Home / RACQ / Determination 762556
Determination 762556
Claim for replacement or re-grouting of living area, kitchen and bedroom tiles declined; delays in water damage claim
Summary
The complainant claimed the insurer should cover replacement or re-grouting of tiles in several rooms after a burst pipe and said repairs were poor and delayed. AFCA found the tile damage was wear and tear outside cover, but accepted delays and confirmed the insurer's $1,000 compensation offer for them.
The insured must prove on the balance of probabilities that the loss was caused by a covered event, and non-financial loss is compensable only where the insurer's handling caused unusual inconvenience.
Issues
- Claim denial primary · not upheld
“The available information does not show the claimed tile damage was caused by the water leak or any other incident for which the insurer is liable.”
- Delay secondary · upheld
“I accept the delay in the repair process was inconvenient for the complainant ... I also accept there have been delays with the insurer's assessment of the tiles.”
- Repairs or contractors secondary · not upheld
“There is no information to suggest the repairers caused this damage or any other unexpected damage to the tiles.”
Subjects and remedies
home or building damagepay non financial loss
Text of the determination
Determination
Case number 762556
Financial firm RACQ Insurance Limited
Determination | Case number: 762556 Page 1 of 6
Case number: 762556 25 May 2021
1 Determination overview
1.1 Complaint
The complainant holds home and contents insurance with the financial firm (insurer). On 22
March 2019 the complainant lodged a claim for damage after a pipe under the sink burst and
water leaked into the home.
The insurer accepted the claim and authorised repairs. Following repairs, the complainant
noticed the grout in the floor tiles had turned chalky and looked to be disintegrating. The
complainant says the damage to the tiles was either caused by the claimed water leak event
or from the insurer’s repairers.
The insurer agreed to cover the cost to clean the tiles throughout the property and to re-grout
the tiles in the bathroom. However, it declined cover for the cost to replace or re-grout the
tiles in the living area, kitchen and bedroom.
The complainant disputes this and raises se veral concerns with the insurer’s handling of the
claim and the overall quality of the repairs.
1.2 Issues and key findings
Is the insurer liable for the claimed tile damage?
No. The available information does not show the claimed tile damage was caused by the
water leak or any other incident for which the insurer is liable.
Did the insurer handle the claim reasonably overall?
There is no dispute there were delays throughout the repair period and during the ongoing
assessment of the tile damage. The insurer has recognised this and offered the complainant
$1,000 compensation. I accept this offer is appropriate in the circumstances.
Why is the outcome fair?
I consider the outcome to be fair in the circumstances because:
the insurer has taken steps to assist the complainant to determine the cause of the
damage
the information is not sufficient to show the insurer is liable for the damage, and
the insurer has fairly addressed the delays during the claims process.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to cover the cost to repair the tiles. If the insurer has not already
done so, it is to pay the complainant $1,000 compensation already offered.
The insurer is not required to take any further action.
Determination | Case number: 762556 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer liable for the claimed tile damage?
No. The available information does not show the claimed tile damage was caused by the
water leak or any other incident for which the insurer is liable.
Available information must show the tile damage was caused by the water leak
The complainant’s policy p rovides cover for loss or damage caused by any of the specifically
listed insured events during the period of insurance. Water leaking or bursting from things
such as a pipe is an insured event under the policy. The complainant also has the optional
‘advanced cover’. This provides cover for accidental loss or damage caused by an event or
incident which the complainant did not intend or expect.
As the party seeking cover for the damage to the tiles, the complainant has the initial onus of
proof to establish, on the balance of probabilities:
the loss being claimed was caused by an event for which the policy provides cover, or
the damage was caused during the insurer’s repair process and fr om no fault of the
complainant.
There is no dispute there was a burst pipe and subsequent water leak. However, this is not
enough on its own to establish the disputed tile damage was caused by the same event.
There must be sufficient information to show this event caused the damage to the tiles, or
some other unexpected incident did.
Complainant says the tiles were not damaged prior to the water leak
After the complainant lodged the claim for the water leak, the insurer organised for the
property to be dried out, the affected material stripped from the property, and repairs carried
out. In October 2019, following completion of the repairs, the complainant advised the insurer
there were issues with the tiled floor.
The complainant says:
the grout in between the tiles has turned chalky and disintegrated
the tiles have continually worsened, and the grout continued to calcify since the initial
event
it was not present before the water leak event
another area of the home, which is detached from the living area, does not have the same
damage and this indicates the damage in the living area was caused by the water leak.
The complainant has not provided any reports, photographs or additional information to
substantiate her position that the tile damage was caused from the water leak event.
However, she says an independent tiler inspected the damage and told her the grout was
damaged from water and the tiles would need to be removed and replaced.
Insurer organised for the cleaning of the calcification
The insurer organised for its builder (AZ) to attend and inspect the damage noted by the
complainant. AZ attended on 24 October 2019 and provided a report advising there was
patchy calcification and staining on the grout throughout the entire tiled section of the floor.
However, AZ said it was not isolated to where the water escaped, and it was more noticeable
Determination | Case number: 762556 Page 3 of 6
in the bathroom which had not been affected by the water leak. AZ did not think the grouting
issue was related to the claimed water event.
The insurer did however authorise the cleaning of the calcification on the tiles.
Insurer agreed to cover the repair of the bathroom tiles under another claim
On 29 January 2020 the complainant advised the insurer she thought there may be another
water leak somewhere. AZ attended the property again and this time found drummy tiles
around the toilet, and the bathroom and kitchen grout still showing calcification in places.
AZ carried out a pressure test which indicated a leak at the toilet tap and the outside tap. AZ
also identified maintenance issues which were thought to be contributing, such as missing
seals and lack of paint that could cause water penetration from the outside tap.
AZ attended again on 31 March 2020 with a plumber (LM). LM completed a leak detection
test and thermal imaging however no leaks were found. LM and AZ also say, while at the
property, the complainant’s friend advised there had be en water leaking from the base of the
toilet which the friend had repaired themselves . LM’s report says, ‘I believe this to be the
reason for the damage claimed’, and AZ says this is the same location as the discoloured
grout and drummy tiles in the bathroom.
Following LM’s and AZ’s further assessment, the insurer lodged a new claim for the damaged
grout in the bathroom tiles caused by the toilet leak. The insurer cash settled the complainant
$1,518 for re-grouting the bathroom and a tile injection for three drummy tiles that had also
been found in the kitchen. However, it maintained the tiles in the rest of the property were not
affected by the original water leak, or any other covered event.
Insurer’s tiling expert says the damage is from wear and tear
The complainant acknowledged the above payment but maintains the tiles in the kitchen,
living area and bedroom were damaged from the water leak as well as from the tradesmen
walking over the tiles during repairs. The insurer therefore agreed to send a flooring specialist
to the property for another assessment.
On 21 September 2020 a ceramic tiling specialist (DC) attended the property to inspect the
claimed damage. In summary, DC concluded:
the tiles have not de-bonded from the existing slab and this shows that the water has not
penetrated through the grout and under the tiles
the water that has spread throughout the floor area, has not caused the grout to discolour
the grout damage appears to be general wear and tear of the property.
Given this, the insurer says it is entitled to rely on the policy exclusions for:
loss to the home which cannot be linked to any identifiable event
gradual deterioration caused by the passage of time
wear and tear through normal use.
Insurer is entitled to decline cover for the claimed tile damage
I appreciate there was a large amount of water that leaked from the burst pipe and the
complainant subsequently noticed the deteriorated grout and calcification. However, the
available information does not show this damage was caused from the clamed event, or any
other incident which would be covered by the terms of the policy. Instead, it shows on
balance, the tile damage occurred from normal wear and tear over time. This is supported by
the builder, plumber and flooring expert.
Determination | Case number: 762556 Page 4 of 6
There is no information to suggest the repairers caused this damage or any other unexpected
damage to the tiles.
I also understand the complainant says the insurer did not assess the tiled floor until months
after the water leak, and only when requested by the complainant. However, when the claim
was first lodged, the insurer organised mechanical drying and restoration and stripped out
any affected material. I therefore consider that the insurer carried out adequate assessment
at the time and took steps to identify the affected areas of the home.
After careful review of the available information and the parties’ respective submissions, I
accept it is fair in all the circumstances for the insurer to decline cover for the claimed
damage to the tiles.
2.2 Did the insurer handle the claim appropriately?
There is no dispute there were delays throughout the repair period and during the ongoing
assessment of the tile damage. The insurer has recognised this and offered the complainant
$1,000 compensation. I accept this offer is appropriate in the circumstances.
Complainant raises concerns with the insurer’s handling of the claim
The complainant also raises several concerns with the insurer ’s handling of the claim and the
overall quality of the repairs. The complainant says:
the process was stressful, and she quit her job so she could be available when the
repairers wanted access
there were lengthy delays, she was told repairs would take six weeks, but she could not
move back into the home for six months
the assessor had the flu which caused some walls and doors to be stripped out, so her
health was not compromised
she is still going around finishing off jobs that were not satisfactorily completed
she expected a more professional service.
I appreciate the complainant’s concerns about the unfinished repairs. However, there is no
supporting information available to suggest the repairs were inadequate or unfinished.
I also appreciate the complainant was concerned that the assessor had influenza and
contaminated the home. However, the information shows parts of the property were stripped
out due to being affected by the water leak and for mould remediation, rather than any other
contamination.
There were delays during the claims process
It is evident the claim has been lengthy, and it has been ongoing for over two years. I can see
there have been various reasons for this. The initial repair process took some time to
commence and it was further delayed when a variation was required, and materials were
needed.
I accept the delay in the repair process was inconvenient for the complainant, especially as
she had been told it would initially be a six-week repair period.
I also accept there have been delays with the insurer’s assessment of the tiles. The
complainant first raised the issues with the grout in October 2019, and this issue has been
ongoing since then.
Determination | Case number: 762556 Page 5 of 6
Compensation may be awarded in certain circumstances
AFCA can award compensation (up to $5,000) for non-financial loss when there has been an
unusual amount of physical inconvenience, time taken to resolve a situation, or interference
with the complainant’s expectations or enjoyment of peace of mind.
In assessing whether to award compensation for non-financial loss, we expect complainants
to be moderately robust, bear the normal degree of inconvenience experienced when a
problem occurs, and take reasonable steps to minimise the inconvenience suffered.
Insurer ’s offer of $1,000 in recognition of the delays is fair and reasonable
The insurer accepts there have been delays and offered the complainant $1,000 in
recognition of this.
I accept this amount is fair in all the circumstances considering the delay with the initial repair
process and the ongoing issues with the assessment of the tiles.
This is because, during the repair process the complainant stayed in a caravan on her
property and the insurer paid the complainant $500 a week until she could move back into the
home. While this was inconvenient I do not consider it greater than that reasonably expected
given the nature of this insurance claim, or when a problem occurs.
Further, while the claim has been lengthy, the insurer has organised for a builder, plumber
and tiling specialist to thoroughly assess the tiles and the additional leaks in the bathroom. It
considered a new claim for this damage and attended to the cleaning of the tiles. The
available information shows the insurer tried to assist the complainant where it could and
continued to escalate her concerns with the tiles when she was not satisfied with the
outcome.
I appreciate the overall claim has been distressing for the complainant, however, considering
our approach to non-financial loss and the insurer’s actions throughout the claim I accept
$1,000 compensation is appropriate in the circumstances.
2.3 Why is the outcome fair?
I consider the outcome to be fair in the circumstances because:
the insurer has taken steps to assist the complainant to determine the cause of the
damage
the information is not sufficient to show the insurer is liable for the damage, and
the insurer has fairly addressed the delays during the claims process.
Insurer has fairly considered the claim and the damage for which it is liable
The terms of the policy set out the parties’ responsibilities and obligations under the contract
of insurance. The available information shows the insurer met its obligations to address the
damage it is liable for, and to assist the complainant in determining the cause of damage to
the tiles.
I appreciate the claim has been frustrating and distressing for the complainant. However,
there is no information available to me to show the insurer has made an error or incorrectly
assessed the claimed damage. It would not be fair to require the insurer to cover any further
costs in the circumstances.
Determination | Case number: 762556 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.