Insurer limited liability to 8% of water damage repair costs under landlord policy and refused loss of rent beyond repair period

FirmSuncorp Group
Decided2021-10-01
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$117,600
SourceAFCA PDF

Summary

The landlord complainant claimed water damage from two leaks and disputed the insurer's offer of 8% of repair costs. AFCA found the insurer had not established that exclusions applied and ordered the claim to be assessed and paid in full, plus loss of rent at $220 per week for the repair period.

The insurer bore the onus to establish exclusions such as gradual escape of liquid, wear and tear and ground movement, and failed to show the leaks were not the dominant cause of the damage.

Issues

Subjects and remedies

home or building damagepay claimpay compensationreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 758063 Financial firm AAI Limited Determination | Case number: 758063 Page 1 of 14 Case number: 758063 29 September 2021 1 Determination overview 1.1 Complaint The complainant holds a landlord insurance policy (policy) with the financial firm (insurer). On 27 May 2020, a claim was lodged for water damage to the insured building due to leaks found to a pipe connected to the kitchen sink and a second to fittings within a wall cavity relating to the hot water system (fittings). The insurer initially declined the claim however has since accepted there exists a valid claim. However, it has limited its liability to 8% of the total cost of repairs on the basis this is what can reasonably be attributed to the leaks. The complainant is dissatisfied with the insurer’s assessment of its liability and is seeking a higher settlement under the claim. He is also seeking loss of rent for the delay experienced in finalising the claim. 1.2 Issues and key findings Is the insurer’s assessment of its liability reasonable ? No. The available information does not support the insurer’s assessment of its liability is reasonable. The insurer is to cover the complainant for the cost to repair the damage to the insured building in line with section 2.1 of this determination. The insurer is to also cover the complainant for loss of rent equal to the time it will take to complete the repairs to be accepted under the claim. 1.3 Determination This determination is significantly in favour of the complainant. The insurer is to cover the complainant for the damage to the insured building in line with section 2.1 of this determination. The insurer is to also cover the complainant for loss of rent at $220 per week for a duration equal to what it will reasonably take to complete the repairs covered under the claim. Determination | Case number: 758063 Page 2 of 14 2 Reasons for determination 2.1 Is the insurer’s assessment of its liability reasonable ? The policy is an insured events contract of insurance The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘Escape of liquid’. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). The insurer is entitled to rely on the policy provisions There is no dispute the insurer provided the complainant with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. Complainant bears the onus to establish a valid claim under the policy There is no dispute the insured building has suffered damage consistent with foundation soil movement as well as mould and water damage to the structure. The parties agree two leaks were identified at the property and which will have caused water to enter the sub-floor affecting the foundation soils. The extent of the water escape and associated foundation movement within the soils remains in dispute between the parties. I am satisfied, given two leaks were found and it is accepted that these leaks will have resulted in damage to the insured building, that a valid claim has been established under the policy. The complainant relies on his app ointed consultants ‘G’ and ‘W’ and says the damage to the insured building is because of the leaks. He accepts he is liable for the cost to repair the leaks but maintains the insurer is liable for the resultant damage. Insurer relies on policy exclusions to limit its liability under the claim The insurer relies on its appointed consultants ‘J’ and ‘R’. It says the significant portion of the damage to the insured building is because of long-term moisture and ground movement caused by several contributing factors, which are excluded under the policy. The insurer does not accept the damage is predominantly because of the leaks. It has estimated 8% of the damage can be attributed to the leaks and for which it offered the complainant $3,120.19, which the complainant declined. The insurer relies on the rotting of piers throughout the dwelling (with the most severe rotting being located away from the leak sites), signs of previous repairs and significant movement right across the dwelling as indications the damage is not covered under the policy. It says most of the damage is because of gradual deterioration and ground movement over a long period of time, which is excluded under the policy. The relevant policy exclusions have been provided in section 3 below. The c onsultants’ have provided conflicting evidence The complainant was informed of the cracking damage to the insured property by his appointed real estate agent in or around November 2011, after the then present tenant had Determination | Case number: 758063 Page 3 of 14 vacated the property. The complainant attended and noted the wall between the kitchen and lounge had dropped as well as cracking damage to walls. He removed the floorboards and kitchen cupboards in the area of the dropped wall and found the kitchen sink drainage pipe was not connected to the sink. This was repaired. Due to COIVD related restrictions he could not re-attend the property until the end or May 2020, at which time further water damage was noted. The complainant appointed G who located the second leak in the fittings within the wall cavity. In his professional opinion, G says significant amounts of water will have leaked into the dwelling’s sub -floor from the two leaks. He conservatively estimates around 1120L per month from the kitchen sink and 6,720L per week from the leaking fittings. The insurer appointed R and J to investigate the cause and extent of the damage to the insured building. R in its report dated 1 June 2020 says it found most of the piers badly rotted consistent with long term deterioration because of moisture exposure. The joists and bearers were in reasonable condition. It noted the entire support system for the dwelling to be sinking and compromised due to subsidence including the brickwork and concrete around the perimeter. R says the ground clearance throughout the dwelling was less than 200mm with no ventilation to the subfloor area. R concluded the damage was consistent with long term ground movement, moisture exposure to the sub-floor, age and method of construction. The complaina nt disagreed with R’s report and so the insurer appointed consultants J. I note in completing its original assessment and associated report J erred with respect to the location of the second leak, so I do not find J’s o riginal report to be a reliable source of information. In its re-inspection report dated 23 March 2021, J says the property was found to be in a poor, uninhabitable and poorly maintained condition. It again completed a hydraulic level survey and found the building overall had heaved by 3.6mm since its previous assessment, indicating the soils have continued to be exposed to moisture. J raises concerns regarding the method of construction of dwelling, ventilation of the sub-floor and poor drainage of the site and says these are not compliant with the Australian Standards (Standards), Building Code of Australia (BCA) and National Construction Code (NCC). It concludes the damage is due to the below contributing factors: - Sub-grade movement - Soil moisture variations and climatic conditions - Site drainage - Plasterwork ageing and construction method - Timber rot - sub-floor ventilation and minimum clearance. In disputing the insurer’s decision, the complainant appointed W who provided a report dated 7 June 2021. W says there were two events in 2019-2020 that are responsible for the damage to the dwelling, these being the two leaks identified. W noted the soil beneath the dwelling was still very damp despite the leaks having been repaired which he says is indicative of the large extent of water that was discharged into the sub-floor. W notes J’s reference to the Standards, NCC and BCA, however, says given the time of the dwelling’s construction (1930’s), reference to the above is not relevant as they did not exist at the time. W notes that the insurer’s appointed consultants seem to have ignored G’s findings which had conservatively estimated a significant amount of water having leaked into the sub- Determination | Case number: 758063 Page 4 of 14 soils. W says the sheer amount of water will have affected the entire house over time and not just areas near the leaks. W says this is the cause for the ground movement and associated damage to the dwelling. Having reviewed photos from the complainant, W notes the dwelling was in very good condition given it had been extensively renovated by the complainant in 2015. There was no evidence of cracking to the walls or tiles nor presence of mould. It had a new kitchen, new bathroom, freshly painted with new floor coverings. The only reason it was found to be in poor condition and uninhabitable is because of the damage done in the investigation and locating of the leaks and pending repairs. W notes J’s reports provide conflicting information as on the one hand it says the damage and floor variations are considered to be very slight and form part of normal homeowner maintenance. However, on the other hand is says 72mm is considered to be significant and above desired slope. W concludes the significant issue with dwelling is the soil movement and associated damage which he says is caused solely by the two events (leaks). W believes even a house built to current standards would not have survived unscathed given the volume of water from the leaks and very reactive clay foundation soils. J responds to W, in its report dated 22 June 2021, J says reference to NCC, BSA and Standards is because they incorporate the latest known best practice and reflect the latest research regarding the factors known to affect performance of building and structures. It says there is no evidence of the volumes of water said to have leaked into the sub-floor soils nor for how long this had been occurring. It accepts there may have been significant quantities of water that leaked over a period of time and that this will have affected the whole dwelling. However, it says the leaks were not the sole nor dominant cause for moisture in the sub-soils, rather, this was contributed to by rainfall given the poor site drainage. It says this is supported by the fact the soils remained wet event after the leaks were repaired. The severity of the timber rot to piers indicates that the rot has been occurring for many years which is supported by a photo from 2012 showing misalignment of a cupboard ’ s doors. A common cause for damaged pipework is foundation/building movement. Relevant information from these consultants’ reports has been provided in section 3. Insurer has not shown the assessment of its liability is reasonable For reasons discussed below, I am not satisfied the insurer has established an entitlement to rely on the policy exclusions referred to under the policy. I accept the policy excludes loss or damage due to wear and tear or loss or damage caused by an escape of liquid due to a gradual process over a period of time. However, this is only if it can be shown the complainant could reasonably be expected to have been aware of this occurring. I have not been provided with any evidence indicating the complainant was or could reasonably have been or was aware of the damage occurring. Quite the opposite, the complainant had undertaken extensive improvement works at the property around four years before the damage become apparent. I also find J’s reference to the home being in poor condition, uninhabitable and inadequately maintained to be misleading. The dwelling was not in this condition because of inadequate maintenance or the like, rather, it was in such condition because of the damage from the events and works needed to locate and repair the leaks. It remained in such condition Determination | Case number: 758063 Page 5 of 14 pending the outcome of the complainant’s complaint against the insurer’s assessment of its liability, and J was aware of this at the time of preparing its report. Further, I accept the policy excludes loss or damage caused by ground movement and in this instance, there exists damage to the insured building consistent with being the result of foundation movement of the sub-soils (ground movement). However, the ground movement in this instance is not the proximate cause for the damage. Rather, it is merely a consequence of the significant amount of water introduced into the sub-soils by the leaks making the escape of liquid cause of the damage. The insurer’s position heavily relies on concerns raised about the dwellings method of construction including the spacing and ventilation within the subfloor and site drainage, saying these do not meet current standards. I do not accept this to be a reasonable position and agree with W’s statement that none of these concerns are relevant given none of these existed in the 1930’s when the dwelling was constructed. So, any reference to the standards or codes cannot be relied on to decline the claim. I ackn owledge J’s reference to W not having established how much water may have escaped into the sub-floor nor for how long this may have been occurring. However, given a valid claim has been established, the onus rests with the insurer to establish the entitlement to decline the claim which would include showing the escaped water was not enough or isn’t the dominant cause for the damage. J accepts it is plausible that a large amount of water did leak into the sub-floor and that this will have impacted the entire dwelling. However, says if the leaks were the cause of the damage, the most severe damage would be expected to be in the areas of the leaks. I acknowledge damage (rotting) to the piers is consistent with having occurred over a long period of time, most likely relating to exposure to moisture. However, the evidence does not establish what equates to a long period of time nor that it is not possible that the significant portion of this damage to the piers does not relate to the leaks. There is evidence to suggest the leaks could have been occurring for quite a long time, this coupled with the issued noted with the ventilation, inability to dry and low sub-floor structure could very well have accelerated the deterioration of the piers. I note the single photograph provided by J said to be from 2012 showing a cupboard at the property. J says this photo shows a misalignment in the cupboard doors which is an indication of long term movement damage at the property. I am not persuaded, given the quality of the photo is poor, a single photo is not adequate evidence to establish a history of ground movement and it is entirely plausible that the cupboards doors did not align because of some other reason such as loose or damaged fixings. I find the evidence from G and W the more persuasive and plausible. I am satisfied, on balance, that large and continued amounts of water have continued to leak into the sub-floor over an extended period of time. This sheer amount of water and associated impact on the very reactive clay soils has caused movement within foundation soils resulting in damage to the insured building. I accept rainwater ingress may be a contributing factor for the saturation of the foundation soils, but I do not accept this has been shown to, on balance, be the dominant or proximate cause. Further, as discussed above, reference to non-compliant methods of construction including site drainage, does not assist the insurer as there were no relevant codes or standards at the time the dwelling was constructed. Determination | Case number: 758063 Page 6 of 14 Insurer may be entitled to refuse cover for the removed floorboards I acknowledge the concerns raised regarding the complainant having removed all the flooring in the kitchen, lounge room and bedrooms before lodgement of the claim. I accept this may not have been the best course of action and it would have been better to allow suitably qualified consultants to undertake the investigative and associated works to repair the leaks. In saying that, I have not been provided with any evidence that establishes the insurer will have been able to undertake the required exploratory works and repairs to the leaks without having to remove some if not all the floorboards in these areas. I accept it is fair in all the circumstances, that the insurer not be required to cover the cost of all the floorboards that were removed, if it can be shown that it could have completed the exploratory works, repair of the leaks and repairs to the dwelling without the need to lift the floorboards. If this is not the case, and the floorboards had to be lifted as part of the above works, then there is no prejudice to the insurer and it is to include this damage within the scope of works to be accepted under the claim. Insurer is to increase its liability under the claim Given the matters discussed above, I do not accept the insurer’s proposed settlement of the claim by way of an 8% contribution to the total cost of repairs. I am not satisfied the insurer has been able to establish an entitlement to rely on the policy exclusions referred to nor its position that the complainant has failed to show a significant part of the damage to the dwelling is not due to insured circumstances. Therefore, I determine within 14 days of the complainant’s acceptance of this determination, the insurer is to arrange for a suitably qualified and licenced consultant to assess and provided a scope of works and quote for repairs for the damage to the insured dwelling. The insurer, at its discretion is to then either authorise and arrange for the repairs to be completed or it can cash settle the complainant for the cost of repairs. In the instance the claim is cash settled, the insurer is increase claim settlement by a further 15% to account for contingencies and the transfer of risk to the complainant. Complainant is entitled to loss of rent cover under the policy The policy includes a loss of rent benefit. I am satisfied, given the area of the leaks, associated damage and nature of repairs that will be needed that the dwelling will not be habitable whilst repairs are completed. Therefore, I determine the insurer is to cover the complainant for loss of rent at $220 per week for the time it will or is reasonably expected to take to complete the repairs. I acknowledge the complainant’s view that the insurer should be required to pay l oss of rent for a longer period given the delay in the finalisation of the claim. However, I am not of the same opinion and accept limiting cover for loss of rent to the period of repairs is fair in all the circumstances. Determination | Case number: 758063 Page 7 of 14 2.2 Why is the outcome fair? Given all the available evidence, there is no dispute the complainant has established a valid claim under the policy. The evidence from the insurer is less persuasive in establishing an entitlement to rely on the policy exclusions. So, in the absence of evidence establishing an exclusion, it is fair in all the circumstances that the complainant be covered for the damage to the insured building as well as loss of rent (for the period of repairs). Determination | Case number: 758063 Page 8 of 14 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. 3.2 Relevant policy provisions Escape of liquid We cover Loss or damage caused by liquid leaking, overflowing or bursting from any of the following: • refrigerators, freezers, dishwashers and washing machines; • any drain, fixed pipes, roof gutters or guttering and rai nwater downpipes, drainage and sewage systems; • … • fixed heating or cooling system; • … Exploratory costs We will pay the reasonable cost of locating, at the insured address, the source of the escaped liquid and to repair and restore the damage to the building and your landlord contents caused by our exploratory work but only if the escape of liquid is covered under this insured event. If the leak is not covered under this insured Determination | Case number: 758063 Page 9 of 14 event, we provide some limited cover for exploratory costs under additional cover ‘Exploratory costs where leak is not covered under insured event ‘Escape of liquid’’. See page 33. We do not cover • wear and tear, or loss or damage by the escape of liquid occurring as a result of a gradual process of leaking, splashing, dripping or overflowing over a period of time when you could reasonably be expected to be aware of this condition; • the cost of repairing or replacing the item from which the liquid escaped; … Other repair/rebuilding costs We cover When we are rebuilding or repairing damaged parts of the building, we will pay the reasonable and necessary costs: • … • to make the damaged parts of the building comply with the current building regulations and laws. … What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events: • ‘Storm’; • ‘Flood’ (but only if you have cover for insured event ‘Flood’); • ‘Earthquake and Tsunami’; • ‘Explosion’ Determination | Case number: 758063 Page 10 of 14 3.3 Relevant evidence from the consultants Record Key points Complainant’s expert (G ) Plumbers Report  Attended the insured property to investigate possible leaks and other plumbing issues  Found drainage for the kitchen sink had become disconnected under the floor. Has been for many years simply running under the house causing damp and water damage  There was also compression plumbing fittings inside the wall cavity, one of which had been leaking causing water damage to the bottom plate, copper pipes and gyprock  Wall between hot water system and f ront bedroom has been damaged by the leaking solder joints in the wall cavity  With the broken kitchen sink pipe, just washing up two times a day would safely be 40L per day and would be going onto the ground under the building, which equates to 280L per we ek, 1120L per month and for how long no one knows  The tap could easily leak 40L per hour which is 960L a day or 6,720L a week  It is difficult to know now det ermine exactly the amount of water impacting the ground and structure but in G’s experience it very easily would have been very significant. Financial firm’s expert (J ) Re - inspection Report 23 March 2021  August 2020 Inspection concluded: - Non - compliant durability and construction issues within the sub - floor including inadequate sub - floor ventilation and ground clearance - This allowed prolonged periods of moisture contact with sub - floor elements, particularly the timber piers causing them to rot and deter iorate in areas throughout the dwelling - Although the escape of liquid had wors ened the condition of the sub - floor elements over time, it is not the fundamental cause - Evidence of post paint/patch repairs were observed, indicating pre - existing cracking Reins pection  Dwelling is supported on bearers and joists on timber piers  Complainant has owned the property for around six years  Property was in poor, uninhabitable and inadequately maintained condition  Complainant advised cracking to the internal linings had b een occurring for some years  Cracking and mould observed throughout the home  Hydraulic level survey retak en across the floor joists of the building to determine extent of movement since last inspection. Overall building heaved by 3.6mm suggesting soils hav e been exposed to consistent moisture Determination | Case number: 758063 Page 11 of 14 Record Key points  Heave not limited to edges of the building and was consistent throughout  This indicates the sub - floor has not been constructed in a manner that allows for adequate drainage  Subsidence through the western corner of the building is not consistent with the leak  Available evidence indicates several factors responsible for footing movement: - Sub - grade movement - Soil moisture variations and climatic conditions - Site drainage – non - compliant with BCA - Plasterwork ageing and construction method - Timber rot - sub - floor ventilation and minimum clearance non - compliant with NCC  Damage has occurred over an extended period of time  Leaking pipes will have only contributed to process already occurring. Contribution percentage of around 8% and does not include replacing the floorboards to the kitchen, living room and bedrooms. Believes will not have been damaged as kitchen leak was in sub - floor and the other leak was in wall cavity F inancial firm’s expert (R ) Reins pection Report 22 Marc h 2021  Complainant was confrontational with assessor in regard to original assessment and decline  Dwelling was in same condition as at original assessment  Moisture condition of soil appeared unc hanged, particularly away from the leak locations which is a clear indication of long term issue with the moisture within the sub - floor rather than in a concentrated location. Complainant’s exper t (W ) Site Inspection Report 7 June 2021  Home is 80 - 90 years old  There occurred t wo events in 2019 - 2020 which have signi ficantly damaged the building. Complainant advised on the advice of real estate cracks discovered in November 2019, in lounge room. Noted wall between lounge room and kitchen had collapsed  Event #1 kitchen sewer waste pipe had become disconnected from the kitchen sink waste outlet. Water had been discharging into the sub - floor space for a considerable amount of time  Due to COVID related delays, when complainant returned to the property on 24 May 2020 he not ed further cracks to bedroom 1, cracks to floor til es in bathroom - G was engaged.  Event #2 G found the copper pipework in the wall to the hot water system located in the bathroom to be discharging into Bedroom 1 sub - floor space. The complainant has then contacted insurer and lodged a claim.  Timber floor ing was progressively removed by the complainant to lounge room, bedroom 1, kitchen and bedroom 2 between 30 November 2019 and 24 May 2020  Soil beneath the rooms was still very damp despite kitchen leak Determination | Case number: 758063 Page 12 of 14 Record Key points repaired 30 November 2019 and bathroom leak repaired 21 May 2020, indicating large extent of wat er which discharged into floor space  There were no relevant/available standards at the time of the construction of the home. It is built on extremely reactive clay soils. Given the construction method, very fragi le to soil exposed to excessive water  G estimated the volume of wat er entering the kitchen/lounge room sub - floor from the sink to be in excess of 280L per week and 6,720L per week from the leaking copper hot water system pipe into the sub - floor space  The sheer amount of water over time will have affected the entire house and not just areas immediately adjacent to leaks  The ground movement occurred because of the two leaks  Photos provided by the complainant after purc hasing the dwelling and completing exten sive renovations show a well renovated cottage, new kitchen, bathroom, freshly painted in and out, new floor coverings complet e with curtains and drapes  The photos do not show any cracked walls, cracked tiles, mould etc.  W states the reference by J to Australian Standards, NCC and BSA have not relevance, as these did not exist at the time of the dwelling’s construction in the 1930’s  W notes the house had survived 80 years despite the construction method of sub - floor and ventilation. This is not the caus e for the damage, it is the two leak events  Timber durability is of no relevance, the bearers and joists are Cypress Pine and excellent condition  The sub - soils are reactive clays which will swell or shrink subject to their reactivity and amount of water, which would seem not to have been an issue over previous 80 years  The home was in a good and well - maintained condition, renovated in 2015  The water pooling noted was not due to method of construction but rather due to the two leaks  J’s information provides conflicting information, on the one hand it states damage and floor variations considered to be very slight and part of normal homeowner maintenance. But then says 72mm is considered to be significant and above desired slope  J has given not consideration to the findings in G’s report and does not explain the significant movement in 2019 - 2020  W concludes: - The signific ant iss ue with t his house is t hat t he s oil movement and s ubs equent damage is attribut able s olely to the Two Events, both of whic h have caus ed an inundation of large volumes of wat er int o the s ub - floor. - The t wo events, in c onjunction wit h very reactive s oils have caused signific ant movement and cracking wit hin what is a Determination | Case number: 758063 Page 13 of 14 Record Key points very fragile st ruct ure. - even a house built on this sit e and in acc ordanc e wit h the modern Australian st andards and c odes would not have survi ved unsc athed given the volume of wat er c aus ed by thes e t wo events. - W notes t hat des pit e t he disc overy of Event #1 on 30 th November 2019, t he leaking sink, t he c omplainant made no claim but proc eeded to att empt to repair t he hous e hims elf, bearing in mind that he had renovated t he c ottage in 2015. It was not until Event #2 was found, the leaking hot wat er system press ure pipe, that, at the suggestion of his son, he approached the ins urer - J and R have both ignored the plumbing report and t he volumes of water whic h t he Two Events caus ed, nor did t hey investigat e t he volumes of wat er c ons ervatively estimat ed by G - Estimated c ost of repairs $117,600.00 Financial firm’s e xpert (J ) Supplement ary Report 22 June 2021  Referenc e to NCC, BSA and Standards is because they incorporate the latest known best practice and reflect the latest research regarding the factors known to affect performance of building and structures  There is no hard evidence from W regarding the volumes of water being referred to  No evidence from W re how long the leaks had been occurring other than reference to G’s evidence  J acknowledges there may have been significant quantities of water that leaked and that it may have been lea king for some time  The sub - floor soils remain moist because of poor site drainage and associated moisture due to rainfall. So, it is not just leaks alone but a combination of leaks and rainfall  The severity of the timber rot to piers indicates that the rot has been occurring for many years  J agrees there was no current issues with rot/durability to the joists and bearers . However, there is a history of foundational movement evidenced by previous packing to the stumps  Photo from real estate listing in 2012 c learly shows misalignment of cupboard doors, which is commonly due to foundation movement  J acknowledges that some movement has occurred due to the leaks, however, most of the movement occurred prior to the leaks  Actual cause of damage to the pipes has not been addressed by G. the most common cause for damaged pipework is foundation/building movement  J accepts water from the leaks has affected the whole house, but it would be expected that the most severe damage would be at the locations of the leaks, which is not the case  W ignores the deteriorated stumps which will have allowed building subsidence at those loc ations. The deterioration of the Determination | Case number: 758063 Page 14 of 14 Record Key points stumps is due to long term moisture ex posure, not just moisture from the leaks  Maintains opinion, that the leaks ha ve cont ribut ed an estimated 8% of the damage .