Home / Suncorp Group / Determination 759653
Determination 759653
Water damage from leaking hot water pipe and shower recess exclusion
Summary
The insurer accepted that a leaking hot water pipe caused damage but limited cover, excluding long-term leakage from the shower recess. AFCA required the insurer to pay $5,685.37 in total, adding $669.90 for mould remediation to its $5,015.47 offer.
The policy covers only pipe-related damage and excludes shower recess leakage and mould, and the expert evidence on the cause of damage was more persuasive.
Issues
- Claim denial primary · not upheld“The policy specifically excludes loss or damage arising from a leaking shower base or walls and loss or damage caused by mould, mildew, corrosion or rot.”
- Claim amount dispute secondary · upheld“The insurer should increase its offer of settlement by $669.90 to a total of $5,685.37.”
Subjects and remedies
home or building damagepay claim
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 759653
Financial firm AAI Limited
Determination | Case number: 759653 Page 1 of 5
Case number: 759653 20 August 2021
1 Determination overview
1.1 Complaint
The complainant holds a Home & Contents Insurance policy with the financial firm (insurer)
and lodged a claim on 19 July 2020, for damage arising from a leaking hot water pipe.
The insurer accepted liability for the damage caused by the leaking pipe and has offered to
cash settle the complainant for the resultant damage.
The complainant disputes the insurer’s assessment and says there is mould and water
damage to the wall boards and base plates of the laundry/bathroom from the insured event.
The complainant seeks cover for the resultant damage and reinstatement of the affected
areas.
This determination has been subject of a preliminary view. The preliminary view was in favour
of the insurer. The complainant has rejected the preliminary view. Further submissions were
made by both parties and have been considered in reaching this determination.
1.2 Issues and key findings
Is the insurer entitled to limit its liability under the terms of the policy?
Yes, the insurer is entitled to limit its liability for damage caused by the leaking pipe and
exclude liability for damage caused by a leaking shower recess.
Is the insurer’s offer fair in all the circumstances?
No. The insurer should increase its offer by $669.90 to $5,685.37 to include the further mould
remediation recommended in the complainant’s mould report of 8 February 2021.
Why is this determination fair?
It is fair that the insurer is entitled to rely upon the terms of the policy. The policy specifically
excludes loss or damage arising from a leaking shower base or walls and loss or damage
caused by mould, mildew, corrosion or rot. On balance, the additional damage claimed by the
complainant was most likely caused by long term leaking from the shower walls which is
excluded from cover.
1.3 Determination
This determination is in favour of the insurer.
Within 14 days of the complainant’s acceptance of this determination, the insurer is to pay the
complainant $5,685.37 in settlement of the complainant’s claim for loss or damage arising
from the leaking pipe. Other than this, the insurer is not required to take any further action.
Determination | Case number: 759653 Page 2 of 5
2 Reasons for determination
2.1 Is the insurer entitled to limit its liability under the terms of
the policy?
Yes. The policy limits liability to insured events and is subject to various limitations and
exclusions.
Policy is an insured events policy subject to exclusions and limitations
The complainant’s Home & Contents Insurance policy provides cover for a series of insured
events including loss or damage arising from the escape of liquid.
Under the insured event escape of liquid, the policy covers loss or damage caused by liquid
leaking, overflowing or bursting from a water main, fire hydrant or water supply pipe. The
policy covers the loss or damage caused by such a leak, and the exploratory cost to identify
the cause of the leak.
The policy however excludes loss or damage caused by a leaking shower floor or base,
shower, cubicle walls, shower glass, screen or doors and loss or damage caused by wear,
tear, rust, fading, rising damp, mould, mildew, corrosion or rot.
No dispute that it was damage caused by a leaking pipe
There is no dispute there was damage caused by a leaking hot water pipe in the wall between
the bathroom and laundry of the complainant’s property. This was identified in the
complainant’s plumber (AS) report dated 19 July 2020.
The leak was repaired prior to the lodgement of the claim. A restorer (R) was appointed with
drying equipment and filters applied to the affected area.
The time line provided in the report from R indicates that between 19 July 2020 and 31 July
2020, the drying was completed, and mould treatment actioned. The report identifies further
elevated moisture levels on 13 August 2020. This is after the leaking pipe had been repaired.
Further drying equipment was installed and on 26 August 2020, the moisture readings had
returned to normal.
Damage arising from leaking shower recess excluded from cover
The policy clearly excludes loss or damage caused by a leaking shower recess or loss and
damage caused by wear and tear, mould, mildew, corrosion or rot.
The complainant does not dispute these terms of the policy but maintains ongoing mould and
water damage was caused by the water from the broken pipe flowing down the wall cavities
and up the walls till the walls were water logged and mouldy.
Expert report from RCC persuasive that damage due to leaking shower recess
The complainant provided a further report from AS based on flood test conducted on 18
March 2021. The insurer has relied on a leak detection report from RCC. The reports provide
conflicting views but, in my view, the report provided by RCC is more persuasive.
AS provided a brief report. AS advised that the bathroom shower was filled with water to the
hob level and left for 24 hours. Part of the process of filling the hob involved water being
sprayed over the walls and grouted areas to look for areas leaking through the wall. AS
Determination | Case number: 759653 Page 3 of 5
confirmed that there was no sign of leakage from the shower base in the laundry, the hallway
or bathroom.
The complai nant says that the view was supported by the insurer’s mould sub -contractor who
states that the initial source of water ingress originated from the damage pipe in the wall of
the laundry, which then seeped into the walls and timbers in the laundry and eventually into
the hallway.
The insurer relies on a report from RCC following attendance at the property on 19 August
2020 which is more detailed than the AS report.
RCC noted that all nitrogen pressure tests with the hot and cold-water lines passed and all
flood testing to all drainage fixtures within the bathroom passed with no evidence of a water
leak. This is consistent with the findings of AS.
RCC found however that after spray testing, the shower recess wall tiles leaked under the
bottom plate. RCC concluded that the water proof membrane in the shower recess had failed
allowing water to penetrate causing the observed damage to the timber bottom plate.
Photographs supplied with the report identified the observed moisture and elevated moisture
readings as well as water leaking from the timber bottom plate upon spray testing of the
shower wall tiles.
While the complainant has said that the shower has not been in use, no other leak has been
identified.
The report from RCC is detailed and persuasive as to the cause of damage. I accept the
findings of RCC that there is likely to have been long-term damage resulting from water
leaking through the shower recess due to the failed water-proofing membrane.
Insurer is entitled to limit its liability based on the terms of the policy
As indicated above, the report provided by the insurer are persuasive that the damage
caused by the leaking pipe is limited. In the most recent response from the insurer’s
assessor, removal of the entire length of wall linings from the hallway and laundry, identified
no moisture or mould concerns in the bathroom/laundry wall at the junctions.
I accept based on the available information that there is evidence of long-term deterioration
and damage to the wall linings and timber framing, most likely caused by the failure of the
waterproof membrane.
In the circumstances, I agree that the insurer is entitled to limit its liability in accordance with
the terms and conditions of the policy.
2.2 Is the insurer’s offer fair in all the circumstances?
Insurer should increase its offer to cover additional mould remediation
The insurer has offered to cash settle the claim for $5,015.47 inclusive of the 20% uplift
based on its assessment of the cost to remediate the damage to the wall linings and skirting
boards.
The complainant has provided a quote for over $36,000 to cover the renovation/rectification of
the bathroom, toilet and laundry areas.
Determination | Case number: 759653 Page 4 of 5
The complainant’s quote is based o n all damage being related to an insured event. As I have
indicated above, the insurer is entitled to limit its damage to the damage caused by the
leaking pipe.
The insurer has agreed to cover the cost of reinstating the hallway and laundry wall linings,
associated skirting boards and painting. It has offered to cash settle this aspect of the claim in
view of the findings contained in the leak protection testing indicating ongoing issues
associated with water leaking from the shower recess.
I accept that t he insurer’s offer to cash settle the claim is fair and based on its assessed
costs, it is fair that it is allowed a 20% uplift.
The complainant obtained a further mould report dated 8 February 2021. The report from
MCA identifies ongoing mould issues in the exposed walls. MCA has quoted $669.90 for
mould remediation being removal of all visible mould in the affected areas and removal of
airborne mould spores.
Although the additional mould may well be related to the ongoing water leaking from the
shower recess, I consider it fair in the circumstances that the insurer agreed to cover the
costs of this additional mould remediation as part of its cash settlement. Accordingly, the
insurer should increase its offer of settlement by $669.90 to a total of $5,685.37.
2.3 Why is this determination fair?
The determination is fair as it requires the insurer to cover liability in accordance with the
terms of the policy. In addition, the determination allows for some further mould remediation
to complete any mould remediation that may be related to damage arising from the leaking
pipe.
Determination | Case number: 759653 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.