Home / Suncorp Group / Determination 756981
Determination 756981
Scope of water leak damage and cash settlement for foundation repairs
Summary
A landlord accepted a leaking water pipe claim but sought demolition and rebuild costs. AFCA found the insurer's $59,761.02 cash settlement for event-related stump repairs fair and reasonable and found no obligation to rebuild.
The policy limits cover to insured-event damage, excludes pre-existing defects and ground movement, and lets the insurer choose a cash settlement that is fair in the circumstances.
Issues
- Claim amount dispute primary · not upheld“The panel does not accept that demolition and rebuilding of the entire house is warranted because of the insured event.”
- Product terms interpretation secondary · not upheld“The insurer's liability is limited to the escape of liquid related damage, which is the repair of the foundations to the southern side of the home.”
Subjects and remedies
home or building damageno remedy
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 756981
Financial firm AAI Limited
Determination | Case number: 756981 Page 2 of 8
Case number: 756981 21 May 2021
1 Determination overview
1.1 Complaint
The complainant holds a Landlord Insurance policy with the financial firm (insurer).
The complainant submitted a claim on 11 November 2018, for damage caused by a
leaking water supply pipe. The insurer declined the claim on the basis the damage
was caused by ground movement, which is excluded under the policy. Following
further discussions between the complainant and the insurer, the claim was accepted.
A dispute has arisen in relation to the scope of works and settlement for the cost of
repairs. The insurer offered a cash settlement for the cost to repair the claim related
damage. The complainant says the most viable option is to demolish and rebuild the
property and is seeking a settlement to cover the cost of doing so.
1.2 Issues and key findings
Is the insurer required to cover the cost to demolish and rebuild the property?
No, the insurer is only required to indemnify the complainant for the ins ured-event
related damage.
1.3 Determination
This determination is in favour of the insurer.
The insurer has offered a cash settlement of $59,761.02 to settle the claim. The panel
confirms this settlement offer is fair and reasonable in the circumstances.
Determination | Case number: 756981 Page 3 of 8
2 Reasons for determination
2.1 Is the insurer required to cover the cost to demolish and rebuild the
property?
No dispute an escape of liquid event caused damage to the property
The complainant is required to show that, on the balance of probabilities, they
suffered a loss caused by an event they are insured for under the policy. This i s
known as a valid claim.
The complai nant’s policy is a l andlord insurance policy that provides cover for a series
of listed events including escape of liquid, subject to conditions and limitations. There
is no dispute the complainant’s property suff ered damage because of a leak from a
water supply pipe. The insurer has accepted the claim for damage.
However, the parties dispute the extent of the insurer’s obligations under the terms
and conditions of the policy.
The complainant and the insurer both appointed experts to assess the cause and
extent of the damage to the foundations of the house.
The parties agree that several of the stumps have been damaged by the insurable
event. Both the insurer’s expert s and the complainant’s expert s say the south west
side of the property has suffered damage consistent with a major water leak as
reported.
The insurer made an offer of $59,761.02, to settle the claim. This is based on a quote
and scope of works provided by the insurer’s builder to replace the stumps damaged
by the escape of liquid event, including a 20% uplift for contingencies and transfer of
risk. The complainant rejected this offer. The complainant says that the most
economical option is to demolish the house to prevent further damage.
Complainant says property to be demolished and rebuilt
The complainant has provided a report from his engineer AC which says it is not good
engineering practice to partially re - stump the site due to the reactive nature of the soil
and the large settlements that have occurred . AC suggest s it is not financially viable
to partially restump the house considering its age and condition and says
consideration should be given to demolishing the house and re - building . AC does not
however discuss the proximate cause of the damage, nor does AC disti nguish
between the event related damage and the pre - existing damage.
The complainant has also provided reports and quotations from builders A and LC.
LC agrees with AC, saying the entire structure of the house has been impacted by the
water damage. AC similarly recommends the house be demolished and rebuilt to be
returned to a satisfactory condition.
Determination | Case number: 756981 Page 4 of 8
The panel notes that LC is not a structural engineer. LC does not provide any
commentary as to why he believes the entire structure of the house has been
damaged by the escape of liquid event.
The panel notes that neither AC nor LC provide any consideration for the insured
event related damage as opposed to any pre-existing, or non-event related damage
that pre-dates the damage from the escape of liquid event.
Insurer ’ s experts say not all damage is related to insured event
The insurer appointed a geologist (SG) shortly after the claim was submitted. SG
classified the soils as highly reactive. SG says the cause of the damage is related to a
combination of factors , which include the leaking water pipe, as well as non - insured
eve nt related causes which include t ree drying o n the southern side of the site,
drought conditions and uncapped soils.
The insurer appointed an engineer, M. M found the settlement of the stumps on the
south side of the property excessive and consistent with the escape of liquid event. M
says the stumps on the south side therefore require replacement, estimating
replacement of 20 stumps. M found no apparent settlement has occurred on the
Northern side of the house. M concluded these stumps will not need replacing.
The insurer later appointed engineer HC to report on the extent of the event related
damage. HC says the building movement is a result of multiple causes, some of
which are not insurable event related causes. HC considers the movement has been
occurring due to the stumps being founded at different depths, resulting in cracking
and movement of the residence. Further, HC says that to return the property to its
pre- insurable event condition, the residence can be re - stumped as per the scope of
works provided by the insurer, noting replacement of 34 stumps. HC does, however,
note that because of pre-existing issues, ground movement will continue. HC says
that demolition and reconstruction of the property would obviate the issue of further
ground movement, however, this would be an upgrade.
The panel also notes the report provided by the leak detection specialist, IL, which
refers to evidence of previous re-stumping of the house, suggesting ground
movement has been ongoing for an extended period and prior to the escape of liquid
event. The panel notes the complainant’s own expert B also refers to defects in the
subfloor, which it says has been altered and relevelled with substandard, non-
compliant workmanship, prior to the insurable event.
Insurer’s l iability limited to insurable event related damage.
Having weighed all available information contained in the expert reports, the Panel
accepts that there is major subsidence of stumps and foundations along the south
west side of the house, consistent with a major water leak. However , the panel does
not accept that demolition and rebuilding of the entire house is warranted because of
the insured event..
Determination | Case number: 756981 Page 5 of 8
The available information raises other issues, unrelated to the escape of liquid event,
which have caused damage (settlement) to the northern side of the house. The panel
finds the engineer report provided by M compelling. M says stumps will not need
replacing and that full restumping is not required. This is consistent with HC ’s views
on what is required to return the house to a pre-event condition compared to
upgrading the house.
The policy states the insurer will not fix a fault that existed before the loss or damage
occurred. It follows that the insurer is not required to upgrade the home to prevent
future movement. Based on the available information, the panel is not satisfied the
home requires demolition because of the escape of liquid. The insurer’s liability is
limited to the escape of liquid related damage, which is the repair of the foundations
to the southern side of the home.
Insurer entitled to settle or repair
The policy provides the insurer with the discretion to:
repair damage to the building;
rebuild the building;
pay you what it would cost us to repair or rebuild the building.
AFCA expects an insurer to exercise this discretion fairly in all the circumstances.
In the current circumstances, the insurer has elected to cash settle the claim. The
information available shows that the house is currently structurally unsafe. It would
require substantial work to address the issues of ground movement and the previous
substandard workmanship to the foundations. As a result, it is understandable that
there is a difficulty in a builder providing a warranty for the event related works. The
panel therefore considers th e insurer’s decision to settle on a cash basis is fair and
reasonable in the circumstances.
The panel has considered whether the settlement fairly represents the repair costs.
The quotation provided by the insurer’s builder incorporates HC’s recommendation for
temporary bracing and M’s recommendations for claim related repair s. The insurer’s
quote for $49,800.85, is comparable to the partial quote provided by the
complainant’s builder A. The insurer has also offered a further 20% uplift to account
for transfer of risk and contingencies. The panel considers this to be fair and
reasonable in the circumstances.
Determination | Case number: 756981 Page 6 of 8
3 Supporting information
3.1 Process
AFCA’s approach to this complaint
This complaint has been determined based on what is fair in all the circumstances,
having regard to the legal principles, applicable industry codes or guidance, good
industry practice and previous decisions of AFCA or its predecessor schemes (which
are not binding).
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised. All the
provided information has been reviewed and considered. The parties have raised
numerous issues in their submissions to AFCA. However, commentary in this
determination is restricted to those issues considered relevant to the outcome.
This matter was determined by a panel
Due to the nature of this dispute, it has been referred to a panel for determination.
The panel comprises the lead ombudsman, a member with significant experience in
consumer and small business advocacy and a member with extensive experience as
a the insurance industry.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on
oath, or to require third parties to give evidence. When we assess complaints, we
consider available documents, the recollections of the parties, and all relevant
circumstances. We give more weight to documents created at the time the events
occurred. If there is no relevant documentation, we will decide what is most likely to
have occurred based on the information provided to us. If there are conflicting
recollections and these are evenly weighted, we may find that a claim cannot be
established.
3.2 Relevant policy wording
PDS reference Wording
P. 24
Escape of Liquid
We cover:
Loss or damage caused by liquid leaking, overflowing or bursting
from any of the following:
[…]
• water main, fire hydrant or water supply pipe;
Determination | Case number: 756981 Page 7 of 8
PDS reference Wording
P. 44
General Exclusions
What we do not cover
Defect, structural fault or design fault
a defect, structural fault or design fault that you knew about (or
should reasonably have known about) and did not fix before the loss
or damage occurred (e.g. if there are signs that a defect previously
caused damage, we will not pay a later claim for further damage
from this defect).
Ground move ment
erosion, vibration, subsidence, landslip, landslide, mudslide,
collapse, shrinkage or any other earth movement, but we will cover
landslide or subsidence that is specifically covered under the
following insured events:
P. 52
How we settle your claim
We choose how we settle building claims
If we agree to pay a claim for loss, theft or damage to the building,
we will decide if we will:
repair damage to the building;
rebuild the building;
pay you what it would cost us to repair or rebuild the building;
pay you the building sum insured shown on your certificate of
insurance;
Note: This does not apply if you have selected the Complete
Replacement Cover® option.
give you a voucher, store credit or stored value card for the
amount it would cost us to repair or rebuild an item.
If we rebuild (or pay you what it would cost us to rebuild), we will
do so on a ‘new for old’ basis.
If we repair (or pay you what it would cost us to repair), we will at
our option repair on a ‘new for old’ basis or repair to a similar
condition to what the building was in before the loss or damage
occurred.
We will not:
pay more than the relevant sum insured (unless you have the
Building Complete Replacement Cover® option) or policy limit;
pay extra to replace the building or landlord contents to a better
standard, specification or quality than they were before the loss or
damage occurred except as stated in the meaning ‘new for old’;
fix a fault that existed before the loss or damage occurred.
P. 54
Building claims
Dealing with defects
We do not rectify structural or design faults
When we accept a claim, we will not pay extra to rectify a
structural or design fault at the building that you knew about (or
should reasonably have known about). We will only pay you wha t
it would have cost us to fix the damage from the incident covered
Determination | Case number: 756981 Page 8 of 8
PDS reference Wording
by your policy or, if we agree, you can pay us the extra amount it
costs to rectify the structural or design fault at the building.
If undamaged defective parts of the building will not s upport
repairs
If undamaged defective parts of the building you knew about (or
should reasonably have known about) will not support repairing
the damage caused by an incident covered by your policy, we will
only pay what it would have cost us to repair the damage had the
building not been defective.
For known defects or faults
Once you become aware of a defect, structural or design fault at
the building, you must rectify it as soon as possible because there
is no cover for loss or damage due to that defect. If you do not
rectify the defect or fault, you may not be covered or we might not
offer a renewal of your policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.