The complainant's pool liner was damaged after a bushfire and the insurer declined the claim as wear and tear. AFCA found the insurer's evidence insufficient and ordered the liner claim to be settled under the policy, with the amount to be assessed.

The insured established a valid claim from bushfire debris, and the insurer did not establish that the gradual deterioration exclusion applied.

Issues

Subjects and remedies

natural disasterpay claim

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 758601 Financial firm The Hollard Insurance Company Pty Ltd Determination | Case number: 758601 Page 2 of 13 Case number: 758601 28 May 2021 1 Determination overview 1.1 Complaint The complainant lodged a claim after the insured property sustained damage because of a bushfire. The financial firm (the insurer) assessed and accepted the claim, including repairs to the complainant’s pool. The complainant says the pool began to leak, which was caused by the debris from the bushfire in the pool. The insurer reassessed the pool and says it is unable to locate a leak and any leaks which have occurred since the event are excluded by the policy as they are the result of wear, tear and gradual deterioration. The complainant disagrees and says he has patched the leaks to ensure further damage is not caused to the pool and the leaks were caused due to the damage sustained in the bushfire. The complainant is seeking for the insurer to cover the cost to replace the pool liner due to the damage caused by the bushfire debris. The case manager provided the parties with a preliminary assessment on the issues in dispute in favour of the insurer. As it was not accepted by the complainant , the complaint has been referred to me for determination . 1.2 Issues and key findings Is the insurer entitled to decline the claim? No, the insurer is not entitled to decline the claim because the available evidence establishes on the balance of probabilities the damage to the pool liner was caused by debris at the bottom of the pool from the bushfires. The insurer’s reports are insufficiently compelling to establish a policy exclusion applies. 1.3 Determination This determination is in favour of the complainant and the claim for damage to the pool liner is to be settled in accordance with the policy terms and conditions. Within 14 days of notification of acceptance of this complaint by the complainant, the insurer is to arrange an assessment of the costs to repair or replace the pool liner. The assessment and quotation are to be provided to the complainant who may obtain his own assessment and quotation. The parties are encouraged to work together to settle the claim. The insurer is to decide whether it will repair or replace the pool liner or pay the complainant the cost of repairing or replacing it. Should the insurer decide to pay the complainant the cost to repair or replace the pool liner, the claim settlement should Determination | Case number: 758601 Page 3 of 13 include a fair uplift to take into account any contingencies or variations which may occur once repair/replacement occurs. Determination | Case number: 758601 Page 4 of 13 2 Reasons for determination I have decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). I have considered all the material submitted by the parties, both before and after the preliminary assessment. I am satisfied that the documentation I have relied on has been provided to both parties. Material after preliminary assessment reviewed and considered The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. After the preliminary assessment was rejected, the parties made further submissions and provided new material. Where relevant, this is referred to in the determination. 2.1 Is the insurer entitled to decline the claim? The complainant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. The complainant must prove the claimed damage was caused by the bushfire on 30 December 2019. The complainant says the pool leaked due to permanent damage caused to the pool lining because of the debris at the bottom of the pool from the fire and because the insurer failed to promptly attend to repairs. He also says the debris was a likely cause but the scrubbing of the pool lining during repairs is another possible cause. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. The insurer must establish the damage was caused by wear and tear. Parties ’ submissions and material considered The insurer does not dispute the pool was damaged in the bushfire event but relying on its experts it says the pool was not leaking when inspected in July 2020; there was no evidence debris had dropped into or caused damage to the pool liner during the bushfire; and there was no evidence of when the pool leaked and when the pool liner was patched. It says the photographs provided by the complainant only show murky water but no evidence of the type of debris in the pool or how it caused the damage. The insurer also contends it did not repair the pool, but cash settled the claim and so was unable to provide evidence of the type of debris in the pool and condition of the pool liner. Determination | Case number: 758601 Page 5 of 13 The complainant acknowledges he received payment for the repairs but does not consider this a cash settlement as the funds were sent to the repairer (DP) to expedite the repair work commissioned by the insurer. He says the insurer organised the original quotation from DP and authorised the initial pool repairs by DP. As for the state of the pool leaks on 30 July 2020 (when the insurer’s experts inspected the pool) the complainant says heavy rain preceded the visit which made it difficult to see water leaking at the base of the pool. After the preliminary assessment the complainant provided photographs of the leak with meta data (showing the dates of the photographs) and a further report from DP. The insurer says neither the photographs or report show any evidence of debris in the pool or the cause or extent of damage to the pool. The insurer also says there was only two months (not five months) between the time the claim was lodged and the cash settlement. The insurer challenges the last report from DP saying there is no photographic evidence of the significant debris build-up nor explanation of the type of debris in the pool or how it damaged the pool lining. The insurer acknowledges the photographs show patches were applied at some point and show the water level of the pool at some point, but it says they do not substantiate when and what caused the damage which required repair of the pool lining. The insurer says if the pool lining was damaged because of cleaning the debris this would not be covered, as the policy does not provide accidental damage cover. The complainant says if the damage to the pool lining occurred during the cleaning and repairs conducted by the ins urer’s own repairer, then this sh ould be covered by the policy because the insurer did not give him the option to seek his own quote or repairer. He does not characterise the payment as a cash settlement for the pool damage as he engaged the insurer’s service provider (DP) due to lengthy delays. The complainant also says when DP first inspected the pool no concerns were raised by DP at that time because of the expectation the insurer would approve immediate repairs. The complainant challenges the expertise of the engineer relied on by the insurer. He reiterates the insurer’s experts inspected the pool after the debris had been re moved and initial repairs conducted and so the only observation they could make were about the temporary patches. The pool has been inspected and photographed on several occasions. A summary of the reports of the inspections is set out in supporting section 3.3 of this determination. Complainant has established a valid claim Having reviewed the available material, I am satisfied of the following relevant chronology: Determination | Case number: 758601 Page 6 of 13 30 December 2019 Bushfire. Pool and pool pump had dust and soot from the fire. Pool pumps not working. 29 February 2020 Claim made. Assessor and pool specialist (DP) 16 March 2020 Assessor and DP inspected the pool and noted ash and soot from fire as claimed and provided quote for initial repairs which included scrubbing and cleaning the pool. DP refers to “d irect contact from airborne ash and debris in and around the swimming poo l.” April 2020 Several letters from complainant to insurer warning of pool deterioration. 27 April 2020 Insurer accepted the claim for the pool and other items and paid the complainant for cleaning the pool and replacing the filter pump and chlorinator. 11 May 2020 Second inspection by DP. 19 May 2020 DP completes repair to pool as per his quote to insurer. Complainant away from property due to work com mitments in Sydney and on return notices pool leaking. 11 - 18 June 2020 Photographs show pool leaking and complainant patched the pool to stop the leaks. 11 June 2020 Complainant claims on insurer saying pool rapidly leaking water due to permanent dama ge to vinyl lining. 30 July 2020 Pool inspected by pool specialist (ET) and Engineer (IE) who say pool not leaking and the pool liner was not damaged by debris from the bushfire. Having reviewed the available material and photographs taken before and after the bushfire I am satisfied the complainant has established a valid claim. My reasons follow. I accept:  before the fire the pool was full of clean blue water and was not leaking  the bushfire was a severe event  after the bushfire the pool water was green  photographs show big trees close to the pool. Determination | Case number: 758601 Page 7 of 13 Having considered the photographs and noting the severity of the bushfire event and the proximity of the trees I accept it is likely the pool was filled with debris, tree branches and leaves because of the bushfire. While the bottom of the pool cannot be seen in the photographs, in an email dated 14 April 2020 the complainant said he could feel sticks and tree branches sitting on the bottom of the pool with a broomstick. While the expert reports relied on by the insurer do not refer to debris in or around the pool, I accept it is likely the surrounding pool area was cleaned by the complainant as part of the post fire clean up and that any debris in the pool was removed by DP in May 2020 when he cleaned the pool. I find the material from DP the most compelling as he is a pool expert, and he inspected the pool both in March 2020 and in May 2020. In his first report he refers to irreparable damage caused by the recent bushfires by direct contact from debris in and around the pool. And in his second report he says there was significant additional debris build-up inside the pool which caused damage to the pool lining causing the pool to leak. This report coupled with the complainant’s positive assertions and photographs lead me to the conclusion the pool was leaking from a time unknown (because of the debris in the pool from the fires) but probably after May 2020. I accept the leaks we re patched sometime after the leaks were identified in June 2020. Insurer’s reports insufficiently compelling to establish policy exclusion I do not find the insurer’s reports sufficiently compelling to rebut the complainant’s contentions or to establish the policy exclusions. ET does not comment on the damage to the pool liner. He simply says the pool is not leaking but has overflowed during the recent heavy downpour. In any event, I accept it is unlikely the pool was leaking significantly in July 2020 as it had rained heavily before the inspection and the pool liner has been patched by the complainant. The same conclusion about leaking applies to the engineer’s report. The insurer’s engineer confirmed three patch repairs inside the pool. Although he refers to corrosion in the steel frame, he makes no comment about the condition of the pool liner. He does not say the liner had gradually deteriorated. The engineer based his opinion on the photographs taken by DP in March 2020 which he says show no tree branches or leaves on the water, or the pool decking and notes the pool level had not then dropped. However, he does not consider tree branches and debris could have been cleared away by that time as contended by the complainant and or that the debris had sunk to the bottom of the pool. The engineer agrees several native trees were growing near the pool and says they were not burnt. He says wind driven tree leaves or small branches are unlikely to generate sufficient impact force to perforate the liner. However, he makes no Determination | Case number: 758601 Page 8 of 13 comment on the actual cause of the tears or on the contentions of the complainant which is that the damage was caused by the debris lying at the bottom of the pool for months. Taking all matters into account I am not satisfied the insurer has established on the balance of probabilities the damage to the pool liner was caused by wear and tear. Fair the claim is paid even if damage caused by repairs Another possible scenario addressed by the parties was that the damage was caused by the work done to the pool by DP in May 2020. In the absence of expert evidence about this contention I am unable to make a finding in this regard. In any event, if subsequent evidence established this contention, I am satisfied it is fair for the insurer to pay the claim. I accept the insurer paid the complainant for the work required to the pool. However, I do not accept it is fair for the insurer to refuse to pay the claim for this reason in circumstances where the cash settlement was used by the complainant to pay for the repairs to the pool, by a repairer chosen by the insurer to identify the work required and provide a quotation to undertake the work required. Moreover, once the complainant was paid for the repairs it was reasonable for him to choose DP to do the work not only because he was the pool repairer identified by the insurer but also because the work had to be done quickly in view of the time the debris had been in the pool. Insurer not entitled to decline the claim Taking all matters into account and for the reasons stated I am satisfied the insurer is not entitled to decline the claim and is to indemnify the complainant for the damage to the pool liner. Claim for pool liner to be settled in accordance with policy terms Neither party has provided a quotation for the costs to repair or replace the pool liner. The policy provides: If your building is insured and we agree to settle a claim, we will settle up to the sum for which your building is insured, or any lesser limit that applies, less any applicable excess. If your building is destroyed or damaged as a result of an Insured event and we accept your claim which occurs during the period of insurance, we will rebuild or repair your building as new, or pay you the cost of rebuilding or replacing it, at our discretion up to the building sum insured shown on your Certificate of Insurance. The claim for damage to the pool liner is to be settled in accordance with the policy terms and conditions. Within 14 days of notification of acceptance of this complaint by the complainant, the insurer is to arrange an assessment of the costs to repair or replace the pool liner. The assessment and quotation are to be provided to the Determination | Case number: 758601 Page 9 of 13 complainant who may obtain his own assessment and quotation. The parties are encouraged to work together to settle the claim. The insurer is to decide whether it will repair or replace the pool liner or pay the complainant the cost of repairing or replacing it. Should the insurer decide to pay the complainant the cost to repair or replace the pool liner, the claim settlement should include a fair uplift to take into account any contingencies or variations which may occur once repair/replacement occurs. Determination | Case number: 758601 Page 10 of 13 3 Supporting information 3.1 AFCA Approach AFCA’s approach to this complaint It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. General exclusions No insurance covers everything so it is important to understand the exclusions of your policy. These exclusions apply to your chosen cover. What is not covered under your policy? Exclusions The following General exclusions apply to all covers under your policy. You are not covered for any loss or damage caused by or resulting from, or the costs incurred from or of:  gradual deterioration, including wear and tear, rust, corrosion, depreciation, fading or deterioration from exposure to light; 3.3 Extracts from material relied on by the parties Date Action Insurer’s a sse ssor March 2020  Inspected and photographed premises 16 March 2020 and told property sustained fire damage to the pool.  Bushfire 30 December 2019. Evacuated. Upon ret urn noted pool and pool pump has ash and soot from the fire. Determination | Case number: 758601 Page 11 of 13 Date Action  Noted pool covered in ash and soot from the fire and the chlorinator and pool pump and filter are damaged.  Engaged pool specialist.  Other items cl aimed, and assessor recommended claim for acceptance under the defined event of fire.  Scope of works: remove and replac e: scrub pool and treat with floc and chemicals – vac uum to waste allowing up to 5 visits – rebalance of pool water including chemicals… Follow - up visit final rebalance of pool and check all equipment is running smoothly – supply and install replacement filter pump and chlorinator – disposal of existing equipment. Pool report (DP) 16 March 2020  Inspected the pool and pool surrounds and pool equipment. Quote reflects the irreparable damage caused by the recent bushfires by one of the following:  Direct fire contact Direct heat causing melting or damage .  Direct contact from airborne ash and debri s in and around the swimming pool.  Electrical outages, power sur ges & electrical supply issues.  All the above. Pool repair quote (DP) 16 March 2020  To supply and install clean - up to fibreglass swimming pool due to bushfire damage included:  Scrub pool and treat wit h floc and chemicals .  Vacuum to waste allowing five visits .  Rebalance pool wat er .  Final rebalance and check equipment running smoothly .  Supply and install replacement filter pump and chlorinator . Complainant’s repair quote (AP) 24 June 2020 I have ins pected damaged pool from the bush fires and have det ermined that it and the pool equipment are deemed . N on - repairable therefore full replacement is required: $72,000. Insurer’s pool inspection (ET) 4 August 2020  Pool Specialist inspected and ph otographed 30 July 2020.  Complainant advised pool filled with debris from the fires and as the pumps and filters were out of operation for a long time due to power outages and the time it took for the initial claim to be processed.  Above ground pool. Aluminium shell with a vinyl liner inside and resin frame.  Pool not leaking but overflowed during recent heavy downpour. Insurer’s structural engineer’s report (IE) 12 August 2020  Inspected and photographed 30 July 2020.  Discussed circumstances and damage history with complainant who says after fire, pool filled with debris, tree branches and leaves from adjacent tree and area Determination | Case number: 758601 Page 12 of 13 Date Action without electricity supply for a long time after the fire.  Repairer removed debris and cleaned th e pool about five mont hs after the fire and after the pool was cleaned and filled with water the water level dropped, the insured located the leak and tried to patch the pool in 3 locations to prevent further leaks. Despite repairs water level continued to drop.  Noted pool was full and noted three patch repairs.  Rust evident on steel frame and the base of the steel former near the overflowing skimmer box. Native trees near north side of pool are not burnt and not covering the pool.  Reviewed aerial images and rain radars which showed no discernible rain activity for at least 44 hours prior to the inspection.  Reviewed photographs taken by DP 16 March 2020. Pool full and green. No tree branches or leaves evident. No evidenc e to suggest any large tree branches had broken from the adjacent trees and dropped into the pool during the bushfire.  Wind driven tree leaves or small branches (if any) into a pool with water filled up to nominal operating water level are unlikely to generate sufficient impact forc es to ca use perforation to the liner at or near the base of the pool.  No rain since a day or more prior to our inspection so believe if the pool is leaking, the water level in the pool should be lower than the skimmer box level and not overflow at the time of our inspection. There is no evidence to suggest that the pool is leaking.  Based on the available evidence, do not believe the damage/patch repairs in the pool liner had been contribut ed to by the debris from the recent bushfire.  We observed nothing to su ggest that the swimming pool is currently leaking but can review our conclusion if further information or evidence is provided.  Corrosion of the steel frame and the base of the steel former has been gradual and is the res ult of regular overflowing pool wa ter from the skimmer box and constant ground/soil contact, not due to the recent bushfire or any fortuitous events. Letter from DP 18 February 2021  On request of (insurer) we completed an onsite inspection of the swimming pool, swimming pool surrounds i.e., paving, deck, fencing etc and the relevant pool equipment i.e., pumps, filters, pool blankets etc on 14 March 2021 after the summer bushfires in 2 019/2020.  Our second onsite inspection of the bushfire damage to the pool on 11 May 2020 determined that excessive delays (5 months) in approving the pool repairs resulted in significant additional debris to build up inside the pool causing damage to the lining and the pool to leak. This was explained verbally to the property owner at the time and this letter now provides written confirmation of that conversation prior to Determination | Case number: 758601 Page 13 of 13 Date Action commencement of repairs. 3.4 Other relevant material considered and relied on  Partie s’ submissions /emails and all attachments to all submissions/emails.  Photographs.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.