Determination 766153

Denial of movement and cracking damage claim to tenanted property

FirmSuncorp Group
Decided2021-06-24
ProductGeneral Insurance · Other general
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for movement and cracking damage to a tenanted property, which the insurer denied. AFCA found a leaking stormwater pipe proximately caused damage to part of the property and ordered the claim settled for that area through an engineer scope and cash settlement, without interest.

Proximate cause of the loss is the dominant, efficient cause, and the leaking pipe was an insured escape of liquid, not excluded ground movement.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 766153 Financial firm AAI Limited Determination | Case number: 766153 Page 1 of 5 Case number: 766153 28 May 2021 1 Determination overview 1.1 Complaint The complainant lodged a claim for movement and cracking damage to his tenanted property with his insurer, the financial firm (insurer). The insurer denied the claim on the basis the damage was not caused by an insured event. The complainant disputes this as he says part of the damage claimed was caused by a leaking pipe. 1.2 Issues and key findings Can the insurer deny the claim? No. This is because the available information shows some of the damage claimed was proximately caused by a leaking pipe. Therefore, the insurer is liable for this damage. 1.3 Determination This determination is partially in the complainant’s favour. The insurer should settle the claim as set out in section 2.1. Determination | Case number: 766153 Page 2 of 5 2 Reasons for determination 2.1 Can the insurer deny the claim? Engineers say an unconnected pipe has caused some of the damage claimed The insurer obtained a report from engineer IL dated 2 June 2020. IL concluded that an unconnected stormwater pipe underneath a deck has exacerbated the damage to the meals area, western side of the lounge and north-western corner of the bedroom. IL stated this would have contributed 80% to this area of damage. IL did note that initial cracking and movement to the entire dwelling has been caused by the combined effects of:  seasonal expansion and contraction of the soils,  proximity of trees and shrubs, and  inadequate surface drainage. The complainant obtained a report from engineer W dated 14 August 2020. W’s opinion was relatively consistent with IL. W accepted the unconnected pipe would have influenced the footings and floor levels within the rooms surrounding the deck area. However, W also noted that given the house is between 50-100 years old, deterioration in other areas is likely long- term and not from a one-off event. BB provided a plumbing report that confirmed most of the roof’s stormwater would be discharging from this unconnected pipe. Proximate cause of some of the damage is the unconnected pipe In this type of dispute, it is important to identify the proximate cause of the damage being claimed. Proximate cause is the dominant, efficient or operative cause of the loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. It requires a common sense evaluation of the evidence. In this regard, I note the following. The engineers’ evidence shows the proximate cause of the damage to the area near the deck was the unconnected pipe. IL says this would have contributed 80% to this part of the damage. This clearly shows the pipe was a dominant cause of this area of damage. This is supported by W. I also accept IL’s evidence that the widespread movement and cracking damage to all the home was not caused by this pipe. Both IL and W agree there are long-term issues causing ground movement to the property unrelated to this leak. This is supported by previous repairs and cracking. I note the complainant does not dispute the property has been affected by long- term movement. Therefore, the proximate cause of damage to the meals area, western side of the lounge and north-western corner of the bedroom is the unconnected pipe. I do not accept any movement and cracking damage beyond this area was proximately caused by the pipe. Determination | Case number: 766153 Page 3 of 5 An insured event has occurred The insurer says this unconnected pipe does not constitute an insured event. This is because water cannot be said to have been escaping, leaking, overflowing or bursting from this pipe. I note the online Macquarie and Oxford dictionaries defines leak to mean: an unintended hole, crack, or the like by which fluid, gas, etc., enters or escapes [Macquarie] any avenue or means of unintended entrance or escape, or the entrance or escape itself [Macquarie] accidentally lose or admit contents, especially liquid or gas, through a hole or crack [Oxford] Given this, I accept this unconnected pipe constitutes a leak. It is clear this pipe should not be discharging water into the soils given their reactive nature and the fact most of the roof’s stormwater system is coming out at this point. It is also clear the complainant was unaware of this issue given the pipe was underneath a deck and out of sight. Therefore, from the complainant’s perspective, I accept water was unintentionally escaping from this point. This falls within the insured event. Even if I am incorrect about the correct legal interpretation about the policy, I do not accept a person of average intelligence and education would have readily understood such an event would not apply in these circumstances. Further, and in the alternative, I consider this interpretation, and its application to these facts, to be fair in all the circumstances for the reasons set out above. Insurer’s other arguments do not assist it The insurer has also argued that this is not a single event. I disagree. The event would have been when the pipe first started leaking. That event has caused all of the damage claimed. Whilst the damage may have occurred over a period of time, I am satisfied it was this single event that caused the loss being claimed. The insurer has referred to an exclusion for ground movement. However, I do not accept this applies because the proximate cause is the leaking pipe, not normal ground movement. I also note there is no specific exclusion for ground movement under the insured event of ‘escape of liquid’. Claim should be settled in this way After careful consideration of all the available information, it is fair in all the circumstances the insurer accept liability for the damage IL says was mainly caused by the leaking pipe. I note IL has prepared a scope of works for this related damage. However, part of these works required the soils to stabilise over a 12-month period. Given this, I consider it fair that the claim be settled in the following way: Determination | Case number: 766153 Page 4 of 5  once the 12-month stabilisation period has passed, IL should provide an updated scope of works to address all of the repairs necessary to the areas said to have been mainly caused by the leak  if IL is unavailable, then an independent engineer should be engaged to do this. That engineer is to be agreed to by the parties. This can be done by the insurer providing a list of three engineers that the complainant can choose one from. Alternatively, the complainant can provide three choices for the insurer to choose one – the engineer’s costs are to be borne by the insurer  once the engineer completes a scope of works, each party can obtain at least one, and no more than two, actionable quotes based on that scope of works. To clarify, an actionable quote is one where the builder is prepared to do the works for the complainant  if only one actionable quote is obtained, then the insurer is to cash settle the claim based on that quote plus a 20% contingency. If more than one actionable quote is obtained, then the insurer is to cash settle based on the average of those quotations with a 20 % contingency The contingency is to address the likely variances that may arise in a complicated job like this and the fact the risks of the works are passing to the complainant. No interest is payable given payment should be based on current rates. If the parties are unable to agree on the final quantum, the complainant can lodge a complaint to AFCA for a decision on this point. Determination | Case number: 766153 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.