Insurer's choice to repair via its builder rather than cash settle hailstorm damage claims
Text of the determination
Determination
Case number 758678
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 758678 Page 1 of 13
Case number: 758678 8 December 2021
1 Determination overview
1.1 Complaint
The complainant is the owner of five properties which were damaged in a storm event in
October 2018. Some of the properties are owned and insured by different entities with similar
names to the complainant. The person making the complaint is a director of all companies.
The complainant is represented by a builder (MA). For the sake of brevity, where relevant
references in this determination to the complainant include all the insured companies, the
director, and the representative.
It is not in dispute all five properties are insured with the financial firm (the insurer).
Each of the five properties has a landlord building insurance policy with the insurer with
different periods of insurance but all having cover during 2018-2019 and all covered at the
time of a hailstorm on 11 October 2018.
There is no dispute about the cause of the damage. The hailstorm damaged the properties.
The complaint is about whether the insurer is entitled to require the repairs are completed by
its builder. The insurer wishes to exercise its option under the policy to undertake the repairs
using its builder who has quoted to repair for $174,939.24. The complainant wants its builder
(MA) to undertake the repairs and wants to cash settle the claim for $168,834.28.
1.2 Issues and key findings
How should the claim be resolved?
The available information establishes a fair settlement of the claim is a cash settlement in the
amount of $194,159.42 as MA’s revised quotations are now over two years old and an uplift
of 15% ($25,325.14) is a fair uplift to take into account the increasing cost of labour and
materials since the revised quotations were made.
Why is the outcome fair?
While the policy allows the insurer to choose whether it will repair the damage or cash settle
the cost of repairs, it must make this choice fairly. If the complainant prefers a cash
settlement (as is the case here) the insurer must not refuse unless it has a fair explanation.
While the insurer may have concerns about how and if the repairs will be done, nonetheless,
the complainant still wishes to be cash settled for $168,834.28 (an amount less than the
insurer’s quotes) and without the policy’s lifetime g uarantee.
1.3 Determination
This determination is in favour of the complainant.
Should the complainant accept this determination then within seven days of notification of
acceptance the insurer is to pay to the complainant $194,159.42 for repairs to the properties.
Determination | Case number: 758678 Page 2 of 13
Otherwise, the insurer is not required to take any further action in relation to the claim, the
repairs, or the complaint.
Determination | Case number: 758678 Page 3 of 13
2 Reasons for determination
2.1 How should the claim be resolved?
Submissions and material considered
The complainant has five properties insured with the insurer. All five properties are insured
under a Landlord insurance policy for the buildings. All five properties were covered at the
time of a hailstorm on the 11 October 2018.
In June 2019 the insured lodged five claims for damage to all five properties. The insurer
arranged for the damage to the five properties to be assessed. The assessor (CR) attended
and photographed the properties and reported to the insurer.
It is not in dispute the five properties were damaged in the hailstorm.
The insured is represented by a builder (MA). In July 2019, MA provided five quotations for
the cost of repairs, provided the breakdown quotations as requested and indicated the
insured had authorised MA as the preferred repairer.
The insurer also arranged for five quotations from its builder (IN).
After the insurer provided MA with IN’s scope of works, MA provided further quotations. CR
reviewed the amended quotations and advised the insurer to proceed with the repairs by IN.
On 23 September 2019 the insurer agreed. CR said:
We note that even though (MA) has submitted an amended quotation, it is not as
cost efficient as the quotation submitted by (IN)
MA provided further quotations. The insurer continued to advise IN was appointed to perform
the repairs.
On 7 January 2020, the insurer said it had considered the quotations from both MA and IN
and advised the complainant:
…. It is clear from the quotes provided that MA ave simply attempted to better IN’s
pricing rather than providing genuine costings. In the worst case MA have
dropped a quote from $70,086.49 to $38,576.82. Such a drastic reduction in
costing does not inspire confidence in either the quality of the works or the
materials to be used. On this basis I made contact with (CR) and requested he
authorise (IN) to carry out the repairs at the property.
If you could please work with (CR) in organising the repairs with IN it would be
appreciated (stet).
MA continued to seek an explanation from the insurer for its decision. MA said the insured
wanted MA to complete repairs as the insured knew MA’s work and did not know IN. MA said
it had been authorised to repair as it had the most economical quotations. MA said it was
qualified to do the work and its reputation for quality repairs and workmanship was known in
the area.
Determination | Case number: 758678 Page 4 of 13
MA also said:
(IN) did not have the same inclusions as our quotation, i.e. Galvanised Steel, New
batten upgrade, paper sarking etc, so these have been taken out and resubmitted
to be on the same wave length as (IN)
The insurer replied on 5 February 2020 saying as per the policy terms it has a discretion to
decide how to settle the claim.
The basis of settlement clause is set out in supporting section 3.2 of this determination.
The insurer said:
The primary function of a property insurance policy is to repair any damages
sustained to a property as a result of an insured event. While an insurance policy
provides an insured with other methods of progressing with their claim these
options are for situations where repair by a panel builder is not the most viable
option.
Given (MA) are also proposing to repair the property, repair is the most viable
option and on this occasion the (insurer) has authorised IN to carry out the
required works. In addition to this, as previously mentioned, the drastic reductions
in costings submitted by MA has further reinforced our decision.
In a letter to the insured dated 13 May 2020 MA set out the reasons why his quotations were
to be preferred.
On 9 June 2020 the insured advised the insurer it would not sign the contract to complete the
repairs as the material quoted by IN was not like for like and repairs to the sheds were not
included.
On 10 June 2020 and 7 July 2020, the insurer addressed the complainant’s concerns. It
agreed the iron was not like for like but said where the roof was galvanised iron it does not
replace with galvanised iron because suppliers will not give a warranty.
The complainant accepted this explanation in an email dated 7 July 2020.
As for the battens, the insurer said if replacement is required then this will be done. It advised
the sheds/garages had been allowed for in the quote and the iron being used for replacement
is the same gauge quoted by MA.
The complainant also complained about claims management delay but later indicated delays
were a small issue compared with its preference for MA to do the repairs.
MA says it reduced the quotes, but the quality of the work was not compromised and the
insurer’s claims officer’s preference for IN was the only barrier to MA proceeding with repairs.
The complainant wanted MA to undertake repairs as had been previously agreed by CR.
CR and the insurer say repairs were not authorised to MA but to IN. They said the significant
reduction in the quotations (which CR estimated to be over $100,000) raised alarm. The
insurer continued to assert its decision to authorise IN to perform the repairs was in
accordance with its right to determine the method of settlement.
Determination | Case number: 758678 Page 5 of 13
The insurer says it is acted in good faith and in the best interests of the complainant ensuring
that any repairs undertaken would have a lifetime guarantee. It points out that the policy only
offers a lifetime guarantee on repairs if the insurer has selected and authorised repairs.
The complainant continues to assert that he is not getting a fair outcome as IN’s quote is not
like for like as to what is currently on the properties. He says he has lost all confidence in both
the insurer and IN as they are not working in his best interests as IN’s scopes of work miss
items and use cheaper materials.
In correspondence with the insured, MA explains the difference between the quotes. MA
explains when instructed to pro vide a quote, comparable to IN’s, MA had to remove items
which dropped the price dramatically. For example, MA says the roofing iron on the roof is
different from that quoted by IN; the roof pitch allowance is different; items required to meet
the code and safety requirements have been omitted to match IN’s quotes; and roof sarking
and full metal roof re-battening is required.
MA also says:
All these items were allowed for safety and to meet current building code for your
property, none of this has been al lowed in (IN)’s Scope Of Works, and therefore
you would be receiving a less inferior product than what we were going to supply.
However we were told we had to match the scope of works by (IN), which we had
done, this then dropped our pricing to what you recently saw, of course now not
allowing for all the extras and Galvanised iron on your roof.
We lowered our quote to such a level, that we were making next to nothing from
the job, however our thoughts were, we would rather build a working relationship
with yourself instead.
Our other thought was with this quote the way it was, is a bit scary, because it
leaves no room for works needed if the structure itself is not in good order, and
additional wood work of steel needed to be installed for safety.
As you can appreciate, it is always good to have a buffer, as we were advised No
variations would be accepted, this being the case, these costs would have to be
passed onto the owner for payment.
Complainant requires a cash settlement of $168,834.28 so MA can repair
The complainant wants the claim to be settled for $168,834.28 so MA can undertake repairs.
The complainant says the pay-out should be $275,368.07 but MA cut costs and products to
match IN.
Insurer authorised repairs to its builder in the amount of $174,939.24
The insurer says it has authorised IN to perform the repairs in accordance with IN’s quotes in
the amount of $174,939.24.
By letter dated 30 October 2020 IN says it will honour the quoted prices for the five claims
with the allowance for any variations which may apply to obtain certification as follows:
Determination | Case number: 758678 Page 6 of 13
11 R Street - $35,811.78
9 R Street - $34,360.20
40 B Street - $23,104.99
7 R Street - $36,275.10
5 R Street - $41,716.10
In June 2021 the insurer said it remains willing to complete repairs to the insured properties
but given the time that has elapsed, it must obtain new quotes.
The complainant says if further quotations are to be provided, they must include the right
materials, safety systems and all damage. The complainant continues to assert it wants to
exercise its right to cash settle upon receiving the new quotations from the insurer.
The insurer continues to say this dispute relates to the insurer’s right to complete repairs, in
accordance with the policy terms rather than quantum.
The insurer says when considering the method of settlement, it does not rely upon the
cheapest quote but will authorise repairs in accordance with the quote which is most likely to
place the insured in the position it was in before the damage occurred. The insurer says it is
satisfied IN is best placed to ensure the repairs necessary to the property are performed in
accordance with this aim.
The insurer says MA has provided contradictory statements as to whether it can perform the
works necessary to repair the damage in accordance with the significantly reduced quote
provided. It also notes MA has claimed it can perform the works necessary to repair the
damage at the lower price quoted without compromising quality and claimed that the cost
quoted will not cover the works required.
MA not authorised to do the repairs by the insurer
The panel has carefully considered all the material provided by the parties. The panel is
satisfied MA was not authorised to do the repairs by CR or by the insurer. The available
material establishes the position of both the insurer and CR was that IN was to carry out the
repairs. MA did not ever provide persuasive information to rebut this contention.
Insurer must exercise its option under the policy fairly
The panel accepts the policy provides for the insurer to choose whether it will repair the home
or pay the reasonable cost of repairs. However, in exercising this option, the insurer must
make this choice reasonably and in good faith. If the complainant prefers a cash settlement
(as is the case here) the insurer must not refuse unless it has a fair and reasonable
explanation.
The panel is not satisfied the reasons given are fair and reasonable. The panel accepts there
is a reduction in costing by MA. The panel also accepts this may not inspire confidence in
either the quality of the works or the materials to be used. While the insurer may have
concerns about how and if the repairs will be done, nonetheless, the complainant still wishes
to be cash settled.
Determination | Case number: 758678 Page 7 of 13
To simply say MA’s quotations are “not cost efficient” or that MA has not provided “genuine
costi ngs” is insufficiently persuasive.
Policy function is to indemnify an insured which can be done by cash
settlement
The panel disagrees the primary function of an insurance policy is to repair any damage. The
panel considers the primary function of an insurance policy is to indemnify an insured for loss
or damage caused by an insured event.
It is not in dispute an insured event (hailstorm in October 2018) damaged all five properties as
evidenced by CR’s first reports to the insurer.
The panel considers an insured can be indemnified under the policy by either repairing the
damage or by cash settling the cost of repairs.
The panel acknowledges the insurer’s wish to act in the best interests of the complainant as
any repairs undertaken by IN would have a lifetime guarantee.
The panel also acknowledges the insurer has acted reasonably by warning the complainant
of the downside of a cash settlement because the insurer’s lifetime guarantee of repairs is
lost. The panel notes the complainant was warned of this risk in the insurer’s final decision
letter dated 25 August 2020. The panel also notes MA advised the complainant of this
consequence in its letter dated 13 May 2020.
The complainant still insists on a cash settlement. In all the circumstances the panel is not
persuaded the insurer has established its refusal to cash settle the claims is fair or
reasonable.
Fair the claim is cash settled for $168,834.28
The panel acknowledges MA originally quoted to do the repairs for a higher amount. The
panel notes the lengthy submissions as to why IN’s quotes are inferior to MA’s first quotes.
Nonetheless, MA adjusted his quotes to make his quotes the most economic and says the
quality of the work will not be compromised. MA explained to the complainant it lowered its
q uotes to such a level that it may make “next to nothing from the job” as it would rather “ build
a working relationship with (the insured)”.
In these circumstances, the panel does not accept that “in reality the payout should be
$275,368.07” because the ava ilable information establishes MA cut costs and products to
match IN and at all times indicated a willingness to settle the claims for the amount claimed of
$168,834.28.
Fair to allow an uplift of 15% to consider increased cost of labour and material
The panel notes the insurer said its builder (IN) remained willing to complete repairs to the
insured property and that in those circumstances it said it was required to obtain new quotes.
The panel considers it is not fair to add this additional requirement. This determination is
made based on the complainant’s cash settlement offer based on MA’s revised quotations.
Generally, a cash settlement is uplifted to take into account variations which may occur once
repairs commence and to take into account the loss of the lifetime guarantee. However, the
panel considers an uplift for these reasons is not fair in the circumstances of this case where
the complainant has factored these elements into its cash settlement offer.
Determination | Case number: 758678 Page 8 of 13
However, MA’s revised quotations are now over two years old. In the circumstances, the
panel considers it is fair an uplift of 15% ($25,325.14) is added to $168,834.28 (total
$194,159.42) to take into account the increasing cost of labour and materials since the
revised quotations were made. As the amount has been uplifted for this reason, the panel
considers it is not fair to add interest pursuant to section 57 of the Insurance Contracts Act to
the determination amount.
2.2 Why is the outcome fair?
While the policy allows the insurer to choose whether it will repair the damage or cash settle
the cost of repairs, it must make this choice fairly. If the complainant prefers a cash
settlement (as is the case here) the insurer must not refuse unless it has a fair explanation.
While the insurer may have concerns about how and if the repairs will be done, nonetheless,
the complainant still wishes to be cash settled for $168,834.28 (an amount less than the
insurer’s quotes) and without the policy’s lifetime guarantee. As MA’s revised quotations are
now over two years old it is fair an uplift of 15% ($25,325.14) is added to $168,834.28 to take
into account the increasing cost of labour and materials since the revised quotations were
made.
Determination | Case number: 758678 Page 9 of 13
3 Supporting information
3.1 The AFCA process
This matter was determined by a panel
Due to the nature of this dispute, it has been referred to a panel for determination. The panel
comprises the ombudsman, a member with significant experience in consumer and small
business advocacy and a member with extensive experience as an insurer.
The panel has decided this complaint based on what is fair in all the circumstances, having
regard to legal principles, applicable industry codes or guidance, good industry practice and
previous relevant determinations of AFCA or predecessor schemes (which are not binding).
AFCA’s approach to this complaint
A full exchange of the relevant information has taken place between the respective parties.
Each party has had the opportunity of addressing any issues raised. All the provided
information has been reviewed and considered. The parties have raised numerous issues in
their submissions to AFCA. However, commentary in this determination is restricted to those
issues considered relevant to the outcome.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an event to
which the policy responds. This is known as a prima facie or valid claim. Once so established,
the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies
if it seeks to deny or limit its liability for the loss.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence. When we assess complaints, we consider available
documents, the recollections of the parties, and all relevant circumstances. We give more
weight to documents created at the time the events occurred. If there is no relevant
documentation, we will decide what is most likely to have occurred based on the information
provided to us. If there are conflicting recollections and these are evenly weighted, we may
find that a claim cannot be established.
3.2 Relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties and in
the insurer’s Notice of Response. Both the policy document and the No tice have been
exchanged with the complainant.
Home and contents section
When you are insured
Your Policy Schedule indicates whether your home and your contents are insured
and the sums insured.
Determination | Case number: 758678 Page 10 of 13
The total contents sum insured consists of a sum Insured for:
1. unspecified contents, and
2. specified contents
What you are covered for
We will pay for the accidental loss of and accidental or malicious damage to your
home, contents or both at the site during the period of insurance. This includes
cover for the insured events and accidental, purposeful, or malicious damage or
theft caused by tenants, tenant’s family, or tenant’s visitors.
Basis of settlement
Home
1. At our option we will:
(a) repair your home; or
(b) replace your home to a condition substantially the same as, but not better
than when new; or
(c) pay the reasonable cost of its repair or replacement to a condition
substantially the same as when new; or
(d) pay up to the sum insured shown in your Policy Schedule.
…….
Insured events
You are insured against loss or damage caused directly by the following insured
events:
……
2. flood, storm (including cyclone or hurricane) and/or rain, which may be
accompanied by snow, sleet or hail, but not for loss or damage resulting from or
caused by:
(a) flood, storm, rainwater or wind to shade cloth, shade sails, awnings, shade
structures, glass houses, hot houses,
Determination | Case number: 758678 Page 11 of 13
swimming pool and spa covers and linings;
(b) flood, storm, rainwater or wind to:
(i) retaining walls;
(ii) free standing walls;
(iii) fences; or
(iv) gates;
unless they are located in Queensland or Western Australia
or they are constructed of:
(i) brick, concrete, masonry, stone or steel; or
(ii) timber, but are 20 years old or less.
(c) the action of the sea, high water, or tidal wave;
(d) water seeping through a wall or floor.
(e) fungus, mildew, mould, algae;
……..
Lifetime guarantee on home repairs
We guarantee that if we have:
selected and directly authorised or arranged for a repairer to replace,
repair or rebuild your home, and
paid, or have a legal liability to pay, the supplier, repairer or builder directly
for this work, and
a defect arises in the lifetime of your home as a result of poor quality
workmanship or use of incorrect or poor quality materials,
we will rectify the problem by arranging, directly authorising and paying for further
replacement, repair or rebuilding.
Determination | Case number: 758678 Page 12 of 13
We will also handle any complaint about the quality or timeliness of the work or
conduct of the repairer as part of our complaints handling process.
This guarantee does not apply to:
home replacement, repairs or rebuilding that you arrange, authorise or
make yourself (even if we give you the name of a possible supplier,
repairer or builder who is involved with the repair), or
home replacement, repairs or rebuilding that you arrange, authorise or
make yourself (even if we give you or a supplier, repairer or builder a
cheque for all or part of the repair cost), or
loss, damage or failure of any electrical or mechanical appliances or
machines that form part of your home, or
wear and tear consistent with normal gradual deterioration of your home
(e.g. paint peeling off as part of its normal life cycle, wood rotting or mould
from moisture in the air or ground, roofs weathering or a hot water system
leaking as a result of normal gradual deterioration).
3.3 Extracts from various quotations
5 R Street
MA quote
3 July 2019
$62,856.06
Main roof and
attached roofs,
cladding, left and
right rear sheds,
rear right gable
shed
MA quote
3 July 2019
$62,856.06
Main roof and
attached
roofs,
cladding, left
and right rear
sheds, rear
right gable
shed
IN quote
$41,716.10.
31 July 2019
Main dwelling roof,
garage roof, left -
hand shed roof,
right hand shed
roof, aluminium
cladding
MA quote
15 November
2019
$41,860.91
MA quote
19 September
2019
$44,185.47.
7 R Street
MA quote
2 July 2019
$70,086.49
Main roof and
lower roofs
MA quote
2 July 2019
$70,086.49
Main roof and
lower roofs
IN quote
31 July 2019
$36,275.10.
Main dwelling roof,
MA quote
15 November
2019
$38,576.82
MA quote
19 September
2019
$40,287.62.
Determination | Case number: 758678 Page 13 of 13
40 B Street
MA quote
3 July 2019
$35,264.38.
Main roof, rear
and front sections
MA quote
25 June 2019
$33,471.77
Main roof, rear
and front
sections
IN quote
31 July 2019
$23,104.99
Main dwelling roof,
MA quote
19 November
2019
$23,106.86
MA quote
19 September
2019
$25,871.02.
9 R Street
MA quote
3 July 2019
$45,080.41.
Main roof, lower
roofs, rear patio
roof
MA quote
2 July 2019
$39,851.24
Main roof,
lower roofs,
rear patio roof
IN quote
31 July 2019
$34,360.20
Main dwelling roof
MA quote
15 November
2019
$33,229.77
MA quote
19 September
2019
$34,805.86.
11 R Street
MA quote
4 July 2019
$62,080.73
Main House
corrugated roof
and bullnose roofs
MA quote
3 July 2019
$60,380.67
Main House
corrugated
roof and
bullnose roofs
IN quote
31 July 2019
$39,477.85
Main dwelling roof
MA quote
15 November
2019
$34,521.86
MA quote
19 September
2019
$36,008.13.
3.4 Other relevant material considered and relied on
Parties’ submissions/emails and all attachments to all submissions/emails.
Assessment reports.
Photographs, invoices and quotations.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.