Determination 758854

Lightning damage claim - plumbing leak; insurer sought invasive exploratory works and relied on corrosion exclusion

FirmSuncorp Group
Decided2021-10-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$47,466
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home was struck by lightning and a later plumbing leak followed; the insurer reserved its position pending invasive exploratory works. AFCA found the claim valid, the corrosion exclusion not established, and ordered cash settlement, reimbursement of re-routing costs, accommodation and interest.

Expert evidence on the balance of probabilities linked the leak to the lightning event, and policy conditions did not authorise invasive exploratory work.

Issues

Subjects and remedies

pay claimpay compensationpay interest

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 758854 Financial firm AAI Limited Determination Case number 758854 Case number: 758854 14 October 2021 1 Determination overview 1.1 Complaint The complainant’s house was struck by lightning on 25 February 2020. The financial firm (Insurer) undertook emergency repairs. On about 8 April 2020 water commenced leaking from the underground plumbing into the kitchen and laundry. The Insurer denies this was part of the lightning damage and relies on an exclusion for corrosion. The Insurer says it needs to remove sections of the kitchen floor and cabinets to prove corrosion was the proximate cause. The complainant has refused to allow this exploratory work. 1.2 Issues and key findings Has the complainant established a valid claim for damage to the plumbing? Yes, expert evidence supports the 25 February lightning caused the 8 April 2020 water leak. Is the insurer entitled to rely on a policy exclusion? No, the insurer lacks evidence that corrosion was the proximate cause of the water leaking. Is insurer entitled to insist on further exploratory works? No, policy conditions do not empower insurer to insist on invasive exploratory work. Why is the outcome fair? The insurer accepts that it lacks evidence to rely on the corrosion exclusion to deny the claim. The insurer has not denied the claim. Instead the insurer has reserved its position pending an opportunity to undertake invasive exploratory works to gather evidence it believes exists to prove an exclusion. However, policy conditions do not give this power to the insurer. 1.3 Determination This determination is in favour of the complainant. Insurer is to cash settle the complainant $39,507 comprising $35,915 plus a 10% margin. In the event the swollen cupboard kickboards in the kitchen are not able to be removed without damage to the kitchen benches, then the insurer is to reimburse the costs incurred by the complainant of new kitchen benches and tops up to a maximum amount of $15,000. Insurer is to reimburse the complainant $7,959 being the costs of re – routing the plumbing and interest thereon from 31 August 2020 to date of payment. Insurer is to pay $800 to the Complainant being in respect of 8 days accommodation ($100 per day) with relatives during repairs. Determination Case number 758854 2 Reasons for determination 2.1 Has complainant established valid claim for damage to plumbing? Yes, expert evidence supports the 25 February lightning caused the 8 April 2020 water leak. Damage from Lightning Event The complainant reported the initial damage caused by lightning; a backyard tree was directly struck and destroyed, a concrete patio and pathway were dislodged, the power meter box was destroyed, electrical appliances were damaged or destroyed and water was leaking from a copper pipe in the toilet. The insurer engaged a builder NC who attended on restoring power and fixing the urgent work required. NC by report of 6 March 2020 stated “lightning strike damaged water pipes”. NC engaged TJ plumbing who (by report dated 21 April 2020) stated they found a small hole in the toilet inlet copper pipe which they repaired. The report further stated “hole in the pipe was formed by a steel reinforcing bar arcing on the unlagged copper tube due to light ning strike.” TJ recommended further testing of the copper pipe. This request for testing was in the context of ensuring the urgent repair work was adequate and was well before any further leaking occurred. Further Leaking On 8 April 2020 the Complainant reported more water leaking. The insurer engaged specialist leak detection service CLD which on 30 April 2020 reported a small leak under kitchen/laundry. CLD also reported attending the same property in January 2014 (for a different insurer) when they repaired two pinhole leaks from corrosion. CLD opined the recent leak was also from corrosion and that, if caused by the lightning, the damage would have been immediate. CLD concluded “ it appears further invasive exploratory works are required to pinpoint and expose the leak. This may involve removing the laundry cupboards and kitchen. This will be a large job.” The insurer’s assessor reported that due to the difficulty of the existing pipe being below a thick cement slab it may be necessary to install new pipes and that to run an all new water service would require replacing two new bathrooms. By assessment report dated 18 May 2020 the insurer concluded further invasive exploratory testing was required. The insurer advised the complainant that if the further exploratory work revealed corrosion, that the insurer would not indemnify for the plumbing work required. The complainant refused permission for the further exploratory work. Subsequently the insurer clarified that even if corrosion was revealed, the insurer would nevertheless completely make good the exploratory work. Policy provides cover subject to conditions and exclusions The policy at page 6 says the insured has “ to prove that an incident covered by the policy has occurred and the extent of loss or damage you have suffered ”. The policy provides cover for loss or damage caused by lightning strike. One of the specific exclusions for lightning cover is: “ loss or damage without written confirmation from a qualified repairer saying lightning was the actual cause of the damage ”. Determination Case number 758854 The policy has the following general exclusions relating to wear, tear and gradual deterioration: “ General exclusions You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Wear, tear and gradual deterioration wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration The insurer says it must undertake further investigative works in order to determine the proximate cause of damage to the copper water supply piping and says a possible cause is corrosion, which is excluded. The policy conditions include: “ To process the claim, you must – allow us to inspect the damaged home and/or contents; – allow us to arrange for experts to assess the damaged home and/or contents and to quote on repair or replacement; … – consult an expert if we ask for this.” Non-compliance with this latter condition may entitle an insurer to refuse a claim. The wording of this condition is not as extensive as the insurer contends. There must be some limit on the power to inspect and assess. There is certainly no language expressly authorising exploratory work. There is no express power to undertake the type of invasive work requested and which would undoubtedly cause inconvenience and the trauma of more damage and more work to be repaired. The policy provides cover for escape of water, subject also to a corrosion exclusion. The policy has additional covers one of which is for the exploratory costs to locate the source of a leak which is not covered and to restore the damage from the exploratory work (page 40). The maximum amount of this additional cover is $2,500. The exploratory work described here is an additional cover at the option of the insured. Complainant engages Plumbers, Builder and an Engineer In the circumstances of the dispute, certain work which was clearly required due to the lightning strike was not undertaken including repairs to the concrete patio. The insurer has calculated that aside from the plumbing issue, it still needed to do over $5,000 of work. This work became stalled due to the dispute. The complainant engaged a plumber PN whose report dated 19 May 2020 stated damage was due to lightning strike as inspection of pipework showed “proper lagging and plumbing were used to reduce corrosion ”. PN is a qualified repairer and his report is sufficient to avoid the specific lightning exclusion above. PN advised that due to the main water supply pipe being located underneath a thick cement slab it would be more economical to re-route the plumbing through the roof of the house. In July 2020 the complainant engaged a new plumber RP who undertook a complete re- routing of the pipes through the roof. The cost was $7959. It sent the invoice to the insurer which amount is in dispute and unreimbursed. Determination Case number 758854 On 20 September 2020 the complainant provided a report from builder K which quoted $35,915 to complete outstanding repairs from the lightning strike. This quote included significant consequential work necessitated by the re-routing of the plumbing in various rooms of the house. K stated that if swollen cupboard kickboards in the kitchen could not be removed then there could be a further $10,000 to $15,000 costs to replace kitchen benches and tops. I have invited the insurer to advise if it has objections to any part of this quote. It has not done so other than to say that it needs to do the exploratory work and if the cause of the plumbing leak is corrosion, then much of these items are the responsibility of the complainant. The complainant in submissions said water utility records showed water use had tripled from the period before the lightning strike. However so far as I can tell the actual usage records were not produced nor did the insurer request these records. The records may have been useful to indicate the date that the further leaking started. However, they would not necessarilly have been conclusive as to the cause. The i nsurer in its Notice of Response dated 30 October 2020 submitted “ The Insurer maintains, based on the report provided by CLD which confirms historic issues with corrosion in the pipes at the property, that it is entitled to carry out the necessary investigative works in order to determine whether the lightning has caused the damage to the pipes”. The complainant provided a report dated 16 November 2020 which appears to be from a civil engineer JC. That report states, “ The small piece of pipe provided does exhibit some form of fusion which is consistent with burn/fusion by an electrical current arc. The internal of the section of pipe shows green oxidation of the copper which is consistent with copper pipe of similar age and the integrity of the wall thickness of the pipe is intact. There are no visible signs of corrosive pitting in the section of pipe examined”. Has the complainant established a valid claim for plumbing repairs? In my opinion the report of the insurer’s builder NC dated 6 March 2020 and plumber TJ dated 21 April 2020 are sufficient to satisfy the burden on the complainant of proving on the balance of probabilities that the 8 April plumbing leak is due to the 25 February lightning event. . The complainant’ s expert reports from the plumber PN and civil engineer K provide additional support for the connection of the subsequent leak to the lightning strike, although they are a little self-serving. The insurer agrees the plumbing was damaged by lightning on 25 February. Uncertainty arises due to the lapse of over a month before the further leak was detected. It is possible that the lightning strike exacerbated some existing level of corrosion. This remains an unknown 2.2 Is insurer entitled to insist on further exploratory work? No, policy conditions do not empower insurer to insist on invasive exploratory work Insufficient evidence to justify invasive work The Insurer on 18 January 2021 provided a further Notice of Response which stated, “ The Insurer submits that Mrs Ms claim has NOT been rejected and that the Insurer wishes only to confirm the cause of the damages in order that the claim may be considered further”. Determination Case number 758854 First and foremost, the policy language does not authorise exploratory/invasive work for the purpose of an insurer determining indemnity. Further, it is far from clear what would be revealed by the further exploratory work especially as it is now eighteen months since the initial damage and flooding. If the investigation revealed pin holes, could it be conclusively stated that these were not caused or contributed to by the lightning strike? On first reviewing this file in September 2021 I enquired if the insurer could advise its estimated cost of the invasive exploratory work. The insurer advised a figure of $7,370. This appeared to be a minimum estimate. In fact, it appears conservative, considering carpentry, plumbing and electrical services will all be required as well as drilling into a concrete slab under the kitchen to locate and remove sections of water pipe. In deciding whether invasive exploratory work is reasonable, one consideration must be proportionality to the underlying loss. In the present situation the cost of the exploratory work and restoration is about the same as the cost of re-routing the plumbing. Similarly, it is notable that the maximum additional coverage for exploratory work to locate a water leak and to do restoration is $2,500 (policy at page 40). An insured would be reluctant to proceed if the estimated costs were over $7,000. It is pertinent also that the insurer has not sought to provide any expert evidence in response to the report of JC, nor as to the availability of non-destructive testing and technology to inspect pipework, nor as to the type of evidence it thought would be obtained and why a suitable expert would be able to differentiate between the effects of lightning and corrosion. In short, the examination requested lacks proper specification and supporting groundwork to justify its authorisation. The limited evidence as to the existence of corrosion in 2014 does not provide a sufficient factual basis for the insurer to insist on exploratory work. Nor does it provide a sufficient basis for the insurer to reserve indemnity until it has had the opportunity to conduct that work. 2.3 Is insurer entitled to rely on exclusion? No, the insurer lacks evidence that corrosion was the proximate cause of the water leaking. Insufficient evidence of corrosion The insurer in its submissions accepts it has the burden of proving facts that enable it to rely on an exclusion such as corrosion. The insurer does have the opinion of CLD that if the cause was lightning, the leak would have been immediate. The insurer accepts that this opinion by itself is insufficient. In effect, the insurer argues it needs the exploratory testing to satisfy the burden of proving the exclusion. In my opinion it is not reasonable in the circumstances for the insurer to reserve its position on indemnity and maintain an entitlement to do the exploratory work being requested. The fact that there were pin holes from corrosion in 2014 which were then repaired, is relevant but not enough to prove corrosion was the proximate cause in 2020. Determination Case number 758854 Insurer is to cash settle the claim The insurer is required to cash settle the complainant the amount of $39,507 comprising $35,915 plus a 10% margin to allow for contingencies and the lack of an insurer’s guarantee. In the event the swollen cupboard kickboards in the kitchen are not able to be removed without damage to the kitchen benches then the insurer is to reimburse the costs incurred of new kitchen benches and tops up to a maximum amount of $15,000. The insurer is to reimburse the complainant the sum of $7,959 being the costs of re – routing the plumbing. Further the insurer is to pay the sum of $800 to the Complainant being in respect of 8 days accommodation ($100 per day) with relatives during repairs. I have given consideration to an order for compensation for non-financial loss. There has been delay and inconvenience to the complainant. However, the circumstances were not straightforward and I do not consider it appropriate to make an order. I make an order for interest under section 57 of the Insurance Contracts Act on the sum of $7959 from 31 August 2020 to date of payment. 2.4 Why is the outcome fair? The insurer accepts that it lacks evidence to rely on the corrosion exclusion to deny the claim. The insurer has not denied the claim. Instead the insurer has reserved its position pending an opportunity to undertake invasive exploratory works to gather evidence it believes exists to prove an exclusion. However, the policy conditions simply do not give this power to the insurer. Undoubtedly such conditions would be unpalatable to many insureds. Determination Case number 758854 3 Supporting Information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.