Home / QBE / Determination 756351

Determination 756351

Dispute over scope of works and cost of repairs following sewage overflow damage; cash settlement and non-financial loss

FirmQBE
Decided2022-06-09
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$20,604
Non-financial loss$3,000
Amount claimed$170,654
SourceAFCA PDF

Summary

Complainants made a claim after a sewage overflow damaged their strata unit and disputed the repair scope and compensation. AFCA required the insurer to add a 20% contingency to repair costs, increase non-financial loss compensation to $3,000, pay $1,400 temporary accommodation, and refund $4,078 with interest, but rejected the complainants' larger scope and accommodation claims.

The policy allows the insurer to choose cash settlement, and the panel found the insurer's SOW adequate, but cash settlement transfers risk so a 20% contingency uplift was warranted under AFCA's approach.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial lossrefund fees or charges

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 756351 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 756351 Page 1 of 17 Case number: 756351 22 March 2022 1 Determination overview 1.1 Complaint The complainants are beneficiaries under a residential strata insurance policy with the financial firm (insurer). In July 2019, a claim was lodged for damage to their property, after a blockage caused the overflow of sewerage into their property. The claim was accepted, and attempts made to remediate the damage. A dispute has arisen over the repairs to the property and the work required to restore the home to its pre-event condition. The complainants also say medical treatment has been required due to the mould and that there has been significant delay and aggravation caused in finalising the repairs. The insurer has made an offer of $22,600.26 to the complainants for the reasonable cost of repairs and additional costs. The complainants reject the insurer’s offer and are seeking compensation in the amount of $170,653.74 to resolve the complaint. 1.2 Issues and key findings Is the insurer required to increase its settlement offer? The insurer has made offers to settle this matter. Based on the available information, the insurer is required to increase its settlement offer for the cost of repairs and compensation for non-financial loss as follows:  Pay 20% contingency on the $14,020.08  Increase the offer of compensation by $1,000 to $3,000  Refund the sum of $4,078 paid by the complainant and pay interest under section 57 of Insurance Contacts Act 1984 (Cth) (the Act)  Maintain the offer of $1,400 for one week of temporary accommodation. Why is the outcome fair? The outcome is fair as all the available material has been considered and the outcome is in line with AFCA’s approach to these types of matters. The complainant and the insurer has made submissions and all issues have been considered 1.3 Determination This determination is substantially in favour of the financial firm. Subject to the acceptance of the determination, the insurer is required to increase its settlement offer for the cost of repairs by an additional $2.804.01, to a total of $16,824.82. The insurer is to pay an additional $1,000 in compensation for non-financial loss, to a total of $3,000. Determination | Case number: 756351 Page 2 of 17 The insurer is to refund (if it has not already done so) the $4,078 paid by the complainants and pay interest under section 57 of the Act, from the date of payment until settlement by the insurer. Pay $1,400.00 for one week of temporary accommodation Determination | Case number: 756351 Page 3 of 17 2 Reasons for determination 2.1 Is the insurer required to increase its settlement offer? Policy provides cover for accidental loss or damage The product disclosure statement (PDS) outlines the circumstances under which the policy provides cover. The policy provides for accidental loss or damage. This policy says this means any partial or total accidental physical loss of, or destruction of property from any sudden and accidental cause not otherwise excluded by the policy. Policy has discretion as to how the insurer settles claims The PDS outlines how the insurer settles claims Claims - how we will settle your claim “ If Your Insured Property is Damaged, we may choose to either rebuild, replace, repair or pay the amount it would cost to rebuild, replace or repair ” . Offers made by the insurer to resolve the complaint Repair works and accommodation The insurer says following discussions with the complainants regarding rectification works, it recommended a cash settlement for the cost of repairs to finalise the claim. Both parties have agreed a cash settlement is an appropriate method of settlement. However, there is a dispute as to the scope of works (SOW) and cost of repairs Following its assessment, the insurer tasked its builder (JLG) to provide a SOW for the claim related repairs. The Insurer requested JLG provide an estimate for the repairs while the complainants obtained their own comparative quotes based on the same SOW. Accordingly, the complainants provided quotations from builders (RC) for $115,469.20 and (EB) for $109,418.51. As RC provided a higher quoted amount, RC’s SOW and quotation were used as the basis in reviewing the information and preparing the determination. The complainants are also seeking compensation for:  sewerage remediation (before and after repair works) totalling $ 5,876  three months temporary accommodation totalling, $19,485.60 for the duration of repairs based upon quotation from (KA). The insurer says the SOW from JLG and that of RC differ significantly. For example, the quotation provided by RC includes removal & replacement of the entire bathroom which the insurer says is not required. Following review, the insurer says it is unable to accept RC ’ s SOW as the extent of repairs are not justified. The insurer says there is insufficient evidence to establish that all works claimed relate to the damage caused by the event. The insurer also says there is a lack of evidence establishing the complainants ’ concerns that there may be undiscovered damage. Determination | Case number: 756351 Page 4 of 17 Based on the advice from its experts, the insurer made an offer to compensate complainants $17,400.08 for the reasonable cost of repairs to complete the works and temporary accommodation. Compensation for non-financial loss The complainants are seeking compensation for non-financial loss in the amount of $24,900. This includes a claim for compensation relating to twenty-six issues that were identified by the complainants. The insurer says AFCA cannot award an amount of $24,900 as it exceeds the $5,000 cap for non-financial loss compensation which applies to complaints relating to General Insurance. The insurer says it has carefully considered the issues raised by the complainants. It accepts that a significant amount of time has elapsed since the event and it has previously provided its apologies to the complainants for the issues experienced under the claim to date. In recognition of the above, the insurer offered an amount of $2,000 for non-financial loss compensation to the complainants. Accordingly, the insurer made an offer of $22,600.26 to the complainants for the reasonable cost of repairs and additional costs. T he insurer’s final offer to the complainants is made up of the following: The complainants reject the insurer’s offer and seek further compensation as outlined in the next section of the determination (below). Breakdown of insurer’s review / offer based on the complainants’ submissions: List of Claims for AFCA Summary Ite m Description Total [insurer] Adjustment GST Inclusive [insurer] Comment Determination | Case number: 756351 Page 5 of 17 I Reimbursements for expenses Insured $ 8,876.94 $ 3,150.18 Reimbursements $ 50.00 adjustment 19/01/2021 as below II Sewage and building rectification (3 months) $ 136,876.80 $ 14,020.08 JLG Quotation # JNAC09453/1AB dated 22nd October 2020 $ 3,380.00 adjustment 19/01/2021 as below Temporary accommodation $ - Furniture removalist and storage III Non financial Compensation - 26 claims $ 24,900.00 $ - Total Cash Settlement Sought $ 170,653.74 $ 20,600.26 Total 19/01/2021 Description Total [Insurer] Adjustment [Insurer] Comment I Total Reimbursement Sought $8,876.94 1 Medical expenses Sunday, 11 August 2019 $ 265.70 $ - Policy 1 does not respond to medical expenses and the insured was referred to policy 2 for consideration of submitting a liability claim against the owners corporation for consideration this was never rec eived. 26th August 2019 $ 56.80 $ - 4th October 2019 $ 50.20 $ - 9th October 2019 $ 51.80 $ - 11th October 2019 $ 51.80 $ - 16th October 2019 $ 692.95 $ - Monday, 21 October 2019 $ 632.15 $ - Tuesday, 25 February 2020 $ 56.80 $ - 2 Electricity, Gas and water (Policy limit) $ 2,000.00 $ - Already included in our expenses reimbursements $600.00 3 Cleaning 9 Aug 19 $ 150.00 $ - Already included in our expenses reimbursements $150.00 4 Removal and Storage Costs $ 660.00 $ - Already included in our expenses reimbursements $660.00 5 Levies/contributions (policy limit $2000.00) $ 2,000.00 $ - Already included in our expenses reimbursements $180.18 Determination | Case number: 756351 Page 6 of 17 6 Removal of Mould 18 Oct 2019 $ 230.00 $ - Already included in our expenses reimbursements $230.00 7 Bathroom Marble Wall Cleaning $ 1,000.00 $ - Already included in our expenses reimbursements $1000.00 8 Skirting board allowance for works not done by [de - identified] $ 330.00 $ - Already included in our expenses reimbursements $330.00 9 Temp Wardrobe 7 Aug 19 $ 99.00 $ - No usable wardrobe due to presence of sewage. Clearance was given by [business] copy of Clearance Certificate attached 10 Extension Power 9 Aug 19 $ 11.99 $ 8.00 No usable power point from 2nd Aug to 10 Sept. Owner Insured was in temporary accommodation from 24th Aug to 3rd Sept claimable amount has been adjusted accordingly. 11 Laundromat 7 to 18 Sep 19 $ 63.00 $ 42.00 No usable plumbing for washing machine 3rd Aug to 7 Sept. O wner Insured was in temporary accommodation from 24th Aug to 3rd Sept claimable amount as been adjusted accordingly 12 Building Inspector Fee (limit $30,000.00) $ 1,107.00 $ - [insurer] to confirm if report was requested. We consider the repor t to be speculative and hold no relevance to the claim. 13 New bed, mattress and bedding $ 1,000.00 $ - Contents Total sums $ 50.00 Total [insurer] Adjustment 19/01/2021 II Sewage and Building Rectification Sought $136,876.80 to reinstate the apartment to before 27 July 2019 sewage incident as suggested by Building Inspector 1 Temporary Accommodation for one bedroom apartment $19,485.60 $ 1,400.00 Allow 1 week accommodation for restoration to attend site to complete full clean of built in robe. JLG allowing to have ozone machine within the proper ty for maximum of 2 days 2 Removal and Storage costs (Limit $2,500.00) $ 1,562.00 $ - JLG scope of works does not require removal and storage of items 3 Sewage Rectification for half the apartment after removal of affected building Materials $ 5,876.00 $ - [Business] cleara nce certificate attached. J LG amended scope of works includes allowance for restoration to bathroom, Determination | Case number: 756351 Page 7 of 17 dedroom, laundry and entry 4 Hygienist to attend $ 3,850.00 $ 1,320.00 Provisional sum for further clearance certificate to be provided at completion of JLG scope of works 5 Allowance for cleaning floor after removing gyprock $ 3,300.00 $ 660.00 Standard cleaning allowance for completion of works 6 Remove laminated flooring, clean and put back again $ 5,875.10 $ - Not required for the repair of resultant damaged works Entry Way (from here on, please look at J7 Revised Builder Quote for Amount) 7 Main entrance fire door to be sanded repaired and painted $ 695.75 $ - Included in JLG scope of works 8 Remove and replace gyprock wall lining and metal stud wall (approx 6.5m2) $ 885.50 Not required for the repair of resultant damaged works Laundry 9 Laundry Area Plasterboard $ 885.50 Not required for the repair of resultant damaged works 10 Bi - fold door to be replaced $ 1,518.00 Included in JLG scope of works 11 Laundry Cabinet door to be r eplaced $ 759.00 Not required for the repair of resultant damaged works 12 Waterproof the laundry sink $ 1,265.00 Not required for the repair of resultant damaged works 13 Drain grate to be replaced $ 316.25 Included in JLG scope of works 14 Remove wall in laundry, clean and put back new floor and wall tiles $ 18,975.00 Not required for the repair of resultant damaged works The only bathroom in the one bedroom apartment 15 Replace Bathroom hinged door $ 885.50 Included in JLG scope of works 16 Replace shower Screen $ 2,277.00 Included in JLG scope of works 17 2 x drain grate to be r eplaced $ 759.00 Included in JLG scope of works 18 Door Stopper $ 94.88 Not required for the repair of resultant damaged works 19 Bathroom Ceiling to be replaced and painted $ 8,855.00 JLG Scope of works includes to complete minor scraping and repair to ceiling set sand and paint. Replacement of ceiling not required for the repair of resultant damage works 20 Remove entire bathroom reuse if possible vanity shower rail towel rail and accessories $ 31,625.00 Not required for the repair of resultant damaged works The only bedroom n the one bedroom apartment 21 Plasterboard to be sanded, touched up and painted $ 4,427.50 Included in JLG scope of works Determination | Case number: 756351 Page 8 of 17 22 The cavity slider sliding door to be replaced which involved removing $ 12,650.00 JLG Scope of works includes for restoration to attend site to complete full clean of built in robe due to smell. Removal and replacement not required for the repair of resultant damage works 23 Plasterboard in the bedroom cabinet $ 1,897.50 Not required for the repair of resultant damaged works 24 Reinstate wardrobe $ 6,325.00 Not required for the repair of resultant damaged works Lounge Area 25 The cavity sliders sliding door (of at least 2.6 m tall x 1.5 m wide) to be replaced which involved removing plasterboard $ 8,855.00 Included in JLG scope of works $ 3,380.00 Total [insurer] Adjustment 19/01/2021 III Non Financial Compensation sought $24,900 for 26 claims for AFCA consideration 1 FF actions caused personal stress, harm and inconvenience by not providing TA and advising it was safe to stay in unit 22 so [complainant] to stay in sewage infested apartment, before cleaning began. In contract, it approved TA for both Unit 23. Both apartments are one bedroom units $ 100.00 $ - Our policy does not include an additional or spe cial benefit which responds to the items claimed. The insured was reimbursed for accommodation incurred and we followed the advice of the appointed specialists concerning the cleaning and habitability. 2 Major Issue 1: FF actions caused personal stress, harm and delayed the claim when it falsely claimed, for a year, only one 'organic' cleaning product was used. The actions contravened FF's good faith policy and provided a false basis to reject [complainant’s] medical claims $ 5,000.00 $ - 3 FF actions in not completing the works caused personal stress, great harm and significant inconvenience with an unusable bedroom in a one bedroom unit because [complainant] had to stay in a sewage infested apartment since 27 July 19. FF admitted this ( [insurer] Para 39) and it's supported by BI's report $ 5,000.00 $ - 4 Major Issue 2: FF's actions in not advising lethality of cleaning chemicals caused personal stress and inconvenience to [complainant] because she had pack, unpack and travel between Unit 22 and TA over 3 individual days from 2 to 5 Aug 2009, because the sy mptoms wer e so strong each time she returned to Unit 22 $ 300.00 $ - 5 major Issue 3: FF actions caused delay in proceedings when it continually refused to offer TA for futur e rectification works in 1 bedroom unit 22 in its settlement offers. The policy provides TA will be provided when works covered by a claim make a home uninhabitable $ 500.00 $ - Determination | Case number: 756351 Page 9 of 17 6 Major Issue 4: FF's actions caused delay of more than a year and great inconvenie nce and stress to [complainant] when it did not provide ED's complete scope of work, nor a complete scope of scope of works from any contractor and refused all scopes of work provided by [complainant] . Hence [complainant] was unable too close the insurance matter by settling with a cash claim, as per FF's policy, which mean she had to endure FF's ongoing inability to get the works done and spend nearly 18 months repeating the same information over and over again, only to be rejected - Th is being far beyond what's reasonably expected of a claimant $ 5,000.00 $ - 7 FF actions caused personal stress to [complainant] when it refused to reimburse 2019 cleaning expense of $150 that prevented injuries caused by FF's cleaning works. The FF r efused to do cleaning works and [complainant] had to mitigate their refusal. Only now it agrees to repay the fees but still has not d one so. $ 100.00 $ - 8 FF actions caused great stress and harm to [complainant] when its contractor failed to clean the drainage pipes as detailed in job scope on 31 Jul 19. [Complainant] had to live with the raw sewage and it's smell from unclean piping for a week after FF stopped TA. $ 700.00 $ - 9 FF's actions delayed the claim and caused great stress to [complainant] when it agreed to r eplace Bi - fold door on 10 Sept 19, then refused to do so multiple times and then agreed again on 27 Aug 20. [complainant] suffered trauma from having to repeat the same facts over and over again in different ways for almost a year and g etting rejected each time. $ 2,000.00 $ - 10 Major Issue 5: FF's actions in caused [complainant] great harm when it failed to manage its contractors and provide timely reimbursement for agreed expenses. [Complainant] had to monitor them and report issues and FF's contractors verbally abused her and treated her disrespectfully to the extent that [complainant] had to warn them to stop bullying her at the 10 Sept 19 site inspection. $ 1,000.00 $ - 11 FF's action caused injury when it failed to order [business] c to return and wipe down surface for [complainant] despite the fact that FF got [business] to do so for Unit 23. [Complainant] burnt her palm once again $ 100.00 $ - 12 FF actions caused inconvenience for [complainant] to move back by not allowing for TA even though the building rectification works were incomplete. Ther e were no tap and no silicon seal to laundry area, a relatively simple matter than could have been resolved with simple project planning $ 100.0 0 $ - 13 FF's action caused delay and stress to [complainant] when it repeatedly refused to provide details for a plumber that caused significant damage to the laundry nor pay for the damages. [Complainant] faced rejection and evasion each time she attempted to get FF to redress the matter or provide information so she could take action $ 1,000.00 $ - Determination | Case number: 756351 Page 10 of 17 14 FF actions caused delay when it agreed to replace the damaged bi - fold door on 10 Sep 19, then spent 11 months denying it's own agreement and [complainant ' s ] evidence based requests until it finally agreed to replace it on 20 Aug 20. In the process FF made fraudulent claim, contravened FF's good faith policy and failed to be diligent by not checking the facts $ 3,000.00 $ - 15 FF actions caused delay of more than a year when it agreed to replace sewage infused bathroom hing ed door since 20 Aug 29 and refused to do so on 1 Nov 19. FF has intentionally made fraudulent claim, contravened FF's good faith policy and failed to be diligent by not checking the facts $ 1,000.00 $ - 16 FF actions caused delay when it contravened it's own response poli cy 4 times by not telling advise [complainant ] it's contractors would not return $ 2,000.00 $ - 17 FF's actions caused delay, enlarge necessary scope of rectification works and caused [complainant] great harm. FF agreed to get [business] to clean the mould when it was only on the shower screen but did nothing for 6 weeks, despite reminders from [complai nant] . FF compounded the issue by not advising [complainant] that [business] wasn't going to clean up. Once [complainant] found out she engaged a mould cleaning specialist, but they then, it was to late. The mould had spread to the ceiling specialists, bu t by then, it was to late. The mould had spread to the ceiling and all over the bathroom. It infected her eyes and ears, disabled her vision and hearing and she had to seek urgent medial treatment with a medial specialist in Singapore. $ 5,000.00 $ - 18 FF's actions caused a delay for more than 9 months from 10 Sep 19 because it did not get ED to return to work. FF stated on 10 Jul 20 that it can issue directive for EB to return to works $ 1,000.00 $ - 19 FF actions caused delay and stress for [complainant] when it did not reply to [complainant’s] request to get a different builder willing to do works when she rejected FF's first lowball cash settlement offer. Another builder could have finished the works and settled the claim, quickly. Instead FF reiterated the same offer of $4078.00 blatantly dis regarding what was agreed upon 10 Sep 19. FF's action caused delay $ 100.00 $ - 20 FF actions caused delay when it did not respond to [complainant’s] email reminders for status update s and progress within 15 business days as per FF's own policy. This began on 7 Jan 20 happened monthly till 9 Sept 20 $ 400.00 $ - 21 FF actions caused delay when it failed to escalate the claim as required by its own policy. FF simply made another offer which had no regards for the rectification works agreed upon on 10 Sept 19, which bogged the claim down as [complainant] had to prove a ll over again what had been agreed upon $ 700.00 $ - Determination | Case number: 756351 Page 11 of 17 Complainants say insurer should increase its settlement offer The complainants say a cash settlement of the claim is essential for timely and sound completion of works. The complainants say if the insurer was to complete a partial or full restoration, they (the policy holder) have little power to influence outcomes. The complainants say this is important because the insurer has consistently demonstrated ineptitude in completing the required works. The complainants say the insurer has a level of accountability, responsibility and control over the builders and works, but it has continually failed to do so over the last year and a half. 22 FF actions caused delay and stress to [complainant] when it continually made low cash settlement offers that ignored the facts and relied on fraudulent information which contravened its good faith policy. It persistently ignored its 10 Sep 19 agreement about the items that needed to be replaced. [Complaina nt] was very stressed by FF's apparent intransigence which look like it would set her back at least 50K (This was before FF admitted to withholding critical information that ballooned rectification costs) $ 300.00 $ - 23 Major Issue 6: FF's actions in caused long delays and enormous stress to [complainant] when it blatantly disregarded of General Insurance Code of Practice by operating in bad faith and engaging in bullying tactics to try force and [complainant] to accep t the low full cash settlement which threatened financial loss of more than $100,000.00 or force her to fear for her safely when it told her on 21 July 20 that ED was the only company it would engage to do the works $ 5,000.00 $ - 24 FF actions in failing to provide timely response on building rectification work scope from 29 July 20 to now delayed the whole claim process $ 400.00 $ - 25 FF's action caused delay of more than a year and caused st ress when it failed to provide [business] 31 July final report for more than a year after [complainant] requested a copy via SMS on 31 July 19 (she was given the ' [business] ' hygienist report instead so she was not aware of the withheld report) I t took FF 12 months to come clean which contravenes its good faith and high standard of service policy. It failed to identify the egr egious errors in the report for the entire year and when [complainant] finally pointed them out shortly after getting the r eport, the FF finally accepted many aspects of [complainant’s] claims. [Complainant’s] stress over a year came about because it was not possible to fathom why FF failed to accept her evidence and proof. $ 5,000.00 $ - 26 FF's actions caused delay when it did not provide a timely response of 15 business days not meet the 28 Aug 20 deadline sent by Head of Claims after escalating the issue on 21 July 20 $ 100.00 $ - $ - Total [insurer] Adjustment 19/01/2021 Determination | Case number: 756351 Page 12 of 17 The complainants submit the insu rer’s SOW has not included all damage requiring rectification. Accordingly, the complainants have raised concerns regarding:  reimbursement of incurred expenses  the SOW and cost of repairs  temporary accommodation  compensation for non-financial loss Accordingly, the complainants are seeking compensation as outlined below: Reimbursement of incurred expenses Having considered all the available information, the Panel is not satisfied the complainants have provided sufficient evidence to confirm how they have suffered losses directly as a result of the claim or their entitlement for further compensation. On this basis the Panel believes the insurer’s offer of $3,150.18 is fair under the circumstances. However, further consideration for non-financial loss has been given as outlined in the latter section of the determination. Accordingly, this part of the determination is in favour of the insurer, and it is not required to make any further payments or take any further action. Scope of works and cost of repairs The insurer has offered to pay the complainants $14,020.08 for the cost of the remaining repairs, while the complainants are seeking an additional $ 115,469.20. The Panel accepts the complainants remain dissatisfied with the insurer’s offer and are seeking compensation as per RC’s quote. The Panel also accepts the insurer is not willing to provide any further increase based on the recommendations from it repairer. A SOW provides a general overview of the required works based on the available information. However, the scope is subject to variations based on additional damages and costs that may be incurred while repairs are undertaken. The complainants’ property suffered damage due to an insured event and the insurer agreed to cover the claim accordingly. The insurer proceeded with appointing various experts to attend the property to assess and address the damage. Having considered all the exchanged material, the Panel is satisfied the i nsurer’s proposed SOW is adequate to address the claim related damages and required rectification work. Determination | Case number: 756351 Page 13 of 17 For this reason, the Panel does not consider it fair to u se RC’s quote and SOW as a basis for settlement, because the Panel is not satisfied all the noted items relate to the claimed event. However, the Panel does believe the insurer is required to increase its settlement offer to allow for contingencies. The policy says in the instances where the insurer chooses to cash settle a claim, it will only pay the policy holder what it would cost the insurer to undertake the repairs. However, when a claim is cash settled all the associated risk is transferred onto the policy holder. On this basis, the Panel considers it appropriate under the circumstances that the insurer increases its offer to allow for contingencies by 20%, due to the transfer of risk which is in line with AFCA’s approach to these types of matters. Therefore, the insurer is to pay the complainants $14,020.08 plus $2.804.02, for contingencies, a total of $16,824.82. Accordingly, this part of the determination is in favour of the complainants. Temporary accommodation The complainants are seeking $19,485.60 for the cost of temporary accommodation, for a period of three months. The insurer has allowed for one week of temporary accommodation at a cost of $1,400.00. It says this period will allow for restoration experts to attend the site, remove air pollutants and to complete a full clean of the built-in robe. Further, the insurer says it is unable to confirm why the complainants would need to vacate their apartment again for the duration of these repairs as the repairs would not deem their unit unfit for its intended purpose. Having considered all the available information, the Panel is not satisfied the complainants have provided sufficient evidence for the requirement or entitlement to further compensation for the cost of temporary accommodation beyond the insurer’s offer. On this basis the Panel believes the insurer’s offer of $1,400.00 (for seven days) is fair under the circumstances. Accordingly, the insurer is to pay $1,400.00 for temporary accommodation. Compensation for non-financial loss AFCAS takes a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience expected during an insurance claim. Under the AFCA Rules, AFCA will award non-financial loss (up to a maximum of $5,000 per claim) where there has been an unusual amount of:  Physical inconvenience  Time taken to resolve a situation  Interference with the complainant’s expectations of enjoyment or peace of mind In assessing to award compensation AFCA expects complainants:  Be moderately robust  Bare the normal degree of inconvenience experience when a problem occurs, and Determination | Case number: 756351 Page 14 of 17  Take reasonable steps to minimise inconvenience suffered. The insurer acknowledges that there have been disagreements in relation to the appropriate SOW. It accepts that a significant amount of time has elapsed since the event and it has previously provided its apologies to the complainants for the issues experienced under the claim to date. In recognition of the above, the insurer offered an amount of $2,000 for non-financial loss compensation to the complainants. Based on the available information the insurer’s handling of the claim caused the complainants a degree of stress and inconvenience. Given this the Panel believes it is fair for the insurer ’s original settlement offer to be increased. Accordingly, this part of the determination is in favour of the complainants, and the insurer is to pay the complainants $3,000 compensation for non-financial loss. The insurer is required to increase its settlement offer The complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions where applicable. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered. Based on the available information, it is evident that there has been a break down in the relationship between the insurer and the complainants. Accordingly, as the two parties have not been able to come to a resolution, the Panel is satisfied a cash settlement of the claim is appropriate in this instance. Based on its review, the Panel believes the insurer is required to increase its settlement offer for the cost of repairs and compensation for non-financial loss. However, the insurer is not required to make any additional payments to compensate the complainants for their expenses or towards temporary accommodation. The Panel outlines its reasoning and recommendations for each item in the determination below. The i nsurer’s offer totalling $20,600.26 – based on available information nothing has been paid to date. Insurer’s offer for reimbursement for expenses should be $3,200.18 as per the table below The Panel accepts that a cash settlement is the most appropriate in the circumstances. The insurer to increase settlement for cost of repairs by 20% ($2,804.02) to cover contingencies and loss of guarantee. - Insurer has already allowed $14,020.08 for repairs - By adding an additional $2,804.02 this brings the total for cost of repairs to $16,824.10 The Panel considers the offer for temp accommodation of $1,400 is fair under the circumstances Determination | Case number: 756351 Page 15 of 17 The insurer is also to pay $3,430.00 [insurer] adjustments(above) which includes $1,400 allowed for temporary accommodation. The insurer is to pay $3,000 compensation for non-financial loss (increase of $1,000 from insurer’s offer) Insurer to increase its original offer by an additional 3,804.02 (increase in cost of repairs and non-financial loss) Total settlement to the complainant should be: - $14,020.08 for repairs - $2,804.02 uplift - $3,150.18 reimbursement for expenses - $3,430.00 [insurer] adjustments(above) - $3,000.00 non-financial loss $26,404.28 Total The insurer is also to pay interest under section 57 of the Act, on the $3,150.18 reimbursement of expenses. 2.2 Why is the outcome fair? This outcome is fair because both parties have had the opportunity to provide information to support their position. Accordingly, all the available material has been considered and the outcome is in line with AFCA’s approach to these types of matters and what is fair under the circumstances to both parties. Determination | Case number: 756351 Page 16 of 17 3 Supporting information 3.1 The AFCA process AFCA’s approach is bas ed on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. A Panel determined this matter Due to the nature of this complaint, we referred it to a Panel for determination. 3.2 Relevant policy sections Section Claims - how We will settle Your claim Replacement If Your Insured Property is Damaged, We may choose to either rebuild, replace, repair or pay the amount it would cost to rebuild, replace or repair. 3.3 Supporting information Document Key points Insurer’s building consultant (JL) scope of works 22 - 08 - 2020  Scope of works outlined  Cost of repairs $10,512.11 Complainants’ b uilding consultant (RC ) quote 9 - 12 - 2020  Quote total $ 115,469.20 Determination | Case number: 756351 Page 17 of 17 Document Key points Complainants’ email 11 - 12 - 2020  Complainants’ counter offer to the insurer, seeking compensation of $ 170,653. 74 Complainants’ email 11 - 12 - 2020  Complainants’ list of 26 claims for non - financial loss , totalling $24,900 Complainants’ email 11 - 12 - 2020  Complainant s ’ submissio n and supporting doc uments (various attachments) Complainants’ email 06 - 01 - 2021  C omplainants stating mould causing medical issues  Medical certificates attached for reference Insurer ’ s email 20 - 01 - 2021  Insurer’s response to the complainant’s submissions and amended offer(s )  Insurer’s builder’s comments and adjustments

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.