Home / Commonwealth Insurance Limited / Determination 760265

Determination 760265

Claim declined for bathroom cracking damage attributed to failed waterproofing membrane

FirmCommonwealth Insurance Limited
Decided2021-04-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$20,405
SourceAFCA PDF

Summary

After a split pipe was repaired, the complainants claimed $20,405 to re-tile a bathroom with cracking damage. AFCA accepted the insurer's expert evidence that a failed waterproofing membrane caused the damage, which is excluded, and ordered nothing.

The insurer's expert evidence showed the damage was caused by a defect or faulty workmanship in the membrane, which is excluded, and the tiler's evidence was not persuasive.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Commonwealth Insurance Limited determinations · Find similar determinations

Text of the determination

Determination Case number 760265 Financial firm Commonwealth Insurance Limited Determination | Case number: 760265 Page 2 of 12 Case number: 760265 28 April 2021 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the financial firm (the insurer). In February 2020, the complainants discovered a split water pipe under the house after noticing water at the edge of the property. They repaired the pipe and lodged a claim on 22 March 2020 for escape of liquid under the policy. The insurer declined the claim because its expert reports found a failed waterproofing membrane in the bathroom. It says water gradually leaked through the membrane into the substrata of the bathroom floor causing the cracking damage. Relying on a report from their tiler, the complainants disagree with the insurer‟s findings and want the bathroom repaired. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the insurer. As the complainants have not accepted the recommendation, the complaint has been referred to me for determination . 1.2 Issues and key findings Is the insurer entitled to decline the claim? The available information establishes on the balance of probabilities the cracking damage in the bathroom has been caused by water ingress into the bathroom floor and joists below which was not caused by the burst pipe but by the compromised water membrane in several locations in the bathroom floor. As this cause of damage is excluded from cover, the insurer is entitled to decline the claim. 1.3 Determination This determination is in favour of the insurer. It is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 760265 Page 3 of 12 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Parties’ submissions and material considered The complainants must establish on the balance of probabilities they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. When making the claim in March 2020 the complainants said on 20 February 2020, they noticed water at the edge of the house. Upon further inspection they found flooding under the house. A plumber was called. He advised there was a split in the pipe, and he advised how to fix it. The male complainant fixed the pipe. The complainants say he also flattened out the area under the house where the water had washed away. Over the next few weeks, the complainants say the house began to move and crack and water was flowing from the shower. The male complainant inspected under the house again and said water was leaking from the shower. The complainants claim the first leak caused the house to move. The complainants rely on material from their tiler and claim $20,405 to demolish and re-tile the bathroom. The insurer arranged for the damage to be inspected and obtained reports about the cause of the claimed damage. The relevant extracts from the material relied on by the parties are set out in supporting section 3.3 of this determination. After the recommendation, no further submissions were made, and no new material was provided by either party. Having reviewed the reports from the parties I accept there is cracking damage in the bathroom. The dispute relates to the cause of the damage. Relying on the report from their tiler, the complainants say the movement in and around the shower recess was sudden and extreme because of a pipe leaking or breaking which caused ground movement. The insurer says there was no sudden or unexpected escape of water but that the escape of water was gradual. The insurer says the deterioration to the bearers and joists supports its contention there has been an ongoing issue with the property. The insurer also says the membrane in the bathroom has failed in multiple locations and is the cause of the resultant damage which is not caused by the burst pipe. Available material shows it’s probable the waterproofing is compromised The insurer‟s policy covers the building for loss or damage caused by the sudden and unexpected escape of water from a fixed water pipe. Cover is not provided if the damage is caused by:  a leaking or faulty shower recess or shower base  any gradual escape of liquid  defects, structural or design faults, faulty workmanship, or faulty design. Determination | Case number: 760265 Page 4 of 12 Extracts from the relevant policy terms are set out in supporting section 2.2 of this determination. The complainants have not provided any material from the plumber who advised about repair of the split pipe. The only available information from the complainants about the cause of damage is from the tiler. The tiler‟s report is not dated but I assume from his quotation that he inspected the property in or about January 2021. Relevantly, the tiler says:  the movement he saw was sudden and extreme because of a pipe leaking and causing ground movement  the waterproofing has been done to standard including a puddle flange in place at the junction of waste pipe and floor  pictures at the underside of the floor show no evidence of mould or blacking of the underside of the wet area chipboard. Having carefully reviewed the available material and the photographs provided, while I accept there was a leaking pipe, I am not satisfied the available material establishes on the balance of probabilities the damage in the bathroom was caused by the leaking pipe. This is becaus e even though the pipe was repaired water was still leaking when using the shower. The complainants assert this was because the leaking pipe had caused movement, but I do not accept the tiler has the requisite expertise to comment persuasively nor has he adequately explained the mechanism of the damage. Photographs taken by the insurer‟s expert (S) show the flooring and floor joists are water stained both at the shower recess floor waste and through the fibre cement floor sheeting. The insurer‟s builder said the water staining to the subfloor sheeting and timber members suggest the waterproof membrane installed to the bathroom floor sheeting is compromised in several locations and does not comply with Australian Standards. The builder explains as water has breached the membrane and gone into the timber floor joists causing swelling that this is the cause of the tile movement. Insurer is entitled to decline the claim I have considered the photographs provided. I accept they show evidence of water staining on the underside of the flooring sheeting and floor joists. I also agree a photograph shows floor tiling at the floor waste with no evidence of waterproofing turn down in the waste pipe. The complainants‟ tiler says the waterproofing has been done to standard but has provided no photographic evidence in support of his statement. Having considered the available information and photographs provided I prefer S‟s opinion which is cogently explained and supported by photographs. I am satisfied the available information establishes on the balance of probabilities the cracking damage in the bathroom has been caused by water ingress into the bathroom floor and joists below which was not caused by the burst pipe but by the compromised water membrane in several locations installed in the bathroom floor. Determination | Case number: 760265 Page 5 of 12 I am satisfied the damage was caused and/or connected with this defect and/or faulty workmanship when the membrane was installed. As this cause of damage is excluded from cover, the insurer is entitled to decline the claim. Determination | Case number: 760265 Page 6 of 12 3 Supporting information 3.1 Process AFCA’s approach to this comp laint This complaint has been determined based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer‟s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. Escape of Liquid What is covered Your building and/or contents are covered for loss or damage caused by the sudden and unexpected escape of liquid from any:  Water main;  Fixed water pipe (but not a garden hose);  Fire hydrant;  Pool or spa;  Fixed water feature; Determination | Case number: 760265 Page 7 of 12  Fixed tank;  Washing machine or dishwasher;  Sink, basin, bath or toilet;  Sealed portable heater; or  Fixed heating or cooling system. If we have agreed to cover the loss or damage caused, we will also pay the reasonable cost of locating the source of the damage, where necessary, provided that:  It is at your insured address; and  We have agreed to pay this cost before you make arrangements for any work to commence. You are only covered for up to $500 for the repair or replacement of the item from which the liquid escaped if it formed part of your building or contents. What is not covered You are not covered under this Insured Event for: · loss or damage caused by any escape of liquid of which you were aware and failed to notify us of within a reasonable period; • loss or damage resulting from a leaking or faulty shower recess or shower base; • loss or damage caused by any gradual escape of liquid; • loss or damage to trees, plants and shrubs growing outdoors; • the cost to replace the liquid which escaped; • exploratory or restoration costs if we have not accepted a claim under this Insured Event. Your building and/or contents are not covered under this Insured Event for loss or damage as described in the General Exclusions did on pages 78 – 81. General Exclusions Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with: 1. defects structural or design faults, faulty workmanship or faulty design; 5. water, including rainwater, after it has disappeared beneath the surface of the land at your insured address; 9. the vibration, settling, shrinking or expanding of earth or any building, foundation, wall, pavement or path (except in the case of the Insured Events „Lightning‟ and „Earthquake‟ claims); 13. mould, toxic mould, mildew, wet or dry rot, rising damp or dampness; 35. gradual loss or damage of any kind Determination | Case number: 760265 Page 8 of 12 3.3 Case law and proximate cause Case law establishes: · The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause. · If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause. · A common - sense approach is taken to determine proximate cause. 3.4 Extracts from material relied on by the parties Date Action Complainant‟s tiler (ML) Letter Undated  Inspected tiles in the ensuite and noticed an extreme amount of movement in and around the shower recess .  Bottom row of wall tiles had a 12 – 15mm gap open up from the floor tiles and also the floor level for the drainage of the water had changed from running water to the drain in the shower to running out the ensuite door .  This type of movement has been sudden and extreme as a result of a pipe leaking or broken and creating ground movement .  Waterproofing has been done to standard including a puddle flange in place at the junction of waste pipe and floor .  Usually a shower recess takes a while to leak and show evi dence of damage. As there is none of this in the ensuite just extreme movement, even pictures at the underside of the floor showing no evidence of mould or blacking of the underside of the wet area chipboard. Quote (MBC) 10 November 2020  Stripping and re - sheeting bathroom including building materials and labour $4, 400 including GST . Quote (ML) 16 January 2021  Demolish and retile bathroom $20,405 including GST. Insurer report (DW)  Inspected and photographed 20 May 2020 .  When using shower complainant noticed water ran from the shower recess and out the door of the bathroom.  Insured inspected the subfloor and found one of the water waste lines had split allowing water to spill out onto the subfloor when the shower was in use. Arranged repairs. Determination | Case number: 760265 Page 9 of 12  Bathroo m built six years ago.  Movement in the subfloor has affected other rooms with cracks appearing.  Area repaired but water still leaking when using shower.  At time of inspection damage was visible to the bathroom – damage to subfloor area movement – noted movement cracks to doorways. Although repaired, under the floor there were a number of leaks coming through the floor in the shower rec ess area. Subfloor le aking around the waste line along the shower wall with water evident leaking in five or six separate areas of the shower. No photographs of damaged line. Said line was split and not a separation of the junction.  Subsequent subfloor movement has caused sep aration between the flooring and the walls in the shower jeopardising the waterproofing and allowing water to exit through separate areas of the wall and floor. Constant exposure to the escaping water prior to this being found has caused a shift in the pie rs of the sub flooring of the property. Also, general movement of the property in other areas.  Recommended an engineer be appointed as the area had been repaired and DW could not determine if the cause of the damage was because of a building fault or a spl it in the pipe. Email from DW to insurer 2 July 2020  Ensuite of the main bathroom has been affected by the escape of liquid into the sub floor area of the property. There is significant movement to the flooring area of the ensuite. This is quite noticea ble under foot when in the bathroom.  Resulting damage to the area appears to have occurred over a period of time due to constant exposure to escaping liquid from the damaged waste line. This movement has occurred over a period and is not the result of a o ne - off event. Due to the constant escape of liquid in the same area the resulting foundational movement is constant with the escape of liquid. Email from DW to insurer 23 July 2020  Resulting movement that has occurred to the nort h western corner of the property (ensuite/main bedroom) is not the result of a burst pipe over a 24 - hour period. The resulting damage to the area has been a gradual one.  Noted deterioration to the bearers and joists of the sub structure indicat e that exposure to constant water h as been an ongoing issue. If the area had been exposed to a 24 - hour exposure of constant water resulting damage both internally and in the sub floor area would be more evident to the area that was affected most. There appears to be none of that with the ground Determination | Case number: 760265 Page 10 of 12 showing no signs of being washed away over a 24 - hour period as an area would be when exposed to a constant flow of wat er. Insurer‟s forensic building report (S) 23 June 2020  Inspected and photographed 15 June 2020  1960‟s building transported to the site with additions comprising of the bedroom and bat hroom in 2 014 supported on concrete block pi llars wit h poured concrete foundations .  Complainant said water service poly pipe had split and was repaired under the western wall of the kitchen adjoining the western bathroom wit hin the subfloor area.  He advised that the western bedroom and bathroom were constructed in 2014, these works included the re - roofing of the whole of the building.  He had additionally noticed water ingress to the subfloor area underneath the western bathroom floor when the shower was in use.  Show er water had also been noticed tracking from the shower recess internally across the ceramic tiled floor to the bathroom doorway adjoining the bedroom to the south.  Western bathroom shower recess had not been in use for a number of weeks.  Noted the subfl oor sewer drainage within the bathroom, draining from the bat h, floor waste, vanity unit and shower recess waste are interconnected in 50mm PVC prior to draining into a 50mm trap installed within the subfloor. Additionally, on inspection the sewer pipework drainage to the bathroom did not have a visible vent pipe installed.  Western bathroom floor structure consists of LVL timber bearers and floor joists with fibre cement sheet flooring.  Flooring and floor joists show signs of water staining both at the shower recess floor waste and at visible nail penetrations through the fibre cement floor sheeting which suggests a failure in the required waterproof membrane on the floor surface int ernal ly.  Internally, the floor tiling installed to the bathroom shows signs of movement. The installed grouting has cracked and or de bonded between the floor tiles predominantly adjacent to the shower recess. Mould was not visible within the shower recess.  F loor wastes fitted to the bathroom do not show evidence of waterproofing turn down into the pipework drainage. Concluded  Sewer drainage pipework requires inspection for compliance to ensure the drainage system is fully operational.  Non - compliance of the existing drainage would be considered a building defect. Determination | Case number: 760265 Page 11 of 12  Evidence of wat er staining to the subfloor floor sheeting and structural timber members suggests the waterproof membrane installed to the bathroom floor sheeting is compromised in several loc ations and does not comply with the requirements of AS3740. Water ingress into timber floor joists is the suggested cause of swelling within the joists and therefore is the cause of movement wit hin the internal tiled surfaces.  Waterproof membrane installed to t he bathroom floor is compromised in several locations and is the cause of movement wit hin the internal tiled surfaces. This item is considered to be a building defect. Insurer‟s forensic building report (S) 11 September 2020  Complainant had said there wa s a burst pipe he repaired under the old part of the house and S confirmed the inspection included the subfloor areas of the original structure and the newer extension as well.  As for identifying any burst pipe S said at the time of inspection water servi ce poly pipe was exposed on the subfloor ground surfaces and there was no evidence of leaking pipes or saturated soil surfaces at the time of inspection .  Reiterates cause movement cracks within the house is water ingress into the timber floor joists and a dditionally the original structure and extension have different met hods of structural pier support (supported by photograph 1).  Movement and cracking bet ween the original structure and the more recent extension are caused by differing foundation structure and moisture levels within the sub floor soils.  If, after compliance inspection, the sewer drainage pipework is deemed non - comp liant wit h AS3500 and local authority requirements, it would be defective. Defective pipework can be a contributing factor to damage within a building.  Where water has made its way through the waterproof membrane and flooring into the timber floor joists, the additional moisture within the timber has allowed it to swell and cause “movement and cracking of tile grouting in the ceramic tiled floor surface” within the bathroom only.  Unable to confirm what type of waterproofing membrane had been installed. Ho wever, the fact remains that water has breached what ever membrane has been used and therefore is considered defective. Insurer‟s forensic building report (S) 22 January 2021  Reviewed material from ML report and not es it is not dated and so he could not co mpare to his inspection 15 June 2020.  Gapping in wall tiles referred to by ML not seen when S inspected.  As for the movement being sudden S said a contributing factor to high moisture levels within the Determination | Case number: 760265 Page 12 of 12 subfloor soils is the lack of roof guttering, downpi pes and an effective roof water drainage system which were not installed at the time of the inspection. Additionally, high seasonal rainfall experienced within the 2020 calendar year has compounded the concentration of water entering the subfloor and the r eactive clay soils.  As the 12 - 15mm gaps were not present at the time of my inspection I cannot agree the movement was sudden and extreme.  Re ML comment regarding pictures of the underside of the floor, S said the ceramic tiled bathroom floor is fitted t o a fibre cement sheet substrate fixed to a timber bearer and joist subfloor frame. The floor is not chipboard as stated and the attached phot ograph‟s 2, 3 and 4 show evidence of water staining on the underside of the fibre cement sheet flooring.  Reiterat es from section 5.2 of report 23 June 2020 which states: “The evidence of water staining to the subfloor floor sheeting and structural timber members suggests the wat erproof membrane installed to the bathroom floor sheeting has been compromised, in several locations and does not comply with the requirements of AS 3740. 3.5 Other relevant material considered and relied on  Parties‟ submissions/emails and all attachments to all submissions/emails  Parties‟ expert reports  Photographs  Correspondence between the parties