Home / Allianz Australia / Determination 756212

Determination 756212

Settlement of water damage building claim

FirmAllianz Australia
Decided2021-09-22
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$2,682
Non-financial loss$1,500
Amount claimed$182,298
SourceAFCA PDF

Summary

The landlord complainant disputed the insurer's cash settlement for water damage repairs and sought further building, asbestos, rent and compensation amounts. AFCA found the insurer's repair settlement adequate, ordered a 20% variation uplift and $1,500 non-financial loss compensation.

Under the policy the insurer pays the reasonable cost of repair less discounts, and the complainants did not substantiate costs above the insurer's independently assessed reasonable repair figure, though poor communication and delay warranted non-financial loss compensation.

Issues

Subjects and remedies

business interruptionhome or building damagenatural disasterpay compensationpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 756212 Financial firm Allianz Australia Insurance Limited Determination | Case number: 756212 Page 1 of 13 Case number: 756212 17 September 2021 1 Determination overview 1.1 Complaint The male complainant held a landlord insurance policy with the financial firm (insurer). On 16 December 2019, a claim was made for damage to the property due to water taps left running when the tenants vacated. The insurer accepted the claim. However, a dispute has arisen regarding the settlement for the repair works already completed (restoration) and the outstanding repairs. The complainants also seek non-financial loss compensation for poor claims handling experience. 1.2 Issues and key findings Is the insu rer’s settlement offer adequate ? Substantially yes. Based on the available information the insurer ‘ s settlement offer is adequate as: > $66,448.90 is higher than the amounts quoted by its own repairers, who were willing to do the job > in the face of the exper t opinion of the insurer‘s engineer, the complainants have not established the claimed costs are reasonable and claims related. > the insurer is not required to pay anything further for asbestos removal and loss of rent. The insurer must increase its offer by 20% ($2,681.78) to account for any variations to its scope of works, which might have been required had it been responsible for the restoration works. Are the complainants entitled to compensation? The complainants are entitled to $1,500 non-financial loss compensation. While the insurer‘s actions were largely appropriate, there were elements the insurer could have handled better which resulted in avoidable inconvenience and stress. Why is the outcome fair? The outcome is fair because the insurer‘s sett lement offer is supported by expert opinion and the insurer‘s builders were willing to carry out the work. Compensation is fair due to the complainant‘s claim experience. 1.3 Determination This determination is partly in favour of the complainants. Should the complainants accept this determination then within seven days of notification of acceptance the insurer is to:  pay the complainants for restoration works a total of $16,090.68 and  pay $1,500 as compensation for non-financial loss. The insurer is not otherwise required to increase its settlement offer and is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 756212 Page 2 of 13 2 Reasons for determination 2.1 Is the insurer’s settlement offer adequate ? Policy allows the insurer to cash settle its liability The policy says the insurer will pay the reasonable cost of repairing or rebuilding any damaged part of the building to the same condition as when it was new. The policy also says the reasonable cost of repairing or rebuilding means: ‗ the cost of repairing or rebuilding less any discounts available to [the insurer] were [the insurer] to repair or rebuild.‘ The policy allows the insurer to pay the reasonable costs of repair, using original materials, and where this is not possible, the nearest available equivalent to the original. Extracts from the policy terms are set out in supporting section 3.2 of this determination. The complainants requested a cash settlement because they have concerns about the insurer‘s timeliness and the ability of insurer‘s repairers to complete the work. Having reviewed the extensive correspondence between the parties, I am satisfied a cash settlement is fair in circumstances where it appears the relationship between the parties has broken down. The material shows extensive correspondence in relation to offers and counter offers to settle the matters in dispute. In its notice of response 29 January 2021, the insurer says the complainant has been cash settled as follows: > removal of asbestos $19,800 (inc GST) > building repairs $66,448.90 (inc GST) > loss of rent $23,723.95 (52 weeks at $456.23 per week) > less excess $800 > total $109,172.85 In correspondence with AFCA the complainants say they do not accept this offer or $1,000 offered for compensation. The complainants seek $182,297.56 and frame their position as follows: > Restoration Works $42,840.60 (incl GST) > Asbestos Removal $19,800 (incl GST) > Building Damages $90,933 (incl GST) > Loss of Rent $456.23 per week x 52 Weeks= $23,723.96 > Compensation $5,000 (incl GST) Material relied on by the parties is set out in supporting section 3.3 and 3.4 of this determination. Asbestos claim is settled The issue of asbestos removal is settled and will not be discussed further in this determination. Determination | Case number: 756212 Page 3 of 13 Loss of rent resolved save for compensation for delays The complainants say loss of rent is resolved and paid according to the policy terms but also say this issue c ould be reviewed because of the insurer‘s delays. This issue will be addressed later in the determination in the section dealing with compensation. Restoration works: insurer to increase offer by 20% for possible variations The insurer relies on a restoration quote from O in the amount of $13,408.90. The insurer says O was refused access to the insured property to complete the work. Additionally, the insurer says as the complainants say they undertook the restoration works then it will pay any reasonable costs the complainants incurred providing the complainants substantiate these costs. The insurer said the complainants had not provided documentation in support of this aspect of the claim. The complainants referred to a restorer (DG) who they say quoted the restoration works for the insurer in the amount claimed. In due course the complainants provided material from AF in the amount of $42,840.60. The insurer required the claimed costs to be itemised. For reasons stated in correspondence the insurer said the breakdown provided was inadequate. The complainants provided what they described as the restorer‘ s further breakdown and highlighted items which they say were not included in O‘s quote. In response the insurer arranges for its restoration expert to respond. An extract from the insurer‘s letter is set out in supporting section 3.5 of this determinatio n. The insurer‘s expert said the amount claimed it was not justified. The complainants say as they have outlaid these costs they should be entitled to these costs. The complainants also say the insurer has not considered the variations which were required to complete job. The complainants highlighted additional works AF carried out. Some highlighted matters appear to have been included in O‘s quote. No persuasive evidence has been provided to show how these claimed variations are reasonable or claim related. This raises concerns as to the accuracy of AF‘s costs for claimed related repairs. Based on the available material I am not satisfied the complainants have substantiated the costs claimed. Accordingly, I accept any additional cost over and above O‘s quote should be at the complainants ‘ expense for this reason and because the insurer was willing to undertake the work. Based on the policy terms, if the insurer was prepared to repair, it is entitled to pay the reasonable cost of repairing less any discounts available. Having considered both parties‘ quotes and the material provided, I find O‘s quote more persuasive because on the available material it more closely reflects the claim related completed works. Had O undertaken the work, I note O‘s quote was subject to change as its unclear if the wall linings would be salvageable or require removal and replacement post drying. Therefore, its quote may not be reflective of the actual costs for restoration had O done the work. Determination | Case number: 756212 Page 4 of 13 In these circumstances, I am satisfied it is fair O‘s quote should be increased by 20% ($2,681.78) to account for any variations to the scope of works which might have been required, had the insurer been responsible for these works. Insurer’s settlement offer for building repairs is reasonable The complainants are dissatisfied with the insurer‘s settlement for building repairs. Both parties have provided quotes from their respective repairers: Insurer: Complainants:  ‗LB‘ – $48,073.03  ‗ AR‘ – $58,036.37  ‗ VC ‘ – $126,276  ‗D‘ – $115,115 The complainants requested a settlement of $90,933, this being the average of the quotes (adjusted and harmonised to match the scope of works). The insurer says it is not obliged to pay anything further as it has paid the complainants the cost to repair the building were it to undertake the repair. The insurer argues given it was ready and able to complete the repairs, but the complainants requested and accepted a cash settlement, any repair costs over and above the settlement because of the complainants‘ choice to engage an alternative builder are at the complainants‘ expense. Prior to arriving at the sum $66,448.90 the insurer points out it arranged two repair quotes from builders who confirmed they were willing and able to complete the works required. The quotes relied on by the insurer are for $48,073.03 (LB) and $58,036.37 (AR). Additionally, the insurer referred the comp lainants‘ project estimate from VE in the sum of $126,276 to an engineer (AA) for analysis. AA inspected the premises with the male complainant, reviewed and analysed the quotations and recommended a fair cost to reinstate the subject dwelling was $66,448.90 including GST. The figure did not include the cost to remove and dispose of asbestos. As set out above the insurer has included this cost in its offer. The insurer submits the costs quoted by VE are consistently higher tha n its builders‘ costs without any reasonable justification as to the discrepancy in cost. It maintains it has cash settled the complainants the reasonable cost to repair the insured property pursuant to the policy terms. The insurer first sought to settle the claim based on LB‘s quote, then increased its offer to match AR‘s quote. Both offers were rejected by the complainants as inadequate. After the parties were unable to agree on a settlement, the insurer arranged an independent review of the quotes by AA. D ‘s quote was excluded in this review, as D was unable to provide a breakdown of costs. AA noted VC‘s costs were excessive and recommended the settlement be increased to $66,448.90 including GST. AA also found additional items within AR‘s quote which were not included by VC or LB. An extract of AA‘s findings is set out in supporting section 3.4 of this determination. The insurer then offered payment based on AA‘s estimate, as it considered this satisfies its obligations under the policy. Determination | Case number: 756212 Page 5 of 13 I have carefully considered the material provided by the parties. I am satisfied AA has the expertise to comment. Further, AA has inspected the premises with the male complainant, reviewed and analysed the quotations provided and reviewed other relevant material including photographs of the premises before the claim. The complainants have not persuasively challenged AA‘s findings. There is no compelling evidence to show AA‘s opinion on repair costs is unfair or unreasonable. Given this and considering both AR and LB were willing to do the works for a lower amount, I am satisfied AA‘s estimate represents a fair and reasonable settlement for the repairs and complies with the insurer‘s obligations under the policy terms. The insurer‘s cash settlement includes $66,448.90 for building repairs. In the circumstances based on the available material and for the reasons stated, I am satisfied that the insurer is not required to pay anything further for this item. 2.2 Are the complainants entitled to compensation? Complainants entitled to $1,500 compensation for non-financial loss AFCA will award compensation (capped at $5,000) if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant‘s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience and anxiety. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. The complainants have expressed dissatisfaction with the handling of the claim, the quality of the service provided and the delays in finalising the claim. They say the claims handling has put their family under immense pressure and the female complainant had to cut short maternity leave to return to work to compensate for shortfalls. The insurer says it has explained the reasoning behind the request for documentation and maintains any delays in the claims process occurred because the complainants failed to cooperate and if there were delays these were of their own making which could have been avoided. The insurer says the complainants frustrated the claims process and failed to provide substantiation for the costs claimed. The complainants first came to AFCA to resolve a dispute regarding the insurer ‘ s request for information to assess the claim. The issue was the subject of another complaint at AFCA. The complaint was settled at conciliation. The insurer agreed to limit the amount of information requested and the complainants agreed to provide the updated information. The terms of agreement strictly related to the information the insurer required to assess the claim. After lodgement of this current dispute about the quantum of the claim, the complainants asked AFCA to review the insurer‘s actions about the handling of the entire claim. It considered the insurer‘s actions or lack thereof, delayed the claim. The insurer considers there was no unnecessary delay during claims handling. The insurer offered to pay the complainants $1,000 compensation for any perceived delays. This was rejected by the complainants. Determination | Case number: 756212 Page 6 of 13 The claim was made on 16 December 2019. After the parties reached agreement about the provision of material, the parties were unable to agree about the quantum of the claim and the complainants came back to AFCA in September 2020. Because of the discrepancy in the quotations for the cost of repairs, to formulate its final position, the insurer arranged for AA to inspect the property and provide a report. Subsequently the cash settlement ($109,172.75) was made, and paid on 23 November 2020. As set out earlier in this determination I accept the offer made was appropriate for most of the items the subject of that offer. I consider it is fair that a further amount ($2,681.78) is paid to account for any variations to the scope of works which might have been required, had the insurer undertaken the restoration repairs. I accept it has taken an unusual amount of time to bring the claim to finality. While I accept delays were caused by the failure to provide certain information, I also accept had the insurer clearly discussed the policy and the processes and the reasons for the information, some delays could have been avoided. The parties‘ material shows the complainants asked the insurer for updates and on some occasions, the insurer did not meet its own timeframes for responses. I consider the insurer‘s handling of this claim and sometimes inadequate communication would have interfered with the complainants‘ expectation of enjoyment and peace of mind. Considering all available information, I am satisfied it is fair the insurer pays $1,500 to the complainants as compensation for non-financial loss. Further compensation for loss of rent is not warranted The complainants say loss of rent is resolved and paid according to the policy terms but also say this issue c ould be reviewed because of the insurer‘s delays. AFCA will award compensation (capped at $5,000) for direct financial loss if the insurer‘s unreasonable delay in responding to a claim causes the complainant to suffer a specific lost that it can substantiate. In these circumstances AFCA may consider compensation more than the terms of the policy. The policy provides for loss of rent up to a maximum period of 12 months. It is not in dispute this maximum payment has been made and was included in the cash settlement paid on 23 November 2020. There has been an unusual amount of time to bring the claim to finality but as set out above I consider the time taken was caused by both parties. Further, in circumstances where the maximum amount under the policy has been paid and the complainants have not substantiated a specific loss of rent over and above the maximum amount paid pursuant to the policy terms, I do not accept an award of compensation for direct loss is warranted. 2.3 Why is the outcome fair? The outcome is fair because the policy allows for the insurer to pay the reasonable costs of repairing the damaged parts of the home, less any discounts available to it to repair the home. T he complainants‘ repair quotes and invoice were excessive and/or unjustified and on balance are not the reasonable costs to reinstate the home in the face of all the available information and the unchallenged expert opinion of the insurer‘s engineer. Determination | Case number: 756212 Page 7 of 13 Based on the available material I do not consider it is fair the insurer pays more than its liability save the insurer is to increase its settlement for the works already completed by the complainants by 20% in the sum of $2,681.78. This is to cover any variations that could have presented had the insurer completed the works. It is also fair the insurer pays $1,500 in non-financial compensation to cover the avoidable stress caused the complainant s by the insurer‘s claims handling as it is reasonable for the complainants to expect regular updates and have had the processes fully explained to them. Determination | Case number: 756212 Page 8 of 13 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness This complaint has been determined based on what is fair in all the circumstances, having regard to the legal principles, applicable industry codes or guidance, good industry practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy provisions The relevant policy extracts are referred to in the correspondence between the parties and in the insurer‘s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. How we will settle your building claim 1. At our option, we will: a. repair or rebuild the damaged part of your building to the same condition as when it was new; or b. pay you the reasonable cost of repairing or rebuilding any damaged part of your building to the same condition as when it was new Determination | Case number: 756212 Page 9 of 13 ….. If we pay you the reasonable cost of repairing or rebuilding, this means the cost of repairing or rebuilding less any discounts available to us were we to repair or rebuild. 2. When it is not possible to use original materials during the repair or rebuilding process, the nearest available equivalent to the original materials will be used. We will not pay to repair or rebuild property which has not been physically damaged 4. If we have chosen to repair or rebuild your damaged building and you do not wish to repair or rebuild then, we will at our option: a. pay you the reasonable cost to repair or rebuild your damaged buildings less an amount for depreciation based on the age and condition of the buildings; or b. pay you the value of the land and buildings at the risk address immediately prior to the occurrence of the loss or damage less the value of the land and buildings immediately after the loss or damage occurred. 3.3 Parties’ quotations and estimates Repairer Comments Insurer’s repair quotation (AR) 17 July 2020  Quotation and trade breakdown which stipulates allowances, assumptions and exclusions that form the basis of this submission.  Tender amount is $58,036.37 inc. gst.  Estimate a starting date of 10 days from signing of contract and a completion date of approx imately 40 days from project commencement. Insurer’s repair quotation (LB) 24 July 2020  Met insured on site and provided a quote which included 19% builders margin $48,073.03.  Insured says in January, water ent ered into the kitchen area causing the ceiling to collapse. He also stated that unk nown intruders had entered the site on numerous occasions since the December storms.  Insured also stated that he had started to carry out repairs to the above dwelling. Extremely difficult to ascertain what is water damage, malicious damage and repairs that the insured has started.  Insured stated he removed all the floating floors in the whole area which is the living room/ entry/ hallway/be droom 1,2 & 3.  Also stated there had been some malicious damage to the cupboards and they had deteriorated beyond repair.  Also stated he removed all the skirting and architraves from the areas listed above.  In the bathroom, the ins ured stated that unkno wn intruders attended and removed the vanity unit. The insured had partly removed the wall and floor tiles in the bathroom and laundry. The inured has started to undertake removing some areas at the above dwelling. Determination | Case number: 756212 Page 10 of 13  Enclosed is a scope of works that we fee l would be adequate for the repairs to the water damaged section and also the malicious damage. Complainant’s quote (D) 10 August 2020  $115, 115.  Please note our quot ation is based on pre - restoration works, the damage to the underlying floors and walls is unknown to D.  Variations may be required depending on what is discovered upon commencement of works.  Kitchen Appliances (oven/cooktop/rangehood/ dishwasher) have an allowance of $3300 inc gst for the purchase of the items Complainant’s project estimate (VE) 18 September 2020  Estimate $126,276 including 20% builders margin to carrying out visible repairs to flood damaged home.  Any further damage found upon commenc ement of works will be raised in a form of a variation. Complainant’s estimate (AF) 18 Sep tember 2020  Completion of restoration works as per attached scopes $42,840.60 Insurer’s repair quotation (0) Undated  Proposed Scope of works in relation to kitchen, family dining room, entry, master bedroom, bedroom 1,2, 3, laundry and toilet and hallway estimated costs $13,408.90.  Note that our technicians are attempting to retain wall linings in the affected areas. Con firmation on whether the linings will be salvageable or will require removal will only be ascertained after the commencement of drying. If removal is required, a positive variation will be submitted. 3.4 Insurer’s engineer’s (AA) comments on parties’ quotes Repairer AA’s Comments Insurer’s engineer (AA) report 12 November 2020  Forensic engineer inspected with male complainant, reviewed material provided by S and photographed property.  Insurer engaged AA to inspect the resultant damage caused by escape of water, review the quotations provided and provide recommendation on reasonable building work costs.  Reviewed before photographs available on Real Estate website  I nundation throughout t he floor of the dwelling is unlikely to have affected the shelves in the pantry or the wall mounted cabinets within the kitchen. The inundation event should not have affected the kitchen appliances (i.e. wall oven, rangehood, kitchen sink and cooktop), whi ch are located above floor level. Determination | Case number: 756212 Page 11 of 13  Reviewed quotations and noted several items that have been included in one quotation and not others. Items such as supply of insulation batts, plaster works, mechanical works etc  After i nspection , reference of historical photographs and review of quotations recommend s :  i) t est the building materials in the kitchen, bathroom and laundry for trac es of asbestos. If asbestos containing materials are confirmed, a separation quotation should be sought to suitably remove and dis pose of the asbestos containing material.  ii) a fair and reasonable cost to reinstate the subject dwelling would be in the vicinity of $66,448.90 (Including GST).  A bove figure does not include the cost to remove and dispose of asbestos containing materia ls. AR  AR including testing for asbestos $365  If asbestos containing materials are confirmed, a separation quotation for the removal of asbestos should be provided for consideration  AR has included reinstatement works to b edroom 4 and the toilet , which are excluded in the quotation provided by others.  R einstatement of the skirting boards to b edroom 4 will be required and should be included in the quotations provided by LB and VC.  T oilet was not damaged and can be excluded from this quotation. LB  LB has included the replacement of the kitchen sink, tapware, wall oven and stove. These items have been removed by the i nsured before LB attended .  These items were locat ed well above the floor level and AA queries how th ey may have been affected by water inundation.  Inspection and testing of these items should be completed to confirm if they are legitimately damaged by the water inundation event. Otherwis e, these items are considered salvageable and should be removed and se t aside for reuse.  The remaining items included in LB‘s quote are considered the lowest and most economic al when compared to the quotations provided by AR and VC. VC  VC has included asbestos removal to the k itchen ( $12,000 ) , l aundry ( $3, 000 ) and b athroom ( $3,000 ) . Given the substantial cost to remove th ese asbestos - containing materials, it is prudent to complet e testing to confirm the presence of asbestos prior to undertaking these works.  These costs should be excluded until asbestos containing material wi thin the subject dwelling is confirmed .  VC has included the removal and replacement of the kitchen sink, tapware, wall oven and stove ( $5, 000 ).  These items were locat ed well above the floor level and AA queries how this may have been affected by the water inundation event.  Inspection and testing of these items should be completed to confirm if they are legitimately damaged by the water inundation event. Otherwis e, these items are considered salvageable and should be removed and set aside for reuse.  The cost to remove and replace the kitchen cabinets and benchtops to best match existing is the highest compared to the quotations provided by LB and AC. Based on historical photographs, the kitchen cabinet ry was previously basic. The cost of $17,000 to remove and replace these items is unreasonable. Determination | Case number: 756212 Page 12 of 13  VC has quoted $2,800 and $1,500 (t otal — $ 4,300) to replace the plasterboard wall linings and compressed cement sheet flooring in the bathroom and laundry respectively. These costs are exorbitant and unreasonable when co mpared to the quotation provided by AR ( t otal — $754) and LB ( t otal — $1144).  VC has also included a project management fee of $7, 170. The scope of works to reinstate the subject dwelling is relatively small. Engaging a p roject m anager to oversee such works is excessive and the quoted fee is not reasonable.  The b uilder‘s m argin of $19,132 is significantly higher than the builder‘s margin of AR and LB.  Overall, the costs of items included in the quotation provided by VC are significantly higher compared to AR ‘s and LB ‘s . 3.5 Extract from insurer’s letter 29 March 2021 Please see the below comments from our restoration expert: As discussed please find below a number of points with respect to my review based on the information provided.  The SOW provided by the O restorer in the amount of $13,408.90 incl GST, compared to the one provided by the other company in the amount of $42,840.60 incl GST is virtually identical. This I will assume tells me that at some point the second company has obtained the original O SOW.  Quote and SOW stipulates that the attending technicians will attempt to retain the wall linings throughout the affected areas and will advise once drying has been completed.  The second company appears to have simply taken the approach to removal all wall linings without making an attempt to establish if they can be restored and dried.  Charges for ―Consultation‖ in the amount of $5,315 ex GST is excessive and there is no explanation or reasoning behind why it is required. Is this an external company or internal staff member?  I am not sure the level of reporting and administration completed to support the $1,200 ex GST over 2.5 days. Further explanation is required.  There is no breakdown for the equipment used or required to support the $7,320 ex GST charged. Further breakdown is required  Bin Hire and disposal in the amount of $8,596 ex GST should be supported with 3 rd party tax invoices for each bin and the location address the bin was dropped off. I am unsure as to what the additional tip fees Determination | Case number: 756212 Page 13 of 13 $2,216 ex GST charges are and also should be supported with 3 r d part tax invoice.  Labour charged @ $80 per hour is above industry standard and it is unknown if the attending technicians hold any form of IICRC certifications or trade licences.  Estimated the job to take 3 x full days of labour to complete the SOW and 1 x additional day to finalise the works following the drying.  The second company has appeared to take approximately 12 days to complete virtually the same works.  There is no supporting documentation provided by the second company of a drying plan which includes a dry standard to support the required drying duration and required equipment deployment.  It would appear that the second company has simply extended the duration of the works and as a result increased the overall costs.  Without further detailed supporting documentation including but not limited to the consultation reports/administration reports, drying charts, equipment make and models, 3 rd party tax invoices as required. The amount listed at $42,840.60 incl GST is not justified and in turn I would not recommend acceptance. 3.6 Other relevant material considered and relied on  Parties‘ submissions /emails and all attachments to all submissions/emails.  Parties‘ quotations and estimates.  Photographs.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.