Text of the determination
Determination
Case number 765637
Financial firm AAI Limited
Determination | Case number: 765637 Page 1 of 4
Case number: 765637 20 September 2021
1 Determination overview
1.1 Complaint
The complainant holds a home and contents policy with the financial firm (insurer). In June
2020, the complainant made a claim for water damage to his home. The insurer relied on a
policy exclusion and denied the claim. On further assessment, the insurer partially accepted
the claim. After further detailed investigations, the insurer denied the entire claim. The
complainant disagrees with the insurer’s decision and wants the insurer to pay his claim. The
complainant also says that the handling of the claim by the insurer has caused significant
stress and inconvenience for him and his family.
The case manager provided the parties with a recommendation for the complaint on 29 June
2021. The recommendation was substantially in favour of the insurer. The insurer accepted
the recommendation. The complainant rejected the recommendation.
1.2 Issues and key findings
Were the findings in the recommendation correct?
The findings in the recommendation were correct and are adopted in this determination.
Is the insurer entitled to deny the claim?
On considering the available information, I am satisfied the insurer has established that an
exclusion under the policy applies to the damage claimed. Accordingly, the insurer is entitled
to deny the claim. However, it is fair and reasonable that the insurer pays the complainant for
certain expenses, as set out in section 2.2 of the recommendation (attached).
Is the complainant entitled to non-financial loss compensation?
The insurer has not handled the claim in a reasonable and timely manner. The complainant is
entitled to $2,000 for non-financial loss compensation.
Why is the outcome fair?
I acknowledge the events have raised financial and personal challenges for the complainant.
However, it is fair that the insurer is entitled to deny the claim for water damage due to an
exclusion in the policy. I do find that the insurer has not handled the claim in a reasonable
manner. It is therefore fair the insurer pays the complainant $2,000 in non-financial loss
compensation for stress and inconvenience caused.
1.3 Determination
This determination is substantially in favour of the insurer. Within 14 days of the insurer being
notified of the complainant’s acceptance of this determination, the insurer must pay the
complainant $2,000 for non-financial loss compensation, and it must reimburse expenses
(subject to valid invoices) as set out in section 2.2 of the recommendation (attached).
Determination | Case number: 765637 Page 2 of 4
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
The findings in the recommendation are correct
The case manager provided the parties with a recommendation on 29 June 2021 on the
issues in dispute. The recommendation was substantially in favour of the insurer. The insurer
accepted the recommendation. The complainant rejected the recommendation.
The recommendation is attached to this determination.
I am satisfied that the case manager’s recommendation contains an accurate summary of the
complaint, the issues to be determined, any applicable paragraphs of the rules and any
relevant law. The findings in the recommendation are correct and are adopted in this
determination.
The complainant provided a brief response to the recommendation. I have carefully
considered this response, but it does not provide any further information that is relevant to the
claim for water damage that occurred in 2020.
2.2 Is the insurer entitled to deny the claim?
Weight of expert assessments shows proximate cause is excluded under policy
A number of expert reports assessing the cause of the water damage were prepared during
the course of this claim and complaint. These reports are outlined in the recommendation
(attached).
Having carefully considered the reports from builders, plumbers and an engineer - and
information from the complainant - I am particularly persuaded by the report of the engineer
MC. On 24 March 2021, MC conducted a thorough on-site assessment of the cause of the
water damage. MC was supported by an assessment from plumber, LP, who did a roof spray
test with a hose for approximately half an hour.
MC’s repor t for this assessment includes photos that show that the water staining was evident
at the base of the shower wall, but not evident anywhere further up the wall.
MC found that while the roof might have leaked slightly under extreme conditions, no
evidence was found to indicate that the relevant damage was in any way related to water
entry via the roof. This assessment was based on visual inspections and moisture content
testing of the timber wall structure.
In considering all reports and information on the cause of the water damage, I find that the
weight of the expert assessments shows that the proximate or dominant cause of the water
damage was water leaking from the shower base.
The insurer is entitled to deny the claim
Accordingly, I agree with the finding in the recommendation that the insurer has established
that the proximate or dominant cause of the water damage is an excluded factor under the
policy. That is, the proximate/dominant cause of the water damage was water leaking from
the shower base, which is an exclusion under the policy.
The insurer is therefore entitled to deny the claim for water damage.
Determination | Case number: 765637 Page 3 of 4
It is fair that the insurer is required to pay for certain expenses
Having considered available information, it is fair and reasonable that the insurer pays the
complainant for certain expenses (on provision by the complainant of valid tax invoices)
incurred by the complainant during the claims process. The details of these expenses are set
out in section 2.2 of the recommendation (attached). The expenses are:
$453.80 for the cost of storage crates used to pack personal items before the insurer could
commence mould remediation work
$252.00 for the cost of clothing items purchased to replace items that were accidently
taken away by the mould remediation team
the cost of an air fryer as initial temporary accommodation did not have cooking facilities
$9,000, being the cost of temporary accommodation for the period of 10 March to 10 April
2021.
In accepting the recommendation of 29 June 2021, the insurer has accepted that it will pay
the complainant for these expenses, subject to receipt of valid tax invoices.
2.3 Is complainant entitled to non-financial loss compensation?
The complainant is entitled to non-financial loss compensation
In considering available information, I agree with the findings in the recommendation that:
the insurer caused unnecessary delays in handling the claim as a detailed/expert
assessment of whether water was leaking from the roof should have been done at a much
earlier stage of the claim
the insurer may have incorrectly advised the complainant on 13 April 2021 that his home
was liveable from 10 April 2021 given the absence of information confirming that
outstanding mould remediation (and subsequent retesting following remediation) had been
done to address the findings in VA ’s report .
In relation to the above point, on 23 March 2021, VA provided a preliminary synoptic fungal
assessment. This found that some remediation works were necessary to be done for the
complainant’s home to return to a normal fungal ecology environment, and that re-testing
would be required following further remediation.
Accordingly, I agree with the finding in the recommendation that the complainant is entitled to
$2,000 non-financial loss compensation for stress and inconvenience caused to him and his
family due to the unreasonablech handling of the claim by the insurer.
2.4 Why is the outcome fair?
The events the complainant has described are unfortunate. They have raised financial and
personal challenges for the complainant. However, it is fair that the insurer is entitled to deny
the claim for water damage due to an exclusion in the policy.
I do find that the insurer has not handled the claim in a reasonable manner. It is therefore fair
the insurer pays the complainant $2,000 in non-financial loss compensation for stress and
inconvenience caused.
Determination | Case number: 765637 Page 4 of 4
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted our
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information. If there are conflicting recollections and these are evenly weighted, we may find
that a claim cannot be established.
Recommendation
Case number 765637
Financial firm AAI Limited
Recommendation | Case number: 765637 Page 1 of 13
Case number: 765637 29 June 2021
4 Recommendation overview
4.1 Complaint
The complainant lodged a claim for water damage to his home after discovering a leak in the
ensuite bathroom.
The financial firm (insurer) denied the claim, saying the damage was caused by a leaking
shower base, which is a circumstance excluded under the policy. Further to an assessment of
the roof above the bathroom the insurer partially accepted the claim.
After further investigation, however, the insurer again denied the entire claim, saying the
proximate cause of damage was the leaking shower base and not the roof.
The complainant disagrees with the insurer’s decision and seeks acceptance of the claim. He
says he was unaware of any leaks until he discovered the damage and believes the leak in
the ceiling contributed to the damage. He is also seeking compensation for non-financial loss
and reimbursement of additional expenses.
4.2 Issues and key findings
Is the insurer entitled to deny the claim?
The insurer is entitled to deny the claim. This is because it has shown, on balance of
probabilities, the proximate cause of damage was the leaking shower base, which is excluded
under the policy. Further, the clause under the policy as to awareness of the event does not
apply in these circumstances.
Is the complainant entitled to reimbursement of additional expenses?
The complainant is entitled to reimbursement of some expenses as outlined in section 2.2 of
this recommendation.
Is the complainant entitled to compensation for non-financial loss?
The available information shows there were significant delays in the insure r’s handling of the
claim. As the delays would have caused the complainant and his family to suffer an unusual
degree of inconvenience, he is entitled to $2,000 compensation for non-financial loss.
Why is the outcome fair?
The events the complainant has described are unfortunate and I understand he and his family
have suffered inconvenience. However, as the proximate cause of damage is excluded under
the policy, it would not be fair to require the insurer to provide compensation for the damage.
4.3 Recommendation
This recommendation is mostly in favour of the insurer. The insurer is to pay the complainant
$2,000 compensation for non-financial loss and reimburse the expenses noted in section 2.2.
The insurer is not required to take any other action in relation to this complaint.
Recommendation | Case number: 765637 Page 2 of 13
5 Reasons for recommendation
5.1 Is the insurer entitled to deny the claim?
Complainant has established a valid claim
The complainant is required to show, on the balance of probabilities, that he has suffered a
loss caused by a risk insured under the policy. This is known as a valid claim.
If the complainant can establish a valid claim, the onus shifts to the insurer to show that, on
the balance of probabilities, it is entitled to rely on an exclusion under the policy or is
otherwise entitled to deny the claim.
The complainant says he discovered water damage to the walk-in-robe adjacent to the
ensuite bathroom, after noticing a musty smell in the area. He initially thought the leak was
from the ensuite. After further investigation, he advised the insurer there was a leak in the
roof above the damaged area.
The complainant provided photographs and the leak was eventually confirmed by the
insurer’s plumber. In these circumstances, I am satisfied the complainant has established a
valid claim.
Accordingly, the onus shifts to the insurer to prove on the balance of probabilities, that an
exclusion applies if it seeks to deny or limit its liability for the loss.
Policy provides cover for insured events subject to exclusions
The complainant’s policy provides cover for damage caused by the events listed in the policy
(including the escape of liquid), subject to the conditions and exclusions set out in the policy.
Cover under ‘escape of liquid’ includes loss or damage caused by an exhaustive list of ite ms
set out in the policy. The list does not include a shower floor or base. Further, the policy
specifically excludes loss or damage caused by:
… a leak ing shower floor or base, shower cubicle walls, shower glass screening or doors;
…
wear and tear, or loss or damage by the escape of liquid occurring as a result of a gradual
process of leak ing, splashing, dripping or overflowing over a period of time when you could
reasonably be expected to be aware of this condition;
Accordingly, to be able to rely on the above exclusion/s, the insurer must show that, on the
balance of probabilities, the claimed damage was caused by an incident noted above.
Experts noted two possible causes of damage
The insurer’s building assessor (AB), in conjunction with a leak detection performed by its
plumber (BB), stated the damage was caused by a leaking shower base, noting:
the waterproofing was compromised by deteriorated seal/grout in the shower base, which
allowed water to escape into the walk-in-robe
the flood and spray tests to the shower base failed.
Shortly after he lodged the claim, the complainant advised the insurer there was a possible
leak from the roof above the damaged area. However, the insurer’s assessor reported there
Recommendation | Case number: 765637 Page 3 of 13
was no visible staining to the ceiling or cornice area to support this and accepted AB’s
decision that the damage was not caused by a leak in the roof.
The insurer engaged BB to complete an assessment of the roof in December 2020. BB (in
conjunction with a leak detection report from NL), reported:
rusted and deteriorated roof screws in the affected area
loose roof screws which left a gap between the roof and screws, allowing water entry
a small hole in the roof above the affected area which allowed water entry
non-compliant aerial penetration
on spray testing the roof, water leaked down the shower wall and into the wall cavity
behind the shower enclosure.
On receipt of BB’s report, the insurer partially accepted the claim but limited its liability to
damage caused by the leaking roof.
Parties disagree about cause of damage
The complainant says the claimed damage was caused by a leaking roof above the damaged
area. He says the water leaked through the wall cavity and down the cement sheeting and
behind the waterproof membrane of the shower. He explains that this caused the concrete
shower base to saturate with water and degrade the membrane within the shower enclosure
and walls.
The complainant has not, however, provided an expert report to confirm his findings. His
builder (JB), on testing the roof using a water hose, found that a downpour caused a slow
leak down the wall in the damaged area. While JB concluded there was evidence of water
leaking from either the shower base or roof, he could not confirm whether there was water
coming from the shower wall, as the base of the shower had been pulled up at the time.
After accepting the leaking roof may have contributed to the claimed damage, the insurer
engaged an engineer (MC) to identify the extent of damage caused specifically by the roof.
MC concluded that while a small amount of water could potentially have entered from the roof
under extreme conditions, the damage sighted to the walk-in-robe was entirely due to water
leaking from the shower recess. It says this is because:
the water staining on the shower recess wall cladding was limited to the base, indicating
water was escaping from the shower recess
moisture-content readings showed the timber wall structure to be consistent, indicating the
lower part of the timber wall structure had dried due to disuse of shower
a high moisture-content reading was found low down on the timber wall structure.
Notably, if the leaking roof was the proximate cause of damage, the lower part of the wall
structure would not have dried out despite the shower not being used.
MC further noted there was no indication of water entering from above, because:
there was no water staining on top of the ceiling of the walk-in-robe or on the upper
surface of the shower ceiling and adjoining timbers
there were no water stains on the extract fan of the shower ceiling
there was no indication of water entering from above, as per visual inspections and
moisture content testing of the timber wall structure.
The complainant refers to a photograph in MC’s report, which shows rusted roofing screws.
He says it confirms long-term water ingress from the rusted roofing screws, which have
corroded due to escaping liquid from the roof. He explains that timber absorbs and retains
moisture and the screws corrode at the point of contact with moist timber.
Recommendation | Case number: 765637 Page 4 of 13
MC agreed there were potential points of water entry on the roof, including:
insufficient underlap of 50mm in the skillion roof sheets (regulation is 150mm)
loose screws and deteriorated seals where some screws had rusted through and created
holes in the roof;
overtightened laps, which flattened the corrugation profile and reduced effectiveness of
waterproofing
tattered sarking, with its lower ends sagging into the roof space and causing water to run
down the sheets to discharge into the ceiling space, instead of reaching the gutters
insufficient roof sheet edging, allowing water to blow back into the roof space.
MC says that despite the insufficient underlap in the roof sheets, there was no sign of water
entry at this line and it is well outside the bathroom area. Similarly, it says the loose and
rusted screws were small and at the ridge of the corrugated profile, with no indication of water
entry in the immediate area.
The complainant says that if the shower base caused the escape of liquid as per MC’s
findings, the damage found in the walk-in-robe would be reflected on the tiled section of the
ensuite floor. MC responds that water is driven away from the tiled wall, however it concedes
it was unable to investigate the previous condition of waterproofing in the shower as the tiles
had been lifted out. Given residual traces of waterproofing membrane on the tiles, it says it
could only assume the membrane had failed allowing the shower water to escape.
Available information shows proximate cause of damage was leaking shower
The insurer is only liable for damage to the property if the proximate cause of damage (that is,
the real, effective or dominant cause) was one of the events insured under the policy that is
not otherwise excluded.
Having carefully reviewed the available information, I consider the proximate cause of
damage to the complainant’s property was the leaking shower. This is because the insurer
has shown that while the leaking roof may have contributed to the damage, the extent of
damage is more consistent with the leaking shower base.
MC concluded that while the roof may have leaked slightly under extreme conditions, no
evidence was found to indicate the damage in the walk-in-robe was in any way related to the
water entering via the roof.
The complainant says the tests conducted on the roof by MC cannot accurately reflect the
impact from water entering during a storm event. However, MC provides a convincing
argument when it says that hosing water on to the roof significantly exceeds the pressure
imposed by a storm event, in relation to watertightness. It further says that water flowing
down the inside of the shower walls would not affect the timber structure other than if the
shower recess was leaking.
I accept the roof had issues which could have allowed water to enter the property. However, I
do not believe they were significant enough to allow the volume of water that would have
been required (over a long period) to cause the extent of damage claimed.
Further, the experts did not find any water staining to support that the damage was caused by
water entering from the roof.
MC’s findings in relation to the roof were also supported by a plumbing specialist (LP), who,
on removing the roof sheets found:
no evidence of water entry directly above walk-in-robe and ensuite
roofing screws corroded with rubber perished
Recommendation | Case number: 765637 Page 5 of 13
no signs of water entry to the roof space, sheets or plaster ceiling linings.
LP further says that it spray-tested the roof with a hose for approximately half an hour but
found no signs of water entry in an inspection of the roof space performed simultaneously. It
therefore concluded the water damage is not a result of water entering from the roof sheets.
Having considered the available information, and on balance, I am satisfied the leaking
shower base was the proximate cause of damage. As the policy excludes damage caused by
a leaking shower, the insurer is entitled to deny the claim.
Policy provision for defects and exception for awareness do not apply
After identifying the roof as a potential cause of water entry, the insurer’s assessor noted the
complainant would not have reasonably been aware of the maintenance required to the roof.
The complainant says he was unaware of defects to the roof such as rusted screws and lack
of flashing to aerial penetration. He says his claim should be accepted under the policy
provision for unknown defects:
If an incident covered by your policy damages the building and an unk nown defect was the
cause or part of the cause, we will pay for the resulting damage…
However, the above provision does not apply to the claim circumstances because the insurer
denied the claim on the basis the proximate cause of damage was the shower base, which is
not an incident covered by the policy, as per the above provision. The policy specifically
excludes cover for damage caused by leaking shower floor or base. The claimed incident in
this instance is not covered by the policy. The cover for unknown defects is therefore not
applicable here.
In relation to the shower, the complainant says he was unaware of any leak until he
investigated an odour coming from the back of the walk-in-robe, adjacent to the ensuite. He
relies on the exception in the following exclusion, to say the claim should be accepted
because he was not reasonably expected to be aware of the condition:
We do not cover
wear and tear, or loss or damage by the escape of liquid occurring as a result of a gradual
process of leak ing, splashing, dripping or overflowing over a period of time when you could
reasonably be expected to be aware of this condition;
However, the above provision only applies in relation to the ‘wear and tear’ exclusion, while
the claim denial was based on the exclusion for a leaking shower base (which does not
contain any provision as to awareness). The above provision therefore does not apply here.
The complainant says the roof is leaking through the wall cavity and down the cement
sheeting behind the waterproof membrane of the shower, which has led to the concrete base
of the shower to become water saturated. He says this has degraded the waterproof
membrane of the shower enclosure and walls, which has then compounded the damage
caused by the primary failure. I am not persuaded by this.
Recommendation | Case number: 765637 Page 6 of 13
5.2 Is the complainant entitled to reimbursement of additional
expenses?
Complainant is entitled to be reimbursed some costs
The complainant has requested reimbursement of some expenses incurred during the claims
process. He says some of the expenses were approved verbally by the insurer’s claim
representatives. However, the available material does not support this.
Given the circumstances of the claim however, and having reviewed the items claimed, I am
satisfied it is fair and reasonable for the insurer to reimburse the following expenses, subject
to the provision of valid tax invoices:
$453.80 for the cost of storage crates used to pack personal items before the insurer could
commence mould remediation work
$252.00 for the cost of clothing items purchased to replace items that were accidently
taken away by the mould remediation team
the cost of an air fryer as initial temporary accommodation did not have cooking facilities
$9,000, being the cost of temporary accommodation for the period of 10 March to 10 April
2021.
I understand the insurer is awaiting further details in respect of the accommodation invoice,
such as an ABN and contact details for the company. I am satisfied it is fair and reasonable
for the insurer to reimburse this amount subject to the provision of a valid tax invoice. This is
because the insurer had partially accepted the claim at the time and mould remediation was
yet to be completed.
While the insurer says purchase of storage crates was unnecessary as the mould remediation
team usually provide containers, there is no information to show this process was explained
to the complainant.
The complainant has also claimed the cost of a 4-piece bedroom suite and bedding, which he
says was required as the existing items were water damaged and removed by the insurer for
sanitation. While the insurer disagrees, saying it offered to place the complainant into
temporary accommodation four days before this purchase, the complainant says there was
no suitable accommodation at the time. The complainant says this was verbally discussed
with the claims consultant, however on reviewing the relevant call recordings, the complainant
was unable to locate a discussion approving this purchase. The insurer is therefore not
required to reimburse this amount.
The insurer is not required to reimburse dry-cleaning costs as the date on the invoice shows
the cost was incurred before the complainant was placed in temporary accommodation.
The insurer is not required to reimburse complainant for damaged rattan drawers and shoes
as there is no documentation showing these items were approved by the insurer.
Recommendation | Case number: 765637 Page 7 of 13
5.3 Is complainant entitled to compensation for non-financial
loss?
AFCA can award compensation for non-financial loss
Under the AFCA Rules, we can award up to $5,000 compensation for non-financial loss if a
complainant suffered an unusual degree of stress, inconvenience or delay because an insurer
mishandled a claim.
We will only award this type of compensation if there has been an unusual degree of stress,
inconvenience, or delay. We will not award compensation for the usual amount of
inconvenience involved in making a claim.
Complainant is entitled to compensation for non-financial loss
Further to a review of parties’ submissions, I am satisfied the complainant is entitled to some
compensation for non-financial loss. While the insurer is entitled to fully investigate any claim
that is brought to it, its claim handling and delay in assessment caused an unusual degree of
inconvenience to the complainant and his family.
The complainant advised the insurer at the outset (4 June 2020) that there may be water
leaking from the roof, however, the roof was not assessed at the time. The available material
shows AB looked at the damage and decided the roof was not leaking. The insurer
subsequently issued a decline letter on 23 June 2020. It later accepted liability for any
damage caused by the roof, following a roof assessment in December 2020. Although the
insurer eventually denied the entire claim, the time that elapsed could have been avoided had
the necessary investigation taken place at the time the claim was lodged.
Further, in confirming the home was liveable, the insurer relied on VA’s report which said its
evidence ‘ suggests a normal fungal ecological environment within the majority of the
property’ . However, VA’s report clarifies that t his indicates that areas not requiring
remediation are suitable for occupation and stated:
remediation works were necessary to return the internal environment to a normal fungal
ecology
following remediation, re-testing of the premises and contents is necessary to confirm
post-remediation verification.
The insurer has not provided any information to show post-remediation verification was
undertaken. While the insurer denied the claim, the claim and remediation processes were
under-way as complainant initially understood the claim to be partially accepted. Therefore, it
was reasonable for the complainant to expect the insurer to ensure the property was safe to
return to and request the relevant assessment reports.
Although the insurer eventually denied the entire claim, I consider the complainant is entitled
to compensation for non-financial loss in the sum of $2,000. This is because the material
shows the insurer’s decision not to assess the roof at the outset caused further delays. The
insurer’s handling of the claim caused stress and inconvenience to the complainant and the
complainant was not kept informed of progress in relation to mould remediation.
5.4 Why is the outcome fair?
The outcome is fair in all the circumstances because the insurer has established a policy
exclusion in respect of the claimed damage. On this basis, it would be unfair to require the
insurer to compensate the complainant for the damage.
Recommendation | Case number: 765637 Page 8 of 13
6 Supporting information
6.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has assessed this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
recommendation to the issues that are relevant to the outcome.
Recommendation | Case number: 765637 Page 9 of 13
6.2 Relevant policy provisions
Section Relevant wording
Escape of liquid
p.22
We cover
Loss or damage to the building caused by liquid leaking, overflowing or
bursting from any of the following:
…
We do not cover
wear and tear, or loss or damage by the escape of liquid occurring
as a result of a gradual process of leaking, splashing, dripping or
overflowing over a period of time when you could reasonably be
expected to be aware of this condition;
loss or damage to, or caused by, a leaking shower floor or base,
shower cubicle walls, shower glass screening or doors;
General exclusions
p.37
We do not cover
…
Defect, structural fault or design fault
a defect, structural fault or design fault that you knew about (or should
reasonably have known about) and did not fix before the loss of damage
occurred (e.g. if there are signs that a defect previously caused damage, we
w ill not pay a later claim for further damage from this defect).
Dealing with defects
p.49
If an unknown defect is the cause of damage
If an incident covered by your policy damages the building and an unknown
defect was the cause or part of the cause, we w ill pay for the resulting
damage.
6.3 Relevant timeline
Date Event
1 Jun 2020 Complainant lodged a claim for water damage to ensuite and walk - in - robe.
4 Jun 2020 Complainant advised insurer that there was water entering from the roof.
15 Jun 2020 Insurer’s assessor noted AB was to provide a leak detection and roof report.
16 Jun 2020 Insurer noted claim decline as damage was caused by leaking shower base.
18 Jun 2020 Claim file notes show AB looked at the damage and decided it was not from roof.
22 Jun 2020 Complainant requested a copy of insurer’s roof report.
Recommendation | Case number: 765637 Page 10 of 13
Date Event
23 Jun 2020 Insurer issued claim decline letter to complainant.
14 Sep 2020 Complainant lodged a complaint with the insurer.
17 Sep 2020 Insurer maintained claim denial following an internal cl aim review.
23 Nov 2020 Insurer agreed to assess ceiling/roof area above the ensuite/walk - in - robe.
1 Dec 2020 Insurer’s roof specialist (BB) completed a roof inspection.
18 Dec 2020 BB reported a small hole in the roof which allowed water to enter the property.
10 Feb 2021 Insurer wrote to AFC A saying it would accept liability for damage caused by the
roof and awaited a relevant scope of works from BB.
24 Feb 2021 Insurer advised it awaited BB’s scope of works, which would include ceilings.
4 Mar 2021 Insurer advised complainant it awaited confirmation from hygienist that the home
was liveable.
15 Mar 2021 Complainant requested mould assessment report.
16 Mar 2021 Hygienist (VA) attended property.
22 Mar 2021 Insurer provided initial mould assessment report and awaited report from VA.
23 Mar 2021 VA completed mould report and recommended post - remedial verification.
24 Mar 2021 Insurer’s plumbing specialist (LP) found no evidence of water entry from roof.
29 Mar 2021 Engineering report (MC ) confirmed damage was caused by shower base.
13 Apr 2021 Insurer wrote to the complainant saying the home is liveable (from 10 April 2021),
and the insurer will not cover any additional temporary accommodation.
Recommendation | Case number: 765637 Page 11 of 13
Date Event
15 Apr 2021 Insurer wrote to complainant confirming entire claim declined.
20 Apr 2021 Insurer provided VA’s report to complainant.
Recommendation | Case number: 765637 Page 12 of 13
Date Event
Relevant reports Record Key points
Insurer’s expert (AB)
6.4 Building assessment
report
6.5 11 Jun 2020
A leak detection to the shower enclosure showed the shower bas e
is the cause of damage
seal and grout have deteriorated at the base allowing wat er to
escape, wat erproofing of the shower has been compromised
Insurer’s expert (BB/NL)
6.6 Roof report
6.7 1 Dec 2020
The roof screws in the affected area are rusted and starting to
deteriorate – they are loose, leaving a gap between the roof and
screws allowing water to enter the property
there is a small hole in the roof above the affected area allowing
water to en ter the property
water is leaking down the shower wall and into the wall cavity
behind the shower enclosure aft er spray testing the roof above.
Insurer’s expert (RI)
6.8 Mould sampling report
6.9 15 Mar 2021
The results of the air sampling showed:
mould levels in the Master bedroom and bedroom were higher in
comparis on to outside referenc e samples
the airborne levels taken in the above areas showed abnormal
levels of mould in comparison to the outside sample
the elevated mould levels within the bedrooms in compari son with
the outdoor referenc e samples, may indicate mould growth within
the property .
6.10 Insurer’s expert (LP)
6.11 Plumbing report
6.12 24 Mar 2021
I nspection of west facing roof above walk - in - robe showed no
evidence water entry
corroded roofing screws and perished rubbers
inspection of east facing roof above the ensuite showed no
evidence of water entry
a spray test of the roof showed no water entry into roof space
no signs of w ater ent ry to roof sheets/ space or plaster ceiling
water damage is not a result of water entering from the roof .
Financial firm’s expert (MC)
6.13 Engineer’s report
6.14 29 Mar 2021
6.15
Water stains on shower recess wall cladding were limited to the
base, indicating shower water escaping from shower recess
moisture content readings showed the timber wall structure was
consistent, indicating the lower part of the structure has dried
following disuse of the shower
several potential points of water ingress via the roof were identified
whilst the roof might have leaked slightly under extreme
conditions, no ev idence was found to indicate the damage in the
walk - in - robe was in any way related to water entering via the roof.
Both visual inspections and moisture content testing of the timber
wall structure confirm this
the entire cause of water damage in the walk - in - robe was due to a
leaking shower recess.
Recommendation | Case number: 765637 Page 13 of 13
Date Event
Complainant’s expert (JS)
6.16 Builder’s report
6.17 11 Apr 2021
A n inspection of the water leak shows it could be coming from the
roof or shower base
testing the roof using a water house showed a heavy downpour
caused a slow leak down the wall where the damage was
as the shower base had been pulled up I could not tell if there was
any water coming from there as well.
Insurer’s expert (VA)
6.18 Mould assess ment
6.19 10 May 2021
Evidence suggests a normal fungal ecological environment within
the majority of the property, indicating the areas not requiring
remediation are suitable for occupation
visual evidence and discernible odour in WIR is consistent with
reported wat er ingress bet ween shared wall of WIR and ensuite
elevated to high moisture levels rec orded to the building materials
within the area of water damage/ visual fungal growth in the WI R,
is consistent with reported leak
remediation works to be conducted at the property to return the
internal environment to a normal fungal ec ology
following remediation, re - testing of the premises and cont ents to
confirm post - remediation verification shou ld be performed.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.