant expert evidence Record Key points Financial firm’s expert (JLE ) Report 04 - 05 - 2020  Upon inspection of the residence there was found to be damages sustained to the first floor timber floating floors throughout from what appears to be water ingress coming up through the concret e slab of the property. During our inspection it appears that somewhere throughout the property the storm water drainage has a blockage which appears to be causing water to back flow beneat h the concrete slab and cause moisture to rise through it and affected the timber floating flooring. Due to the mould growth bene ath the timber flooring it appears that this has been an underlying issue present to the property for a period of time.  It is my professional opinion that due to a blockage in the stormwater system located at the front, right corner, water would not be dra ining away correctly and as a result, I believe it is backing up and overflowing from the stormwat er points located at the rear of the property. As a result, I believe the water has leaked back into the property from this area and has caused the damage to the timber floor. I would recommend having the entire stormwater system jet cleaned to remove any blockages, to ensure that the drain can drain away correctly. I also found that there is a cracked junction located at the back, left side of the property, as well as roots growing int o a section of the drain at the back of the property. I recommend that this section of drain be removed and replaced to ensure that water does not leak out through the crack in the pipe, and to ensure that the roots do not grow in to the drain any further and cause issues in the future.  Damages appear to be caused by an unforeseen issue to the property and not a maintenance issue however please note the insured is to have the issue regarding the storm wat er drainage repaired as reco mmended in the professional CCTV report prior works commencing to the property to allow a warrant able outcome Financial firm’s expert (SP ) Report 07 - 05 - 2020  Upon inspection I found evidence of water damage to the timber flooring throughout the ground floor of the property, which can be seen below  During my inspection of the stormwater system, I found that there is a blockage at the front, right side of the property. Due to the pipe being blocked at this point, water would not be able to drain away cor rectly and as a result, I believe it can easily back up within the system and overflow. I believe the water has overflowed from the stormwater points at the rear of the property, which I believe has then leaked back into the property, causing the large ex tent of damage found. Financial firm’s expert (EHS ) Report 05 - 06 - 2020  The floorboard throughout the lower level have swollen and popped in several locations. The particle board subfloor remains wet (top left). There is visible mould below the floorboards (bottom left, centre) and behind skirting (bottom right) in areas where access was available. Where access was not available there is a strong assumption that mould is present, this is true for both the floor and the wall cavity. Visible mould beneath the particle board flooring is expected throughout the bottom floor however, the full extent will be unknown until more access is available. Bathroom and stairs can remain until further investigation can be completed. Determination | Case number: «reference_id» Page 11 of 13 Record Key points Financial firm’s expert (L ) Report 06 - 06 - 2020  During our review of the hygienist report, it was noted that the air levels within Bedroom 2 and the Master Bedroom were significantly higher than the external comparis on, particularly in the count of as pergillus, indicating that there is likely an active water issue occurring at the property.  There is no visual mould growth within either room to indicate where a water ingress issue may be occurring and as such, it is recommended that invasive testing is carried out.  Envirofree report recommends a plumbe r also attend to identify water ingress issues, including an inspection of the first floor column heater.  It was also noted that the surface samples taken to form the scope of works were taken at the entry point of each bedroom, deeming the carpet non - res torable.  Again, no visual mould was found, nor were moisture readings taken to indic ate damage to the carpet. Thes e readings may be a result of cross contamination from the downstairs affected area to upstairs carpet given that this is a high traffic area .  It would be recommended prior to any strip out works, that further sampling is taking of the upstairs premises of this property to determine the extent of works further (ie. Condition 2 or condition 3 remediation). Complainant’s expert (JPE ) Report 11 - 11 - 2020 Area Damag e category Comment Ground Floor Entry C2 Door frame cracked, door sticks lightly No cracks visible on walls but out of plumb by about 15 mm Bedroom C2 Door frame cracked and buckled, door sticks lightly Hairline cracks on ceiling, out of plumb wall by about 5 mm Stairs N/A Water stains and mould on bottom part of the stair and the stair cavity. Kitchen Living C4 Cracks up to 30 mm on party wall, out of plumb by 25 mm Skirting parting apart on most walls, with the most damage on the eastern wall (up to 30 mm) Loss of bearing capacity Small cracks on ceiling First Floor Bedroom C2 Door frame cracked, door sticks lightly No cracks visible on walls but out of plumb by about 6 mm Retreat C1 Small cracks on ceiling Bathroom C0 No visible crack Master bedroom C3 Cracks on ceiling Out of plumb w all by about 15 mm Possible loss of bearing capacity Ensuite C0 No visible crack  The house was subject to a stormwater ingress through rear courtyard flooding during March - April as stated by the owner. The house now shows sign of movement. There is no known modification to the house since constructed in 2011 - 2012.  According to the own er, the house was vacated few months ago following the presence of mould, resulting from the flood. Owner stated that cracks on the ground floor party wall were not noticeable in June - July. Since then, cracks on walls became noticeable and more cracks star ted to appear on the partywall such as corner skirting boards splitting at joints.  Based on the observations made during the inspection and available Determination | Case number: «reference_id» Page 12 of 13 Record Key points documents: > House was damaged by a flooding event which took place in March - April 2020; > Party wall show s excessive cracks (up to 30 mm) on the ground floor; > Eastern external walls, on both ground floor and first floor are out of plumb; > Cracks are visible on most door frame, few cracks on ceilings. > No other known event was recorded.  The following structural distress is the most probable chain of events: > Due to the flooding event, all timber members on the ground floor, including underlay of the flooring, skirting boards, timber flooring and bottom plates started swelling. > As the eas tern wall is a solid earth retaining structure, the only way for timber flooring to expand was towards the party wall. > The additional stresses on the bottom of the party wall, associated with weaken bottom plate lead to movement of the bottom of the party wall. > As the ground floor party wall moves, the first floor party wall and first floor joists move too. > As the first floor party wall moves, it leads to roof movement, which is then transferred to first floor external wall. > Difference in load pattern a nd transfer on the first floor will be transmitted to the eastern external load bearing wall, leading to out of plumb wall. Financial firm’s expert (RCE ) Report 01 - 12 - 2020 Civil drainage  During rain events, water is collected from roofs; however, significant amounts of water are also generated from the walls, pavements and land. The purpose of civil drainage is to direct water away from the structure. Some examples of functioning civil dra inage include roofs collecting water and transporting it to the legal point of discharge, or Determination | Case number: «reference_id» Page 13 of 13 Record Key points paving diverting water away from the dwelling’s edges. Where adequate civil drainage doesn’t exist adjacent to external walls, stormwater can migrate below the foo tings or enter the structu re.  The soil is roughly one meter higher than the slab at the northeastern corner of the dwelling. This height difference is due to the Insured’s property being cut level prior to construction in 2010. The moisture from this soil appears to be permeating through the masonry and into the floorboards, causing them to expand. The expansion of the floorboards has caused a build - up of pressure within the flooring, resulting in the tenting. The expansion has also pushed the eastern archi traves into the wall, cracking the plaster in the process. The migration of the water through the masonry indicates that no wat erproof membrane was painted on.  The translation of the architraves into the wall has may have moved the bottom plate and studs s lightly. Based on the extent of the cracking, it is believed that the wall may have translated up to 10 mm. As this movement is minor, it does not pose a structural risk and does not require make - safe works. The cracked plaster will need to be removed to d etermine if the framing is water damaged and needs to be rectified

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.