Home / IAG / Determination 761439
Determination 761439
Insurer denied claim for cracking damage to rental property, alleged to be from 2017 flood
Summary
The complainant claimed under his landlord building policy for cracking damage he attributed to a 2017 flood, and the insurer denied the claim. AFCA decided the insurer could deny the claim because the damage was not shown to be proximately caused by an insured event.
The policy covers only loss proximately caused by an insured incident, and exclusions for settling, movement of earth, defects and gradual deterioration applied on the expert evidence of long-term damage.
Issues
- Claim denial primary · not upheld“Yes. This is because the available information does not show the damage being claimed was caused by the 2017 flood or another insured incident.”
- Inadequate claim investigation secondary · not upheld“None of these were observed or refuted by M... The insurer's experts have provided an opinion about the cause of the loss.”
Subjects and remedies
home or building damageno remedy
Related
Text of the determination
Determination
Case number 761439
Financial firm Insurance Australia Limited
Determination | Case number: 761439 Page 1 of 8
Case number: 761439 3 November 2021
1 Determination overview
1.1 Complaint
In 2017, the complainant lodged a claim under his landlord building insurance policy for
damage to his property due to a flood. The insurer accepted the claim and undertook repairs.
This involved replacing the damaged concrete pad at the stairs.
On 23 January 2020, the complainant contacted the insurer after he noticed cracking
throughout the property. He believes this is attributable to the flooding event in 2017.
The insurer declined the claim on the basis that damage was not caused by the flooding
event in 2017. The insurer says the damage has been progressive and happening over a long
period.
The complainant disputes this and is seeking the insurer pays for repairs to the property.
1.2 Issues and key findings
Can the insurer deny the claim?
Yes. This is because the available information does not show the damage being claimed was
caused by the 2017 flood or another insured incident.
1.3 Determination
This determination is in favour of the insurer.
The insurer can deny the claim.
Determination | Case number: 761439 Page 2 of 8
2 Reasons for determination
2.1 Can the insurer deny the claim?
Complainant has an onus to establish a valid claim
The complainant is required to show, on the balance of probabilities, he suffered a loss
caused by an event insured for under the policy. This is known as establishing a valid claim.
If established, the onus shifts to the insurer to show, on the balance of probabilities, the loss
either falls within an exclusion or it is otherwise entitled to deny the claim.
Policy provides cover under specific circumstances
The product disclosure statement (PDS) outlines the circumstances under which the policy
provides cover.
The policy covers the property for loss or damage as a result of the incidents listed in the
document. Incidents include loss or damage as a result of storm, flood, rainwater or wind. An
incident is a lso defined by the policy to mean ‘a single occurrence or a series of occurrences,
including an accident or series of accidents, arising out of one event’.
Therefore, to establish a valid claim, the complainant must show the damage being claimed
was as a result of an insured incident. This would require the complainant to show the insured
incident was the proximate cause of the damage. Proximate cause is the dominant, efficient
or operative cause of the loss. It is not required to be last in time or the sole cause. It is a
question of fact that depends on the circumstances of each case. It requires a common sense
evaluation of the evidence.
Complainant says damage to property was caused by flood
The complainant lodged a claim in March 2017 for damage sustained to the property
following a flooding event.
Following lodgement, the insurer appointed builder A to attend the complainant’s property and
report on the damage. They found soil had been swept out from under the concrete pad on
which the rear staircase rested on.
Accordingly, the insurer accepted the claim and arranged for A to undertake the required
repairs to the property. This mainly involved replacing the damaged concrete pad at the stairs
Insurer has relied on several policy exclusions to decline the claim
The insurer disputes the proximate cause of damage to the complaina nt’s property was the
flood event in 2017.
The insurer has provided several engineer reports in support from C and P.
C attended the complainant’s property o n 24 April 2020. C produced several reports. C says
the shear cracking and concrete slab separation at the rear corner is unrelated to the
noted storm / flooding event and is not the cause of the internal cracking damage
the main factor attributing to the upper level internal damage is the sagging floor joists,
resulting in loss of support to the wall frames – this has caused cracking and distress
the existing joists display as weathered with some showing ‘loss of section reducing their
capacity to withstand the applied l oads’
Determination | Case number: 761439 Page 3 of 8
damage both internally and externally has occurred over an extended period of time and is
not the result of any one single event
P attended the complainant’s property o n 26 August 2020. P did not accept the damage was
caused by the 2017 flood event. P says the damage was mainly caused by the footing system
not being adequate. P noted:
the structure should have been designed and constructed according to the soil
classification
if this was the case it should have been able to cope with movement without the resultant
damage
some of the works have not been completed in accordance with a building approval
process and would not have been certified by a building practitioner or plumbing inspector.
Complainant says insurer should pay for repairs
The complainant says the proximate cause of loss is a combination of the flooding event in
2017, and damage that was overlooked or not assessed correctly by the insurer at the time.
This has now led to extensive cracking throughout the property.
Accordingly, t he complainant disagrees with the insurer’s expert’s findings and says the
insurer should pay the full cost of repairing the property.
The complainant has also provided reports from engineering firm (M) to support his position.
M says:
the footings have been designed in accordance with the relevant Australian standard
the bracing has been designed in accordance with the relevant Australian standard.
The complainant says following repairs to the property in 2016 (caused by cyclone Marcia in
2015) the property was subject to a complete internal/external inspection. The complainant
says there was no external damage and minimal internal damage, which was repaired by the
previous insurer.
Accordingly, the complainant was issued with a certificate of completion on 31 August 2016.
This, he believes, negates the findings of the insurer’s expert s and confirms damage to the
property has not occurred over a period of time.
The complainant also says images within A’s report from 2017 shows a bend to the adjoining
PVC pipe as a result of the house dropping. He says this indicates that damage to the stumps
(movement) was caused by flood water and was not addressed by A at the time of
assessment in 2017.
Further investigations were conducted
After an AFCA conciliation, C was engaged by the insurer to arrange a soil test and further
assessment by a geotechnical engineer to determine a site classification
Based on the geotechnical findings, C produced a further report which said:
the results of the soil test confirm that the soil type is classified as extremely reactive
based on the findings of the site investigation and subsequent laboratory testing, the
predicted surface movement for this site is between 75 - 85 mm
In addition to this response, C also commented on the findings of M’s report. C said:
the design of the property is inherently inadequate to cater for the ground movement
the fact that the bracing was not installed exacerbates the situation and allows the building
to sway, which in turn promotes movement
Determination | Case number: 761439 Page 4 of 8
a total rebuild of the slab and footing system is required in order to warrant the works.
The insurer also obtained information from A about the sagging pipe. A said:
damage to the pipe is attributable to improper installation
the pipe should have a bracket every 1.2 metres, which is not the case
due to the weight of the water, some sagging can occur if the pipe is not supported by
brackets
Insurer is entitled to rely on its policy exclusions to decline the claim
After careful consideration of all the available information, I note the following.
The insurer’s experts have provided an opinion about the cause of the loss. None of them
support the view the damage claimed was caused by the 2017 event. They say this is long-
term damage.
C’s opinion is consistent with his observations about the sagging floor joists. This was
supported by photographs. It is not refuted by any other expert.
Both C and P raise various concerns about the construction of the slab and foundations and
the likely causal effect this had on the damage being claimed.
M’s report does not assist the complainant’s position. M does not provide an opinion about
the cause of the damage claimed. M’s report is limited to reviewing the paperwork associated
with the restumping done in 2005 and said these were adequate. However, M did not inspect
the site to determine if:
the works were done in accordance with appropriate standards, or
comment on the foundation material used for the property in general to determine if it is
suitable.
In contrast, C and P both physically inspected the property and observed various issues with
the footing system. This was consistent with the following observations:
an absence of bracing that was, at one time, installed
P noting the extensive cracking across the residence being consistent with the footing
system not performing as it should
None of these were observed or refuted by M.
The complainant referred to a previous claim and the fact the previous insurer’s contractor, N,
observed no structural damage and only found some plasterboard damage to the lounge and
bedrooms. However, no report was provided by N. It is therefore difficult to assess how
thorough this inspection was or place much weight on it.
The complainant also provided statutory declarations of the people who occupied the property
since 2008. This does not assist him. The declaration from the person who occupied the
property from 2008 to 2016 merely said there was no damage when she left the property in
2016. She does not say the property was clear of issues throughout her time.
The other statutory declaration was from the complainant’s daughter. She said she noticed
cracking and movement damage after the repairs. However, no photos were taken. Despite
notifying the complainant, no claim was lodged or concerns raised until 2020.
I also note there were no periodic inspection reports during these tenancies which could
assist in understanding or verifying the state of the property during this time.
Determination | Case number: 761439 Page 5 of 8
The complainant refers to a sagging pipe as evidence this is associated with the claimed
event. However, A’s evidence on this issue is compelling and unrefuted.
Insurer can deny the claim
Given all of the above, I am not persuaded the available information shows the proximate
cause of the claimed loss is the storm or flood event in 2017.
It is therefore fair in all the circumstances for the insurer to deny the claim because:
the policy only covers loss or damage that is proximately caused by an insured incident,
and
the available information does not show the damage being claimed was proximately
caused by an insured incident.
Determination | Case number: 761439 Page 6 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
3.2 Relevant policy sections
Section
Exclusions to your cover We will not cover any loss or damage as a result of, or caused
by:
settling, shrinkage or any movement of earth
erosion, rust, corrosion, gradual deterioration,
depreciation, wear or tear
a defect in an item, structural defects, or faulty workmanship or
design
landslide or subsidence, unless: we agree to cover the incident as
described under ‘Landslide or subsidence’
Landslide or subsidence We will cover your buildings or contents for loss or damage
as a resu lt of a landslide or subsidence
We will only do this if the loss or damage occurs within
72 hours of:
an earthquake or explosion
a storm or flood including rainwater or wind, or
liquid escaping from a fi xed pipe, or a n object attached to a pipe,
fixed gutter, fixed tank or a drain
3.3 Supporting information
Determination | Case number: 761439 Page 7 of 8
Document Key points
Insurer’s engineer’s report
(C)
10 - 03 - 2021
the results of the soil test confirm that the soil type is classified as
extremely reactive
based on the findings of the site investigation and subs equent
laboratory testing, the predicted surface movement for this site is
between 75 - 85 mm
the design of the property is inherently inadequate to cater for the
ground movement
the fact that the bracing was not installed exacerbates the
situation and allows the building to sway, which in turn promotes
movement
a total rebuild of the slab and footing system is required in order to
warrant the works.
Complainants quote from
repairer (H)
09 - 02 - 2021
quote for the cost of replastering da maged sections of the
property
total cost of repairs $8,784.60
Complainants quote from
repairer (K)
01 - 02 - 2021
quote for the cost relevelling the property
total cost of repairs $9,900
Insurer’s engineer’s report
(P)
14 - 09 - 2020
damage is attributable to pre - existing defects
defects are a direct result of a poor construction techniques
damage to the basement slab has occurred prior to February
2020, or the pre - existing defects may have been exacerbated as a
result of the February 2020 rainfall event.
Insurer’s engineer’s report
(C)
10 - 05 - 2020
the shear cracking and concrete slab separation at the rear corner
is unrelat ed to the noted storm / flooding event and is not the
cause of the internal cracking damage
the main factor attributing to the upper level internal damage is the
sagging floor joists, resulting in loss of support to the wall frames
causing cracking and distress.
damage both internally and externally has occurred over an
extended period of time and as such is not the result of any one
single event
the property has been subject to movement over many years
evidenced by two previous restumps.
the observed damage is attributable to inadequate design
majority of the cracking was located within the extension portion or
later added portion of the property
given the large structural cracking in the walls and floor where the
extension meets the original building, it was clear that the
extension is moving
majority of the cracking appeared aged compared to structural
cracking
Determination | Case number: 761439 Page 8 of 8
Document Key points
Complainant’s engineer’s
report (M)
06 - 03 - 2020
the basement ground slab displayed significant cracking and
doming, and this cracking and doming is known as ‘heave’ which
first appeared during the signific ant rain event.
It is likely that an increase in t he water table due to stormwater
has caused an uplift force that is greater than the slabs uplift
capacity.
there was significant localised flooding during the rain event and
others also experienced ground slab heave.
due to the severity of cracking and doming it would be appear that
the ground slab reinforc ement has yielded.
it is expected that any further rise in the water table due to
stormwat er runoff or flooding could worsen the cracking and
doming.
due to this a rea being the main access rout e for residents’
vehicles it will be constantly subjected to vehicle loads which may
exacerbate the noted damage.
Insurer’s builder’ s report (A)
February 2020
damage included plaster damage and cracking throughout the
propert y
damage to the property was attributable to racking (moving side to
side) and twisting of the property
this will need to be confirmed by a structural engineer who can
provide a causation
report to see if event related, caused by under engineered
stumping or general movement
cost of repairs $10,846.67
Insurer’s builder’ s report (A)
26 - 04 - 2017
rear stairs have sunk to one side
flood water has washed the away soil around the slab and footing
to the stairs
the property was under approximat ely 1.0m - 1. 5m of water for
several days
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.