Determination 757870
Storm damage claim repairs: defective door installation, continuing roof leak and water damage, and claim conduct
Summary
The complainant disputed storm damage repairs to an upstairs door and a continuing roof leak, with the insurer offering a cash settlement of $10,388.95 for the door. AFCA ordered further investigation of the leak, a cash settlement with a 20% uplift for the door and floor works, and $1,500 non-financial loss compensation.
Under fairness principles, the insurer must cash settle the door with a 20% contingency uplift and undertake further investigation of the uncertain water ingress source, with non-financial loss awarded for the claims process experience.
Issues
- Repairs or contractors primary · upheld
“Insurer ordered to undertake further inspection, gyprock removal and further scope of works for floor and door water-tightness; door repair quality disputed and found to need rectification.”
- Claim amount dispute secondary · upheld
“Insurer should cash settle the door replacement with a 20% uplift for contingencies and loss of guarantee, totalling $12,466.74.”
- Inadequate claim investigation secondary · upheld
“Source of water ingress remained uncertain; further examination required as the insurer's investigation was not sufficient to establish the cause.”
- Poor communication secondary · unclear
“Complainant dissatisfied with the insurer's conduct of the claim; AFCA awarded non-financial loss for the claims process experience.”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay non financial lossprovide documentsreassess claimrepair or rectify
Text of the determination
Determination
Case number 757870
Financial firm Commonwealth Insurance Limited (CommInsure)
Determination | Case number: 757870 Page 1 of 7
Case number: 757870 25 February 2022
Determination overview
1.1 Complaint
The complainant held a building and contents insurance policy with the financial firm (insurer).
The complainant lodged a claim with the insurer following a storm damage. The insurer
accepted the claim and arranged for repairs. The complainant is dissatisfied with the repairs
and says that an upstairs door, which was installed, is smaller than the original and was
subject to water leaks. She also maintains that there is a minor leak in the roof which is
related to the claim.
The insurer has denied that the leak in the roof is related to repairs carried out by the insurer
but has agreed to cash settle the complainant the sum of $10,388.95 for replacing the door.
This matter has been a subject of a preliminary view which was in favour of the insurer. The
complainant rejects this, and the matter has been referred for determination.
1.2 Issues and key findings
Is the insurer required to carry out further repairs to the roof?
On the information provided to me I am unable establish whether the leak in the roof was
caused by the insurer’s repairer or the storm.
The insurer is to undertake a further inspection including removing up the gyprock in the
kitchen
The insurer is to provide the report of this inspection to the complainant within 7 days of its
receipt
Is the insurer’s offer of cash settlement for the door reasonable?
On the information provided to me I am satisfied, on balance, that:
the insurer has obtained an accurate quotation for replacement of the door
there has been further ingress of water and damage has occurred to the floor below the
door
the insurer is to obtain a further scope of works for the damage to the floor
the insurer should uplift the sum paid by 20% to cover contingencies and loss of lifetime
guarantee.
Is the complainant entitled to financial loss?
I am satisfied that the complainant suffered physical inconvenience and interference with her
expectations of enjoyment or peace of mind, particularly in relation to the quality of repairs to
the door and assessment of the ingress of water.
The insurer is to pay the complainant the sum of $1,000.00 non-financial loss compensation.
Why is the outcome fair?
The insurer has provided expert reports in support of their decision. The source of the water
ingress is still uncertain. The further investigation is an appropriate process.
Determination | Case number: 757870 Page 2 of 7
The award of non-financial compensation is a recognition of the claims process experience by
the complainant.
1.3 Determination
This determination is partially in favour of the insurer. Within 14 days of acceptance of this
determination the insurer is to pay:
$12,466.74 for the door replacement including uplift.
$1,500.00 non-financial compensation.
Arrange a further report as set out in 2.1 together with any resultant payments.
Determination | Case number: 757870 Page 3 of 7
Reasons for determination
The complainant lodged a claim for storm damage on 11 August 2017. The insurer accepted
the claim and a dispute has arisen in relation to repairs carry out to a door and further in
relation to a continuing roof leak.
The complainant is also dissatisfied with the insur er’s conduct of the claim.
2.1 Is the insurer required to carry out further repair to the
roof?
Following the complainant’s dissatisfaction with the roof repairs the insurer arranged further
inspection of the roof.
A report dated 30 August 2019 by (RC) provided the following conclusion:
…
we can confirm that when the client’s own contractor has carry out the
replacement of the roof sheets the flashing has not been replaced. As a result of
this water ingress is possible via wind driven rain to the North West corner, this
indicates that the work carried out the client’s own contractor is inadequate and
not fit for purpose.
We recommend that the flashing to the previously replaced roof is also replaced
by the client’s own contractor insuring a water tight fitting. It can be confirmed that
[bb] has undertaken no work to the roof flashings or sheeting either at or adjacent
to this area’.
The insurer also obtained a report from a forensic building consultancy (S) who examined the
premises and inspected the wor k that had been carried out by the insurer’s repairer.
In particular S looked at the issue of water ingress. S provided the following summary:
‘I am of the opinion that there is no current water ingress evident related to the
original claim and I observed no mould growth in the repaired areas.
I have provided a Scope of Work for the rectification of defective building work or
building maintenance related issues that are the responsibility of the insured’.
A further assessment was found by a consulting engineer (GG) GG examined the door that
had been fitted provided the following summary:
The design and the installation of the door and the frame meets the requirements of
Australian standards.
Minor adjustment and additional sealing are required.
The overall frame size matches the opening in the external wall.
The insurer obtained a further report from engineers and building consultants (MC) the site
was inspected on the 15 June 2020. MC noted that water ingress occurring to the northern
side of the dwelling at the new polycarbonate skylight location.
Determination | Case number: 757870 Page 4 of 7
MC provided an extensive report and advised that the insurer stated that water ingress had
occurred on 26 February 2020 and has occurred again it occur from normal rainfall with little
to no wind. The polycarbonate corrugated skylight sheeting to the northern side of the
dwelling was replaced MC provided a conclusion and found as follows:
The point of water ingress could not be definitively determined.
MC gave four possible locations of ingress:
a from the holes in the flashing
the flashing lap location (however unlikely)
from the wall cladding screw fixing
from the window location (however unlikely)
MC further recommended as follows:
the open screw holes and flashing at the lap joint should be sealed
the screw fixings to the wall cladding to be checked and reinstated with new screws/seals
as required
the intersection of the window pressings/flashings to the sealed with an exterior grey
silicon/ mastic
The complainant obtained a report from a licensed building inspector (BI).
BI inspected the property on 4 August 2021.
BI found:
“ Kitchen window sills
The drop down ceilings in the kitchens are showing high levels moisture 2 of the light fittings
in the drop down bulkhead over the kitchen bench had to been removed because of moisture
ingress
The support beam running through the kitchen bulk to back wall has high levels of moisture in
the gyprock cladding
The gyprock needs completed removed to allow for a complete inspection for any
underlying.damage ”
“ Kitchen and Meals Area
Floor
The kitchen floorboards have started to buckle because of moisture ingress under the door
frame which suopposed (sic) to have been remediated during insurance repairs ”
BI provided a large number of photographs of the damaged and moist area.
The insurer is to arrange a further examination of the property
At this stage there has not been sufficient information provided to establish what is causing
the ingress of water. The complaint says that until the storm and the movement of the
insurer’s trade people on the roof, the building was water tight.
MC was not able to definitely determine the cause of the water entry.
Determination | Case number: 757870 Page 5 of 7
BI said, re the kitchen, the gyprock needs complete removal to allow for a complete
inspection.
To achieve fairness, it is necessary for the removal of sufficient gyprock in the kitchen to
determine the source of the water ingress. The insurer is to undertake this removal and is to
allow a sum for reinstatement of the gyprock whether the cause of the water ingress be
covered under the policy or not.
Further action by insurer
If it is found the water damage is as the result of an event to which the policy responds the
insurer is to obtain a scope of works(SOW).
The insurer is also to obtain a SOW for the reinstatement of the gyprock.
The insurer is to cash settle the sums determined by the SOW
If the damage is not covered under the policy the insurer is to cash settle the cost of
reinstatement of the removed gyprock.
In the circumstances it is appropriate that the insurer cash settle the claim and they should
pay an uplift of 20% to cover contingencies and loss of guarantees on any cash settlements.
Repairs to floor
The insurer is also to obtain a further SOW to provide repairs to the floor in the kitchen and
meals area and to make the door water tight..
In the circumstances it is appropriate that the insurer cash settle the claim and they should
pay an uplift of 20% to cover contingencies and loss of guarantees.
Replacement of door
The insurer has obtained a quote for replacement of the upstairs door. The insurer is to pay
$10,388.95 for replacing the door together an uplift of 20% to cover contingencies and loss of
guarantees. A total sum of $12,466.74.
2.2 Is the complainant entitled to non-financial loss
compensation?
AFCA will only award compensation for non-financial loss where:
1. There has been an unusual amount of:
physical inconvenience
time taken to resolve a situation
interference with the complainant’s expectation of enjoyment or peace of mind,
In assessing whether to award compensation for non-financial loss, AFCA expects
complainants to:
be moderately robust
bear the normal degree of inconvenience experienced when a problem occurs, and
take reasonable steps to minimise the inconvenience suffered .
Determination | Case number: 757870 Page 6 of 7
In the circumstances it is appropriate the insurer pay non-financial compensation of $1,500.
Determination | Case number: 757870 Page 7 of 7
Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.