Home / IAG / Determination 758526
Determination 758526
Underpinning claim for damage from leaking stormwater pipes
Summary
The complainant claimed for underpinning after leaking stormwater pipes damaged her home, and the insurer denied the claim. AFCA found the pipes contributed but most damage predated the policy, so it ordered $3,000 plus the reasonable engineer report cost.
The loss must be caused by a sudden and unexpected escape of liquid during the period of insurance, and the insurer must show any exclusion applies.
Issues
- Claim denial primary · upheld“The insurer is to pay the complainant the amount of $3,000 plus the reasonable cost of the report from the complainant's engineer.”
- Claim amount dispute secondary · not upheld“most likely much of the damage occurred prior to the period of insurance coverage.”
Subjects and remedies
home or building damagepay claim
Related
Text of the determination
Determination
Case number 758526
Financial firm Insurance Australia Limited
Determination | Case number: 758526 Page 2 of 7
Case number: 758526 16 June 2021
1 Determination overview
1.1 Complaint
The complaint relates to a claim by the complainant under her Home Insurance policy held
with the financial firm (insurer), regarding damage to the home.
The insurer has denied the complainant’s claim. It says that the loss suffered by the
complainant is not covered under the terms and conditions of the policy.
1.2 Issues and key findings
What is the extent of the insurer ’s obligation to the complainant under the
terms of the policy?
The insurer is required to meet the comp lainant’s claim in accordance with the provisions of
this determination.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is required to meet the complainant’s claim within the terms of this determination.
Determination | Case number: 758526 Page 3 of 7
2 Reasons for determination
This complaint has been the subject of a preliminary view issued by the Service on 7 April
2021.
It was the case officer’s view that the insurer was required to meet the complainant’s costs of
underpinning at the property together with the report costs from the complainant’s engineer.
The insurer was not required to pay the internal costs of repairs, the cost to repair the item
from which the liquid escaped, or the cost of locating the cause of the damage.
The insurer has disputed the preliminary view.
I have carefully considered all the material provided both before and after the preliminary
review in the preparation of this determination.
This determination follows consideration of all the information exchanged and is based on
what is fair in the circumstances, having regard to the relevant legal principles, terms of the
policy, good industry practice and where applicable, prior determinations.
2.1 What is the extent of the insurer ’s obligations to the
complainant under the terms of the policy?
Coverage of the policy
The complainant’s Home Insurance policy provid es coverage for loss and damage caused by
insured events which are detailed within the policy documentation.
This coverage is subject to conditions and exclusions which are also detailed within the policy
documentation.
The full details of the policy coverage are contained within the Product Disclosure Statement
(PDS) and the Certificate of Insurance (COI).
The PDS details:
Bursting, leaking or overflowing
We will cover you for loss or damage caused by the sudden
and unexpected escape of liquid from:
• a do mestic appliance,
• an aquarium holding more than 60 litres of water,
• fixed heating or cooling systems,
• basins, sinks, toilets, baths or spa baths,
• drainage or sewerage systems, or
• taps, fixed pipes, water mains, gutters, guttering, water
tanks or fixed tanks.
We will not cover you for loss or damage caused by:
• seepage or slow escape of liquid over time,
• a leaking or faulty shower recess or base,
• condensation,
• watering systems or hoses,
• escape of water from a stormwater pipe off the site,
stormwater channel or canal, or
• an inadequate drainage or sewerage system.
Determination | Case number: 758526 Page 4 of 7
We will not cover you for loss or damage caused to retaining walls.
We will not cover you for the cost of:
• repairing or replacing the item that the liquid escaped from,
• repai ring a leaking or faulty shower recess or base, or
• locating the cause of the damage unless it is causing permanent
damage and we have agreed to the costs beforehand.
The PDS also details:
General Exclusions
We do not cover
We will not pay for any loss, damage or liability arising directly
or indirectly from or in any way connected with any of the following:
…
landslide, landslip, subsidence, erosion, settling, heaving,
shrinkage, expansion or any other earth movement not caused by an earthquake,
…
inherent or structural defects, faulty design or
workmanship,
…
settlement, shrinkage, vibration, contraction, or expansion
in building, foundations, walls or pavements,
…
Your buildings are covered against loss or damage caused by any of the events
described on pages 18-23, which occur during the period of insurance
…
It is accepted insurance law that the complainant carries the initial onus to establish a loss
which is covered by the terms and conditions of the policy, including establishing that the loss
occurred during the period of insurance coverage.
Once the complainant has established a loss covered by the terms and conditions of the
policy, the insurer is then required to show the application of an exclusion or condition upon
which it seeks to deny the claim or limit its liability under the terms of the policy.
Circumstances of the claim and complaint
The exchanged material confirms that the complainant took out the Home Insurance policy on
29 July 2019, to cover the period 29 July 2019 – 29 July 2020.
The exchanged material includes a quotation from an underpinning and sub-floor specialist
(UL) dated 18 September 2019, regarding works proposed to be carried out at the insured
property.
The complainant provided a second quote from UL, saying that a second lot of underpinning
was required due to a worsening of the damage since the first inspection.
The exchanged material further suggests that the underpinning work, the subject of the
original quotation from UL, was completed in either late January 2020 or early February 2020.
The parties have provided several reports to support their respective positions.
The insurer says that the evidence from the Bureau of Meteorology confirms that the only
major rainfall recorded between 29 July 2019 (the date of inception of the policy) and 18
September 2019 (the date of UL’s quotation) was on 30 and 31 August 2019.
Determination | Case number: 758526 Page 5 of 7
The insurer also relies upon a report from its engineer (SW) which details:
… considering the short period of two (2) weeks in between the most recent
heavy rainfall prior to UL site inspection, unless a sudden collapse would have
occurred, in our opinion, the undermining and erosion is a progressive and
gradual process which would take more than one off event prior to the building
exhibiting categoric sign of footing subsidence as a result.
On the other hand, SW confirms that any timeframe for foundation movement to occur from a
broken stormwater pipe would be speculative.
The exchanged material confirms that the pipe in question had already been repaired at the
t ime of SW’s inspection and thus it was not able to establish the extent of damage to the
pipework or the estimate of any water escaping.
The complainant’s plumber (CP) located breaks in the stormwater system at the southern and
northern ends in the front of the home, where there were severe breaks causing erosion
under the house and footpath. CP was of the view that the water flowing from the breaks was
causing foundation movement.
Like the case officer, I accept that it is more likely than not that the damaged pipes have
contributed to the damage at the home because the cracks appear in close proximity to the
damaged downpipes. The areas requiring underpinning were also near the damaged
downpipes.
I note that the policy requires the loss or damage to be caused by the sudden and
unexpected escape of liquid.
There is no evidence to suggest that the escape of liquid was not unexpected insofar as the
complainant was concerned. There is also no evidence to suggest that the water did anything
other than suddenly leak from the piping.
Further, the fact that the water leaked over a period of time does not in my view make the
leakage any less sudden or unexpected from the point of view of the complainant.
The insurer also says that it has been prejudiced by the complainant’s actions in proceeding
to repair prior to it having the opportunity to inspect the pipes.
Whilst I agree with the insurer to the effect that this is in breach of the policy provision
requiring the complainant not to arrange or authorise any repairs, except necessary to
minimise or prevent further loss or damage, I am of the view that there is sufficient
information to establish that in fact there has been some contribution from the leaking pipes
although the insurer has been prejudiced as to its ability to assess the amount the leaking
pipes have contributed to the loss.
That said, I do accept that the contribution to damage by the leaking pipes is evidenced by
the proximity of the damage to the pipes.
Whilst I accept there has been contribution from the damaged downpipes, noting the short
period of time between inception of the policy and the original quotation for underpinning
obtained, I also accept that the contribution to the damage from the downpipes during the
period of insurance, is likely to be on the lower side.
Determination | Case number: 758526 Page 6 of 7
After the preliminary view the insurer made an offer to the complainant of $3,000 plus
reimbursement of an invoice from the complainant’s engineer, provided the invoice is
assessed as reasonable.
In my view the insurer’s post preliminary view offer is fair and consistent with the evidence
that the leaking pipes have contributed to the loss but that most likely much of the damage
occurred prior to the period of insurance coverage.
I am satisfied that it is fair that upon acceptance of this determination by the complainant, the
insurer is to pay the complainant the amount of $3,000 plus the reasonable cost of the report
from the complainant’s engineer, in full a nd final settlement of this claim and complaint.
Upon acceptance of this determination the insurer would not be required to take any further
action.
Determination | Case number: 758526 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.