The complainant's home was damaged by a neighbour's tree and storm water, and the insurer accepted the claim but delayed repairs through its appointed consultants. AFCA ordered $1,500 non-financial loss compensation but refused reimbursement of $1,881 for maintenance works.

Non-financial loss may be awarded under the AFCA Rules for an unusual degree of inconvenience and delay caused by the insurer, while maintenance costs unrelated to an insured event remain the owner's responsibility.

Issues

Subjects and remedies

home or building damagepay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 759820 Financial firm AAI Limited Determination | Case number: 759820 Page 2 of 5 Case number: 759820 16 March 2021 1 Determination overview 1.1 Complaint The complainant holds a home building and contents insurance policy (policy) with the financial firm (insurer). On 12 August 2020, the complainant lodged a claim for damage to the insured building caused by impact from a neighbour’s tree and associated storm water ingress into the home. The insurer has accepted the claim. However, the complainant is dissatisfied with the insurer’s management of his claim and associated delays in commencing repairs to the insured building. The complainant is also seeking reimbursement of $1,881 incurred in arranging maintenance works on the instruction of the insurer ’s appointed builder . 1.2 Issues and key findings Is the complainant entitled to compensation under the claim? Yes. The complainant is entitled to $1,500 in non-financial loss compensation in line with the AFCA Rules, because of the insurer’s poor management of his claim. The insurer is not required to reimburse the complainant $1,881 incurred in completing maintenance works to the insured building. 1.3 Determination This determination is partially in favour of the complainant. The insurer is to pay the complainant $1,500 in non-financial loss in line with the AFCA Rules. The insurer is not required to reimburse the complainant $1,881 under the claim. Determination | Case number: 759820 Page 3 of 5 2 Reasons for determination The complainant raised various issues about the insurer and its management of his claim when lodging this complainant with AFCA, including the fact the insurer was yet to commence repairs to the insured building. I am satisfied, since lodgement of the complainant, several of these issues have been resolved between the parties including concerns relating to consultants ‘J’, management of the contents damage claim and repairs to the insured building have since commenced. Accordingly, in providing this determination, consideration will be limited to those that remain unresolved between the parties. 2.1 Is the complainant entitled to compensation under the claim? Insurer is to pay the complainant $1,500 in non-financial loss compensation The AFCA Rules (Rule D 3.3) allow for an award of up to $5,000 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. The complainant has raised several concerns relating to the insurer’s management of the claim. He is of the opinion the poor management of his claim has resulted in unreasonable delays and associated stress, anxiety and inconvenience. The insurer refutes the com plainant’s position and says it’s management of the claim has been reasonable and had not caused any undue delays. I accept the insurer’s overall management of the claim , especially the assessment stage, has caused and contributed to undue delays. This includes the commencement of repairs authorised under the claim and therefore the life of the claim. The available information shows the insurer’s appoint ed consultants ‘J’ conduct did cause undue delays between 12 August 2020 and 8 October 2020, after which J were removed from the claim. This includes issues with J’s make safe works which needed to be rectified, a delay of 35 days in completing reasonable make safe works and J’s refusal to commence repairs to the insured building when instructed to do so. J refused to commence repairs based on its position that the complainant did not complete all maintenance works recommended by J. However, I accept it was subsequently found the recommended maintenance works (which the complainant refused to authorise) were not necessary nor were they necessary for the repairs accepted under the claim to be completed. It is not the role of the insurer or its appointed consultants to insist the complainant undertake maintenance works to the insured property that are unrelated to a claim. Determination | Case number: 759820 Page 4 of 5 This is only reasonable in instances where such maintenance works are needed to repair damage that is preventing the insurer from being able to warrant or complete repairs. The insurer subsequently appointed consultants ‘K’, to the claim. K recommended other maintenance works that were relevant to and needed to be completed before K could commence the authorised repairs. The evidence shows the complainant delayed completing these repairs by around five weeks. I accept the delay on the part of the complainant brought the claim to 9 December 2020. At this point K advised it could not commence the repairs until mid-January 2021, given trades and suppliers were going away for the Christmas and New Year break. I am of the view, had the initial approximate two months delay not occurred because of J, this issue relating to the Christmas/New Year period would not have arisen and building repairs could have commenced before this period. T he available evidence shows, despite K’s advice that repairs would commence in mid-January 2021, the external repairs did not commence until 10 February 2021. The internal repairs will not be started until external repairs are completed. The complainant has already been without the use of 3 bedrooms and part of the living area for approximately 6 months. I accept not all the delays experienced under the claim are the fault of the insurer, however, a significant part of the delays experienced relate to the insurer and its appointed consultants. I am satisfied these failures have resulted in an unusual degree or extent of physical inconvenience, time taken to resolve the situation and interference with the c omplainant’s peace of mind . Accordingly, I determine the insurer is to pay the complainant $1,500 by way non- financial loss compensation in line with the AFCA Rules, within 14 days of the complainant accepting this determination. Insurer is not required to reimburse complainant for maintenance works In the interest of completeness, I acknowledge the complainant’s expectation that the insurer should be required to reimburse the $1,881 he spent in arranging t he maintenance works recommended by K. I am satisfied these expenses were incurred in arranging building maintenance works needed by the insured building as well as so K could commence its works under the claim. The maintenance works were not caused by an insured event. Maintenance of the insured property is always the responsibility of the complainant and not the insurer. Accordingly, I determine the insurer is not required to reimburse the complainant $1,881 under the claim. Determination | Case number: 759820 Page 5 of 5 3 Supporting information 3.1 Process AFCA’s approach to this complaint This complaint has been determined based on what is fair in all the circumstances, having regard to the legal principles, applicable industry codes or guidance, good industry practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. 3.2 AFCA Rules D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate the Complainant for non-financial loss: a) for a complaint relating to an individual’s privacy rights - injury has occurred to the Complainant’s feelings or humiliation has been suffered by the Complainant; or b) for other complaints – an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Complainant’s expectation of enjoyment or peace of mind has occurred.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.