Home / Suncorp Group / Determination 765121
Determination 765121
Claim denial for subsidence/slab damage caused by escape of liquid
Summary
The complainants claimed under their home policy for slab cracking and movement damage caused by leaks in the stormwater and sewer systems. AFCA found the leaks were an insured event, that the insurer is liable, and ordered the claim settled by independent scope of works and cash settlement plus 15% contingency, with the insurer reimbursing expert report costs.
The damage was caused by an escape of liquid, an insured event under the policy, and the panel preferred the complainants' engineers' evidence that foundations were properly designed and constructed.
Issues
- Claim denial primary · upheld
“Is the insurer entitled to deny the claim? No. This is because the available information shows the damage claimed was caused by the leaks.”
- Inadequate claim investigation secondary · upheld
“MCS's evidence on this point is not persuasive; the panel prefers B and C's evidence on this point.”
Subjects and remedies
home or building damagepay claimpay compensationprovide documents
Text of the determination
Determination
Case number 765121
Financial firm AAI Limited
Determination | Case number: 765121 Page 1 of 6
Case number: 765121 15 November 2021
1 Determination overview
1.1 Complaint
In or about early 2016 the complainants noticed major cracking and other damage around the
property. The complainants contacted their home insurer, the financial firm (insurer), and
informed it of the damage to the property. They indicated that they wished to conduct further
investigations and speak to the builder of the home before lodging an insurance claim.
Between March 2016 and June 2018, the complainants pursued a builder’s warranty claim
against the home builder. The warranty claim could not be settled between the parties.
On 3 June 2018, the complainants lodged a claim with the insurer for the damage. The
complainants say the damage was due to multiple leaks and issues in the stormwater
drainage system.
The insurer says the cracking and movement damage was not caused by an insured event.
The insurer says the damage was due to construction defects in the slab. The complainants
dispute this.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
No. This is because the available information shows the damage claimed was caused by the
leaks.
Are the complainants entitled to further compensation?
No. The panel does not accept it is fair in all the circumstances for the insurer to pay non-
financial loss.
1.3 Determination
This determination is in favour of the complainants.
The insurer must settle the claim as set out in section 2.1.
Determination | Case number: 765121 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
The policy is an insured events contract of insurance
The policy covers the insured property against loss or damage caused by one or more the
listed insured events. This includes Escape of liquid. Cover under these benefits is subject to
the conditions, limitations and exclusions specified in the product disclosure statement (PDS).
The insurer provided the complainants with the relevant policy documentation, including the
PDS and certificate of insurance (COI). Therefore, the insurer is entitled to rely on the policy
provisions to assess its liability under the claim.
An expert plumber (A) conducted various tests to the stormwater and sewer systems and
provided a report dated 30 April 2016. This identified the stormwater system had major
evidence of backfall, pondage and internal stains. Four breaks were located. Another break
was located in the sewer system. These issues were eventually repaired by the complainants.
The insurer accepts an escape of liquid event has been established by the complainants. The
insurer initially accepted this caused some resultant damage. However, the insurer says most
of the damages were not caused by this event. The insurer says the damage was caused by
design or construction defects in the slab.
Parties dispute whether slab was properly designed and constructed
An issue in dispute between the experts is whether the slab has been properly designed and
constructed.
In a report dated 12 August 2016, engineer B raised various concerns about the design and
construction of the slab that warranted further enquiries. This included whether bored piers
were done, the type of fill placed and whether edge beams and internal load bearing footings
were founded into natural soils.
Following this, geotechnical engineers C were appointed by the complainants. C drilled two
boreholes and exposed one footing. Based on these tests, C concluded the slab abides by
Australian Standards given the following:
their site classification was class H, which was consistent with the original site
classification
the minimum beam depth for waffle raft foundations is 385mm – the exposed footing had a
depth of (470mm) and the founding conditions comprised of natural high plasticity
B reviewed this and agreed the slab was designed and constructed in accordance with
Australian Standards. B also noted that bored piers were not required as a deeper layer of fill
was not found.
Given all this, B and C concluded the damage claimed was caused by the leaks.
The insurer has provided numerous reports from engineer MCS in support. MCS disagrees
the slab has been properly constructed. MCS noted that the original drawings refer to
deepened strip footings of 1,100mm. MCS also believes the bored piers were not an option
but a requirement.
Determination | Case number: 765121 Page 3 of 6
Further, MCS says that C’s investigations do not conclusively show the extent of the fill at the
site or th e depth of the beams. C’s testing was based on one exposed area. In addition, MCS
raises other issues that show the damage is not consistent with the leaks:
the floor measurements conducted
issues with the swimming pool which was constructed near the slab
Information does not show foundation was improperly designed or constructed
Having carefully considered the available information, the panel notes the following.
MCS’s opinion that bored piers was not an option is inconsistent with the other evidence.
CG, who was the geotechnical engineer engaged when the property was first constructed,
provided an investigation report dated 16 July 2007. In this report, CG said that a ‘Class H
waffle pod system’ can be used but ‘bearing in mind the use of bored piers over excessively
filled areas’. This does not indicate bored piers were a requirement.
This is consistent with B and C. B said that load bearing beams were not required generally
and, based on C’s investigation, the foundation was correctly assessed, designed and
constructed. C accepted the footings was properly designed and constructed.
Regarding the deepened strip footings, B said this was for an isolated wall. This is because in
all other aspects, the documentation shows the floor foundation structure to be for a waffle
raft design. This requires a minimum beam depth of 385mm as stated in CG’s and C’s
reports.
This does not support MCS’s evidence that the footings required 1,100mm strip footings.
Regarding the pool, MCS says there is an absence of a standpip e which ‘suggests that a
subterranean storm water drainage system’ was not installed. It does not appear MCS has
confirmed this absence.
The complainants and B noted the pool had the relevant Certificates of Design and Final
Inspection. B also noted the ge ometry of the depth and offset of the pool ‘correctly place its
excavation above the 1 in 1 influence line down from the building foundation’.
Therefore, the available information does not show the pool was improperly designed or
constructed or that it caused the movement and cracking damage claimed.
Regarding the floor measurements, the panel notes there have been extensive breakages
identified that were possibly ongoing for years. The breakages were not isolated to one part
of the home. It is also not c lear if the leaks were limited to these areas as A’s report could not
test all areas. Further, no evidence was provided of the topography to indicate their path of
travel and the likely areas of the foundation they could affect.
Complainants’ engineers ar e preferred
Given all of the above, the panel notes the following.
The available information does not show the foundation was incorrectly designed or
constructed. MCS’s evidence on this point is not persuasive.
Neither is the panel persuaded the swimming pool was improperly designed or constructed or
caused the movement and cracking damage.
Determination | Case number: 765121 Page 4 of 6
There is no dispute there have been extensive breakages identified in the stormwater system.
There was at least one breakage identified in the sewer system. Further, the breakages were
not isolated to one part of the home.
Both B and C accept these leaks were the cause of all the damage being claimed. MCS’s
reasons for disagreeing are not persuasive. Given this, the panel prefers B and C’s evidence
on this point. That is, the panel accepts the cause of the damage being claimed are the leaks,
which is an insured event.
It therefore follows the insurer is liable for the damage being claimed.
How the claim should be settled
The complainants have provided a quote from MC totalling $317,356.87. This includes
substantive foundation works totalling $158,000, exclusive of GST. This quote notes
engineering advice is to be obtained.
The panel does not accept payment of this quote is fair. This quote involves significant
foundation works that have not been certified or verified as necessary. It is clear the extent of
such works would have an impact on the internal fixtures and fittings.
No other quote, or information, has been provided.
Given this, the panel proposes the claim be settled in this way.
The parties are to engage an independent structural engineer to inspect the property and
provide a full scope of works for all the required repairs. This should include any required
works to the foundations.
The engineer should be one agreed to by the parties. This can be done by the insurer
providing a list of three engineers that the complainant can choose one from. Alternatively,
the complainants can provide three choices for the insurer to choose from. The engineer
should be appropriately licenced and qualified to do this.
The engineer’s costs are to be borne by the insurer.
Once this engineer has been engaged and has completed the scope of works, each party can
obtain at least one, and no more than two, quotes based on that scope of works.
If only one quote is obtained, then the insurer is to cash settle the claim based on that quote
plus a 15% contingency. If more than one quote is obtained, then the insurer is to cash settle
the claim based on the average of those quotations with a 15% contingency.
The contingency is to address the fact the risks of the works are passing to the complainants
and the likely possibility that there may be variations required during the works.
If the parties are unable to agree on the quantum, the complainants can lodge a new
complaint with AFCA for a decision on this point.
The complainants incurred professional costs
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs
incurred by a complainant in the course of a complaint. These costs can be awarded if the
complainant needed an expert to understand or establish their claim. These costs are
normally capped at $5,000 unless exceptional circumstances apply.
Determination | Case number: 765121 Page 5 of 6
It is clear the complainants have incurred costs. They engaged C and B to do investigations
and provide multiple reports. They also had A do extensive testing of the stormwater and
sewer system. The panel accepts these reports and investigations were necessary to
establish their claim. The panel also considers exceptional circumstances apply because:
the issue of whether the slab was properly designed and constructed was important and
complex
the insurer’s experts provided numerous reports disputing the complainants’ position,
which the complainants’ experts had to re spond to.
Therefore, subject to the complainants providing invoices, the insurer is to reimburse A, B and
C’s costs for their reports.
The panel does not accept the insurer is required to reimburse MC’s costs for preparing a
quote. This is because the panel does not accept this assisted the complainants to
understand or establish their claim.
2.2 Are the complainants entitled to further compensation?
Compensation is awarded conservatively
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss if the insurer causes the complainant to suffer an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
We take a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
AFCA can award compensation in certain circumstances .
The panel accepts the complainants have suffered an unusual degree of stress and time
taken to resolve their issues.
However, the panel considers this was due to the complicated nature of the claim, rather than
the insurer’s conduct. It is clear there were legitimate concerns about whether the foundation
was properly designed and constructed. B initially raised concerns consistent with this. The
complainants pursued a warranty claim initially believing this was the case.
Therefore, the insurer’s position about the slab was not unreasonable. It was also supported
by an expert.
Given this, the panel does not accept it is fair for the insurer to pay non-financial loss.
Determination | Case number: 765121 Page 6 of 6
3 Supporting information
3.1 The AFCA processes
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.