Home / Commonwealth Insurance Limited / Determination 756988

Determination 756988

Insurer limited heating system cover to $500 and handled the claim with unreasonable delay

FirmCommonwealth Insurance Limited
Decided2021-05-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$12,595
Non-financial loss$3,000
Amount claimed$12,595
SourceAFCA PDF

Summary

A failed T join caused water escape and damage to a heating system, and the insurer limited its liability for the heating system to $500. AFCA ordered a further $12,595 for the heating system with interest, temporary accommodation cover until repairs finish, and $3,000 non-financial loss compensation, but refused travel expenses.

The policy's $500 limit applies to the individual item that leaked (the T join), not to the complete fixed heating system, and the insurer's delays were unreasonable.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interestpay non financial loss

Related

All Commonwealth Insurance Limited determinations · Find similar determinations

Text of the determination

Determination Case number 756988 Financial firm Commonwealth Insurance Limited Determination | Case number: 756988 Page 2 of 8 Case number: 756988 16 April 2021 1 Determination overview 1.1 Complaint The complainant holds a home building and contents policy (policy) with the financial firm (insurer). On 12 November 2019, a claim was lodged for damage to the insured property because of an escape of liquid event. The insurer has accepted the claim, however, says its liability with respect to the hydronic heating system replacement is $500 in line with the policy. The complainant disputes this and is seeking a further payment of $12,595. The complainant is also seeking cover for temporary accommodation costs and travel expenses incurred because of having to move into temporary accommodation. The complainant is dissatisfied with the insurer‟s management of the claim and the delays experienced over the life of the claim. 1.2 Issues and key findings Is the insurer’s assessment of its liability reasonable in the circumstances ? No. The insurer is not entitled to limit its liability relating to the hydronic heating system (heating system) to $500. The insurer is to pay the complainant the outstanding amount of $12,595 plus interest in line with section 57 of the Insurance Contracts Act 1984 (the Act). Is the complainant entitled to temporary accommodation expenses? Subject to the complainant providing the insurer with relevant information, the insurer is to cover the complainant for the claimed temporary accommodation at $495 per week in line with this determination. The insurer is not required to cover the complainant for the claimed travel expenses in line with the policy provisions. Is the complainant entitled to non-financial loss compensation? The insurer is to pay the complainant $3,000 in non-financial loss compensation for the reasons stated in this determination and in line with the AFCA Rules. 1.3 Determination This Determination is substantially in favour of the complainant. The insurer is to pay the complainant a further $12,595 towards replacement of the hydronic heating system. The insurer is to pay interest on this amount in line with this determination. Subject to the complainant providing evidence of the temporary accommodation expenses, the insurer is to cover the complainant for these expenses in line with this determination. The insurer is not required to cover the complainant for travel expenses in line with the policy. The insurer is to pay the complainant $3,000 in non-financial loss compensation in line with the AFCA Rules. Determination | Case number: 756988 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer’s assessment of its liability reasonable ? The policy is an insured events contract of insurance The policy covers the insured property against loss or damage caused by one or more the listed insured events, including „Escape of liquids‟. Cover under the benefits is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). The insurer is entitled to rely on the policy provisions The insurer provided the complainant with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. Policy covers failure of T join There is no dispute a valid claim exists under the policy for the damage to the insured property due to the failure of a T join connected to a fixed water pipe utilised by the heating system. The dispute relates to the parties‟ interpretation of the relevant policy provisions and the extent of cover available for the loss and damage claimed in line with their respective policy interpretations. The relevant policy wording states the following: Escape of Liquid What is covered Your building and/or contents are covered for loss or damage caused by the sudden and unexpected escape of liquid from any: • … • Fixed water pipe (but not a garden hose); • … • Sealed portabl e heater; or • Fixed heating or cooling system. … You ae only covered for up to $500 for the repair or replacement of the item from which the liquid escaped if it formed part of your building or contents. On reading the above policy wording, I am satisfied it says the policy: Determination | Case number: 756988 Page 4 of 8 ‒ Covers loss caused by the sudden and unexpected escape of liquid from various items including fixed water pipes and fixed heating systems ‒ Covers damage caused by the sudden and unexpected escape of liquid from various items including fixed water pipes and fixed heating systems ‒ Limits cover up to a maximum of $500 to repair or replace the item from which the liquid escaped, if it formed part of the insured building. I am satisfied the evidence shows the water escaped from a failed T join attached to a fixed water pipe in the ceiling of the insured property. There is no dispute the escape of liquid has then resulted in significant damage to the insured building, contents on lower levels and the heating system. I do not agree with the insurers position. The policy does not define the term „item‟ and so it is fair to rely on the terms ordinary meaning as defined in the Macquarie Dictionary, which is “a separate article” and an article being an “an individual piece”. Insurer liable to cover damage to the heating system A fair interpretation of the policy limitation is that it limits cover up to $500 to repair or replace the item, this being the individual T join in this instance. If it was the intention of the insurer to apply this to a complete fixed heating or cooling system, then this should have been clearly explained/noted in its drafting of the policy provisions. Similar to how clear reference is made to fixed heating and cooling systems just above the on the same page of the PDS. I have not been provided with any evidence which would suggest the cost of the replacement of the heating system incurred by the complainant is excessive. Rather, both available quotes are consistent. Accordingly, I determine the insurer is to pay the complainant a further $12,595, subject, to the complainant providing the insurer with evidence of payment. The insurer is to also pay the complainant interest on this amount in line with section 57 of the Act, from the date of payment made by the complainant to the date on which payment is arranged by the insurer in line with this determination. 2.2 Insurer is to cover temporary accommodation till repairs are completed The complainant is seeking cover for the cost he has incurred and continues to incur for temporary accommodation, which is said to be $495 per week inclusive of GST. The insurer has accepted to cover the complainant for these expenses, subject to being provided evidence (invoices) in support of this claim. However, the insurer says it will limit cover to that noted in the policy provisions (52 weeks) from 1 April 2020 to 31 March 2021. The insurer says, had it not been for delays caused by the complainant over the life of the claim, it would have been able to repair and restore the insured property within this timeframe. The complainant says the delays experienced are the fault of the insurer and as such it is not reasonable for it to seek to limit cover for temporary accommodation to the policy limit of 52 weeks. The complainant also says, under the policy he would been entitled to a like for like temporary accommodation to the insured property, which would have cost the insurer upwards of $2,000. However, he in good faith has attempt ed to reduce the insurer‟s expenses under the claim. Having considered all the available information, I accept there is clear evidence of delays experienced over the entire life of the claim. However, it is not as simple as accepting the insurer alone is responsible for these delays. It is clear, the insurer chose not to deal with the Determination | Case number: 756988 Page 5 of 8 damaged heating system and partially cash settled the complainant to arrange for its repair or replacement, before it subsequently sought to significantly reduce its liabilit y to $500 only. The complainant made reasonable efforts to get these works done, however, given the limited experts available, it not being his expertise, requirements for testing of the system once installed and significant complications relating to the COVID-19 situation in Melbourne, delays occurred. I accept both parties hold the other responsible for these delays which took the claim to around June 2020, however, I am of the opinion it would not be fair to hold either of the parties liable for this period of delay given the reasons above. Following this, the evidence shows there was some delay in starting the remediation works by the insurer‟s appointed consultants „R‟. This included delay in setting the remediation works commencement date of 12 October 2020. I note the complainant‟s position that he did not cause any delays as the works did commence on 12 October 2020. However, I am not of the same view, as it is the factors that contributed to the delay in setting this commencement date which are relevant. The available information shows the complainant strongly insisted that he be provided with the building repairs scope of works before he would accept the remediation scope of works. The insurer on several occasions attempted to inform him that this was not its process and building repairs cannot be accurately determined until such time the remediation works were completed. These negotiations between the parties delayed the remediation works being completed. I note the insurer, because of the compl ainant‟s insistence, did provide him with a building scope of works before remediation works were commenced. I acknowledge the complainant‟s insistence came from a lack of trust in the insurer because of earlier poor claim experiences, however, I accept th e insurer‟s position that it was unhelpful and pointless to demand the building scope of works be estimated before the remediation works were completed. So, I accept a delay of around two months or so, was significantly contributed to by the complainant. In saying that, I also note that if the insurer was prepared to provide the building scope of works before the remediation works had been completed, it could have done so much earlier in the negotiations in the attempt to prevent the extended delays. I note on being provided with the building scope of works in December 2020, the complainant straight away identified several concerns with the contracts which he brought to the attention of the insurer and its appointed consultants „J‟. The concerns raised wer e reasonable and included matters such as repairs to items which never existed at the insured property, liability being placed with the complainant for property he was not reasonably liable for and other issues which were poorly explained and/or were included from standard building contracts. It is clear for quite some time, the insurer and J, flatly refused to acknowledge the concerns and informed the complainant that no changes would be made to the contracts. However, the evidence shows, this is exactly what occurred once the parties communicated, some changes were made to the contracts, some items remained the same and others were more clearly explained to the complainant by J. Again, I am of the opinion, had the insurer been more receptive to the compl ainant‟s communications and there was better communication between the insurer and its consultants, the unreasonable delay of over two months could have been avoided. So, for this I am satisfied it is reasonable to hold the insurer significantly liable. I accept the evidence shows there was an unreasonable delay in finalising the buildings scope of works and contracts once the remediation works were completed. This did not occur until 5 February 2021, when the contracts were finally signed Determination | Case number: 756988 Page 6 of 8 Accordingly, it is fair in the circumstances the insurer continues to cover the complainant for the cost of temporary accommodation until the repairs authorised under the claim are completed. This based on information exchanged would most likely be a couple months after 31 March 2021. Insurer is not obliged to cover travel expenses The complainant is also seeking cover for travel expenses for two return trips from Rye (temporary accommodation) to Melbourne per week at approximately $0.70 per kilometre. The complainant says this rate is consistent with information sourced from the Australian Tax Office website. The complainant says he was fair and modest in choosing to live in a home owned under a trust for $450 per week and it would be fair for the insurer to cover the claimed travel expenses. This would still result in the insurer paying less than it otherwise would, if he were to be provided a comparative accommodation. The insurer does not dispute this, however, says the complainant chose to stay at their holiday home in Rye despite the insurer‟s offer to locate a comparative prop erty closer to home in Ivanhoe. Further, that although he was entitled to more expensive comparative property for the temporary accommodation, this does not mean he is entitled cover equal to the higher expenses despite electing to reside in a lower cost accommodation. The insurer originally offered to place the complainant and his wife in a hotel until such time they could locate a comparative property to the complainant‟s home. The complainant declined to stay in hotel accommodation given significant concerns relating to COVID 19 and exposure to the virus in hotels at the time (March-April 2020). I accept this was reasonable especially the complainant‟s responsibilities for the care of his elderly mother. The complainant strongly believes that he was given the impression in a communication from the insurer that in accepting the temporary accommodation, it was also accepting the travel expenses. I acknowledge the complainant‟s position and reasons for it. However, I do not believe the evidence is sufficient to prove the insurer misled the complainant with respect to this. Although the complainant has been modest in his expectations regarding temporary accommodation which has assisted in keeping the claims costs down, this does not translate into an entitlement to the travel expenses. I am satisfied the policy does not extend to cover the travel expenses. If they were to be paid, it would be at the insurer‟s discretion to pay on a commercial basis, which it has advised it does not wish to do. 2.3 Is the complainant entitled to compensation? AFCA can award non-financial loss compensation The AFCA Rules (Rule D 3.3) allow for an award of up to $5,000 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. Insurer is to pay the complainant $3,000 in non-financial loss compensation The complainant raises several concerns with the insurer‟s ov erall claim handling, communication and the extent of time it has taken to finalise the claim. Determination | Case number: 756988 Page 7 of 8 The issue of delays experienced under the claim has been considered in detail within section 2 above when discussing the parties position on temporary accommodation. In short, I accept there have occurred unreasonable delays over the life of the claim. I am of the opinion a significant portion of the delays could have been avoided with better communication from the insurer and applying the same degree of flexibility earlier in the claim as opposed to months later. The complainant has also raised concern of unreasonable delays in addressing requests for window coverings for lower level windows at the insured property. These concerns relate to a few attempted break-ins at the property said to be because windows were left uncovered with lights on and doors open by repairers. Photographic evidence does show the insured property has large windows which allow for someone from the outside to see inside the property. The available information also supports the complainant‟s position that over several months repeated requests were put to the insurer to ensure lights were turned off, doors closed and for the windows to be covered, which the insurer failed to action. I accept the insurer‟s representative dealing directly with the complainant did put forward these requests, however, such requests were not put into action by those given instruction. This is a further example of concerns referred to in this determination regarding communication between the insurer and its agents. I acknowledge the complainant ‟s opinion that he was bullied by the insurer under the claim, especially in matters relating to acceptance and signing of contracts. The complainant especially refers to an email sent to him from the insurer‟s representative „R‟ dated 1 February 2021. An allegation of bullying is serious matter and requires persuasive evidence in support. Having considered the available information, I am not of the opinion it satisfies the level of evidence required to accept the allegation. I accept the said email could have been drafted better to communicate the insurer‟s position and that its intention was to present the complainant with an alternative option i.e. cash settlement for the repairs. However, equally, I do not believe it was necessary for the insurer to then include reference to the deadline for temporary accommodation, its pending expiry and its unwillingness to extend this benefit any further. This was a reference not necessary in asking the complainant to sign and return the building scope of works contract as is, or as part of presenting alternative options. The available information also shows poor management of the insured property whilst in the care of the i nsurer‟s appointed consultants. I accept the insurer‟s reference to the fact it would arrange a clean-up of the property at completion of the repairs. However, this does not mean that reasonable care should not be taken at all times over the course of the repairs, especially with respect to furniture and use of furniture by appointed repairers. I am satisfied the insurer‟s management of the claim has caused the complainant and his wife to experience an undue degree or extent of physical inconvenience, stress, anxiety and time taken to bring the claim to finality. Accordingly, in line with AFCA‟s approach to compensation, I determine the insurer is to pay the complainant $3,000 in non-financial loss compensation within 14 days of his acceptance of this determination. Why is the outcome fair? Given the policy wording, the fact that am insured event occurred and the delays in resolving this dispute, it is fair that:  the complainant is covered for the cost to replace the heating system  the complainant be compensated for the additional accommodation expenses till the insured building is repaired due to delays experienced under the claim Determination | Case number: 756988 Page 8 of 8  the complainant be compensated for the unusual degree of physical inconvenience and time taken over the life of the claim  the insurer be allowed to decline cover for the travel expenses in line with the policy provisions. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this Determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. 3.2 AFCA Rules D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate the Complainant for non-financial loss: a) for a complaint relating to an individual‟s privacy rights - injury has occurred to the Complainant‟s feelings or humiliation has been suffered by the Complainant; or b) for other complaints – an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Complainant‟s expectation of enjoyment or peace of mind has occurred.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.