Storm damage claim, whole-house rebuild declined
Summary
After two storms damaged a house about 100 years old, the complainants sought a full rebuild and loss of rent. AFCA held the insurer must pay its storm damage cash settlement of $174,531.75 and assess any loss of rent and contents claims, but refused the full rebuild due to pre-existing excluded damage.
Policy exclusions for wear, tear, gradual deterioration and insect damage apply to pre-existing defects, so the insurer need only pay for the confirmed storm damage.
Issues
- Claim denial primary · not upheld“Pre-existing termite damage and maintenance issues are excluded, so it would not be fair to require the insurer to pay for a complete rebuild of the house.”
- Claim amount dispute secondary · not upheld“The insurer is entitled to limit its liability for the storm damage claim to $174,531.75, including a 15% contingency uplift.”
- Repairs or contractors secondary · upheld“Further storm damage occurred due to a failed make safe.”
Subjects and remedies
home or building damagenatural disasterpay claimreassess claim
Related
Text of the determination
Determination
Case number 760181
Financial firm Insurance Australia Limited
Determination | Case number: 760181 Page 1 of 11
Case number: 760181 22 July 2021
1 Determination overview
1.1 Complaint
The complainants lodged a claim with the financial firm (insurer) in May 2020 after a storm
damaged their house which was further storm damaged a few weeks later.The complainants
say the building requires demolition as a sole result of the storm event. The insurer does not
dispute the house requires demolition but says it is entitled to limit its liability to the damage
confirmed as storm damage. The insurer says the house had substantial pre-existing
structural and maintenance issues. The insurer has offered to cash settle for the damages it
says are storm related. The complainants say IAL is liable for the replacement of the whole
building and also seeks payment for loss of rent.
1.2 Issues and Key Findings
Have the complainants established a valid claim on the policy?
The complainants have established a valid claim on the policy and that further storm damage
occurred due to a failed make safe.
Is the complainant entitled to the reasonable cost of demolition and rebuild of
the whole house?
No, the complainant is entitled to the reasonable costs of repair of the storm damage as
identified by the scope of works and quotation provided by the Insurer‟s appointed builder.
Are the complainants entitled to other compensation?
The insurer has requested documents from the complainants in order to consider their loss of
rent claim. Upon provision of the required documents, the insurer is required to assess a
claim for loss of rent under the terms of the policy. Further there appears to be no discussion
of loss of contents. Under the item Landlords Additional Benefits it would appear the
Complainant has an entitlement for contents.
Why is the outcome fair?
The experts agree the proximate cause of some of the damage is due to structural,
maintenance and gradual deterioration matters which are excluded by the policy. Therefore, it
would not be fair to require the insurer to pay for a complete rebuild of the house.
1.3 Determination
This determination is in favour of the insurer.
Within 14 days of the complainants accepting this determination, the insurer is required to pay
the complainants $174,531.75.
Determination | Case number: 760181 Page 2 of 11
The insurer is required, upon receipt of the requested documents, to assess the loss of rent
claim including for the period to undertake repairs and any claim made for contents pursuant
to the Landlord Additional Benefits provisions (page 65ff of the Policy).
Determination | Case number: 760181 Page 3 of 11
2 Reasons for determination
2.1 Have the complainants established a valid claim?
Policy covers storm and accidental damage subject to exclusions
The policy defines storm as „ violent wind or thunderstorm (including a tornado or cyclone),
hail, rain or snow ‟ . Further, the policy defines accident as „ a sudden, unexpected and
unintended event ‟.
The insurer‟s builder (WB), who attended site soon after the event on 24 May 2020, advised
there was damage consistent with storm and violent winds. All other appointed experts also
confirm damage occurred during a storm event, although all experts advise they have
concerns that storm was not the proximate cause of all of the damage.
Further, the policy covers accidental damage. Provided the damage was sudden, unexpected
and unintended from the complainants‟ point of view, the complainants have established a
valid claim for accidental damage. In particular the loss of the tarpaulin cover and storm and
water damage in the first week of June 2020 was covered as both accidental loss as well as
storm damage.
There was substantial evidence as to defects in relation to the ceilings and roof which likely
contributed to the ripping and lifting of sections of roofing. However, the insurer has not
asserted these were the proximate cause of the whole loss.
Therefore, I am satisfied the complainants have established a valid claim on the policy,
whether this be under the insured events of storm or accident.
2.2 Is the complainant entitled to the reasonable cost of
demolition and rebuild of the whole house?
Replacement policy says repair, replace as original
The policy selected by the complainant is not limited to indemnity value but provides
replacement cover. The promise by the insurer (page 60 of policy) is to replace, reinstate,
repair to the original condition or pay the reasonable costs to do so.
On this basis the complainant, in effect, is arguing that the existence of termite damage and
other deterioration does not diminish the obligation of the insurer to replace to “original”
condition. The complainant seeks to ignore this damage and deterioration. Following the two
storm events there was extensive water damage throughout much, if not most, of the house.
Virtually every room requires replacement of walls and ceilings. However, despite this
widespread damage the position is not that the storm destroyed the house. In my assessment
the more accurate position is that the storm damage combined with the existing defects and
damage has resulted in the house being beyond repair. .
House in poor condition
The insurer says all appointed experts, including the complainants‟ builder (SB) , agree the
building suffered had significant termite and maintenance related damage prior to the storm
event. The house is about 100 years old, showed substantial building defects and generally
was in a poor condition. It was inhabited by a manager of the complainant and his partner. All
Determination | Case number: 760181 Page 4 of 11
parties‟ experts agree the building cannot be repaired and any repair works could not be
warranted. The experts all agree the building requires demolition and rebuilding.
The complainants agree there was pre-existing termite damage to the building prior to the
storm. However, they say the termite issue was treated and that the termites were no longer
active.. In any event the termite damage was not rectified prior to the storm.
The insurer has provided several quotes and a final quote and scope of works for the damage
it says its experts have confirmed as storm damage. This includes an amended quote to
account for further damage which occurred after its June 2020 make safe failed.
Allowance for pre-existing damage
The complainants have not provided a scope of works or formal quote for the repairs. They
have provided an estimate from their chosen builder (IB) for $396,000 for demolition and
rebuild but this is not a formal quote. Whilst WB and SB clearly state in their reports the
property has pre-existing termite damage and other maintenance issues, IB has not
accounted for this pre-existing damage in its estimate.
IB ‟s quot e lacks details such as the breakdown of labour and material used. IB has not
identified the damage which he considers as storm related. Further IB has not provided any
compelling evidence to refute WB and SB‟s findings.
Therefore, given all of the experts agree there is storm damage at the premises, I am
satisfied the proximate cause of some of the damages is storm. H owever, all parties‟ experts
agree there is pre-existing damage to the property,
Some claimed damages are excluded on the policy
The insurer says that both WB and SB confirm significant pre-existing damage to the building
prior to the storm. My own review of the expert reports confirms this also. The insurer says
damage is excluded on the policy due to the following exclusions:
failure to keep insured property in good condition
consequential loss
damage by insects
structural faults/faulty design/faulty workmanship the complainants knew or ought to have
known about and did not fix/arrange to fix
wear, tear, rust, corrosion or gradual deterioration.
Each expert‟s comments on th ese issues are summarised in section 3.2 below.
Expert WB, who provided the final scope of works and quote, focused on the pre-existing
termite damages in particular when providing its reports. The insurer says damage caused by
insects (such as termites) is a general exclusion on the policy. I am satisfied termites are an
insect and therefore any pre-existing damage to the property by termites should be excluded
from the repair costs.
Experts SB, who the complainants engaged to report on the damages, identified a large
number of pre-existing maintenance issues as set out in section 3.2 below. A brief summary
of some of these issues and the applicable policy exclusions:
Determination | Case number: 760181 Page 5 of 11
Description of damage by SB Applicable policy exclusion /s
Concerns over general state of repair of this
existing dwelling.
Wear, tear, rust, corrosion or gradual
deterioration.
Timber Fascia, rafter tails and battens are in
poor condition due a lack of maintenance
over the years and exposure to the
elements.
Wear, tear, rust, corrosion or gradual
deterioration.
Fly screens attached but typical greying of
the exposed timber joinery to the sa sh
windows as a result of poor maintenance
over many years.
Wear, tear, rust, corrosion or gradual
deterioration.
Stained & weathered Timber fascias. No
eaves lining or vermin boards.
Wear, tear, rust, corrosion or gradual
deterioration.
Damage by insects.
Poorly laid blockwork. Sometimes it is left
rough if the surface is to be rendered.
However as with most of thi s dwelling
nothing i s to a quality standard and is left
incomplete.
Structural faults/faulty design/ fa ulty workmanship
the complainants knew or ought to have known
about and did not fix/arrange to fix.
We can see gaps to the roof where end of
the ridge capping is not sealed off and gaps
to wall linings where roofing purlins carry
through the face of the e xternal wall.
Structural faults/faulty design/ faulty workmanship
the complainants knew or ought to have known
about and did not fix/arrange to fix.
Weathered timber to exposed eaves in front
verandah.
Wear, tear, rust, corrosion or gradual
deterioration.
Closer look at the base of the circular
hollow section bore casing reveals severe
corrosion.
Wear, tear, rust, corrosion or gradual
deterioration.
Termite damage to the Kitchen wall.
Owners have had to arrange regular
treatment and inspections due to termite
activity.
Damage by insects.
Due to nature of the construction works
there are many areas that would allow easy
access for subterranean termites to enter
the building undetected.
Damage by insects.
Wall studs and top wall plates eaten away.
Suspe ct a number of areas have suffered
Damage by insects.
Determination | Case number: 760181 Page 6 of 11
termite damage in the existing dwelling.
Manager advised [SB] that they had monthly
termite inspections performed to monitor
and treat infestations.
Typical of termite damage Areas of walls
where only a film of paint hides termite
activity.
Damage by insects.
Sign of vermin activity as many areas have
expansion foam filling voids and
compensating for poor workmanship.
Damage by vermin.
Structural faults/faulty design/ faulty workmanship
the complainants knew or ought to have known
about and did not fix/arrange to fix.
Inadequacies were highlighted by the recent
damaging storm that peeled off the eastern
part of the roof and thi s has happened again
as at 3rd August 2020.
Failure to keep insured property in good
condition.
Damage by insects.
Structural faults/faulty design/ faulty workmanship
the complainants knew or ought to have known
about and did not fix/arrange to fix
Wear, tear, rust, corrosion or gradual
deterioration.
These issues existed before the storm damage. They were not caused by the storm. It is true
that the storm exposed and exacerbated some of these concerns. Combined with the storm
damage the house is beyond repair but that outcome is not solely or even predominantly due
to the storm damage. I am satisfied a significant portion of the loss claimed by the
Complainant occurred prior to the storm due to a combination of the policy exclusions
outlined in the policy.
Insurer liability for storm damage only
The insurer has provided a final scope of works and quote for all confirmed storm damages,
including the further damages which occurred after failed make safes. Further, it has offered
to pay an additional 15% amount to account for contingencies and the transfer of risk to the
complainants.
The complainants have provided an estimate only which does not account for the pre-existing
damages and maintenance issues which even their own experts agree were present prior to
the storm.
Therefore, given the insurer is the only party to provide a scope of works and formal quote for
the confirmed storm damage repairs, I am satisfied the insurer is entitled to limits its liability
for the claimed damages based on this expert information.
WB quoted $151,766.74, inclusive of a 19% builder‟s margin, to compl ete the works which it
says are related to the storm and failed makes safes.
The insurer has offered to apply an additional 15% to this settlement offer for contingencies
and transfer of risk. I am satisfied this is a fair amount in the circumstances, particularly given
the complainants have not provided their own scope of works or quote for comparison.
Determination | Case number: 760181 Page 7 of 11
The insurer‟s final quote amount is $151,766.74. A 15% contingency payment for this figure
equates to $22,765.01.
Therefore, I am satisfied the insurer is entitled to limit its liability for the storm damage claim
to $174,531.75, less any applicable policy excess and GST if the insured party is registered
for GST.
I have considered whether the complainants are entitled to any interest amount on this
payment as per Section 57 of The Insurance Contracts Act 1984 . However, the insurer has
maintained this offer from an early stage and amended it where required to account for further
damages when identified. Therefore, I am satisfied the insurer should not be required to pay
interest on this settlement amount.
2.3 Are the complainants entitled to other compensation?
Insurer obliged to assess loss of rent claim once documents are provided
The complainants say their building manager stayed in the damaged building prior to the
storm. Since the storm, the building manager has occupied another building on the premises
which is normally rented out at $250 per week.
The insurer confirms the policy covers loss of rent. However, it has requested the following
documents to assess the loss of rent claim:
the managers‟ employment contract
a copy of the rental agreement
a copy of the rental ledger.
The complainants have not provided any of these documents to the insurer or AFCA.
Therefore, I am unable to confirm whether the complainants are entitled to loss of rent under
the terms of the policy.
However, if the complainants do provide these documents (or as much as is available) for the
insurer to review, the insurer is required to complete its assessment for a loss of rent claim
under the terms of the policy accordingly.
Landlords Additional Benefits
There appears to be no discussion of loss of contents. The Complainant did not take out a
contents policy. However under the item Landlords Additional Benefits it would appear the
Complainant has an entitlement to claim for contents.
2.4 Why is the outcome fair?
Outcome is fair
The experts agree the proximate cause of some of the damage is due to structural,
maintenance and gradual deterioration matters which are excluded by the policy. Therefore, it
would not be fair to require the insurer to pay for a complete rebuild of the house.
Determination | Case number: 760181 Page 8 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
3.2 Key references
Record Key points
Insurer’s builder report (WB)
Report
01 - 06 - 2020
Building is most probably built in 1920/30s then added on as the
years went on it is of varying materials, they have had Pest
Cont rol man out to eradicate white ants over the period which are
contained.
Note - Due to extent of termite damage, [WB] cannot warrant
repairs. WB recommend a Cash Settlement.
CAUSE OF DAMAGE:
Recent storm.
Note - Termit e damage pre - existing (non - active)
Investigations conducted have identified the following
maintenance / defect related issues that are directly responsible or
a contributing fa ctor to the damages that exist
- Termite damage pre - existing (non - active)
Pre - existing termite damage TBA/coverage???
Note - Due to extent of termite damage, [WB] cannot warrant
repairs.
Determination | Case number: 760181 Page 9 of 11
Record Key points
Complainants’ builder’s
report (SB)
Report
30 - 07 - 2020
It was recently damaged in a storm with part of the skillion roof
being peeled back over the main roof structure. Also concerns
over general state of repair of this existing dwelling.
Timber Fascia, raft er tails and battens are in poor condition due a
lack of maintenance over the years and expos ure to the elements.
Fly screens attached but typical greying of the exposed timber
joinery to the sash windows as a result of poor maintenance over
many years.
Stained & weathered Timber fascias. No eaves lining or vermin
boards.
Just not finished off as per standard building practice.
Closer view of poorly laid blockwork. Sometimes it is left rough if
the surface is to be rendered. However as with most of this
dwelling nothing is to a quality standard and is left incomplete.
In this photo we can see gaps to the roof where end of the ridge
capping is not sealed off and gaps to wall linings where roofing
purlins carry through the face of the external wall.
Weathered timber to expos ed eaves in front verandah. (Looking
Nort h)
Closer look at the base of the circular hollow section bore casing
reveals severe corrosion.
Adding fuel to the fire! Termite damage to the Kitchen wall.
Owners have had to arrange regular treatment and ins pections
due to termit e activity.
Due to nature of the construction works there are many areas that
would allow easy access for sub terranean termites to enter the
building undetected.
Wall studs and top wall plates eaten away. Suspect a number of
areas have suffered termite damage in the existing dwelling.
Manager advised [SB] that they had monthly termite inspections
performed to monitor and treat infestations.
Typical of termit e damage Areas of walls where only a film of paint
hides termite activity.
Mould to shower bas e accentuated by t he storm damage.
Sign of vermin activity as many areas have expansion foam filling
voids and compensating for poor workmanship.
Note that since writing this report [SB] has been advised by the
Manager that the roof has now come off for a second time during
storms 3rd August 2020.
it is strongly recomm ended that the subject dwelling…be
demolished.
In [SB‟s] opinion there are too many structural, health and amenity
issues to w arrant repairing this building.
Inadequacies were highlighted by the recent damaging storm that
peeled off the eastern part of the roof and this has happened
again as at 3rd August 2020.
The Building was flawed from the start and is of Jerrybuild
construction, and it is „likely‟ that some if not all of the building
work was not the subjec t of any Building Licenses issued by the
Shire .
Determination | Case number: 760181 Page 10 of 11
Record Key points
Insurer’s builder report (WB)
Report
31 - 08 - 2020
Investigations conducted have identified the following
maintenance / defect related issues that are directly responsible or
a contributing factor to the damages that exist
- Termite damage as per previous claim.
- Floor Paving in bedroom and Family not as per standard.
- Pre - existing claim outstanding from anot her storm.
- Due to extensive storm damage and areas of building not to
codes/ standards, [WB] ca nnot warrant repairs. Recommend cash
settle.
Insurer’s builder’ s quote
(WB)
Quote
05 - 11 - 2020
$151,766.74 quoted
Insurer’s re sponse
Letter
22 - 02 - 2021
we will cash settle you $151,766.74, as per the amended quote
I am willing to offer you a 15% uplift to the cash settlement to allow
for contingencies and transfer of risk. This amounts to an
additional payment of $22,765.01.
Complainants’ submi ssi on
Letter
03 - 03 - 2021
Please find our account for housing our managers…who resided
at the premis es which was damaged on May 23, 2020.
They have been residing in a chalet on the property which is let
out at $100 per night or $250 per week for permanent residents.
We have covered the rental for them over the past 41 weeks @
$250 per week.
The consequential damage t o the house includes all wiring, wall
damage, all ceilings damaged, inbuilt robes, Stove and Meter Box,
carpets curtains & blinds.
We seek restitution from [the insurer] as a failure to properly
secure the building after repeated contact from us when the r oof
again lifted off and close to one meter of rain entered and
destroyed the building.
We acknowledge receipt of your letter that states all the faults in
the building which you obtained from [SW] Certification, whom we
employed to inspect the building. Y ou state the list from them of
the Pre - existing condition of the property. YET YOUR AGENT
[DP], who inspected the property when he increased the sum
insured, obviously overlooked the pre - existing condition.
Determination | Case number: 760181 Page 11 of 11
Record Key points
Complainants’ quote (I)
Quote
10 - 03 - 2021
Through out the period of pre tarping and multiple storms blowing
this tarp off has caused major damage from rain penetrating walls,
floors, cabinets, and any anchor points to re secure the roof. The
house unfort unat ely is beyond repair. The scope of works would
i nclude but not limited to: Demolition of structure and disposal/
recyclable consumables. New floor from the ground up to give the
clients a new roof over their head to meet todays Australian
Standards and the National Building Code of Australia. Without
go ing too far into context we will need to replace bedroom for
bedroom, bathroom for bathroom, kitchen for kitchen and so forth.
These prices are estimations I will guarant ee from the multiple
inspections I have done on the house while moving the managers
in to one of their (usually hired out) chalet.
$396,000 estimate only for complete rebuild
Does not account for any pre - existing termite damage