The insurer accepted a storm claim for a home but offered a cash settlement based on a narrower repair scope than the complainant's builder quote. AFCA preferred the complainant's repair method, excluded unrelated wall and carport damage, and set a settlement of $66,142.05 or alternative options, with interest.

The insurer must repair or rebuild the damaged part so the building is restored to its pre-loss state, and any cash settlement must be fair and reasonable.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Commonwealth Insurance Limited determinations · Find similar determinations

Text of the determination

Determination Case number 757774 Financial firm Commonwealth Insurance Limited Determination | Case number: 757774 Page 2 of 8 Case number: 757774 28 April 2021 1 Determination overview 1.1 Complaint The complainant ‟s property was impacted by a garage roof blown from the neighbouring property during a storm. He lodged a claim for the resulting damage under his home insurance policy with the financial firm (insurer). The insurer accepted the claim and offered to cash settle the complainant for the value of the repair work. The dispute is about whether the settlement offered fairly reflects the cost of the repairs. The complainant says the insurer must cover the full cost of the quote he provided to ensure he can complete the repair without adversely affecting the value of his property. The insurer disagrees and says the complainant‟s quote is excessive both in the amounts quoted and the scope of repairs it covers. The insurer says its builder ‟ s quote is more reflective of the true cost of the repairs. 1.2 Issue and key findings Does the insurer’s settlement offer meet its policy obligations? No. The complainant‟s information on the cost of repairs is preferred because the repair he proposes more closely reflects the pre-damage state of the property. Further, the insurer has not established its proposed repair, which is limited to the damaged sections, is an adequate repair outcome. Therefore, the insurer cannot limit its liability as it prefers. 1.3 Determination This determination is in favour of the complainant. The insurer is to settle the complainant with one of the options outlined in section 2.1 of this determination. Determination | Case number: 757774 Page 3 of 8 2 Reasons for determination 2.1 Does the insurer’s settlement offer meet its policy obligations? Complainant’s position on repair method is preferred I am not satisfied the insurer has shown its position is the more reasonable for settling the claim. The insurer has accepted the claim and there is no dispute the insurer must settle the complainant for his loss. The dispute is essentially about what repairs need to be completed to meet the policy obligations. Both parties now agree the repair needs to consider the bushfire zoning (BAL-FZ) requirements, meaning the only issue in dispute is which repair method and scope is more reasonable. The insurer says replacing the undamaged sections of external wall are excessive. The complainant says this is unfair, as the mismatched materials are likely to impact the resale value of the property. In this, the complainant‟s position is preferred , as his quote restores the property more closely to the state and aesthetic in place before the claimed incident. Conversely the insurer‟s proposed repair has not satisfied me it either fairly addresses its policy obligations or it will avoid a manifestly inadequate result. My reasoning is outlined below. Settlement method cannot be manifestly inadequate Relevant to this dispute is the provision under the heading „How we settle a claim‟. The provision states the insurer will “repair or rebuild the lost or damaged part of your building.” The insurer seeks to limit the extent of its repairs on the basis it is entitled to repair only the damaged part of the building. In this case, the repair proposed by the insurer requires a change in material where some material will be installed immediately next to existing material from 60 years ago. This is in addition to the insurer‟s proposal to install a bushfire shutter over the French door where none currently exists. In contrast, the complainant supplied a quote from a specialist door builder (NF) showing the bushfire shutter is not necessary to repair the French door while meeting the BAL-FZ standard. The complainant also obtained the opinion of a real estate sales manager (CR), who says the proposed repair could have a drastic effect on the resale value of the Determination | Case number: 757774 Page 4 of 8 property. CR cites the weatherboard replacement and the approach to the French door as items of concern. Considering all the evidence, I do not consider it is fair in the circumstances for the insurer to limit the repairs the way it intends to. This is because its proposed method of repair not only would likely result in a mismatch of materials but, concerningly, the repairs themselves may reduce the value of the property. I am satisfied such an outcome would be manifestly inadequate and would not meet the requirement which is to restore the building to its pre-loss state. Therefore, the complainant‟s builder quote (SS) is more persuasive, particularly in bringing the areas up to the BAL-FZ standard with as little impact to the building aesthetic as possible. I accept it is fair in the circumstances this quote, and its repair method are used to form the basis of the settlement. Insurer may settle the claim with a cash payment to complainant I am satisfied the insurer may settle the claim with a cash payment in lieu of repairs. The policy states the insurer decides the settlement method. As there are concerns over appropriate licensing for repairs to BAL-FZ standard, a cash settlement is appropriate in the circumstances. Also, both parties agree to a cash settlement. Where an insurer exercises its discretion to cash settle a claim, AFCA expects this to be fair and reasonable, as it may affect an entitlement to other benefits under the policy, such as a repair guarantee. As the complainant is assuming the risk of managing the repair process and will lose the lifetime repair guarantee for the repair work offered by the policy, the amount of the quote should be uplifted to reflect this. In this instance, a figure of 10% is fair. Complainant’s quote is excessive in some parts I have considered the insurer‟s remaining arguments about SS ‟s quote being excessive as it:  repairs practically the whole front facing section of the property despite only part of it being damaged in the event  replaces parts of the carport which are deteriorated rather than damaged by the storm. For the reasons outlined previously, I consider it is fair to extend repairs to areas, to avoiding the repairs adversely affecting the value of the property. I am satisfied SS‟s quote for work to walls “B”, “C”, and “D” are part of the current claim. However, I have not accepted wall “A” as the evidence shows, on balance, this damage has not been caused by the same storm event. The report from the insurer‟s Determination | Case number: 757774 Page 5 of 8 engineer (IT) indicates it was impacted by a tree branch sometime before the storm and is therefore due to a separate event. The complainant‟s information does not dispute this is the case. I also note this part of the damage is well away from the other impact points on the property and has signs of age and vegetation entering the hole. On balance, this is sufficient to show it is not related to the subject storm. I note that impact by a tree branch either by itself, or due to another storm, are covered events. Ordinarily, the complainant would need to lodge a different claim for this damage which will need to be assessed separately by the insurer. The complainant‟s builder will also need to quote the repairs separately as well. Alternatively, and for the sake of practicality the insurer may choose to accept SS‟s quote for all walls and settle both claims as a result of this determination by applying a second excess to the cash settlement as outlined below. I also accept full replacement of the carport is excessive. The reports from the insurer‟s builder AG and IT both concur there is advanced corrosion preventing them from warranting repair work or reusing these items. Th e complainant‟s expert also quotes to entirely replace the carport, indicating the existing structure cannot be reused. As the damage in question is due to corrosion and not the impact caused by the subject storm, this does not fall within the scope of claim related repairs. The complainant is entitled to replace the damaged carport in its entirety if he wishes, but the insurer is only required to settle the value of its liability for the carport repairs as outlined in AG‟s quote. Insurer to settle the complainant with one of the following options The complainant can be settled on the available information. However, to do so will put the insurer in a position where it must forgo lodging a second claim and performing an additional assessment. The information collected so far in this dispute may be sufficient for it to make a claim decision however. Accordingly, it is fair the insurer is given the opportunity to resolve the matter fully by either:  paying the complainant, a settlement based on the full value of SS‟s quote ($68,496.50)  reducing the settlement by twice the policy excess ($1,000 total representing two claims being made)  further reducing the settlement by the value SS quoted for the carport ($14,004.10 including GST) Determination | Case number: 757774 Page 6 of 8  increasing the settlement by the value of the carport repair from AG‟s quote ($3,740.83 including builder ‟ s margin and GST)  increasing the settlement by the value of the boundary fence from AG‟s quote ($2,805 including builder‟s margin and GST)  increasing the settlement by the 10% contingency on the total cost for unforeseen costs and the transfer of the risk to the complainant to manage the repair and the loss of the lifetime repair guarantee ($6,103.82)  paying the complainant $66,142.05 as full and final settlement of the claim(s) and complaint. or:  SS resubmits the current quote less wall A, and quoting only the replacement of the roof sheets to the carport with the insurer to accept the quote for cash settlement so long as it remains fair and reasonable  less the policy excess  plus, the value of the boundary f ence from AG‟s quote as above  plus, a 10% contingency on the total cost as per above  the complainant may then lodge a second claim for impact or storm damage to wall A which the insurer must assess in accordance with the policy. In either case, the insurer must also pay the complainant interest calculated in accordance with section 57 of the Act, payable from 11 November 2020 until the claim(s) are settled. This is the date the insurer supplied its position on the settlement which we did not accept as fair in the circumstances. I note that an issue in relation to asbestos contamination has been settled by agreement between the parties. Accordingly, that matter has not been considered as part of this determination. Determination | Case number: 757774 Page 7 of 8 3 Supporting information 3.1 Process AFCA’s approach to complaints This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions of AFCA or its predecessor schemes (which are no t binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Policy wording How we settle your claim Building claims If we agree to pay your claim, we will decide whether to:  repair or rebuild the lost or damaged part of your building  …  provide you the amount we determine to be the reasonable cost of repairing or rebuilding the lost or damaged part of your building up to the sum insured stated on your Certificate of Insurance . 3.3 Key points on expert evidence relied on Record Key points Complainant’s real estate sales manager ( CR )  Replacing weatherboards and French door are not very attractive and would affect the property value. Determination | Case number: 757774 Page 8 of 8 Record Key points Letter Undated  Property value would be affected by the repair , perhaps by $50,000 to $100, 000 due to the kind of buyers interested in this type of property. Insurer’s builder ( AG ) Report 30 J uly 2020  Guttering to the carport severely rusted.  Some missing guttering at the carport was removed prior to the storm.  Post supports not structurally sound.  Unable to warrant repairs to the front veranda area due to wood rot.