Text of the determination
Determination
Case number 756212
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 756212 Page 1 of 13
Case number: 756212 17 September 2021
1 Determination overview
1.1 Complaint
The male complainant held a landlord insurance policy with the financial firm (insurer). On 16
December 2019, a claim was made for damage to the property due to water taps left running
when the tenants vacated.
The insurer accepted the claim. However, a dispute has arisen regarding the settlement for
the repair works already completed (restoration) and the outstanding repairs. The
complainants also seek non-financial loss compensation for poor claims handling experience.
1.2 Issues and key findings
Is the insu rer’s settlement offer adequate ?
Substantially yes. Based on the available information the insurer ‘ s settlement offer is
adequate as:
> $66,448.90 is higher than the amounts quoted by its own repairers, who were willing to do
the job
> in the face of the exper t opinion of the insurer‘s engineer, the complainants have not
established the claimed costs are reasonable and claims related.
> the insurer is not required to pay anything further for asbestos removal and loss of rent.
The insurer must increase its offer by 20% ($2,681.78) to account for any variations to its
scope of works, which might have been required had it been responsible for the restoration
works.
Are the complainants entitled to compensation?
The complainants are entitled to $1,500 non-financial loss compensation. While the insurer‘s
actions were largely appropriate, there were elements the insurer could have handled better
which resulted in avoidable inconvenience and stress.
Why is the outcome fair?
The outcome is fair because the insurer‘s sett lement offer is supported by expert opinion and
the insurer‘s builders were willing to carry out the work. Compensation is fair due to the
complainant‘s claim experience.
1.3 Determination
This determination is partly in favour of the complainants. Should the complainants accept
this determination then within seven days of notification of acceptance the insurer is to:
pay the complainants for restoration works a total of $16,090.68 and
pay $1,500 as compensation for non-financial loss.
The insurer is not otherwise required to increase its settlement offer and is not required to
take any further action in relation to the claim or the complaint.
Determination | Case number: 756212 Page 2 of 13
2 Reasons for determination
2.1 Is the insurer’s settlement offer adequate ?
Policy allows the insurer to cash settle its liability
The policy says the insurer will pay the reasonable cost of repairing or rebuilding any
damaged part of the building to the same condition as when it was new.
The policy also says the reasonable cost of repairing or rebuilding means:
‗ the cost of repairing or rebuilding less any discounts available to [the insurer] were [the
insurer] to repair or rebuild.‘
The policy allows the insurer to pay the reasonable costs of repair, using original materials,
and where this is not possible, the nearest available equivalent to the original.
Extracts from the policy terms are set out in supporting section 3.2 of this determination.
The complainants requested a cash settlement because they have concerns about the
insurer‘s timeliness and the ability of insurer‘s repairers to complete the work.
Having reviewed the extensive correspondence between the parties, I am satisfied a cash
settlement is fair in circumstances where it appears the relationship between the parties has
broken down.
The material shows extensive correspondence in relation to offers and counter offers to settle
the matters in dispute.
In its notice of response 29 January 2021, the insurer says the complainant has been cash
settled as follows:
> removal of asbestos $19,800 (inc GST)
> building repairs $66,448.90 (inc GST)
> loss of rent $23,723.95 (52 weeks at $456.23 per week)
> less excess $800
> total $109,172.85
In correspondence with AFCA the complainants say they do not accept this offer or $1,000
offered for compensation.
The complainants seek $182,297.56 and frame their position as follows:
> Restoration Works $42,840.60 (incl GST)
> Asbestos Removal $19,800 (incl GST)
> Building Damages $90,933 (incl GST)
> Loss of Rent $456.23 per week x 52 Weeks= $23,723.96
> Compensation $5,000 (incl GST)
Material relied on by the parties is set out in supporting section 3.3 and 3.4 of this
determination.
Asbestos claim is settled
The issue of asbestos removal is settled and will not be discussed further in this
determination.
Determination | Case number: 756212 Page 3 of 13
Loss of rent resolved save for compensation for delays
The complainants say loss of rent is resolved and paid according to the policy terms but also
say this issue c ould be reviewed because of the insurer‘s delays.
This issue will be addressed later in the determination in the section dealing with
compensation.
Restoration works: insurer to increase offer by 20% for possible variations
The insurer relies on a restoration quote from O in the amount of $13,408.90. The insurer
says O was refused access to the insured property to complete the work.
Additionally, the insurer says as the complainants say they undertook the restoration works
then it will pay any reasonable costs the complainants incurred providing the complainants
substantiate these costs. The insurer said the complainants had not provided documentation
in support of this aspect of the claim.
The complainants referred to a restorer (DG) who they say quoted the restoration works for
the insurer in the amount claimed.
In due course the complainants provided material from AF in the amount of $42,840.60.
The insurer required the claimed costs to be itemised. For reasons stated in correspondence
the insurer said the breakdown provided was inadequate.
The complainants provided what they described as the restorer‘ s further breakdown and
highlighted items which they say were not included in O‘s quote.
In response the insurer arranges for its restoration expert to respond. An extract from the
insurer‘s letter is set out in supporting section 3.5 of this determinatio n.
The insurer‘s expert said the amount claimed it was not justified.
The complainants say as they have outlaid these costs they should be entitled to these costs.
The complainants also say the insurer has not considered the variations which were required
to complete job.
The complainants highlighted additional works AF carried out. Some highlighted matters
appear to have been included in O‘s quote. No persuasive evidence has been provided to
show how these claimed variations are reasonable or claim related. This raises concerns as
to the accuracy of AF‘s costs for claimed related repairs.
Based on the available material I am not satisfied the complainants have substantiated the
costs claimed. Accordingly, I accept any additional cost over and above O‘s quote should be
at the complainants ‘ expense for this reason and because the insurer was willing to undertake
the work. Based on the policy terms, if the insurer was prepared to repair, it is entitled to pay
the reasonable cost of repairing less any discounts available.
Having considered both parties‘ quotes and the material provided, I find O‘s quote more
persuasive because on the available material it more closely reflects the claim related
completed works.
Had O undertaken the work, I note O‘s quote was subject to change as its unclear if the wall
linings would be salvageable or require removal and replacement post drying. Therefore, its
quote may not be reflective of the actual costs for restoration had O done the work.
Determination | Case number: 756212 Page 4 of 13
In these circumstances, I am satisfied it is fair O‘s quote should be increased by 20%
($2,681.78) to account for any variations to the scope of works which might have been
required, had the insurer been responsible for these works.
Insurer’s settlement offer for building repairs is reasonable
The complainants are dissatisfied with the insurer‘s settlement for building repairs.
Both parties have provided quotes from their respective repairers:
Insurer: Complainants:
‗LB‘ – $48,073.03
‗ AR‘ – $58,036.37
‗ VC ‘ – $126,276
‗D‘ – $115,115
The complainants requested a settlement of $90,933, this being the average of the quotes
(adjusted and harmonised to match the scope of works).
The insurer says it is not obliged to pay anything further as it has paid the complainants the
cost to repair the building were it to undertake the repair. The insurer argues given it was
ready and able to complete the repairs, but the complainants requested and accepted a cash
settlement, any repair costs over and above the settlement because of the complainants‘
choice to engage an alternative builder are at the complainants‘ expense.
Prior to arriving at the sum $66,448.90 the insurer points out it arranged two repair quotes
from builders who confirmed they were willing and able to complete the works required. The
quotes relied on by the insurer are for $48,073.03 (LB) and $58,036.37 (AR).
Additionally, the insurer referred the comp lainants‘ project estimate from VE in the sum of
$126,276 to an engineer (AA) for analysis.
AA inspected the premises with the male complainant, reviewed and analysed the quotations
and recommended a fair cost to reinstate the subject dwelling was $66,448.90 including GST.
The figure did not include the cost to remove and dispose of asbestos. As set out above the
insurer has included this cost in its offer.
The insurer submits the costs quoted by VE are consistently higher tha n its builders‘ costs
without any reasonable justification as to the discrepancy in cost. It maintains it has cash
settled the complainants the reasonable cost to repair the insured property pursuant to the
policy terms.
The insurer first sought to settle the claim based on LB‘s quote, then increased its offer to
match AR‘s quote. Both offers were rejected by the complainants as inadequate.
After the parties were unable to agree on a settlement, the insurer arranged an independent
review of the quotes by AA. D ‘s quote was excluded in this review, as D was unable to
provide a breakdown of costs.
AA noted VC‘s costs were excessive and recommended the settlement be increased to
$66,448.90 including GST. AA also found additional items within AR‘s quote which were not
included by VC or LB. An extract of AA‘s findings is set out in supporting section 3.4 of this
determination.
The insurer then offered payment based on AA‘s estimate, as it considered this satisfies its
obligations under the policy.
Determination | Case number: 756212 Page 5 of 13
I have carefully considered the material provided by the parties. I am satisfied AA has the
expertise to comment. Further, AA has inspected the premises with the male complainant,
reviewed and analysed the quotations provided and reviewed other relevant material
including photographs of the premises before the claim.
The complainants have not persuasively challenged AA‘s findings. There is no compelling
evidence to show AA‘s opinion on repair costs is unfair or unreasonable. Given this and
considering both AR and LB were willing to do the works for a lower amount, I am satisfied
AA‘s estimate represents a fair and reasonable settlement for the repairs and complies with
the insurer‘s obligations under the policy terms.
The insurer‘s cash settlement includes $66,448.90 for building repairs. In the circumstances
based on the available material and for the reasons stated, I am satisfied that the insurer is
not required to pay anything further for this item.
2.2 Are the complainants entitled to compensation?
Complainants entitled to $1,500 compensation for non-financial loss
AFCA will award compensation (capped at $5,000) if there has been an unusual degree or
extent of physical inconvenience, time taken to resolve a complaint or interference with the
complainant‘s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainant has suffered some inconvenience and anxiety. AFCA
expects complainants to be moderately robust and to bear the normal degree of
inconvenience experienced when a problem occurs and to take reasonable steps to manage
the situation.
The complainants have expressed dissatisfaction with the handling of the claim, the quality of
the service provided and the delays in finalising the claim. They say the claims handling has
put their family under immense pressure and the female complainant had to cut short
maternity leave to return to work to compensate for shortfalls.
The insurer says it has explained the reasoning behind the request for documentation and
maintains any delays in the claims process occurred because the complainants failed to
cooperate and if there were delays these were of their own making which could have been
avoided. The insurer says the complainants frustrated the claims process and failed to
provide substantiation for the costs claimed.
The complainants first came to AFCA to resolve a dispute regarding the insurer ‘ s request for
information to assess the claim. The issue was the subject of another complaint at AFCA. The
complaint was settled at conciliation. The insurer agreed to limit the amount of information
requested and the complainants agreed to provide the updated information. The terms of
agreement strictly related to the information the insurer required to assess the claim.
After lodgement of this current dispute about the quantum of the claim, the complainants
asked AFCA to review the insurer‘s actions about the handling of the entire claim. It
considered the insurer‘s actions or lack thereof, delayed the claim.
The insurer considers there was no unnecessary delay during claims handling. The insurer
offered to pay the complainants $1,000 compensation for any perceived delays. This was
rejected by the complainants.
Determination | Case number: 756212 Page 6 of 13
The claim was made on 16 December 2019. After the parties reached agreement about the
provision of material, the parties were unable to agree about the quantum of the claim and the
complainants came back to AFCA in September 2020.
Because of the discrepancy in the quotations for the cost of repairs, to formulate its final
position, the insurer arranged for AA to inspect the property and provide a report.
Subsequently the cash settlement ($109,172.75) was made, and paid on 23 November 2020.
As set out earlier in this determination I accept the offer made was appropriate for most of the
items the subject of that offer. I consider it is fair that a further amount ($2,681.78) is paid to
account for any variations to the scope of works which might have been required, had the
insurer undertaken the restoration repairs.
I accept it has taken an unusual amount of time to bring the claim to finality. While I accept
delays were caused by the failure to provide certain information, I also accept had the insurer
clearly discussed the policy and the processes and the reasons for the information, some
delays could have been avoided.
The parties‘ material shows the complainants asked the insurer for updates and on some
occasions, the insurer did not meet its own timeframes for responses.
I consider the insurer‘s handling of this claim and sometimes inadequate communication
would have interfered with the complainants‘ expectation of enjoyment and peace of mind.
Considering all available information, I am satisfied it is fair the insurer pays $1,500 to the
complainants as compensation for non-financial loss.
Further compensation for loss of rent is not warranted
The complainants say loss of rent is resolved and paid according to the policy terms but also
say this issue c ould be reviewed because of the insurer‘s delays.
AFCA will award compensation (capped at $5,000) for direct financial loss if the insurer‘s
unreasonable delay in responding to a claim causes the complainant to suffer a specific lost
that it can substantiate. In these circumstances AFCA may consider compensation more than
the terms of the policy.
The policy provides for loss of rent up to a maximum period of 12 months. It is not in dispute
this maximum payment has been made and was included in the cash settlement paid on 23
November 2020.
There has been an unusual amount of time to bring the claim to finality but as set out above I
consider the time taken was caused by both parties. Further, in circumstances where the
maximum amount under the policy has been paid and the complainants have not
substantiated a specific loss of rent over and above the maximum amount paid pursuant to
the policy terms, I do not accept an award of compensation for direct loss is warranted.
2.3 Why is the outcome fair?
The outcome is fair because the policy allows for the insurer to pay the reasonable costs of
repairing the damaged parts of the home, less any discounts available to it to repair the
home. T he complainants‘ repair quotes and invoice were excessive and/or unjustified and on
balance are not the reasonable costs to reinstate the home in the face of all the available
information and the unchallenged expert opinion of the insurer‘s engineer.
Determination | Case number: 756212 Page 7 of 13
Based on the available material I do not consider it is fair the insurer pays more than its
liability save the insurer is to increase its settlement for the works already completed by the
complainants by 20% in the sum of $2,681.78. This is to cover any variations that could have
presented had the insurer completed the works.
It is also fair the insurer pays $1,500 in non-financial compensation to cover the avoidable
stress caused the complainant s by the insurer‘s claims handling as it is reasonable for the
complainants to expect regular updates and have had the processes fully explained to them.
Determination | Case number: 756212 Page 8 of 13
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
This complaint has been determined based on what is fair in all the circumstances, having
regard to the legal principles, applicable industry codes or guidance, good industry practice
and previous decisions of AFCA or its predecessor schemes (which are not binding).
A full exchange of the relevant information has taken place between the respective parties.
Each party has had the opportunity of addressing any issues raised. All the provided
information has been reviewed and considered.
The parties have raised numerous issues in their submissions to AFCA. However,
commentary in this determination is restricted to those issues considered relevant to the
outcome.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an event to
which the policy responds. This is known as a prima facie or valid claim. Once so established,
the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies
if it seeks to deny or limit its liability for the loss.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence. When we assess complaints, we consider available
documents, the recollections of the parties, and all relevant circumstances. We give more
weight to documents created at the time the events occurred. If there is no relevant
documentation, we will decide what is most likely to have occurred based on the information
provided to us. If there are conflicting recollections and these are evenly weighted, we may
find that a claim cannot be established.
3.2 Relevant policy provisions
The relevant policy extracts are referred to in the correspondence between the parties and in
the insurer‘s Notice of Response. Both the policy document and the Notice have been
exchanged with the complainant.
How we will settle your building claim
1. At our option, we will:
a. repair or rebuild the damaged part of your building to the same condition as
when it was new; or
b. pay you the reasonable cost of repairing or rebuilding any damaged part of
your building to the same condition as when it was new
Determination | Case number: 756212 Page 9 of 13
…..
If we pay you the reasonable cost of repairing or rebuilding, this means the cost of
repairing or rebuilding less any discounts available to us were we to repair or
rebuild.
2. When it is not possible to use original materials during the repair or rebuilding
process, the nearest available equivalent to the original materials will be used. We
will not pay to repair or rebuild property which has not been physically damaged
4. If we have chosen to repair or rebuild your damaged building and you do not
wish to repair or rebuild then, we will at our option:
a. pay you the reasonable cost to repair or rebuild your damaged buildings less
an amount for depreciation based on the age and condition of the buildings; or
b. pay you the value of the land and buildings at the risk address immediately
prior to the occurrence of the loss or damage less the value of the land and
buildings immediately after the loss or damage occurred.
3.3 Parties’ quotations and estimates
Repairer Comments
Insurer’s
repair
quotation
(AR)
17 July 2020
Quotation and trade breakdown which stipulates allowances, assumptions and
exclusions that form the basis of this submission.
Tender amount is $58,036.37 inc. gst.
Estimate a starting date of 10 days from signing of contract and a completion
date of approx imately 40 days from project commencement.
Insurer’s
repair
quotation (LB)
24 July 2020
Met insured on site and provided a quote which included 19% builders margin
$48,073.03.
Insured says in January, water ent ered into the kitchen area causing the
ceiling to collapse. He also stated that unk nown intruders had entered the site
on numerous occasions since the December storms.
Insured also stated that he had started to carry out repairs to the above
dwelling. Extremely difficult to ascertain what is water damage, malicious
damage and repairs that the insured has started.
Insured stated he removed all the floating floors in the whole area which is the
living room/ entry/ hallway/be droom 1,2 & 3.
Also stated there had been some malicious damage to the cupboards and
they had deteriorated beyond repair.
Also stated he removed all the skirting and architraves from the areas listed
above.
In the bathroom, the ins ured stated that unkno wn intruders attended and
removed the vanity unit. The insured had partly removed the wall and floor
tiles in the bathroom and laundry. The inured has started to undertake
removing some areas at the above dwelling.
Determination | Case number: 756212 Page 10 of 13
Enclosed is a scope of works that we fee l would be adequate for the repairs to
the water damaged section and also the malicious damage.
Complainant’s
quote (D)
10 August
2020
$115, 115.
Please note our quot ation is based on pre - restoration works, the damage to
the underlying floors and walls is unknown to D.
Variations may be required depending on what is discovered upon
commencement of works.
Kitchen Appliances (oven/cooktop/rangehood/ dishwasher) have an allowance
of $3300 inc gst for the purchase of the items
Complainant’s
project
estimate (VE)
18 September
2020
Estimate $126,276 including 20% builders margin to carrying out visible
repairs to flood damaged home.
Any further damage found upon commenc ement of works will be raised in a
form of a variation.
Complainant’s
estimate (AF)
18 Sep tember
2020
Completion of restoration works as per attached scopes $42,840.60
Insurer’s
repair
quotation (0)
Undated
Proposed Scope of works in relation to kitchen, family dining room, entry,
master bedroom, bedroom 1,2, 3, laundry and toilet and hallway estimated
costs $13,408.90.
Note that our technicians are attempting to retain wall linings in the affected
areas. Con firmation on whether the linings will be salvageable or will require
removal will only be ascertained after the commencement of drying. If removal
is required, a positive variation will be submitted.
3.4 Insurer’s engineer’s (AA) comments on parties’ quotes
Repairer AA’s Comments
Insurer’s
engineer
(AA) report
12 November
2020
Forensic engineer inspected with male complainant, reviewed material provided
by S and photographed property.
Insurer engaged AA to inspect the resultant damage caused by escape of
water, review the quotations provided and provide recommendation on
reasonable building work costs.
Reviewed before photographs available on Real Estate website
I nundation throughout t he floor of the dwelling is unlikely to have affected the
shelves in the pantry or the wall mounted cabinets within the kitchen. The
inundation event should not have affected the kitchen appliances (i.e. wall
oven, rangehood, kitchen sink and cooktop), whi ch are located above floor
level.
Determination | Case number: 756212 Page 11 of 13
Reviewed quotations and noted several items that have been included in one
quotation and not others. Items such as supply of insulation batts, plaster
works, mechanical works etc
After i nspection , reference of historical photographs and review of quotations
recommend s :
i) t est the building materials in the kitchen, bathroom and laundry for trac es of
asbestos. If asbestos containing materials are confirmed, a separation
quotation should be sought to suitably remove and dis pose of the asbestos
containing material.
ii) a fair and reasonable cost to reinstate the subject dwelling would be in the
vicinity of $66,448.90 (Including GST).
A bove figure does not include the cost to remove and dispose of asbestos
containing materia ls.
AR AR including testing for asbestos $365
If asbestos containing materials are confirmed, a separation quotation for the
removal of asbestos should be provided for consideration
AR has included reinstatement works to b edroom 4 and the toilet , which are
excluded in the quotation provided by others.
R einstatement of the skirting boards to b edroom 4 will be required and should
be included in the quotations provided by LB and VC.
T oilet was not damaged and can be excluded from this quotation.
LB LB has included the replacement of the kitchen sink, tapware, wall oven and
stove. These items have been removed by the i nsured before LB attended .
These items were locat ed well above the floor level and AA queries how th ey
may have been affected by water inundation.
Inspection and testing of these items should be completed to confirm if they are
legitimately damaged by the water inundation event. Otherwis e, these items are
considered salvageable and should be removed and se t aside for reuse.
The remaining items included in LB‘s quote are considered the lowest and most
economic al when compared to the quotations provided by AR and VC.
VC VC has included asbestos removal to the k itchen ( $12,000 ) , l aundry ( $3, 000 )
and b athroom ( $3,000 ) . Given the substantial cost to remove th ese
asbestos - containing materials, it is prudent to complet e testing to confirm the
presence of asbestos prior to undertaking these works.
These costs should be excluded until asbestos containing material wi thin the
subject dwelling is confirmed .
VC has included the removal and replacement of the kitchen sink, tapware, wall
oven and stove ( $5, 000 ).
These items were locat ed well above the floor level and AA queries how this
may have been affected by the water inundation event.
Inspection and testing of these items should be completed to confirm if they are
legitimately damaged by the water inundation event. Otherwis e, these items are
considered salvageable and should be removed and set aside for reuse.
The cost to remove and replace the kitchen cabinets and benchtops to best
match existing is the highest compared to the quotations provided by LB and
AC. Based on historical photographs, the kitchen cabinet ry was previously
basic. The cost of $17,000 to remove and replace these items is unreasonable.
Determination | Case number: 756212 Page 12 of 13
VC has quoted $2,800 and $1,500 (t otal — $ 4,300) to replace the plasterboard
wall linings and compressed cement sheet flooring in the bathroom and laundry
respectively. These costs are exorbitant and unreasonable when co mpared to
the quotation provided by AR ( t otal — $754) and LB ( t otal — $1144).
VC has also included a project management fee of $7, 170. The scope of works
to reinstate the subject dwelling is relatively small. Engaging a p roject m anager
to oversee such works is excessive and the quoted fee is not reasonable.
The b uilder‘s m argin of $19,132 is significantly higher than the builder‘s margin
of AR and LB.
Overall, the costs of items included in the quotation provided by VC are
significantly higher compared to AR ‘s and LB ‘s .
3.5 Extract from insurer’s letter 29 March 2021
Please see the below comments from our restoration expert:
As discussed please find below a number of points with respect to my review
based on the information provided.
The SOW provided by the O restorer in the amount of $13,408.90 incl
GST, compared to the one provided by the other company in the amount
of $42,840.60 incl GST is virtually identical. This I will assume tells me that
at some point the second company has obtained the original O SOW.
Quote and SOW stipulates that the attending technicians will attempt to
retain the wall linings throughout the affected areas and will advise once
drying has been completed.
The second company appears to have simply taken the approach to
removal all wall linings without making an attempt to establish if they can
be restored and dried.
Charges for ―Consultation‖ in the amount of $5,315 ex GST is excessive
and there is no explanation or reasoning behind why it is required. Is this
an external company or internal staff member?
I am not sure the level of reporting and administration completed to
support the $1,200 ex GST over 2.5 days. Further explanation is required.
There is no breakdown for the equipment used or required to support the
$7,320 ex GST charged. Further breakdown is required
Bin Hire and disposal in the amount of $8,596 ex GST should be
supported with 3 rd party tax invoices for each bin and the location address
the bin was dropped off. I am unsure as to what the additional tip fees
Determination | Case number: 756212 Page 13 of 13
$2,216 ex GST charges are and also should be supported with 3 r d part tax
invoice.
Labour charged @ $80 per hour is above industry standard and it is
unknown if the attending technicians hold any form of IICRC certifications
or trade licences.
Estimated the job to take 3 x full days of labour to complete the SOW and
1 x additional day to finalise the works following the drying.
The second company has appeared to take approximately 12 days to
complete virtually the same works.
There is no supporting documentation provided by the second company of
a drying plan which includes a dry standard to support the required drying
duration and required equipment deployment.
It would appear that the second company has simply extended the
duration of the works and as a result increased the overall costs.
Without further detailed supporting documentation including but not limited
to the consultation reports/administration reports, drying charts, equipment
make and models, 3 rd party tax invoices as required. The amount listed at
$42,840.60 incl GST is not justified and in turn I would not recommend
acceptance.
3.6 Other relevant material considered and relied on
Parties‘ submissions /emails and all attachments to all submissions/emails.
Parties‘ quotations and estimates.
Photographs.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.