Home / Suncorp Group / Determination 760296
Determination 760296
Declined further subsidence and cracking damage claimed as related to 2016 leak
Summary
The complainants claimed further cracking and subsidence damage to their home was caused by a 2016 water leak, and the insurer declined it as seasonal ground movement. AFCA found the damage was caused by the insured leak and ordered the insurer to settle the claim by paying the LBS quote plus a 10% allowance, without interest.
On the balance of probabilities the further damage was proximately caused by the insured escape of liquid event, so the policy responds.
Subjects and remedies
pay claim
Text of the determination
Determination
Case number 760296
Financial firm AAI Limited
Determination | Case number: 760296 Page 2 of 9
Case number: 760296 17 May 2021
1 Determination overview
1.1 Complaint
The complainants hold a home insurance policy with the financial firm (insurer). They
lodged a claim in 2016 for water damage caused by a leaking shower waste pipe,
which was accepted and repaired by the insurer.
Following this, further rectification works took place and were covered by the insurer.
The complainants say further cracks have since appeared and are seeking coverage
under the policy because they say it is related to the 2016 event.
The insurer declined further rectification works because it says the cover does not
respond to damage caused by the seasonal, expected movement of the ground
beneath the property.
1.2 Issues and key findings
Should the insurer cover the further rectification works?
Yes. The available information shows the movement and cracking damage was
caused by the leaking pipe event from 2016.
Therefore, the insurer is entitled to cover the further rectification works as quoted by
LBS, including an additional allowance of 10% for conti ngencies and variations.
1.3 Determination
This determination is in favour of the complainants.
The insurer is required to indemnify the complainants for the additional damage to the
property. The insurer is to settle the claim in the manner set out in section 2.1.
Determination | Case number: 760296 Page 3 of 9
2 Reasons for determination
2.1 Is the insurer entitled to decline further damage?
Complainants are required to establish a valid claim
The complainants must establish on the balance of probabilities they suffered a loss
caused by an event to which the policy responds. This is known as a valid claim.
The complainants must establish the claimed damage was caused by an insured
event. An i nsured event includes ‘Escape of liquid’.
There is no dispute a leaking shower waste pipe was discovered. However, the
insurer disputes the 2016 event caused the new damage.
Circumstances of loss
The complainants requested a further review from the insurer after they noticed some
further cracks appear post rectification works. They say the insurer fixed cosmetic
damage, however, have not followed its own engineer’s advice to fix the damage
under the slab.
The insurer says the cracks are not related to the initial insured event and are only
due to general earth movement. In support, the i nsurer referred to SES’s report which
said ongoing building movement is due to the house being located on reactive clay
foundation soils and from the ground conditions. SES concluded that any new
damage is not linked to the shower waste pipe event.
The complainants say the insurer’s engineers, SES and BM, indicated a longer drying
time of the soil was required and this was not followed.
The complainants also provided photographs showing water and movement damage
of the property.
The property was subject to an escape of liquid event in 2016
The insurer appointed CL to assess the damages in 2016. CL engaged BM to
determine the proximate cause and extent of damage. At the time of the 2016 event,
and based on BM’s report, CL noted:
there was a leaking pipe under the shower base
water ingress resulted in the soil beneath the slab becoming saturated, causing
foundation movement.
The insurer states BM recommended a six-month period for the affected subfloor and
soil to dry. However, BM’s 2016 report does not state this anywhere. Further, BM’s
2018 report notes the soils could take anywhere between 18 to 36 months to dry.
Determination | Case number: 760296 Page 4 of 9
LBS were authorised to repair the damage to the subfloor, shower base and wall
cavity. The repairs were completed and signed off by the complainants on 11 April
2017.
Expert evidence confirms further damage to the property
The complainants raised quality issues and further damage. The insurer obtained
further information from a variety of experts and their reports are summarised in
section 3 of this determination.
SES attended the site in July 2018. In summary, SES concluded that the building
movement is due to reactive clay foundation soils, and not related to the leaked
shower waste pipe event.
Assessor DG inspected the property in August 2018 with two builders from JLG. They
all disagreed with SES’s findings. DG noted there is evidence the house is moving
and repairs are substandard. DG noted it was highly likely there is a second leak
under the slab related to the initial event.
BM was engaged again to inspect the property and determine the likely cause. BM
provided a report dated 27 November 2018 concluding:
The movement of the floor in the bathroom, hall laundry and toilet are due to the
foundation soils drying out after they were saturated from the plumbing leak. For
this site it is my opinion that it could take anywhere between 18 to 36 months for
the soils to dry back. … Since the repair work has been undertaken in the
dwelling the floor has undergone additional subsidence. This additional
subsidence of the slab has compromised the silicone seal in the shower recess
which has allowed water to escape into both the wall cavity and under the floor
tiles.
A leak detection company (L) was appointed. L concluded water is escaping the
shower recess due to a waterproofing and sealing failure. L was also concerned that
an appropriate leak control flange may not have been installed.
Proximate cause of the loss is the leaking pipe event
After taking into consideration all the available information, the panel is satisfied the
evidence shows the further cracks were caused by the leaking pipe event.
The panel is persuaded by BM’s 2018 report. This indicates the soils were not
provided sufficient time to dry. There is also continued evidence of leaking in the
shower area. There is damage proximate to this area. BM’s report is supported by an
assessor and two builders.
In contrast, SES’s report is not compelling. SES says this property will always be
subject to earth movement. This is refuted by the complainants who say in their 18-
year occupation of the property, no such damage has been sustained. SES does not
Determination | Case number: 760296 Page 5 of 9
address this or provide any evidence to refute this. For instance, there is no evidence
of previous repairs or relevelling required.
Also, SES’s floor survey shows general settlement in the area near the bathroom.
This indicates there is movement proximate to the leak.
In terms of the drying period, SES said it would recommend 12 to 18 months for the
soils to dry. SES presumed 14 months had passed since the shower waste pipe was
repaired and repairs works started. This is incorrect. The claim was lodged on 28 July
2016. The leak did not appear to be fixed until several months later. A completion
certificate of the claim related repairs was signed by the complainant on 11 April
2017. According to the insurer’s submission, it allowed a 6 -month drying period.
This shows the drying period allowed was likely significantly less than what SES
presumed. It was also less than the 12-18 months SES recommended.
Given all this, the panel is persuaded the damage being claimed was likely caused by
the 2016 event and the claim related repairs.
Insurer is to settle the claim based on LBS’s quote
The complainants have provided a quote from LBS. This included resin injections to
stabilise the floor and prevent further dropping.
The insurer pointed to SES ’s report and noted that it was too late to consider re-
levelling of the slab by injection of grout. This is because these would cause
significant damage to the tiled linings in the bathroom and wall linings in the hallway
and adjacent rooms.
However, it is clear further damage has occurred and may continue to occur.
There is no other evidence to indicate LBS’s quote is unreasonable. LBS’s q uote
addresses the damage that has occurred and includes a scope of works that should
restore the property to its pre-incident condition.
Therefore, the panel considers it is fair in all the circumstances the insurer settles this
claim by paying the compl ainants the amount set out in LBS’s quote, with an
additional allowance of 10% for contingencies and variations. No interest is payable
as this should reflect current rates.
Determination | Case number: 760296 Page 6 of 9
3 Supporting information
3.1 Process
AFCA’s approach to this complaint
This complaint has been determined based on what is fair in all the circumstances,
having regard to the legal principles, applicable industry codes or guidance, good
industry practice and previous decisions of AFCA or its predecessor schemes (which
are not binding).
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised. All of the
provided information has been reviewed and considered. The parties have raised
numerous issues in their submissions to AFCA. However, commentary in this
determination is restricted to those issues considered relevant to the outcome.
This matter was determined by a Panel
Due to the nature of this dispute, it has been referred to a Panel for determination.
The Panel comprises of an ombudsman, a member with significant experience in
consumer and small business advocacy and a member with extensive experience as
a [field of expertise].
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on
oath, or to require third parties to give evidence. When we assess complaints, we
consider available documents, the recollections of the parties, and all relevant
circumstances. We give more weight to documents created at the time the events
occurred. If there is no relevant documentation, we will decide what is most likely to
have occurred based on the information provided to us. If there are conflicting
recollections and these are evenly weighted, we may find that a claim cannot be
established.
3.2 Relevant policy terms
What you are covered for – Insured Events
We cover the building for loss or damage at the insured address caused by an
insured event during the period of insurance. There are some things we do not
cover and these are shown in the ‘We do not cover’ section of the following tables
on pages 16 to 25 and in the ‘What we do not cover – general exclusions’ on
pages 35 to 40.
[…]
Escape of liquid
We cover
Determination | Case number: 760296 Page 7 of 9
Loss or damage to the building caused by liquid leaking, overflowing or bursting
from any of the following:
• refrigerators, freezers, dishwashers and washing machines;
• any drain, fixed pipes, roof gutters or gutte ring and rainwater downpipes,
drainage and sewage systems;
Insured event
means the insured events on pages 16 to 25. In addition, an insured event is
always a single event, accident or occurrence which you did not intend or expect
to happen
3.3 Relevant expert evidence
Record Key points
F inancial firm ’s expert ( CL )
Report
10 - 10 - 2016
Resultant damage was limited to the shower, resulting from
leaking pipe under the shower base .
Authorised Link to conduct furt her exploratory works - removing
shower base to expose fixed pipe and allowing soil under concrete
slab to dry .
Insured could not have been aware of escaping liquid or possibility
of faulty workmanship during recent bathroom renovations .
Financial firm’s expert ( BM )
Report
21 - 09 - 2016
About 12 months ago the owner noticed the carpet in an adjac ent
bedroom to the bathroom was damp .
Leaking floor waste has caused the sand supporting concrete slab
to subside and cause identified damage .
The floor is structurally adequat e in its current condition .
If it is desired to return the floor to its original level prior to the leak,
it will require injection of grout under the slab .
Stage 1 works: the waste pipe inspected for the leak and repair;
once shower base removed the condition of the foundation soils
can be assessed to det ermine how long before the foundation
soils will achieve an equilibrium condition. Once soils have
stabilised , stage 2 repairs can be undertaken .
Stage 2 works is removing/ replacing shower base, bath, tiles,
architraves and door jambs and r emoving bottom water damaged
plates. New plaster and paint required to match existing.
Financial firm’s expert ( SES )
Report
20 - 08 - 2018
Normally recommend a drying period of 12 - 18 months following
repairs of leaking pipes for the soil moisture content in area
affected by leaking drainage pipes, to dry, stabilise and reach
equilibrium .
It has been 14 months since insured indicated shower waste pipe
was repaired and repair/redecoration works started and lack of
recent movement damage, S believes sufficient " drying period"
has passed.
Comparison of the floor level surveys indicates there has been
little or no movement of the low area of the slab in centre of the
Determination | Case number: 760296 Page 8 of 9
Record Key points
house adjacent the area where the bathroom shower waste pipe
leaked .
S says drying of the subbase material which has been ongoing
has been successful and not caused further
settlements/subsidence of the floor slab .
There is some minor ongoing building movements throughout, but
particularly around the perimet er walls of the hous e .
Building movement is d ue to reactive clay foundation soils and
from the ground conditions which exist around the perimeter of the
house .
This movement is not related to leaked shower waste pipe event.
Financial firm’s expert ( RL )
Report
31 - 08 - 2018
Representatives from JLG and insured dis agreed with engineer
( S ) that house is not moving, and repairs are substandard .
Movement is occurring to home in areas where repairs were
completed, door binds in bed 2, tiling in shower to bat h 1 has
separated at wall/floor junction and is mos t likely leaking .
Tiles in shower base are chipped as they are stressed .
Robe doors are out of alignment to a significant degree post
repairs .
Cracks have appeared since painting 6 months ago .
Highly likely there is a 2nd leak under the slab which was caus ed
by the initial event.
Financial firm’s expert ( LT )
Report
2 - 10 - 2018
Area in the hall between the bathroom, WC and laundry is
experiencing movement .
Prior to LT attendance, property underwent repairs due to
movement. Repairs were due to shower waste pipe being broken
and leaking water into soil beneath the slab. This pipe was fixed
as part of repairs .
Shower recess in bathroom had a tiled shower base. Inspection
found there is no water stop angle under the shower screen frame .
Some silicon caulking between the floor and wall tiling was not
fully sealed in some areas and looked wet .
When pushing on the silicon, water squeezed out of the join .
Top of the waste was r emoved for inspection of drain - no
evidence of waterproofing downturn, nor any clear and open
channels for the under - tile drainage .
It does appear an adapter has been installed below the brass
waste to allow for drainage .
Flood test was conducted to showe r recess base using hot water
to track water with thermal camera. As soon as water reached the
floor and wall tile interface and shower screen frame, water
escaped the recess and leaked into the wall cavity under the tiling
outside the recess .
Water is not being contained wit hin rec ess. Spray test confirmed
water escaped in same locations .
Water is escaping shower recess due to a wat erproofing and
sealing failure. This is allowing water to leak into wall cavity and
Determination | Case number: 760296 Page 9 of 9
Record Key points
under the floor tiling outside shower recess.
Complainant’s Expert (BM)
Report
27 - 11 - 2018
Report was done on the request of Andrew George of Link
Building Systems .
Andrew George indicated their company was informed by AAMI
when the repair work was to be undert aken. He was unaware of
anybody checking foundation solid beneath the slab and if it had
dried back sufficiently to achieve equilibrium moisture content.
Movement of floor in bat hroom, hall laundry and toilet are due to
foundation soils drying out after saturation from plumbing leak .
It could take any where between 18 to 36 months for the soils to
dry back .
Since repair work, the floor has undergone additional subsidence.
This additional subsidence of the slab has compromised the
silicone seal in the shower recess, which has allowed water to
escape into both the wall cavity and under the floor tiles .
Non - installation of a water stop angle as identified by LT would
also be contributing to the leak of water under the tiles.
Financial Firm’s expert (BC)
Report
21 - 06 - 2019
In accordance with the BM civil engineers report and S report -
house is founded on H2 clay soils, these are highly reactive and
are expected to move .
Cracking identified is due to seasonal movement .
The hair line cracks within the cornice at the bathroom, and other
minor cracks throughout home are less than category one .
As house continues to move, the cracks will open and close .
No further warrantable rectification works required.