Text of the determination
Determination
Case number 765708
Financial firm Bank of Queensland Limited
Determination | Case number: 765708 Page 2 of 8
Case number: 765708 26 November 2021
1 Determination overview
1.1 Complaint
The complainants entered into a construction loan (loan) with their financial firm (bank) in July
2017. The loan was used to finance the construction of the complainants‟ principal place of
residence.
The bank paid progress payments to the builder from the loan account as follows:
$130,000 on 28 August 2017 (ground plumbing - stage 1)
$160,000 on 6 September 2017 (base - stage 2) and
$160,000 on 17 October 2017 (ground floor frame – stage 3).
The complainants say:
the building works were substandard and incomplete and required correction by a second
builder
the bank breached the Code of Banking Practice (Code) by asking them to sign Progress
Payment Authorities (PPA) before the builder commenced building
the bank made the first three progress payments without their knowledge and, because it
did so, they lost the opportunity to have the builder correct the defective and incomplete
works
the bank‟s conduct has caused them financial loss.
The bank says it made the progress payments in accordance with the loan‟ s terms and
conditions and is not responsible for the complainants‟ losses flowing from the defective
building works.
On 23 August 2021, an AFCA case manager provided a recommendation on these issues.
The recommendation was in favour of the bank and a copy of it is attached. The complainants
rejected the recommendation for the reasons set out in section 2.1 below.
1.2 Issues and key findings
Were the findings in the recommendation correct?
The findings in the recommendation were correct and are adopted in this determination. We
have considered further submissions provided after the recommendation including a statutory
declaration provided by the complainants.
Should the bank have accepted the PPAs?
The bank did not breach the Code by accepting the pre-signed PPAs but did so in acting
upon them without obtaining either verbal or email consent to do so. The bank was entitled to
hold the signed PPAs until it understood the builder had completed each of the first three
stages of construction and had obtained confirmation form the complainants to pay the
builder.
Determination | Case number: 765708 Page 3 of 8
Has the bank’s conduct caused the complainants loss?
The available information shows the complainants were aware that the builder had
commenced construction and was receiving progress payments for the works carried out.
This means the complainants had the opportunity to discover the defective works and require
the builder correct them. It is not the bank‟s role to ensure the construction work is in
accordance with the complainants ‟ building contract.
Why is the outcome fair?
The events the complainants have described are unfortunate and I understand the defective
building works have caused the complainants additional expenses when completing the
building of their home. However, the bank was not responsible for monitoring the quality of
the building works before making each of the progress payments – this was the complainants‟
responsibility. Under these circumstances, it would not be fair to require the bank to
compensate the complainants for the additional costs they say they have incurred.
1.3 Determination
After considering all available information and the submissions of the parties, this
determination is in favour of the bank.
The bank is not required to compensate the complainants.
Determination | Case number: 765708 Page 4 of 8
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
The findings in the recommendation were correct and are adopted in this determination. We
have considered further submissions provided after the recommendation.
The recommendation found in favour of the bank
I am satisfied that the case manager‟s recommendation contains an accurate summary of the
complaint, the issues to be determined, any applicable paragraphs of the rules and any
relevant law. The findings in the recommendation are correct and are adopted in this
determination.
In his recommendation, the case manager found:
the complainants had authorised the progress payments by signing the PPAs
the bank was not liable for any losses the complainants had suffered because of the
defective building works.
The complainants rejected the recommendation saying:
the bank breached the Code‟s guiding p rinciples by asking them to sign the PPAs
by signing the PPAs, they lost the opportunity to have the builder rectify the defective
works.
2.2 Should the bank have accepted the PPAs?
The bank did not breach the Code of Banking Practice (Code) by accepting the pre-signed
PPAs. The bank was entitled to hold the signed PPAs until it understood the builder had
completed each of the first three stages of construction.
The complainants say the bank did not act in accordance with the Code
The complainants quote a number of the Code‟s guiding principles in their rejection of the
recommendation. They refer to the guiding principle about integrity which says:
The bank will act honestly and with integrity.
We will be fair and reasonable in our dealings with you.
We will build and sustain a culture bas ed on strong et hical foundations.
The complainants say the bank has breached this guiding principle (amongst others) by
asking them to sign the PPAs in advance of the construction.
AFCA gives weight to contemporaneous documents
When we assess complaints, we consider available documents, the recollections of the
parties, and all relevant circumstances. We give more weight to contemporaneous
documentary information.
If there is no relevant documentation, we will decide what is most likely to have occurred
based on the information provided to us. If there are conflicting recollections and these are
evenly weighted, we may find that a claim cannot be established.
Determination | Case number: 765708 Page 5 of 8
It is not clear why the PPAs were signed in advance
In this complaint, there are conflicting accounts about why the complainants signed the PPAs.
The complainants say:
the bank told them it was standard practice with construction loans
they would not have signed them had they not been asked to do so by the bank.
The bank officers concerned (Mr RR and Mr RM) have provided statements of recollection
which include recollections of why the PPAs were signed prior to the commencement of the
construction.
Mr RR says in his statement of recollection that the complainants wished to sign the PPAs as
they:
lived far away from [the bank branch] and wanted the process of doing progress claims
made easier
could not open any PDF that [the bank] would send them.
Likewise, Mr RM says in his statement of recollection, the complainants:
had difficulties printing emailed forms to sign and return
were located 36 km from [the bank branch] and did not want to attend the Branch each
time to sign the progress payment authorities, however wanted the Builders to be paid
promptly.
Neither party has provided any contemporaneous record of the conversations the
complainants had with Mr RR or Mr RM about the PPAs in or around August 2017.
Although the female complainant has provided her recollections in the form of a statutory
declaration, AFCA is not a court of law. This means AFCA does not have the power to take or
test evidence on oath . Accordingly, I have not given the female complainant‟s recollect ions
more weight than if she had provided her recollections in a statement (as did the bank‟s
representatives).
As there are conflicting statements of recollection and no contemporaneous notes of the
relevant discussions, I am unable to decide which version of events is the most accurate. This
means the complainants have not established that it was the bank‟s suggestion that they sign
the PPAs and they would not have signed them otherwise.
The bank did breach the Code
In my view, the fact that the bank accepted pre-signed PPAs is not, of itself, a breach of the
Code nor does it show a lack of integrity on the bank‟s behalf. It was merely an expedient way
of handling the progress payments to the builder and would not have raised any issues if the
builder had carried out the construction in accordance with the building contract. It would also
not have raised any issues if the bank had contacted the complainants, either by telephone or
email, prior to acting in accordance with the pre-signed authorities. However, it did not do so.
The bank did not seek any confirmation from the complainants prior to acting upon them, and
I consider that to be in breach of the Code in that it would be fair and reasonable of the bank
to hold pre-signed authorities which were to be acted upon following email or verbal
confirmation. To pre-sign the authorities and make no contact with the complainants prior to
acting upon them, in my view, breaches the obligation to act fairly and reasonably and in
accordance with good banking practice.
Determination | Case number: 765708 Page 6 of 8
2.3 Has the bank’s conduct caused the complainants loss?
The complainants have not suffered financial loss.
The available information shows the complainants were aware that the builder had
commenced construction and was receiving progress payments for the works carried out.
This is apparent from the fact that the complainants were copied into the first two invoices
submitted by the builder to the bank, and were aware, from the fact that the account became
overdrawn and discussions were had with the bank which indicated to the complainants that
the bank had acted upon the authorities to the bank and paid the builder.
This should have put the complainants on notice that the bank would act on the authorities
without reverting to them. If this was not acceptable to them, the complainants could at that
stage have required the bank to obtain updated authorities prior to making further payments.
They did not do so. In addition, the bank provided online access to the account, which
enabled the complainants to monitor the account for payments made.
Whilst the complainants were not copied into the invoice for the payment for the ground floor
framing, this was paid on 17 th October 2018.
The complainants instructed the bank on 13 March 2018 not to release any further funds to
the builder without the complainants‟ specific consent. This indicates that the complainants
were aware that they could impose such a requirement, and yet they did not do so after
becoming aware in October 2017 that the bank was paying out on the basis of the pre-signed
authorities. By that stage, even if the frame had not been completed in October 2017, it would
have been completed by March 2018, and the builder entitled to its payment
As indicated in the recommendation, the bank is not responsible for any losses caused by
defective works of the builder, or for the poor structure of the contract. The bank cannot be
held liable for such losses.
The complainants claim lost opportunity
In their letter to AFCA dated 21 September 2021, the complainants say:
The stages were incomplete and defective when the payments for those stages were
made by the bank and [the complainants] knew it.
…they lost the opportunity to contest the three progress claims in question because of
the bank‟s improper practice in requesting our clients provide pre-signed payment
authorities for all progress claim stages.
The complainants had the opportunity to contest the progress payments
The complainants have not provided any information to show that they were aware that any of
the first three stages of the build were incomplete or defective at the time the stage payments
were made. As the case manager pointed out, it was not until March 2018 that the
complainants raised any issues about the quality of the construction when they told the bank
not to make any further progress payments. This is (as the case manager noted) five months
after the bank made the third of the disputed progress payments.
Additionally, it is clear from the communications between the builder, the bank and the
complainants that the complainants knew that the builder was claiming for each of the first
two stages. A summary of these emails is in the following table.
Determination | Case number: 765708 Page 7 of 8
Date Parties
7 August 2017 Builder to
complainants
Trust you are both well.
As you may know, the Ground Plumbing Works on
your site are now complete. Please find attached
invoic e for these works.
Conc rete Footings will commence this week.
Please confirm when this payment has been
processed.
24 August 2017 Builder to bank and
complainants
Trust you are all well.
Please find attached progress claim for base stage…
Please let us know if you have any questions.
Given the content of these emails, I am satisfied that the complainants were aware that the
builder was making claims for the first two stages and that the bank was paying these claims.
If they had any issues regarding the quality of the build, they would have raised them at this
point.
Additionally, the complainants have provided photographs they took of the construction site.
The first of these photographs is dated 8 October 2017 and, consequently, does not support
the complainants‟ contention that they w ere aware of any defects (or even attended the
construction site to check the construction works) prior to the bank paying the builder for the
first three stages.
In my view, the most likely explanation of these events is that the complainants believed the
bank would take responsibility for checking the quality of the construction works before paying
each progress payment claim. As the case manager pointed out in his recommendation, this
was not the bank‟s responsibility but rather the responsibility of the complainants.
2.4 Why is the outcome fair?
Explain why the outcome is fair
The outcome is fair in all the circumstances because the complainants have not established:
the bank breached the Code by having the complainants pre-sign the PPAs
the bank‟s conduct c aused them to lose the opportunity to withhold payments from the
builder due to poor construction of the house
they would have acted any differently if they had been made to attend the branch as each
progress payment authority was required.
It is clear from the terms and conditions of the construction contract (which were set out in the
recommendation) that the bank was not responsible for the quality of the building works and,
if the complainants thought otherwise, they were mistaken.
Determination | Case number: 765708 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted our
determination to the issues that are relevant to the outcome.
.
Recommendation
Case number 765708
Financial firm Bank of Queensland Limited
Recommendation | Case number: 765708 Page 1 of 5
Case number: 765708 23 August 2021
4 Recommendation overview
4.1 Complaint
The complainants entered into a construction loan (loan) with their financial firm (bank) in July
2017.
The bank paid progress payments to the builder from the loan account as follows:
$130,000 on 28 August 2017
$160,000 on 6 September 2017 and
$160,000 on 17 October 2017.
The complainants say:
the bank made the progress payments without their authority and in circumstances where
the construction works paid for had not been completed in accordance with the
construction contract
the bank‟s conduct has caused them financial loss.
The bank says it made the progress payments in accordance with the loan‟s t erms and
conditions.
4.2 Issues and key findings
Did the bank make an error when it paid the progress payments?
The complainants signed the Progress Payment Authorities (PPAs) authorising the first three
progress payments before construction began. Even if this had not been the case, the
complainants have not shown that they would have acted differently if they had been asked to
sign the PPAs at the completion of each of the relevant construction stages.
The bank was not responsible for ensuring the building works were carried out in accordance
with the construction contract. Accordingly, any losses the complainants have suffered are
not due to the bank‟s conduct, but rather the inadequacies of the builder.
Why is the outcome fair?
The events the complainants have described are unfortunate and I understand the
complainants have suffered financial losses due to reasons beyond their control. But when it
made the progress payments, the bank complied with its obligations under the loan contract.
The defects in the building works were not the bank‟s fault and it was not responsible for
ensuring the construction works were carried out in accordance with the building contract.
Under these circumstances, it would not be fair to require the bank to compensate the
complainants.
4.3 Recommendation
This recommendation is in favour of the bank.
The bank is not required to compensate the complainants or take any further action.
Recommendation | Case number: 765708 Page 2 of 5
5 Reasons for recommendation
5.1 Did the bank make an error when it paid the progress
payments?
The bank made the first three progress payments in accordance with its obligations under the
loan contract. Further, it was the complainants‟ responsibility, rather than the bank‟s, to
ensure the works were properly carried out.
The complainants signed the PPAs
On 31 July 2017, the complainants entered into the loan to construct a house. Under the loan
contract, the bank was required to make progress payments to the builder (in accordance
with the construction contract) as each stage of the construction was completed.
The complainants say the bank asked them, before construction commenced, to sign and
return three Progress Payment Authorities (PPAs) to cover the first three progress payments.
I note that the three PPAs provided are all dated 16 August 2017 and I accept that the bank
asked the complainants to sign these documents in advance of the actual construction work
being carried out. All the PPAs are identically worded and have the following (among other
things) above the complainants‟ signatures:
I/we advise that the building being constructed for me/us by the Builder has been completed to
the said construction stage to my/our satisfaction according to the builder‟s certificate and
building contract.
Clearly, it is not possible for the complainants to verify at the beginning of construction that
they are satisfied with works that have not yet been carried out. However, it was the
complainants‟ decision to sign and return the PPAs and, by doing so, they gave their
authorisation for the bank to make the first three payments.
In any event, there is no information to show that the complainants would not have signed the
PPAs had they been presented to them at the purported completion of each of the first three
stages. This is because the complainants did not raise any issues about the quality of the
construction with the bank until March 2018 when they told the bank not to make any further
progress payments. This is five months after the bank made the third of the disputed progress
payments. Accordingly, there is no information to show that the complainants were aware of
any issues with the construction at the time the bank made the first three progress payments.
It was the complainants’ responsibility to check for defects
The complainants say the bank should not have mad e the first three progress payments “in
circumstances where the works claimed had not been completed in accordance with the
contract plans and specifications”.
The loan‟s terms and conditions, however, make it clear that it is the complainants‟
responsibil ity, not the bank‟s, to confirm that the construction is being carried out in
accordance with the plans and specifications. The terms and conditions say:
2.3 If you have a construction loan :
(b) you alone are responsible for ensuring that all plans are followed and that
materials and workmanship are satisfactory even if we also monitor the
Recommendation | Case number: 765708 Page 3 of 5
works . (If we do so, it is only for our own purposes, and even if we make a
loan advance, it does not mean the works are necessarily satisfactory). We
are not liable for the quality of, or any delays in, the works ; …
The bank did, in fact, obtain reports from a valuer before making the first three progress
payments. The reports contained (amongst other things) the following:
Date of report Drawdown
amount
Valuer’s comments
24 August 2017 $130,000 Ground plumbing appears complete, progressing
with base stage.
Please note recommended payment is as per the
Contract which is NOT in line with HIA standard.
4 September 2017 $160,000 We confirm slab is now complete. The „market
value‟ estimate as if complete is $3,250,000.
Building contract price is $1,600,000.
We recommend release of payment for slab
completion stage.
13 October 2017 $160,000 [Second of two reports carried out]
Amended report. We have amended this progress
payment due to the exclusion of the ground level
block work located at the rear of the property in the
last report provided. We note first level frame stage
appears complete.
The above inspections were carried out by a qualified and independent valuer and it was
reasonable for the bank to rely on the conclusions they contained. As a result, I do not
consider that the bank made an error by releasing the first three progress payments.
The bank did not have a fiduciary duty
The complainants say the bank has not looked after their interests in relation to the build. In
their initial complaint, the complainants say:
…the bank didn't respond accordingly and left us to fight the battle on our own, thinking we were
protected by the bank as their customer.
However, i n general, a bank does not have a „fiduciary‟ duty or responsibility to its customer.
The relationship is generally that of creditor and debtor.
A bank may find itself in a position as a fiduciary to its customer in limited circumstances, for
example where:
the bank has acted in such a way to make it a constructive trustee
there is a resulting trust
Recommendation | Case number: 765708 Page 4 of 5
the bank‟s conduct in relation to its customer justifies a finding that the bank has assumed
the role of a fiduciary.
A finding the bank has assumed the role of fiduciary by reason if it‟s conduct is exceptional as
there is a theoretical conflict between the existence of fiduciary responsibility and the bank‟s
pursuit of commercial self-interest.
However, a fiduciary responsibility can arise where the bank‟s role is seen to extend beyond
that of finance provider and into the area of advice.
In this case, there is no information to show that the relationship between the bank and the
complainants in relation to the construction loan was anything other than creditor and debtor.
The interactions between the bank and the complainants were commercial in nature related
to the bank as a lender and the complainants as borrowers. None of the information provided
shows the bank expressly or impliedly undertook to act in the complainants‟ best interests in
relation to the quality of the construction undertaken by the complainants‟ builder.
5.2 Why is the outcome fair?
The outcome is fair
The outcome is fair because:
the complainants signed the PPAs giving their consent to the bank making the first three
progress payments
in any event, there is no information to show the complainants would not have signed the
PPAs had they been given to them at the completion of each stage
the complainants did not raise any issues with the construction until well after the bank had
made the third of the progress payments
the bank is not responsible for the quality of the construction work carried out by the
builder.
The complai nants’ losses are not the fault of the bank
On 25 March 2018, the complainants obtained a report from a building consultant which
detailed numerous defects in the construction works including, as I understand the report,
defects in the first three stages of construction.
Nonetheless, it is clear from the loan documents that the bank is not responsible for the
quality of the building works. While I understand the complainants may have suffered financial
loss due to having to correct the defective works, it is my view, that this loss is due to the
builder‟s conduct rather than the conduct of the bank.
Recommendation | Case number: 765708 Page 5 of 5
6 Supporting information
6.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has assessed this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
recommendation to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information. If there are conflicting recollections and these are evenly weighted, we may find
that a claim cannot be established.