Home / Suncorp Group / Determination 760845

Determination 760845

Claim declined for pool damage attributed to ground movement, not earthquake

FirmSuncorp Group
Decided2021-04-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for pool leak damage he attributed to earthquakes in 2018. AFCA found the engineer's evidence more persuasive, that the damage was not caused by earthquake, and ordered nothing.

The complainant had to prove on the balance of probabilities that the earthquake caused the damage, and the expert evidence did not support that.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 760845 Financial firm AAI Limited Determination | Case number: 760845 Page 2 of 10 Case number: 760845 28 April 2021 1 Determination overview 1.1 Complaint The complainant had a home and contents insurance policy for his home with the financial firm (insurer). The complainant lodged a claim for damage to his pool claiming the damage occurred following an earthquake. The insurer declined the claim because it says the damage was not due to an earthquake but was caused by gradual ground movement. The insurer says that this type of damage is excluded by the policy. The complainant disagrees and says that there were no issues with the pool prior to the earthquake and the insurer is required to cover the claim. The case analyst provided the parties with a preliminary assessment on the issues in dispute. The preliminary assessment was in favour of the insurer. The insurer accepted the preliminary assessment, but it was not accepted by the complainant . In the circumstances, the complaint has been referred to me for determination . 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. The available information does not establish on the balance of probabilities the pool was damaged by earthquake. As the complainant has not established a valid claim, the insurer is entitled to decline the claim. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 760845 Page 3 of 10 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Parties’ material and submissions considered The complainant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. Relevant extracts from the policy are set out in supporting section 3.2 of this determination. In relation to this claim the complainant must establish the claimed damage was caused by earthquake. When lodging the claim in May 2020 the complainant‟s wife said she did not know exactly what happened with the pool, but it was leaking and that it could have been because of one of the earthquakes which occurred in September 2018 and November 2018. The insurer does not dispute the pool is leaking. It relies on an engineer‟s report and says an event for which the policy provides cover did not cause the damage and/or that the cause of damage is excluded by the policy. The complainant has made lengthy submissions and has provided some material in support of his position. A summary of the material relied on by the parties is set out in supporting section 3.4 of this determination. The complainant says he believes the November 2018 earthquake was the cause of the damage. He says the ground shook heavily at the property in November 2018. He says this was an earthquake and it created substantial ground movement damaging the pool. He says water bills increased in the period following the earthquake because the pool was automatically refilling itself via the infinity trough. The complainant has also provided information from a pool repairer (DP) indicating salt was diluting quickly in the pool in early 2019 because of water loss. Various attempts were made to repair the leak without success. In December 2019 the complainant engaged a pool specialist (TL). He said the pool was leaking through the concrete and needed a liner or total resurface to prevent any more leaks. As for the cause of leaking damage, TL says this happened “due to movement of some kind.” The complainant provided a pre-purchase report, but the report does not address the pool. The complainant made lengthy submissions about the engineer‟s report. Essentially, he says the report is conflicted as it recognises that the leaks commenced at the time of the earthquakes but says the leaks were caused by normal ground movement. The complainant says damage caused by earthquakes can cause movement if the vibration is severe enough and cracking then occurs. He relies on evidence about the severity of the earthquake as felt by him and others and says it is “too convenient” for the engineer to suggest seasonal factors were at play during the earthquakes. Determination | Case number: 760845 Page 4 of 10 He makes several observations about the engineer‟s report including denying the design of the pool was unusual. He also challenges the statement that „a damage radius of just 16km was recorded by Geoscience Australia‟ as he did not report the pool damage to Geoscience Australia, so they have no record of it. In the absence of other expert material engineer’s report persuasive I have carefully considered the engineer‟s report. He says the earthquakes were not the proximate cause of the damage. Rather, he says the damage was caused by a combination of the design and construction of the pool with normal ground movement occurring over a long period of time. He concludes a combination of natural ground movement and the design of the pool resulted in cracks forming at the interface between the pool walls and bottom combined with natural seepage of the masonry construction materials. He says: Upon investigation, I agree that ground movement has contributed to the bond between the tiles and masonry deteriorating. However, in my opinion, the nature of the pool design and construction has contributed mostly. Considering the evidence on the following pages I do not believe the Lake Muir earthquakes to be the proximate cause of the leaks. The engineer specifically references the Geoscience Australia website. It confirms earthquakes were felt at the location of the insured property, but it also confirms damage was only reported within a 16km radius of the epicentre. The report also provides information about the pool construction. The engineer says the timing between the earthquakes and the leaks is a coincidence. Complainant has not established the pool was damaged by earthquake I acknowledge the complainant‟s arguments but in the absence of any expert material to the contrary, I find the engineer‟s report more persuasive. The complainant‟s own pool repairer says the pool is leaking due to movement of some kind. He does not specifically say the damage was caused by earthquakes. The insurer‟s engineer has the requisite expertise to comment. The report is cogently argued and supported by photographs and other supporting information. Further, there was no other significant movement damage at the property (except for 2 cracked pavers near the north east corner of the pool). It is not in dispute the property was located 200kms from the epicentre. A damage radius of 16kms was recorded by Geoscience Australia. While the complainant has not reported the damage, I accept no other damage was otherwise reported other than damage within 16kms of the epicentre. Having reviewed all the available information, I am not satisfied the complainant has established on the balance of probabilities the damage to the pool was caused by an earthquake. As the complainant has not established a valid claim, the insurer is entitled to decline the claim. In these circumstances it is redundant to consider the policy exclusions. Determination | Case number: 760845 Page 5 of 10 Section 46 Insurance Contracts Act 1984 does not assist the complainant The preliminary assessment refers to section 46 of the Insurance Contracts Act 1984 (the Act). The complainant made some further submissions regarding the application of section 46 after the preliminary assessment. He says he should be covered under the policy because there was a clear disturbance in the pool after the earthquakes and not before. He notes he took reasonable precautions when purchasing the property and was not aware of pre-existing defects. He says he could not be „reasonably be expected to know‟ that the pool would start to leak in late 2018 due to earthquake related ground movement. Section 46 of the Act precludes the insurer from declining a claim:  based on an exclusion which operates by reference to a defect in a thing  where the defect existed before the policy was taken out  in circumstances where the insured was not aware (and a reasonable person the circumstances could not be expected to have been aware) of the defect at that time. Section 46 has been considered by the courts where it was held that section 46 only applies to exclusions that have a temporal or time-based aspect. In other words, section 46 only applies to assist the complainant in circumstances where the insurer relies on an exclusion which operates by reference to the time at which the relevant defect arose – that is, where the exclusion expressly refers to the defect or design fault having been present before the policy was taken out. The relevant exclusion in the policy says the insurer will not cover loss or damage caused by ground movement or a design fault, structural defect, or faulty workmanship; it makes no reference to the time of the defect occurring. That means section 46 does not operate to assist the complainant because the exclusions relied upon by the insurer do not expressly refer to the defect having been present before the policy was taken out. In any event consideration of section 46 and policy exclusions are redundant as I am satisfied from the available information the complainant has not established a valid claim as he has not established on the balance of probabilities the damage to the pool was caused by earthquake. While acknowledging the consequences for the complainant, I do not accept it is unfair for the insurer to rely on its expert evidence and the policy terms and exercise its entitlement to refuse to pay the claim. Therefore, on the available information and for the reasons stated, I am satisfied the insurer is entitled to decline the complainant‟s claim. Determination | Case number: 760845 Page 6 of 10 3 Supporting information 3.1 Process AFCA’s approach to this complaint This complaint has been determined based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer‟s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. What you are covered for – Insured Events We cover the building for loss or damage at the insured address caused by an insured event during the period of insurance. There are some things we do not cover and these are shown in the „We do not cover‟ section of the following tables on pages 16 to 25 and in the „What we do not cover – general exclusions‟ on pages 35 to 40. Earthquake and Tsunami We Cover Loss or damage to the building caused by an earthquake or tsunami Determination | Case number: 760845 Page 7 of 10 We do not cover loss or damage caused by erosion, vibration, subsidence, landslip, mudslide, collapse, shrinkage or any other ground movement but we will cover damage to the building caused by a landslide or subsidence proved to have occurred within 72 hours of and directly because of an earthquake or tsunami and not because of erosion over time, structural fault or design fault. What we do not cover – general exclusions (cont’d) You are not covered under any section of your policy for damage, loss, cost, or legal liability that it caused by, arises from or involves: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events:  „Storm‟;  „Flood‟ (but only if you have cover for insured event „Flood‟);  „Earthquake and Tsunami‟;  „Explosion‟. 3.3 Case law and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common sense approach is taken to determine proximate cause. 3.4 Extracts from material relied on by the parties Date Action Email from Complainant‟s pool repairer 9 June 2020  After ins pecting pool and the amount of water loss . This has only happened due to movement of some kind. Environmental would be my thoughts. Complainant‟s invoice 9 June 20 2 0  Labour and costs to repair pool $21,780 Complainant‟s invoice 3 November 20 2 0  Labour / material to remove tiles from overflow $1,300.2 0 Determination | Case number: 760845 Page 8 of 10 Assessor 23 June 2020  Earthquake occurred about 500kms away from the loss location and unlikely to be the cause of the damage.  Recommend WB be appointed to c arry out leak detection test and engineer to determine if earthquak e the cause of the damage. Leak detection test (WB) 31 July 2020  DP Pools were cont acted. Confirmed they servic ed the pool for some time and their first note of a leak recorded was in January 2019.  Complainant says leak located in the infinity trough and provided photograph of the infinity trough drained and photo indi cated leak in concret e.  Pool repairer believes pool is leaking through the concrete.  Pressure test carried out on t he pool pipework and the house wat er services and all held pressure with no leaking pipes det ected.  Recommend complainant carry out bucket t est. Engineer‟s report (MC) 16 September 2020 Findings  Earthquakes occurred in Sept ember and November 2018.  Leaks in the pool were first suspected around the same time as the earthquakes.  Reported damage radius due to earthquakes was 16km, and felt more than 200km away.  Property is located around 200km from the earthquak e epicentre (well outside the reported damage radius).  Swimming pool is constructed using a bespoke design and was built by the property owner at the time (whom the current owners p urc hased from around 2012).  Site of t he leaks is undetermined and could be numerous.  Conc rete construction of any pool is inherently porous and relies on perfect sealing from the tiles and grout (or commonly, a plastic membrane / liner material).  Source of the leaks is the interface bet ween the pool bottom and walls which is susceptible to fatigue failure due to small movements.  Small ground movements are normal at all property sites and can often be attributed to expansion and contraction of the underlying soil due to changes in its moisture content.  Leaks were first suspected during a change in season from Spring to Summer (moist soil drying out).  Leaks are NOT a direct result of the eart hquakes but are more likely a combination of natural grou nd movement and t he design of the pool resulting in cracks forming at the interface bet ween the pool walls and bottom combined with natural seepage of the masonry construction materials. Determination | Case number: 760845 Page 9 of 10 Proximate Cause  Pool was designed using a „Besser block‟ construction with a 90deg corner between the pool walls and floor.  90deg interface introduces a high stress concentration factor to inherently brittle mat erials, (concret e / plaster).  Masonry materials are inheren tly porous and will allow water to seep t hrough under positive pressure (suc h as the inside of a swimming pool).  Ground has naturally moved at various times during the 10yr life of the pool (most noticeably, but not limited to the eart hquakes in Sept ember and November 2018).  Design of the pool (particularly the interface between the walls and bottom) is susceptible to damage arising from any form of ground movement and will also allow water to seep through naturally over time.  As a result of the above, l eaks have occurred in the pool and became obvious around the end of 2018. Sequence of Events  Considering the pool design - a liner would have been a much more preferable option for waterproofing the structure during initial construction.  Actual quality of the construction beneat h the tiles is unknown.  Ground has moved naturally over the 10yr lifetime of the pool and caused a fatigue failure at the interfac e between the pool walls and bottom where there is a high stress concentration factor due to the sh ape of the connection.  Additionally, the masonry construction materials will allow water to seep through after a period of being subjected to positive water pressure.  Leaks were first noticed after the earthquakes.  The recorded damage radius for the ear thquakes was 16km and the property is around 200km from their epicentres.  Timing between the earthquakes and the leaks is a coincidence and also corresponds to a change in season where the soil moisture content is reduced (causing movement). Assessor 23 September 2020  Reviewed engineer ‟ s report and recommended claim be declined relying on policy exclusion.  Noted engineer recommended a pool liner is installed to prevent further damage in the future. Determination | Case number: 760845 Page 10 of 10 3.5 Other relevant material considered and relied on  Parties‟ submissions /emails and all attachments to all submissions/emails  Expert reports  Photographs and invoices  Correspondence between the parties

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.