Home / Chubb / Determination 763402
Determination 763402
Declined building damage claim for underpinning, water bills and resultant damage
Summary
The commercial property owner claimed underpinning, excess water bills and resultant leak damage after a 2019 burst pipe. AFCA found long-term ground movement the proximate cause and excluded, but ordered payment of the $2,707.96 cash settlement offered for the 2019 leak.
The proximate cause of the damage was long-term ground movement, which falls within the earth movement and subsidence exclusion.
Issues
- Claim denial primary · not upheld“The proximate cause of the damage was, on balance, long-term ground movement/subsidence, not the burst pipe(s); the policy expressly excludes earth movement or subsidence.”
- Product terms interpretation secondary · not upheld“I am not satisfied the available evidence establishes the impact of leaks caused significant separately identifiable damage that would trigger the exception to the exclusion.”
Subjects and remedies
pay claim
Related
Text of the determination
Determination
Case number 763402
Financial firm Chubb Insurance Australia Limited
Determination | Case number: 763402 Page 2 of 12
Case number: 763402 7 September 2021
1 Determination overview
1.1 Complaint
The complainant (represented by its broker) holds an Industrial Special Risks insurance
policy with the financial firm (insurer). On 3 June 2019 the broker lodged a claim after finding
a substantial water leak and damage to the insured property.
A loss adjustor, building assessor, and engineer were appointed to assess and report on the
cause of damage. Based on their reports, the insurer declined the claim, saying that long-
term ground movement was responsible for the claimed damage, not water leaks from burst
pipes.
The complainant disagrees with this decision and wants the insurer to cover:
underpinning costs of $70,570.50
excess water bills for 2018 ($2,978.76) and 2019 ($10,038.91)
approximately $5,000 for the balance of the resultant damage repairs.
In this determinat ion, references to ‘the complainant’ include references to the ir broker and
the complainant as the context allows.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
The insurer is entitled to decline the claim. This is because:
the proximate cause of the damage was, on balance, long-term ground
movement/subsidence, not the burst pipe(s)
the policy expressly excludes any loss arising from earth movement or subsidence.
I understand the insurer did, however, offer to cash settle an amount of $2,707 (which is
exclusive of GST), representing the complainant’s costs for investigation and repair of
resultant damage from the latest leak. That is fair in the circumstances.
Why is the outcome fair?
It is clear the complainant has suffered a loss. However, since the available evidence shows,
on balance, the cause of the damage is excluded under the policy, it would not be fair to
require it to pay the claim.
1.3 Determination
This determination is in favour of the insurer. It is fair, however, that it pays the complainant
$2,707 for the investigation and rectification of the 2019 leak, less any policy excess.
It is not required to take any further action.
Determination | Case number: 763402 Page 3 of 12
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Complainant has established a valid claim
The complainant carries the initial onus to show, on balance, any loss or damage arising from
an event falls within the scope of cover of the terms and conditions of the policy. This is
known as establishing a ‘ valid ’ claim.
The complainant’s policy provides cover in the event of any physical loss, destruction or
damage, subject to the policy terms, conditions and exclusions.
The complainant advised the insurer on 3 June 2019 that a substantial leak had been
discovered under the building floor, measured at 60 litres per minute, and the insured building
had sustained damage (movement and subsidence).
Given the broad scope of cover provided under the policy, I am satisfied the circumstances of
the loss represent a valid claim for building damage.
The onus then shifts to the insurer to establish, on the balance of probabilities, a policy
exclusion applies or that it is otherwise entitled to deny the claim.
Previous claims had been lodged in 2016 and 2018
The complainant’s broker had previously lodged a claim with the insurer in respect of the
insured property on 4 May 2016 for escape of water, after a leak was found in the female and
disabled toilet area. Over 2,500,000 litres of water was estimated to have escaped
underneath the foundations on that occasion.
The insurer had accepted that claim for a burst pipe, paying for the plumbing repairs and
settling half the excess water bills. However, no further assessment or investigation of the
cause of the leak was undertaken.
It is relevant to note that, at the time of the 2016 claim, the property was owned by a different
party (although the broker was the same), and I understand the complainant did not purchase
the property until 2017.
On 14 May 2018, t he complainant’s then broker lodged another claim for a ‘water ingress
issue, [requiring] an assessor and exploratory works’.
The insurer requested certain information from the broker on 13 June 2018 in order to
determine the cause of loss and its liability: confirmation of when the insured purchased the
property; a claims history with the insured’s previous insurers ; a pre-purchase building
report/appraisal, and a claims history of the property.
The broker replied on 27 June 2018 to advise that the complainant had withdrawn that claim.
No reason for the withdrawal was given at the time (although the broker has since said the
cost of repairing the leak would have been less than the policy excess). The insurer notes
that further investigation of that claim was required due to its complex nature, but this could
not occur once the claim was withdrawn.
However, before the claim was withdrawn, the insurer had commissioned a report from its
engineer (F) who attended the site on 23 June 2018. (Key details of this and other relevant
reports are in section 3 of this determination.) In summary, F’s report of 9 July 2018 recorded:
there was a slope to the south in the building, particularly near the toilets
Determination | Case number: 763402 Page 4 of 12
there is a general pattern of relative settlement toward the south and east of the building
the complainant had the sewer lines inspected by a plumber using CCTV and it was found
the sewer pipes from the toilet had dislodged allowing sewer water to escape
none of the damage or movement has been caused by a single event
while escape of water and moisture ingress may have exacerbated the underlying cause of
the movement, it (the movement) would have occurred regardless of the water ingress
the moisture ingress itself was the result of foundation soil movement
damage to the building has been caused by:
> differential movement of the footings
> long- term settlement of the upper ‘controlled’ fill layers causing movement of the
slabs and damaging the sewer pipes
> the floor level survey indicates patterns of fall across the external office area towards the
south and the location of a large tree that is located on the adjacent site but in close
proximity to the building (south-east)
> movement as a result of long-term and ongoing variations in the moisture content of the
imported reactive clay materials.
The report made numerous recommendations, including remediation of the building, geo-
technical investigation, underpinning to the external office and remediation of all plumbing,
including roofing, stormwater, sewer and supply. This report was provided to the broker by
the loss adjustor for the purposes of the 2018 claim.
After the current 2019 claim was lodged, the insurer engaged a loss adjustor (M) to oversee
the allocation of experts to the claim. On 25 August 2019, M emailed the broker to clarify
whether any of the recommended works from F’s previous report had been carried out, as M
suspected this was not the case.
In response, the complainant’s broker said that ‘all leaks have been repaired very promptly
when discovered’ (and provided invoices pertaining to that work); but with regard to the very
extensive remediation work recommended in F’s report, the broker said that had not been
undertaken because they were advised they needed to wait for the area to dry out first.
Experts identify significant long-term ground movement, and also water leaks
M then engaged building consultant and engineers (A), geo-technical engineer (P), and
consulting engineer (F again) to report on the cause of damage in 2019.
In summary, these reports found:
the south and east sides of the office have been subjected to subsidence
a large volume of water has discharged under the building from a burst water line and
sewer pipe
water discharging from these pipes has likely entered soils under the building, contributing
to differential movement
damage within the office area appeared aged and consistent with long term differential
movement of the imported reactive clay soils (and the underlying relatively weak swamp
deposits)
the vast majority of subsidence damage was already apparent to the current tenants
commencing approximately five years ago
geotechnical investigations also suggest that significant subsidence damage along south
side of the office and moderate subsidence in proximity to south-east corner of the factory /
warehouse was attributable to the drying effect of a large tree located at the south-east
corner of the office area
geotechnical investigations suggest the burst pipe event had not been a contributing factor
to significant subsidence damage.
Determination | Case number: 763402 Page 5 of 12
P and A did acknowledge the soil moisture would not yet have stabilised from the previous
leak, and that there would likely be further differential movement while that happened (for
about 12 months). However, F noted the level survey did not indicate significant movement
during the July 2018 – June 2019 period, and was of the opinion that meant the burst water
pipe was not the sole or proximate cause of the damage.
F stressed the expert reports (and the testing conducted) highlighted that the majority of the
water from the burst pipe events flowed away from the property, and that any resulting
moisture in the soil would have exacerbated, rather than caused, the problem. The expert
evidence from A also indicates significant leaking of water had been occurring since the time
of construction (and from before the tenancy commenced in 2015).
The broker engaged the services of its own engineer (MM), whose report (dated 10 August
2020) provided conflicting opinion as to the cause of loss, and commented on the findings of
th e insurer’s reports. In summary, MM says:
the most likely explanation for the observed damage is a large water leak washing away soil
there is no evidence of soil build-up to the south side of the retaining wall, leaving only two
reasonable explanations for the subsidence:
> a large volume of water travelled through the soil and the soil was transported away
through the site drainage
> the fill material behind the retaining wall was very loose and not compacted, and water
travelling through the fill migrated the fines, causing settlement and compaction of the fill
material.
Available information indicates damage pre-dating the first claim
It is not in dispute that water leaks have been occurring at the property since at least 2016.
The complainant withdrew the 2018 claim when the broker was provided with the first report
from F recommending extensive and costly remediation works, this report having found the
damage was not caused by a single event. The proximity of the large tree (and its potential to
cause ground movement) was also noted in this report.
The insurer’s panel builder (S) had attended and provided a report dated 30 April 2018. It
noted issues with the building, including evidence of long term movement, a concrete ground
slab subsidence (approximately 200mm) at the external south east of the property, a visible
gap in the warehouse wall above the affected area, prior attempts to repair floor tiles, large
amounts of silicone applied to separated roof flashings and further evidence of patched
repairs.
The broker says on further enquiries with the complainant, ‘it was advised the area had
suffered a similar event leading to these repairs approximately 6 - 10 years prior’.
On balance, I am satisfied a significant amount of damage had happened (and been
happening progressively) to the building even before the lodgement of the first claim by the
previous owner in 2016. The insurer has reported (F’s) conversations with the tenants who
say there was evidence of cracking/movement damage along the south side of the building
and south concrete paving when they first moved in (which was apparently in about 2015,
and therefore before the first water leak in 2016). This is supported by evidence that no
painting has been carried out inside the property since the tenants occupied it. The
representative of the tenant was also reported by F as saying there had been no apparent
further movement since he commenced employment there in 2017.
Proximate cause of damage, on balance, long-term ground movement
F notes the evidence in the expert reports indicates that the movement in the foundation soil
was the catalyst for the burst pipe events and not the other way around. In other words, the
Determination | Case number: 763402 Page 6 of 12
ground movement was the proximate cause of the damage, rather than the water/sewer
leaks.
It is well established at law that the proximate cause of a loss or damage is not
necessarily the first or the last or the sole cause of the damage. It is the dominant or
effective or operative cause.
The proximate cause of the loss is a question of fact to be determined based on the
surrounding circumstances. Where there are several causes operating, each must be
examined for the qualities of predominance and efficacy in relation to the resultant
damage.
I find the reports of experts F, A and P persuasive. Their reports are consistent in showing
(and explaining why) the water leaks, while likely contributing to the damage, are not the
proximate or operative cause. Instead, the proximate cause of damage is long-term
differential ground movement which, in turn caused the concrete foundation to sink / collapse,
breaking the pipework and so causing the water leak(s). In other words, if it were not for the
ground movement in the first place, then on balance the pipes would not have cracked and
the water leaking would not have occurred.
The reports from F, A and P are detailed, comprehensive and substantive as to the
methodology (geo-technical, concrete scanning) used to come to their findings. I
acknowledge the expertise of MM, but on balance am not satisfied the findings of his report
are sufficient to contradict those of the insurer’s experts in this case.
While I acknowledge water leaks may have exacerbated the situation, I am satisfied, on
balance, the proximate cause of the damage is long-term differential ground movement, likely
also aggravated by tree roots.
Policy exclusion 7(c) excludes cover for physical loss or damage occasioned by, or
happening through, erosion, subsidence, earth movement, or collapse resulting from that.
Broker maintains insurer should accept claim
The broker, however, maintains the insurer has not correctly identified the cause of the
current damage, given the pre-existing circumstances. It says ‘ a large percentage of the
movement can be attributed to [the] first leak ’ and the insurer has ‘neglected to consider any
resultant damage of contributory influences that the leak has had to the movement, nor has it
taken into consideration the likely future movement attributed to the drying out of the soil’.
In particular, the broker says the insurer failed to consider the following exception to the
ground movement exclusion when declining the claim:
… this Exclusion [7(c)] shall not apply to subsequent loss, destruction or
damage to the Property Insured occasioned by a peril (not otherwise
excluded) resulting from any event or peril referred to in this exclusion.
The broker says the escape of water/liquid has contributed to the movement within the
building, and so the resultant damage from the leaks should be covered. The complainant is
claiming $5,000 as the approximate costs for resultant damage (apart from the underpinning
works and water bills).
The experts have acknowledged some minor contribution by the leaks to the ground
movement and building damage. However, as already noted, the proximate cause of the
damage – that is the dominant, effective or operative cause – was long-term ground
movement, which was already affecting the building, irrespective of any leaks claimed. I am
not satisfied the available evidence establishes the impact of leaks (whether from 2016 or
Determination | Case number: 763402 Page 7 of 12
more recently) caused significant separately identifiable damage that would trigger the
exception to the exclusion. Any drying out and re-settling of the ground following the leaks in
2016 and 2018 has not been shown to have caused damage not already attributable to the
pre-existing and on-going issues with the site.
The fact the insurer previously accepted and paid the 2016 claim for a water leak (lodged by
the previous owner of the insured building, and apparently settled without substantial
investigation as to the underlying cause), does not mean it is required to accept further similar
damage as having been the result of an insured event.
Insurer is entitled to decline the claim
The broker has said the insurer did offer a cash settlement of $2,707.96 (exclusive of GST) in
June 2019 for investigation costs and resultant damage it attributed to the water leak. That
represented the investigations into and location of the burst pipe, repair of the pipe and
reinstatement of the bathroom. In the particular circumstances, I consider it fair that the
insurer pay the complainant $2,707.96 (less any applicable policy excess).
However, the proximate cause of the damage is long-term and progressive ground movement
and subsidence, occurring, on balance, since before the policy was taken out. That is
excluded under the policy and I am satisfied the insurer is entitled to decline the claim on that
basis.
Determination | Case number: 763402 Page 8 of 12
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
3.2 Supporting information
Key reports and documents
Report Key points
FF engineer (F )
Report
9 July 2018
it was found the sewer pipes from the toilet had dislodged allowing
sewer water to escape
none of the damage or movement has been caused by a single
event
while escape of water and moisture ingress may have
exacerbated the underlying cause of the movement, it (the
movement ) would have occurred regardless of the water ingress
the moisture ingress into the soil is a result of the foundation soil
movement
damage to the building has been caused by:
> differential movement of the footings
> long - term settlement of the upper ‘control led’ fill layers causing
movement of the
slabs and damaging the sewer pipes
> movement as a result of long - term and ongoing variations in the
moisture content of the imported reactive clay materials
> l ong - term settlement under load of the underlying relativel y
weak swamp deposits
> t he floor level survey indicates patterns of fall across the
external office area towards the south and the location of a large
tree that is located on the adjacent site but in close proximity to
the building.
> l eaks to the roof of the external office area which may have
been contributed to by the above - mentioned settlement.
r ecommendations made for extensive geo - technic al investigation,
remediation
Determination | Case number: 763402 Page 9 of 12
Report Key points
Com plumber (H)
Report / invoice
11 June 2019
i nvestigated water leak on site
found faulty section of 15 mm copper water line due to sinking
concrete foundation forcing pipework to split
r epair ed section of drain off of female WC as P VC sewer drain is
coming away from itself leaving large gaps between pipework due
to collapse of con crete foundation
FF engineer (F )
Re - attendanc e report
24 June 2019
the floor level surveys taken in 2018 and 2019 show the
magnitude and pattern of settlement has not changed in that time
the levels survey did not indicate significant movement within the
year bet ween July 2018 and June 2019, so it is the opinion of F
that the identified burst to the water - supply pipe is not the sole
cause, nor th e proximate cause of the damage
reiterates causes of damage as listed in its first report 23 June
2018
says it is expected that any moisture entering the upper layers of
fill material at the subject site, from both the recently identified
supply pipe burst and the sewer leak identified prior to Jun e 2018,
may have exacerbat ed the settlement of the fill material (by
washing out fine material and reducing friction between the soil
particles in the fill material).
recommendations made are the same as made in the 23 June
2018 report
FF building consult ant and
engineer (A)
Report
3 October 2019
b uilding leas ed by current tenant (I) approximately three years
ago
no internal painting undertaken in this time
strong smells detected in disabled toilet approximately six months
prior
repairs to water lines undertaken approximately three months prior
different style in colour tiles in toilets and washrooms, suggesting
previous repairs
south and east sides of the office area and factory/warehouse
have been subjected to subsidence as evidenced by floor level
survey, variations in width of concrete panels, misalignment of
glass and doors within frames
subsidence may be related to the effect of tree roots but this is yet
to be confirmed
a large volume of water has discharged under th e building from a
burst wat er line and sewer pipe located under the disables WC
water discharging from these pipes has likely entered soils under
the building, contributing to differential movement
damage within the office area appeared aged and consistent with
long term differential movement
FF building consultant and
engineer (A)
Caus ation Report
14 December 2019
g round penetration radar and geotechnical investigations
undertaken by P (appointed by A)
a ccording to two tenant representatives, movement da mage to the
building since lease of premises, with no or negligible further
movement in the two years prior
the vast majority of subsidence damage was apparent to the
Determination | Case number: 763402 Page 10 of 12
Report Key points
current tenants commencing approximately five years ago
three boreholes (BH’s) drilled, number 1 at the eastern corner
where a large tree is present, number 2 in the storeroom (directly
between lin e of sight to boreholes 1 and 3) and borehole 3 in the
southern section of the structure where previous plumbing leak
was repaired
m oistu re conditions at borehole 1 were drier than optimum, in all
probability due to the large tree in close proximity
b orehole 2 located under the storeroom slab returned similar
moisture condition to borehole 1, indicating excessive subsidence
to South side of the storeroom and adjoining boardroom was
attributable to the drying effect of trees rather than saturation of
soils due to the reported burst pipe event
t he moisture contents from BH3 appear to be higher than
comparis on of BH1 and BH2 which is consistent with the known
ingress of water into the subsoil previously.
s ignificant tree roots were discovered in borehole 2 under the
storeroom slab
s ite drainage is poor due to surrounding properties and subsided
paving along North elevation
f ootings provided to the office area may not have considered the
drying effects of the tree
g eotechnical investigations suggest that signi ficant subsidence
damage along s outh side of the office and moder ate subsidence
in proximity to south - e ast corner of the factory / warehouse was
attributable to the drying effect of a large tree located at south -
e ast corner of the office area
t he timeline between existence of the tree and construction of the
building has not been substantiated. Removal of the tree may
assist in stabi lising the building or may have a detrimental effect
on further movement to the building
g eotechnical investigations suggest the burst pipe event had not
been a contributing factor to significant subsidence dam age
site drainage is poor due to surrounding p roperties and subsided
paving along north elevation
s ewer drainage servicing the Male W.C. and adjoining kitchenette
has in all probability been damaged due to subsidence in and
around the area and had repor tedly not been repaired to date
sewer drainage pr obability continues to leak and is in all
probability a contributing factor to elevated moisture content to
founding soils identified in borehole 3
Com engineer (MM )
Report
10 August 2020
it is likely several actions are occurring that have result ed in the
subsidence along the e ast and s outh of the office annex and
about the toilet area of the factory
P’s report shows the reactive clay to the south of the office annex
as much drier than would be expected for the rainfall in the
months preceding the sampl ing. In general 2019 was a drier year
than average (665mm of rain compared to long - term average of
771mm); however, the immediate 3 months prior were fairly
typical (75/56/75mm rainfall ) compared with long term average
71/70/ 71mm; 5mm lower rain than avera ge, or approximately
Determination | Case number: 763402 Page 11 of 12
Report Key points
2.5%). The potential import ed fill material or underlying swamp
deposits were not observed in the geot echnical investigation by
Protect Engineering, suggesting the settlement is related to
reactive clay movement.
January to June 2020 w ere above average rainfall, 462mm of rain
recorded for the 6 months compared with long term average of
360mm. Despite the almost 30% greater rainfall, and the
additional moisture this provides to offset tree drying of the soil,
the 2020 levels showed sligh tly higher subsidence relative to the
2019 levels.
the external pavement to the south of the factory is significantly
voided and has subsided
the subsidence of the south pavement cannot be attributed solely
to drying of reactive clays or to settlement of fill material
for this extent of settlement, focused to a confined area bet ween
the retaining wall and the factory, with some settlement under the
factory slab about the toilets, there must have been a reasonable
volume of water running through the soil a nd a reasonable loss of
soil volume.
the most likely explanation for the observed damage is a large
water leak washing away soil.
there is no evidence of soil build - up to the sout h side of the
retaining wall, leaving only two reasonable explanations for the
subsidence:
> a large volume of water travelled through the soil and the soil
was trans ported away through the site drainage
> the fill material behind the retaining wall was very loos e and not
compacted, and water travelling through the fill migrated th e
fines, causing settlement and compaction of the fill material.
FF building consultant and
engineer (A)
Report in response to broker
queries
13 November 2020
Flow testing to Sout h concrete paving showed water enters soils
at the paving / South wall junction, exactly where previous burst
pipe event had occurred and since been rectified.
c onsiderable volumes of water flow under South concrete paving,
exiting onto the South neighbouring property via a gap under the
concrete retaining wall and South conc rete tilt - panel wall of the
Office / Boardroom area. The gap at base of retaining wall and
South wall of the Office / Boardroom provides inadequate support
of retained soils and is conducive to soil settlement.
… concludes majority of movement damage occu rred prior to the
first reported burst pipe event in 2016
i t is possible minor movement had occurred to central areas of the
building attributable to the burst pipe event/s, however evidence
available suggests any such movement had been superficial
requiri ng only minor internal rectif ication works
c onsidering evidence provided by current tenants that movement
damage along South side of the building and Sout h concrete
paving was existing in 2015 when tenancy commenced, and
therefore prior to the first report ed burst pipe event, evidence
available suggests building movement along South side is
a ttributable to two main factors:
Determination | Case number: 763402 Page 12 of 12
Report Key points
1) long term leaking of stormwater drainage system and wat er
penetration via junction of Sout h concrete paving and South
wall of the build ing since the time of construction
2) drying effect of tree roots as determined by geotechnical
investigations
information provided by the tenants in relation to the age of
movement damage coincides with evidence of nil distortion to the
paint work at the stor eroom expansion joint that had sustained
considerable movement. The premises had not been painted
internally since current tenancy commenced, therefore movement
at this panel junction was pre - existing prior to 2015 and therefore
prior to the first reported burst pipe event.
Says ‘ The water accounts provided clearly show 3 - million litres of
water used over a 3 - month period, therefore a question is raised
as to where the discharged water has gone. It has not saturated
under the building so has in all probabil ity flowed into services
trenches, agricultural drainage, fractured stormwater / sewer
drainage or the like and flowed away from the premises.’
Says the ‘ majority of water escape from the burst pipe events had
entered service trenches and agricultural drai nage within the
neighbouring property, explaining dry soils under the Storeroom
discovered during geotechnical investigations. Soils under the
Storeroom should have been exceedingly wet following escape of
approximately 3 - million litres of water fr om the l atest burst pipe
event.’
e vidence available to date suggests movement along South side
of the building and Sout h concrete paving had been the catalyst
for the burst pipe events and damage to sewer drainage servicing
the amenities blocks, rather than the bu rst pipe events causing
damage to the building.
Policy wording
Perils Exclusions
The Insurer[s] shall not be liable under Sections 1 and/or 2 in respect of …
(7) Physical loss, destruction or damage occasioned by or happening through:
…
c) erosion, subsidence, earth movement or collapse resulting therefrom
Provided that this Exclusion 7(a) to (d) shall not apply to subsequent loss, destruction or
damage to the Property Insured occasioned by a peril (not otherwise excluded) resulting from
any event or peril referred to in this exclusion