The landlord complainant claimed for water and termite damage after a leaking bath waste pipe, and the insurer denied part of the claim. AFCA found other contributors and ordered the insurer to pay 50% of the repair cost, loss of rent and expert report costs, with interest.

The complainant must prove on the balance of probabilities that all claimed damage was caused by the escape of liquid, and the policy good-condition exclusion did not entirely defeat the claim given termite and other contributing causes.

Issues

Subjects and remedies

home or building damagerelated party investmentthird party authoritypay claimpay compensationpay interestreinstate policy or contract

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 759714 Financial firm AAI Limited Determination | Case number: 759714 Page 1 of 25 Case number: 759714 15 October 2021 1 Determination overview 1.1 Complaint The complainant is represented. For the sake of brevity and convenience, where relevant, references to the complainant include references to the complainant‟s representatives. The complainant lodged a claim under his landlord insurance policy held with the financial firm (insurer) for damage sustained to his property from a leaking bath waste pipe. The insurer accepted the claim in part. However, it denied liability for the remaining damage, saying it was not caused by the claimed event or other event insured under the policy. The complainant seeks reimbursement for the cost of repairing the remaining damage as he believes it resulted from the leaking bath waste pipe. He also seeks compensation for loss of rent and additional costs incurred. 1.2 Issues and key findings Is the insurer entitled to limit its liability? The insurer is not entitled to limit its liability to the damage it accepted because the available evidence shows the „escape of liquid‟ event contributed to some of the claimed damage. As the available material also shows there are other contributors to the claimed damage it is fair the insurer pays to the complainant 50% of the claimed damage. Is the complainant entitled to loss of rent? The complainant is entitled to be paid some loss of rent based on the available information and as per the terms and conditions of the policy as outlined in section 2.2 of this determination. Is the complainant entitled to additional expenses? The complainant is entitled to be reimbursed the cost of expert reports that have furthered his position in relation to the complaint, and as outlined in section 2.3 of this determination. 1.3 Determination This determination is partly in favour of the complainant. Should the complainant accept this determination then within seven days of notice of acceptance the insurer is to pay to the complainant:  $15,259.90 being 50% contribution for claimed cost of repairs  interest pursuant to Section 57 of the Insurance Contracts Act (the Act) on $15,259.90 from 19 January 2021 (the date the insurer could reasonably have decided, having received the complainant‟s engineers report) until settlement.  $10,041.42 for loss of rent Determination | Case number: 759714 Page 2 of 25  interest pursuant to Section 57 of the Act on $10,041.42 from 19 January 2021 (the date the insurer could reasonably have decided, having received the complainant‟s eng ineers report) until settlement  reimbursement for the cost of expert reports as outlined in section 2.3  interest pursuant to Section 57 of the Act on the cost of the expert reports from the date of payment until the date of settlement. Otherwise, the insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 759714 Page 3 of 25 2 Reasons for determination 2.1 Is the insurer entitled to limit its liability? Complainant has established a valid claim The complainant is required to show on the balance of probabilities, that he has suffered a loss caused by a risk insured under the policy. This is known as a valid or prima facie claim. If the complainant establishes a valid claim, the onus shifts to the insurer to show, on balance, that it is entitled to rely on an exclusion under the policy to deny the claim. The complainant‟s landlord policy covers loss or damage caused by events listed under the policy, including the escape of liquid. „Escape of liquid‟ includes liquid leaking, overflowing or bursting from any drain, fixed pipes, drainage system or bath, subject to exclusions. The complainant lodged a claim for damage caused by water leaking from a failed waste pipe under a bathtub (leaking plumbdinger). There is no dispute about the source of the leak and the insurer accepted part of the claimed damage. On this basis, the panel is satisfied the complainant has established a valid claim under the policy. The complaint is about the extent of the damage caused by the escape of liquid. The complainant must establish on the balance of probabilities the proximate cause of all the claimed damage was the escape of liquid from the plumbdinger. Should this be established, the insurer is required to show that it is entitled to rely on an exclusion to deny any part of the claim. The terms of the policy are set out in the product disclosure statement (PDS). Relevant policy extracts are set out in section 3.2 of this determination. Both parties have relied on extensive expert opinion. A summary of the expert opinion is set out in supporting section 3.3 of this determination. Parties disagree about the extent of damage caused by the leak The insurer accepted the complainant‟s claim f or resultant damage to the bathroom vanity and wall lining behind the vanity, on the basis it was caused by the leak. The insurer also accepted it was liable for exploratory works. The insurer has paid for the accepted damage ($3,133.90) and exploratory costs ($621.50). The insurer denied liability for damage to:  wet rot damage to other timber stud framing and walls  subfloor below the bath and floor tiles in the bathroom, toilet, and laundry. It says this is because:  the proximate cause of the claimed damage was not the escape of liquid event  the damage was long-term with evidence of wear, tear, and gradual deterioration, which are circumstances excluded under the policy  there was evidence of extensive termite damage which is excluded as this is part of the policy requirement to keep the property in good condition Determination | Case number: 759714 Page 4 of 25  there was no evidence showing the subfloor below the bathtub was damaged  the leak was not sufficiently severe to cause the extent of damage claimed  there was no evidence of resultant damage to floor tiles. The complainant relies on his expert reports to say all damage was caused by the leak event and believes the leak is also responsible for attracting termites and causing the other claimed deterioration. The complainant says the tiles are drummy and the subfloor is damaged from the leak. The complainant agrees the damage was long term but says it was due to a single bath leaking event which could not reasonably have been discovered until the vanity was removed. The complainant describes the leak as severe. The complainant also argues it is fair that all the tiles are replaced so they match and, current national construction code standards now require all bathrooms to be waterproofed. Consequently, he says if some tiles must be replaced all tiles will need to be removed and replaced so the waterproofing can be carried out. The complainant refers to entry, exit and routine reports prepared by his property manager, (and provided to the insurer) which he says show the property was well maintained and in good condition. He says the water and termite damage could not be identified until the walls and tiles were taken apart during his planned refurbishment and during the exploratory works. The complainant refers to a termite pest inspection report carried out in October 2019 (it is not provided to the panel but is referred to by one of his experts). The expert notes the inspection did not find any live termite activity in the walls of the property. The complainant also asserts the termite damage is on top of the water damaged timber and so regardless of the termite damage, the wall linings, steel corners and studs need to be replaced necessitating complete renovation of the bathroom, toilet and laundry. Experts disagree on extent of damage caused by the leak The complainant‟s builder (IB) identified a leaking bath waste plumbdinger to be the cause of damage, following an invasive inspection. IB said the plumbdinger was leaking under the bathtub and tracking down the walls when the bath was draining. He refers to a video which he says shows half an inch of water sitting under the bath running out of the plumbdinger. IB concludes over time the bath has leaked through the back corner of the house causing excessive water damage and the termite damage is a direct result of the water leak. IB says the bathroom, toilet and laundry floors are on a concrete slab and water is tracking under the tile bed down to the lowest point which is the external laundry wall . In relation to the laundry and bathroom walls/subfloor, IB noted resulting damage:  extensive water damage to the external load bearing walls  the continued moisture ingress attracted termites causing more damage  back right side of house is not structurally sound as bottom plates and many wall studs rotting from water leak  no leaking pipes in the laundry but there is much moisture along the wall bottom  moisture meter detected high levels of moisture in the toilet  all flooring in bathroom, toilet and laundry sounds drummy which is caused by water ingress breaking the adhesion of the tile bedding to the slab  the bracing ply on the back of the wall frame was soaking up water along its bottom edge, as it was in the bathroom behind the vanity and in laundry wall. Determination | Case number: 759714 Page 5 of 25 The insurer disagreed with IB about resultant damage as per the findings of its assessor and builder (AB), who noted the termite damage but said:  the studs in the laundry and bathroom were in reasonable condition  the laundry studs had no apparent water damage, but had evidence of termite damage  the timber bath cradle appeared in good condition, with no evidence of a long-term leak  no extensive water damage to the gyprock wall in the toilet, although located next to bath  grout and silicone in good condition for age, despite a cracked skirting tile in bathroom  no evidence of significant water damage to the frame works as stated by IB. The assessor concluded:  if the pipe had leaked to the extent claimed, the damage would have been more extensive  it is more likely the damage was caused by untreated termite damage in wet areas, which went undetected for some time  the wall lining is gyprock and likely not waterproofed. The complainant disagrees with the insurer‟s asses sment, saying:  the studs in the bathroom and laundry are not in „reasonable‟ condition, given they are water-damaged along with the rotten bottom plate in the laundry  the toilet is not located directly next to the bath as there is a timber frame between the wall sheet and skirting on the other side. He says further the mould and moss observed on the bricks directly outside the bathroom/laundry wall, support that water leaked toward the lowest point (the laundry). The complainant arranged a further leak detection test in May 2020. This expert (AJ) found the bottom plate under the bath was wet but not rotten. He said the condition of the bottom plates under the bath were consistent with an escape of liquid over a relatively short period of time. Nonetheless he said this could do significant damage as it was undetected. AJ also described a tracking mechanism to the external wall of the bathroom along the wall frame between the bottom plate and gyprock sheeting, through the toilet and into the laundry. AJ observed the bathroom, toilet and laundry tiles are drummy from water sitting under the tiles or in the bed for a period. AJ said this was not consistent with the damage in the laundry which was damaged by termites. AJ refers to a termite report conducted in October 2019 which found termites in the fence to the right side of the property. Although the report did not find live termite activity in the walls the report had a disclaimer regarding unseen areas including behind walls. AJ said it could not “rule” regarding the termite damage as “there are too many variables with termites.” When the insurer‟s expert (MB) inspected he agreed the plumbdinger was leaking but found no evidence of drummy tiles or water damage or termite damage to the timber frame to the bath and external timber wall frame. He said the bathroom vanity and laundry tub were leaking but has not provided further information to support this. MB says there is no direct damage caused by the leaking plumbdinger but says the laundry tub leak allowed moisture to hold within the bedding cement and timber frame which attracted termites. Engineers disagree on the extent of damage caused by the leak The parties were unable to agree on the cause of damage or the extent of damage caused by the leaking plumbdinger. As a result, engineers were engaged. The engineers have provided reports. They have reviewed each other‟s reports. There are some areas of agreement and Determination | Case number: 759714 Page 6 of 25 some areas of disagreement. A summary of the engineers ‟ reports and responses and the assessor‟s observations on the reports is set out in supporting section 3. The insurer‟s engineer (JH) noted:  the bath waste outlet was leaking slightly when water was run into the bath at a high rate  long-term water and termite damage to the stud wall timber framing on the rear side of the dwelling is caused by water leaking from the bathtub and tracking along the bottom plate of the stud frame  significant termite damage in the stud wall framing mostly in the laundry and other water damage related timber decay  this mechanism of damage is due to the lack of waterproof membrane to the walls and floors (and this also corroded the steel corner angles)  annotated photographs refer to termite damage to stud framing and water staining on the slab and timber; high moisture levels in the toilet wall; and long-term corrosion to corner angles which indicates long-term contact with water  in a third report JH agrees the prolonged leak has possibly led to termite activity but reiterates inadequate waterproofing contributed to the damage in the wet areas and maintains findings regarding tile damage  tiles were not cracked but there was a small percentage (less than 10%) of floor tiles in each area were drummy (he conducted tile tapping or sonic wand testing) and this was due to combination of long-term tile growth, shrinkage of the concrete slab, and absence of expansion joints. (JH noted joints in bathroom were adequate but found lack of flexible joints in laundry)  tiles near the leak were not drummy which is inconsistent with the leak being the cause of the drummy tiles. In a second report JH noted random isolated tiles were found in the laundry at least 3m away from the leak and away from the likely tracking path of the leak. JH recommended some owner maintenance saying the drummy tiles can either be removed/replaced or chemically filled underneath to secure the tiles to the slab. In addition to the floor perimeters, JH said tile expansion and control joints should be installed within the tile matrix in accordance with the Code which will assist in minimising further tile delamination. The complainant‟s engineer (CD) found a significant quantity of water had flood ed the void under the bathtub and subsequently permeated through the laundry and toilet wet areas. CD noted:  the presence of long-term decay to the bottom plate of the bathroom/toilet partition wall indicates likely leaking from the plumbdinger for several years  long term decay in the form of wet rot to the timber framing of the external load bearing and internal partition walls of the bathroom, toilet and laundry  it is plausible the water leak has contributed to the degree of decay  extensive termite damage (no active wet rot) in the base plate of the external timber stud wall in the bathroom  long-term wet rot in the base plate in the external timber stud wall and partition wall to the toilet  extensive termite damage in the bottom plate of the external and partition walls in the toilet and long-term corrosion in the metal trimming angle to the rear corners of the toilet and laundry  extensive termite damage in the bottom plate and vertical studs in the external walls of the laundry  elevated moisture levels in the exposed concrete slab in the laundry  efflorescence to external brick veneer walls outside bathroom, toilet and laundry Determination | Case number: 759714 Page 7 of 25  water leaking from the bathtub tracked along the bottom plate of the rear wall of the three rooms causing damage to the tile bedding in these three rooms  some floor tiles were removed and most had the tile bedding firmly attached  the escaping water de-bonded the tile bedding from the concrete slab substrate  leaking water from the plumbdinger is the primary cause of damage to the tiling through debonding of the tile bedding from the concrete slab  CD undertook a tap test and estimated 40% of the floor tiles in the bathroom, 20% within the toilet and 25% of the floor tiles in the laundry were drummy  Australian Standards providing for the installation of waterproof membranes (relevant at the time of construction) would not have contained the water leak and were intended to contain water within the local area above the bathtub and would not have prevented damage from a leaking plumbdinger under the bathtub  no waterproof membrane in the wall lining or concrete slab of the laundry. Because of the damage to the tiled floors and tile bedding CD recommended all wet areas are completely reinstated including replacement of the decayed/termite damaged timber stud framing. CD challenged JH‟s opinion about the cause of damage to the floor tiles because he says the failure was between the tile bedding and the concrete slab substrate not between the tile and the bedding. However, CD agreed lack of expansion jointing was a contributing (but small) factor to isolated drummy floor tiles in the bathroom and laundry. The insurer‟s assessor reviewed the engineers‟ reports and his own previous assessment and based on his original assessment he said the leak had not damaged the tiles in the three rooms. He concluded damage to the laundry is long-term and due to the lack of waterproofing in the laundry wall and high moisture levels which he attributed to the adequate drainage of the hot water service overflow pipe directly outside the laundry. The panel notes a photograph from the complainant‟s leak detection report showing the hot water waste unit waste was not connected to the drain. Complainant has not established all claimed damage caused by leak The complainant must establish on the balance of probabilities all the claimed damage was caused by the escape of liquid event. The panel accepts the bath waste outlet leaked. Many of the experts described the same mechanism of damage. The panel accepts the preponderance of expert evidence is that water leaked from the bathtub and tracked along the bottom plate of the stud frame causing water damage in the bathroom, toilet, and laundry. Having considered photographs and reports the panel accepts there is water damage in the three rooms. But there is also termite damage. The issue is whether the termite damage was caused by the water leak or is independent of the water leak. Having considered all the available information and photographs, the panel also considers there are other causes of the claimed damage. While the panel accepts water leaks attract termites the panel also notes the presence of termites in the fence near the laundry in October 2019 which is not long before the termite damage was identified in the three rooms when the vanity unit was removed in the bathroom. The report was not provided but the complainant‟s expert (AJ) refers to it and notes while the report did not find live termite activity in the walls the report had a disclaimer regarding Determination | Case number: 759714 Page 8 of 25 unseen areas including behind walls. AJ said it could not “rule” regarding the termite damage as “there are too many variables with termites.” The panel notes another contributor to high moisture levels in the laundry and subsequent termite activity is the inadequate drainage of the hot water service overflow pipe directly outside the laundry. The panel notes a photograph from the complainant‟s leak detection report showing the hot water waste unit waste was not connected to the drain. The panel also considers there was a third contributor to the damage in the three rooms. While JH accepts there is long-term water and termite damage in the three rooms the panel notes he says this is due to the lack of waterproof membrane to the walls and floors. CD says a waterproof membrane would not have prevented water leaking from the plumbdinger under the bathtub, but CD accepts there is no waterproof membrane in the wall lining or concrete slab of the laundry. Policy exclusion does not entitle insurer to decline all the claimed damage The insurer relies on a policy exclusion. It argues the complainant must keep the property in good condition, including ensuring there is no termite damage. The relevant general exclusion, says there is no cover for damage caused by or arising from a „ failure’ to keep the property in „ good condition’ , an example of which, is ensuring there is no termite damage. However, while the policy reference to termites is linked to the maintenance of the property the policy exclusion does not preclude termite damage if it resulted from the leak. The panel does not accept the exclusion applies to defeat the claim because:  the exclusion is in relation to an action/inaction on the part of the insured, which would necessitate awareness of the condition  the leak and its source were undetectable until an invasive inspection was undertaken  the damage, including termites, was discovered following the invasive inspection  the policy reference to termites is linked to maintenance of the property and does not preclude termite damage resulting from an event insured under the policy. While termites are a contributor, the panel does not accept the policy exclusion relied on by the insurer applies to completely defeat the claim. Fair the insurer pays 50% of the claimed damage Taking all matters into account, and for the reasons set out above, the panel is satisfied there are other contributors to the claimed damage. Therefore, the panel is not satisfied the complainant has established on the balance of probabilities all the claimed damage was caused by leaking plumbdinger. Taking all matters into account, the panel is satisfied a fair outcome is the insurer indemnify the complainant 50% of the claimed damage to the three rooms. Fair the insurer pays 50% of the claimed damage to the floor tiles The parties‟ experts disagreed about the extent and cause of damage to floor tiles in the bathroom, toilet, and laundry. JH conducted tile tapping tests or sonic wand tapping tests and said less than 10% of the floor tiles were drummy. Determination | Case number: 759714 Page 9 of 25 CD also undertook a tap test and estimated 40% of the floor tiles in the bathroom, 20% in the toilet and 25% of the floor tiles in the laundry were drummy IB simply says all tiles “sounded” drumming. He does not describe what kind of te sting he did. As set out above the engineers exchanged opinions about the cause of the damage to the tiles. Having considered the available information the panel finds JH‟s opinion more compelling because the tiles near the leak and the path of the leak were not drummy which is inconsistent with the leak being the proximate cause of the drummy tiles. Further, CD agrees the lack of expansion jointing was a contributing (albeit small) factor to the isolated drummy floor tiles in the bathroom and laundry. The panel acknowledges the complainant‟s argument that new standards require waterproofing in wet areas but based on the available material, the panel does not accept this is a sufficiently compelling reason to require the insurer to pay to replace all the tiles. The panel is not satisfied the complainant has established on the balance of probabilities all the claimed damage to the tiles was caused by the escape of liquid event. Considering the available information as set out above, the panel is satisfied a fair outcome is the insurer pay for 50% of the cost to replace the tiles. Insurer to pay the complainant $15,259.90 plus interest The complainant has provided a quotation from his builder (IB) dated 24 June 2020 in the sum of $32,381.80 including GST. The quote includes all labour, materials, supervision fees and builder‟s margin. In a report dated 17 August 2020, the insurer‟s assessor comments on a repair quotation but in review of its liability position it challenged the quotation and indicated it would request clarification on several items. The report concludes: “r epair estimate review: $12,214.40 is satisfactory .” A conciliation was held in January 2021. The panel notes the insurer was to review the complainant‟s engineer‟s report and a scope o f works was to be provided by the complainant. If a scope of works was provided by the complainant or if the assessor sought clarification on several items, this material was not available to the panel. The panel has considered the quotation dated 24 June 2020 which is described as water damage repairs to laundry, toilet, and bathroom. Having considered the available material and the photographs, the panel accepts there is substantial damage to all three rooms. The panel accepts the insurer is not required to pay for supply and delivery of the shower screen, laundry tub, pressed metal bath and new toilet suite. The panel considers this part of the quotation is attributable to the planned refurbishment. The panel notes the insurer has paid the complainant $3,133.90 for damage to the wall lining and vanity in the bathroom and for exploratory works to ascertain the cause of the damage. The complainant accepted the offer and said this does not form part of this complaint. Therefore, the panel is satisfied a fair outcome is as follows: > IB quote for all work $32,381.80 > less $1,862 for supply of shower screen etc > total $30,519.80 Determination | Case number: 759714 Page 10 of 25 > 50% of total $15,259.90 The insurer is to pay interest pursuant to section 57 of the Insurance Contracts Act (the Act) on $15,259.90 from 19 January 2021 (date the insurer could reasonably have decided, having received the complainant‟s engineers report) until settlement. 2.2 Is the complainant entitled to loss of rent? Insurer to pay the complainant $10,041.42 plus interest for lost rent The complainant claims loss of rent for the period from 10 March 2020 when the claim was lodged and until repairs were completed and property was ready to be leased. The complainant discovered the claimed damage when carrying out cosmetic renovations to the property at the end of a lease. The available information shows:  the damage caused by the leak necessitated significant repairs  before repairing, the complainant awaited the insurer‟s assessment and claim decision  the complainant commenced repairs in January 2021 which repairs were completed in April 2021, so the property could be let. The relevant timeline shows:  the complainant initially lodged his claim on 14 February 2020, which the insurer denied  the complainant made a complaint to the insurer on 15 April 2020  the insurer provided its final decision letter on 8 July 2020, saying it accepted some of the damage but denied liability for other claimed damage. The final decision letter stated the insurer would appoint an engineer to investigate the floor tiles in the bathroom and laundry. Its engineering report was provided at the end of July 2020. It is reasonable for the complainant to have waited for this report before commencing repairs. It was reasonable for the complainant to proceed with repairs to re-let the property. The panel notes the complainant has a general duty to mitigate damage. Further, noting the findings above, the panel is not satisfied the insurer is liable for loss of rent for the entire period claimed by the complainant. The policy excludes payment for loss of rent if the insured address was not occupied by a paying tenant at the time the loss or damage occurred, unless it can be shown that it would have been rented during the time taken to repair, replace or rebuild the property. The information shows the property was let until the lease ended and the complainant undertook cosmetic renovation before re-letting it. The lease which came to an end before the claim shows weekly rent was $330. The panel notes repairs commenced in January 2021 and were completed in April 2021. No information is provided as to how much of that period was spent repairing claim related damage and how much time was spent on the planned refurbishment. The panel considers a fair amount of time for the claim related repairs is four weeks. As it out earlier in this determination, the panel considers a fair offer to settle this claim would have been by paying to the complainant 50% of the claimed cost of repairs. Considering the findings the panel has made and all available information, the panel is satisfied it is fair the insurer makes some contribution for lost rent. To mitigate loss, the panel considers a fair time to start repairs was at or about the end of July 2020. Determination | Case number: 759714 Page 11 of 25 Therefore, the panel is satisfied it is fair the insurer pays the complainant for loss of rent for the period from 14 February 2020 (when the claim was first made) until 14 September 2020 which includes four weeks to repair plus two weeks for contingencies. The panel calculates loss of rent at $10,041.42 (213 days by $47.14 per day). The insurer is also to pay interest pursuant to section 57 of the Act on $10,041.42 from 19 January 2021 (the date the insurer could reasonably have decided, having received the complainant‟s engineers report) until settlement . 2.3 Is complainant entitled to costs incurred in making the complaint? Insurer to reimburse cost of expert reports up to $5,000 Under the AFCA Rules, we may require an insurer to reimburse a complainant for costs incurred in making a complaint (capped at $5,000). This may include legal costs, expert report fees, or travel expenses. In deciding whether a complainant is entitled to these costs, we will consider whether they were reasonable and necessary and whether they helped resolve the complaint. The complainant is entitled to be reimbursed the cost of reports which furthered his position in relation to the claim particularly in circumstances where the insurer obtained expert opinion. The panel is satisfied the complainant is entitled to be reimbursed the cost of reports from IB, CD and AJ. The panel notes the total cost presently claimed for the three reports is $3,798. Subject to provision of receipts, the insurer is to reimburse the complainant up to $5,000 toward the reports mentioned above and any other expert opinion from the engineer CD. If the complainant has paid for the reports, then the insurer is also to pay interest pursuant to section 57 of the Act from the date of payment of the reports until settlement. Complainant not entitled to reimbursement of representative’s costs The complainant seeks reimbursement of costs for legal representation and additional work completed by his real estate agent, in relation to his complaint. AFCA‟s service is a free service for complainants, and it is usually not necessary for a party to be legally represented or pay for representation. If a complainant chooses to be represented our approach is the complain ant usually must cover representatives‟ costs themselves. When considering whether an insurer is required to make a cost contribution, we consider the complexity of the complaint and whether the complainant needed to incur the cost to understand or establish the claim. The complaint did not raise any complex legal issues. Although there were several expert reports to be considered, the panel is not satisfied the nature of the claim warrants payment of the representatives‟ fees. The complainant is therefore not entitled to reimbursement of these costs. Determination | Case number: 759714 Page 12 of 25 2.4 Why is the outcome fair? The outcome is fair because the available information does not establish on the balance of probabilities all the claimed damage was caused by the leaking plumbdinger. The available information establishes there were other contributors to the damage. Policy exclusions relied on by the insurer have not been established to entitle the insurer to decline all the claimed damage. In all the circumstances, based on the available information, the panel considers a fair outcome is the insurer pay to the complainant 50% of the claimed damage and loss of rent and the cost of expert reports (capped at $5,000). Determination | Case number: 759714 Page 13 of 25 3 Supporting information 3.1 Process AFCA’s approach to this complaint This complaint has been determined based on what is fair in all the circumstances, having regard to the legal principles, applicable industry codes or guidance, good industry practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. Case law and proximate cause Case law establishes: > The proximate caus e of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause. > If there are several caus es operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absenc e of the first, the first is the proximate cause. > A common-sense approach is taken to determine proximate cause. This matter was determined by a panel Due to the nature of this dispute, it has been referred to a panel for determination. The panel comprises the ombudsman, a member with significant experience in consumer advocacy and a member with extensive experience in insurance matters. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 759714 Page 14 of 25 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer‟s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. What you are covered for – insured events If you have a property insurance policy, we cover your property for loss or damage at the insured address caused by an insured event during the period of insurance. Escape of Liquid We Cover Loss or damage caused by liquid leaking, overflowing or bursting from any of the following: - any drain, fixed pipes […] - baths, sinks, toilets and basins; We do not cover - broken, worn or aged tiles or grouting in bathrooms, kitchens or laundries unless the damage is caused by liquid leaking from pipes in the walls or floors …. - loss or damage caused by wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot; General Exclusions - (cont’d) You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Failing to take care of your property or contents your failure to: -take reasonable care of your property or unit and contents -keep your property or unit and contents in good condition and well maintained. For the meaning of ‘good condition’ see the “words with special meaning; section on pages 56 to 59; Determination | Case number: 759714 Page 15 of 25 Good Condition Means your property or unit and contents do not have any faults or defects that might cause loss or damage to your property and contents, loss or damage to property of others or injury to people. This includes but is not limited to the following: … - there is no wood rot, termite or white and damage at your property or unit; 3.3 Extracts from material relied on by the parties Date Action Insurer’s builder (AB) 19 February 2020  Inspected and photographed property and provided a mud map on 19 February 2020.  Complainant and property manager said vanity in the bathroom has water damage and the wall is wet as well.  Mud map notes property manager said water damage wall behind laundry tub (photographed). Moisture reading of wall high .  Unable to provide a cause of damage as the vanity has already been removed and plumbing capped off prior to attendance.  Moisture reading of bottom plate normal . Asse ssment Report 21 February 2020  Assessor has spoken to AB estimator, and he has stated it appears the house is undergoing renovations in the kitchen and bathroom areas as the kitchen has also been completely removed and the vanity is removed from the bathroom and there is a builder‟s sign on the front gate. Complainant’s builder (IB) 9 March 2020  Photographed and did invasive inspection re water damage in the laundry walls and behind the vanity in the bathroom.  All walls affected are the external load bearing walls and they have extensive water damage and consequently the continued moisture ingress has attracted termites which have also caused excessive damage.  Back right side of this house where the bathroom, toilet and laundry is, is not structurally sound as the bottom plates and a lot of the wall studs have been rotting out from the water leak.  Laundry: pulled out the tub and cut the bottom half of the wall sheets off, and much moisture along the Determination | Case number: 759714 Page 16 of 25 bottom plates of the wall but even with all the copper pipes in that section of the wall there was no visible leaks.  Toilet in bet ween the laundry and bathroom moistu re meter detected high levels of moisture.  Cut a hole in the left wall of the toilet that backs on to under the bath and run the bath for 5 minutes without the plug. Confirm leak is coming from the bath waste plumb dinger which is excessively leaking out i nto under the bath and tracking down the walls when the bath is draining.  Attached is a video that shows half an inch of water sitting under the bat h running out of the plumb dinger.  As the bathroom, toilet and laundry floors are all bedded on top of the concrete slab and as they are all side by side, I believe water is also tracking under the tile bed naturally down to the lowest point which in this case is the external laundry wall and behind the vanity.  Can back this up by the fact that all the floorin g in the bathroom toilet and laundry sounds very drummy when tapped - caused by the wat er ingress breaking the adhesion of the tile bedding to the slab causing the bedding to be sitting loose on top of the slab. This would explain the excessive moisture un der the bottom plate in the external laundry wall while there a no visible leaks anywhere else in the laundry.  Attach es a photo of the bracing ply on the back of the wall frame where the ply is clearly soaking up wat er evenly along its bottom edge, this is the same in the bathroom behind the vanity and in the external laundry wall.  Bath leak over time has spread rite through the back corner of the house causing excessive water damage structurally and non - structurally and all the termite damage is a direct result of this wat er leak issue. Complainant’s plumber (KP) tax invoice 23 March 2020  Investigat ed for leak as requested.  Could not come up with conclusion. Builder had turned water off 2 weeks ago when he went to property and water had been off since a nd leak dried up.  Pressure tested water mains with no evidence of a leak.  Pressure test bath combo and bath waste pipe, no leak occurring while onsite.  Pressure tested laundry no evidenc e of a leak.  Vanity had been removed so unable to determine is leaking inside the vanity via waste or taps.  No leaks - Builder was contacted aft er testing and confirmed source of leak - and builder is fixing this leak Determination | Case number: 759714 Page 17 of 25 from bath waste (plumbdinger) Asse ssment report 14 April 2020  Reviewed complainant‟s report from plumber and builder and refers to on - site dual inspection 27 March 2020.  Bathroom framing where the vanity has been removed has clear evidence of termit e damage to the bottom plate as does the laundry bottom plates, th e studs in the laundry and bathroom appear in reasonable condition, laundry studs have evidence of termite damage and do not appear to have wat er damage. No wall sheeting in the WC have been removed, so no assessment of any suggested damage could not be as sessed.  Timber bath cradle visible from the WC wall appears in good condition and would show evidence of a long - term leak from bath waste, also the WC gyprock wall does not appear to have suffered extensive water damage which would be evident due to its l ocation directly next to the bath.  During the onsite inspection the condition of the tiles, grout and silicon in the bathroom appeared to be in good condition for the age with 1 cracked skirting tile evident.  REA email states that the vanity was removed because it was “aesthetically unappealing” and was to be replaced prior to any new tenants occupying the property.  If the bath waste was leaking to the extent that is claimed in the builder‟s report assume the res ulted damage for be far more extensive tha n what was observed during the dual assessment.  Claim for vanity be declined as follows: as plumbing report dat ed the 23/3/20 was unable to find a cause of the leak; building report and the not ed damage was not evident during the onsite inspection conduct ed on the 27/3/20; no evidence of significant water damage to frame works as stated.  There is evidence of termite damage throughout the bathroom and laundry, which is a policy exclusion.  B ath timber cradle does not show evidence of water damage which wou ld be reasonably expected in the case of a bath waste leak.  Notes i mages of the original vanity shows that it has evidence of long - term wear and tear and has evidence of water damage which would directly has been due to splashing, dripping, and overflowing over time which the customer would have been reasonably aware.  N o evidence that a long - term leak has occurred from Determination | Case number: 759714 Page 18 of 25 the bath waste which would result in water/termite damage in the bathroom, toilet, and laundry as sugge sted in the building report.  M ore likely scenario that the resulted damage is due untreated termite damage in wet areas which has been undetected over an extended period. Complainant’s leak detection report (AJ) 19 May 2020  Inspected, tested, and photographed 18 May 2020. Visually checked exposed bottom plat es in the bathroom, toilet, and laundry for evidence of a prolonged leak. After inspecting the areas listed it was noted that the bottom plates under the bath, although we t, did not show signs of decay/deterioration/termite damage or wood rot. This is not consistent with the damage in the laundry; however, it must be noted that the laundry area has been affected by termite damage which has significantly increased the visibl e damage to the bottom plates.  Drain test to bathroom - fill bath with hot water and release to check bath waste (plumbdinger) for leaks. After testing it was found that water is leaking from the underside of the bath waste where it connects to the plumbdin ger when the bath is in use. This water is tracking to the external wall of the bathroom and appears to be tracking along the wall frame between the bottom plate and the gyprock sheeting through the toilet area, across the laundry threshold and pooling in the laundry area before seeping through the external wall where there is evidenc e of dried moss.  It was further noted that water has also been seeping through the bathroom wall behind the hot water unit.  Moisture readings - Moisture readings were taken in the bathroom, toilet, and laundry to check for residual moisture. The returned readings were all dry as the property has been empty for a period .  Thermal Imaging - We used thermal imaging equipment to track the escape of liquid from the bath waste. The ima ges showed that water was tracking to the external wall of the bathroom under the bath.  Reviewed the copy of the REA termite/ pest inspection which was carried out on 28 October 2019 while the dwelling was still occupied. This report identified termites in the fence to the right - hand side of the property which were treated shortly aft er on or around the 29th of October 2019. The report did not find any live termite activity in the walls of the property, however due to latent conditions with wall coverings i n place, the report has a disclaimer regarding unseen areas of the hous e, including behind walls.  Plumbdinger is classed as the drain and fixed pipe”. Determination | Case number: 759714 Page 19 of 25  Re exclusions to this policy as the house is rented and the REA routine inspections may be anywhere from 3 - 6 months apart, if a leak presented itself which has gone unnoticed can cause significant damage to the property in a relatively short period of time.  From the pictures supplied to me from the rec ent routine inspection prior to the exit report showed the property in a reasonable condition with no evidence of swelling to the vanity cabinet.  Condition of the bottom plat es under the bath show that they are wet, but not mouldy or rotten which would be consistent with an escape of liquid over a relatively shor t period of time.  As a building company, we cannot rule, advise or sway regarding the termite damage, as there are too many variables with termites and it is impossible to state whet her the termites were active, but dormant, etc.  Further noted on the day of testing that the bathroom, toilet, and laundry tiles are all drummy from water sitting under the tiles, and or in the bed for a period.  Note photograph Hot water unit waste not connected to drain. Insurer’s builder (MB) 2 July 2020  Attended the site with Assessor and the Property Manager to investigate an escape of liquid from the bathtub.  Vanity in the bathroom is removed and there is an evident sign of termite damage to the internal timber frame.  An inspection report from the Pro perty Manager of the vanity has shown an evident sign of water damage to the vanity doors. The vanity looked to be in poor condition and was needing replacement.  Invasive holes have been made to the toilet walls and the adjac ent laundry walls also have te rmite damage. On inspection, I ran the bat htub for approx. 5 mins and found that there is a leak in the waste pipe/ plumbdinger.  Inspection to the timber frame to the bath and external timber wall frame I found no evident of water damage or termite damage .  Water damaged vanity and the damage to the walls in the laundry are not in relation to the leaking bat h waste. The laundry tub and vanity were both leaking and requiring complete replacement.  Laundry tub plumbing was leaking for a period to allow moist ure to hold within the bedding cement and timber frame which has attracted termites.  Found that the tiles are not "drummy ”, and the bedding Determination | Case number: 759714 Page 20 of 25 and tiles are not affected and still fixed securely to the substrate.  Resulting damages are maintenance issues and Termite damage is not covered under the policy.  Maintenance issues include repair termite damage timber frame and replace vanity and laundry sink.  Resultant damage: no direct damage has been caused by leaking bath waste Insurer’s engineer (JH) 28 July 2 020  Inspected and photographed (which are annot ated) with property manager and builder 16 July 2020.  Hous e about 28 years old and has been vacat ed and unoccupied since January 2020. Dwelling in a satisfactory condition.  Property manager said leak occurring over time but not noticeable until early February 2020.  Concluded only a small percent age of the tiles were drummy which is due to a combination of long - term tile growth, shrinkage of the concrete slab, and a lack of adequate perimeter joints as observed in the laundry. There was no readily observed cracking to the tiles or any significant damage that could be attributed to an escape of liquid event.  Visual evidence indicated the presence of long - term water and termite damages to the stud wall ti mber framing on the rear side of the dwelling.  Extent of wat er and termite damages are reflective of water leaking from the bathtub and tracking along the bottom plate of the stud frame due to lack of bathroom walls and floors water proofing into the laun dry area over a prolonged period , which has also caused corrosion to the steel corner angle.  Drummy tiles are away from the ex pected direction of water tracking along the stud frame, whereas some tiles near the loc ation of leak were not drummy. This is in consistent with the leak being the cause of the drummy tiles.  Observed floor tile delamination is not attributable to an escape of liquid event. Asse ssment report 17 August 2020  Reviewed repair quotation for vanity replacement and wall lining repair an d exploratory costing to source the leak.  Items included in the customers quotation for the repairs as per numerous assessment reviews and engineer‟s report include supply and install new vanity including all plumbing works; repair damaged wall linings in bat hroom and toilet, which includes the removal of all floor tiling in both rooms; new bedding, Determination | Case number: 759714 Page 21 of 25 water proofing and floor tiles and various other associated repairs.  Notes assessment reviews and engineer‟s report that the tiles and bedding were unaffected i n the EOL from the bath.  REA, she has appointed the customers builder to remove the existing floor bedding and tiles to prove that the tiles where “drummy” due to the event.  Noted that the repair quotation includes the removal of all tiling in bathroom and toilet. REA will need to advise as to what tiling and bedding has already been removed by the customers builder.  Bathroom wall lining is included but at no stage has any reports submitted noted that the entire bathroom wall lining (fibrous cement) is damaged and requires replacement as well as the floor tiling.  Noted that the only damaged wall lining is directly behind the vanity, this has been removed so as the plumbing could be isolat ed, the existing bedding and tiling was finished up to the prev ious vanity so therefore the wall lining can be replaced and repaired without removal of any bedding and tiling, there is no evidence the remaining bat hroom wall lining is damaged and requires replacement.  Toilet wall is gyprock lined and REA will need to provide a break down to replace the wall lining in this section only.  Noted during previous assessment reviews property has termite damage throughout, it is reasonable to assume that if termit e repairs are being undertaken then any required wall lining in the toilet can be done in conjunction with these repairs and therefore insurer will not be responsible for the replacement cost of any tiling and associated works as noted previously that the tiling and bedding were unaffected from the EOL as per engineer‟ s findings.  Quotation also includes total exploration works $1500.00 and customer has already been CS $621.50 approved 24/4/20 for exploratory works, REA is provided furt her details as to the portion of the repair quotation.  Conclusions REA has included se veral repair items which need clarification prior to any acceptance of quotation total. Assessor will email REA requesting clarification on a number of thes e items and provide recommendations once correspondence is received.  Excess: $1,000 unpaid  Repair es timate review: $12,214.40 is satisfactory. Determination | Case number: 759714 Page 22 of 25 Complainant’s engineer’s (CD) report 11 September 2020  Inspected and photographed property on 31 August 2020 with the property manager and builder.  Plumbdinger drains the bathtub in the main Bat hroom of the r esidence. The Insured and Property Manager say a significant leak has been present from the plumbdinger for an unknown time which has caused resultant damages to;  1.1.1 tiled floor surfaces of the Bathroom, Toilet and Laundry.  1.1.2 Dec ay in the form of wet rot to the timber framing of the external loadbearing and internal partition walls of the Bat hroom, Toilet and Laundry.  1.1.3 The long - term presence of moisture within the external wall cavities of the wet areas from the subject water leak, and some d egree of moisture seepage through the external walls, has attracted termite activity to the external timber stud walls resulting in significant termite damage to these walls.  Damage to tiled floor surfac es of wet areas  1.2 Inspection of the Bathtub and e scape of water from the leaking plumbdinger identified a significant quantity of water flooding the void under the bathtub and subsequent permeation through the Toilet/Laundry wet areas.  1.3 From ins pection of the failed tile bedding within the wet areas, escape of water from the plumbdinger has been the primary cause of damage to the tiling, in particular, through debonding of the tile bedding from the concrete slab substrate i.e., drummi ness within the tiles has occurred over the full depth of the bedding, not between the tile and the bedding. This opinion is based on the presence of drummy tile bedding strongly correlating with the location of moisture permeation through the tile bedding from the water leak source.  1.4 We attribute ingress of fine tree roots under the tile bedding within the Toilet as a contributing factor in the debonding of the tile bedding from the concrete slab substrate. We believe the subject water leak has attract ed tree roots from the nearby Palm trees towards a sourc e of moisture.  Damage to the timber wall framing  1.5 Inspection of the timber framing identified some degree of long - term decay in the form of wet rot. It is plausible that the subject water leak ha s contributed to the current degree of decay in the timber framing. Note: The provisions within the Australian Standard for the installation of waterproof membranes, relevant at the time of construction, would not have contained the water leak to this room , while preventing damage to Determination | Case number: 759714 Page 23 of 25 adjacent rooms.  1.6 Based on the current damage to the tiled floor surfaces within all wet areas, in particular the tile bedding, we recommend all wet areas are completely reinstated. During reinstatement of the wet areas, rep lacement of decayed/termite damaged timber stud framing is required. Asse ssment report 15 January 2021  Reviewed complainant‟s and insurer‟s engineers reports and as there are different conclusions about the damage caused by the leak asked JH to comment Insurer’s engineer (JH) 1 February 2021  Reviewed complainant‟s engineer‟s report and commented on conclusions made and maintained the drummy tiles caused by a combination of long - term tile growth, shrinkage of the concrete slab, and a lack of adequate perimeter joints.  Drummy tiles have occurred due to long - term, and construction related issues and not the leak event.  Visual evidence indicated the presence of long - term water and termite damages to the stud wall timber framing on the rear side of the dwelling. This has occurred in the laundry areas because of inadequate waterproofing to this area. Asse ssment report 8 February 2021  Reviewed engineer's reports and previous assessment reports: the tiled floor in the laundry, toilet and bathroom where u naffected from the event.  During the original assessment there was no observed damage to any of the tiled floor, most of observed damage as noted in images was long term damage to the laundry framing with evidence of rusting fittings, internal angles and long - term termite damage.  During original assessment not ed directly outside the laundry the HWS overflow pipe extinguished into the ground as well as the dwellings downpipe had a visible hole which would extinguish directly outside the laundry this may be a contributing factor in the observed termite damage throughout the laundry and minor damage to the bathroom framing.  Claimed a significant amount of water was escaping the plumb dinger when the bath was in use, (as noted in the C D report ). If this is the case it would be reasonable to assume that this level of wat er would be visible throughout either the bat hroom toilet or laundry during the bath use, as noted in the original reports the damage to the vanity wall frame was only discovered during the remova l of the vanity during renovations at the property not due to any observed EOL event.  I do not attribute any damage to the bathroom, toilet, Determination | Case number: 759714 Page 24 of 25 and laundry tiling to the leak in the plumb dinger.  Damage to the laundry framework is long term and due to a lack of waterproofing in the laundry wall linings which has led to the termite damage due to high moisture level likely in conduction with the sodden soil directly outside the laundry external wall. Response from engineer (CD) to JH 2 June 2021  1.1.1 Hydrostatic pressure, in terms of an uplift force would only be relevant as a „buoyancy effect‟, and not relevant in this case as ceramic tiles are twice as dense as water (2,200kg/m3).  1.1.2 Instead, debonding has occurred from detachment of the be dding from the concrete slab substrate.  1.2.1 Property Manager advised that during the initial JH inspection, there was a larger % of tiles found to be drummy.  1.2. 2 This is consistent with the CD ins pection which identified approximat ely 40% of the tile s within the Bathroom drummy, 20% within the Toilet and 25% within the Laundry.  1.3.1 JH state that one of the primary causes of tile debonding has been from tile growth. For tile growth to occur, in our experience this inevitably occurs as „tenting‟ i.e. , differential movement relative to the substrate. Refer below image;  1.3.2 Tenting of tiles from „tile growth‟ inevitably occurs between the tile and tile substrate, in this case the bedding, due to the differing materials. The porous ceramic tile has el ongat ed relative to the cement - based bedding. It is not plausible that the bedding could also elongate at the same rate as the ceramic material.  1.4.1 Tracking of water was found to the perimeter of the Laundry, particularly the rear wall. This was confir med by moisture tests during the CR inspection.  1.5 CR say water leak has necessitated full reinstatement of the Bathroom, Toilet and Laundry primarily from the water leak due to; debonding of the floor tiles, ingress of tree roots and termite damage to t he external loadbearing and internal partition walls.  1.6 It is not known how long the leak had been occurring for, the presence of long - term decay to the bottom plate of the Bathroom/ Toilet partition wall indicates the leak may have been occurring for se veral years, most likely initiated as a slow leak.  1.7 It is a known construction issue that termites are attracted to a source of moisture, and additionally tree root growth. We do not find it a coincidence, but a Determination | Case number: 759714 Page 25 of 25 result of the wat er leak that termite ac tivity and ingress of tree roots is limited to the Bathroom, Toilet and Laundry areas of the residence only.  1.8 This opinion is also supported by JH; Engineer’s report (JH) 2 July 2021  Reviewed letter from ins urer, statement from property manager and letter from complainant‟s engineer and maintained opinion.  Ceramic tiles are robust materials used in showers and swimming pools, which exposes them to constant water contact. They undergo growth, which must be accounted for in the installation of expansion joints as required by the Australian Standard AS3958. Such joints have not been installed in the subject tiled floor.  Available evidence indicates the drummy tiles have occurred due to lo ng - term tile growth, construction related issues and not the leak event.  While subjective opinion may differ, tile delamination has occurred remote to the leak location and JH have relied on the objective benchmark AS3958 as to causation.  Confirm the visu al evidence indicat ed the presence of long - term water and termite damages to the stud wall timber framing on the rear side of the dwelling. This has occurred primarily in the Laundry because of inadequate waterproofing to this area. 3.4 Other relevant material considered and relied on  Parties‟ submissions /emails and all attachments to all submissions/emails.  Parties‟ expert reports .  Photographs, quotations, and invoices.  Correspondence between the parties.