Home / Lloyd's / Determination 754806

Determination 754806

Storm damage claim declined under earth movement exclusion

FirmLloyd's
Decided2021-06-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$58,927
SourceAFCA PDF

Summary

A bed and breakfast owner claimed storm damage to a 102-year-old building and sought 70% of a $84,181.27 quote. AFCA found the movement damage was long-term earth movement, excluded under the policy, so the insurer could decline.

The policy excludes earth movement unless damage occurs within 24 hours and directly results from storm, and the storm was not shown to be the dominant cause.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Lloyd's determinations · Find similar determinations

Text of the determination

Determination Case number 754806 Financial firm Lloyd's Australia Limited Determination | Case number: 754806 Page 2 of 9 Case number: 754806 21 June 2021 1 Determination overview 1.1 Complaint The complainant holds a bed and breakfast insurance policy (policy) with the financial firm (insurer) providing accidental damage cover for the insured property. On 5 July 2018, the complainant lodged a claim for storm damage to the insured building through her broker and representative ‘M’. The insurer has declined the claim. It says the claimed damage is not the result of a single storm event as claimed but that the damage has occurred over a long period of time and notes the building is over 100 years old. The complainant is dissatisfied with this decision. While she accepts there was some pre- existing long-term movement damage to the property, she considers a significant amount of present damage is due to the 10 May 2018 storm event. To resolve the complaint, she is seeking for the insurer to cover at least 70% of the claimed damage. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. The available evidence shows, on the balance of probabilities, that movement damage to the insured building is the result of long term ground movement because of various contributing factors including wear, tear and gradual deterioration which is excluded under the policy. Why is the outcome fair? The policy excludes cover for loss or damage caused by subsidence, heave, earth movement, landslip, landslide unless such damage occurs within 24 hours and as a direct result of an event, in this case storm. The available evidence shows although the movement damage to the insured building may have been exacerbated by the storm in May 2018, the building was already subject to long term movement damage because of various contributing factors over many years, which is excluded from cover under the policy. 1.3 Determination This Determination is in favour of the insurer. The insurer is entitled to decline the claim and is not required to take any further action. Determination | Case number: 754806 Page 3 of 9 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Complaint has established a valid claim The complainant has the onus of establishing, on balance, that she has suffered a loss that falls within the terms of the policy. This is commonly known as a prima facie claim. The policy covers the insured property against accidental damage subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). There is no dispute the insured building presents with significant movement damage in various locations. Given the policy responds to accidental damage, I am satisfied the complainant has established a prima facie claim within the terms of the policy. Policy covers damage to the insured property subject to the exclusions The policy, although an accidental damage contract of insurance, does not cover every eventuality. The conditions of cover, and extent of the insurer’s liability is governed by the policy terms which include limitations and exclusions. Relevant policy provisions are provided in section 3 below. The insurer has declined the claim as the policy excludes loss or damage caused by earth movement, unless such loss or damage occurs within 24 hours of and is a direct result of storm, rainwater, earthquake, explosion or water escaping from fixed pipes or apparatus. The policy also excludes loss or damage caused by wear, tear and gradual deterioration. The insurer does not dispute that a significant storm event occurred on 10 May 2018 or that the insured building presents with movement damage. However, the insurer says although the damage may have been exacerbated by this storm event, it was already present and is due to long term earth movement caused by several contributing factors, which is not covered under the policy. Complaint says significant movement damage occurred after storm event The complainant says the date of the storm event which she considers to be the cause of the claimed damage was 10 May 2018. However, I note she has also referred to noting movement damage after heavy rains in February 2018 in an email to M dated 2 July 2018. Nevertheless, she says the damage for which she is claiming cover occurred after a significant storm event on 10 May 2018. She says she was overseas at the time of this storm event and upon her return she could see the brickwork of the building had shifted substantially. She also says her neighbour had advised her that the water level in her yard was as high as the brickwork which acts as a perimeter foundation to the building. The complainant says her neighbour reported the water was like a river flowing through the fence and under the house towards the driveway. The insurer’s appointed expert says the damage is not consistent with a single storm event The insurer appointed engineering and building expert ‘ MC ’ to inspect the property and provide an opinion on the cause of damage. In its report dated 15 August 2018, MC noted the building is a single-storey weatherboard dwelling on a timber subfloor supported upon brick piers and perimeter brickwork. Determination | Case number: 754806 Page 4 of 9 MC advised the complainant had reported the building was 102 years old and that she had purchased it 23 years ago. MC says the complainant acknowledged the building is old and has had pre-existing movement and repairs undertaken, but that further movement and cracking had recently developed following the storm event during which water was reported to have inundated the subfloor area. MC confirmed presence of cracking and movement damage internally and externally to the building. Internally, in the hall, MC observed the floors to exhibit a significant amount of movement, however the cracking to walls was not consistent with the degree of movement to the floors. MC says this shows pre-existing movement had occurred in previous years with repairs undertaken to the wall linings. The complainant is noted to have acknowledged there had been previous repairs and painting of the property in the last 10 years. MC also noted a door had previously been cut down to suit movement to the door frame. Regarding the subfloor, MC found the timber bearers, which are supported upon brick piers, exhibited long-term rotation, movement and moisture staining. MC also noted the piers have previously been packed (supported by photographic evidence) indicating a pre-existing issue that has led to maintenance being undertaken previously. Similarly, MC observed the perimeter brickwork of the building to have long-term moisture staining indicating long-term water entry to the subfloor. MC has provided multiple photos showing loose brickwork and mortar decay to the perimeter brickwork, with cement patching and repairs over some of these areas. MC believes this damage pre-dates the installation of the concrete path around the property, as this concrete fills in some of the existing defects in the brickwork. MC concluded that water has been entering the subfloor over a long period of time resulting in long-term movement damage throughout the property, with the age of the building, method of construction and general wear and tear also contributing. MC was of the view that the brick piers and footing system are ‘reasonably robust’ enough to withstand a single water inundation event and the movement and rotation to the piers is consistent with long-term ground moisture causing movement over a long period of time. Given the age of the building and the time at which it was constructed, MC was of the view the depth to which the footings are founded is likely to be relatively shallow which would be expected to exacerbate long-term movement. MC noted however that while recent water inundation to the subfloor is not the proximate cause of the movement damage, the additional volume of water may have exacerbated the already ongoing movement. In a subsequent report dated 15 July 2020, MC re-confirms its findings that the home has incurred significant building movement resulting in undulating floors, wet subfloor conditions, mould growth, damaged perimeter base brickwork and footing systems. MC provides the opinion these are ongoing, redeveloping and long-term progressing issues. MC says the storm event in May 2018 is not the proximate cause of the building movement and damage. The building movement and damage was pre-existing prior to the purported storm event. It will have provided an additional volume of water into the subfloor exacerbating the pre- existing movement. MC acknowledges the constant presence of a strong odour and mould growth in the subfloor, despite having had sufficient time to dry in the 16 months or more after the May 2018 storm event, indicates it is not the sole source of water entry into the sub-floor. Rather, it is and has been a long term ongoing issue of moisture entry into the sub-floor. The complainant relies on the reports from her preferred consultants The complainant dissatisfied with the findings of MC relies on the opinions of engineers ‘TA’ and ‘HS’, who have provided their reports to the complainant. I n its report dated 27 September 2019, TA notes the property was 102 years, that substantial renovations and additions were carried out to the property in 1997-1998 and it was understood that no Determination | Case number: 754806 Page 5 of 9 foundation problems were detected at that time. TA found extensive movement and cracking in the perimeter brick footing around the north-western corner of the building which it says was exposed to a concentration of surface water run-off from an illegally constructed concrete slab and gravel area in the neighbouring property. TA notes the sub- floor soils consist of ‘highly reactive clays’ which exhibited an unexpectedly high level of moisture content. Additionally, TA noted green discoloration of bricks in the eastern perimeter foundation is considered consistent with water having ponded inside the sub-floor area behind the brick wall. TA says there was no significant damage detected to the internal areas of the building, however, that the perimeter brick foundations of the building had been damaged due to inflow of surface water from areas outside of the property (such as the neighbouring property). TA says while some of the defects observed to the perimeter foundation walls may have pre- dated the illegal construction of the concrete slab at the neighbouring property in around 2009, in its opinion water ingress from the concrete slab on the neighbouring property has contributed to the current condition or defects at the complainant’s property. In its subsequent report dated 3 July 2020, TA notes it is acknowledged by all that the property had some defects that pre-dated the May 2018 storm event. However, it says but for the effects of the significant storm in May 2018, the building would have continued to act adequately and would not have suffered the now evident damage. TA concludes the damage to the building is the direct result of the severe storm and large volumes of stormwater flow from the neighbouring property because of the illegal construction of a large concrete slab along the boundary with the insured property. TA disagrees with MC ’s findings and says if not for the high volume of stormwater run -off, the insured building would not have suffered the claimed damage. HS attended the insured property on 16 September 2019 and has provided reports dated 4 December 2019 and 13 May 2021 relating to assessments of the insured building and the neighbouring property (#15). In its report dated 4 December 2019, HS found the subfloor to be saturated, with the reactive clay subgrade exhibiting discoloration and mould with a strong musty smell evident. HS said there was evidence of waterborne debris in the subfloor indicating that water had flowed through the sub-floor, not just seepage and considered illegal works at the property next door was causing water to flow into the complainant’s property during storm events. HS noted some openings had been made in the foundation wall on the western side of the building to facilitate sub-floor works which have allowed water to flow into the sub-floor during significant storm events. HS concluded that while there may well have been pre-existing seasonal movement and cracking of perimeter foundation walls and internal walls of the building, surface water run-off from the neighbouring concrete slab would have caused flooding of the sub-floor during the storm event, exacerbating damage to the foundation walls and the fabric of the building. HS also said it is likely that the concentration of flow during lesser storms would also cause water to enter the sub-floor, ensuring it stays constantly wet. The complainant also obtained comment from J from whom she obtained a scope of works and repair quote for the damage to the insured building. J’s conclusion being that ‘the probable cause of damages to the property is due to a combination of general wear and tear and the extreme weather conditions suffered in May 2018. J suggests a 70% of the damage is the result of the storm event and should be covered under the claim. The complainant has provided an email from a plumbing contractor ‘AP’ who completed plumbing works at the complainant’s property at the time that a new extension to the original building was constructed in 1996-1997. AP says there were no problems sighted with the underfloor foundations and no existing damage at the time these renovations were undertaken. I am not persuaded by the limited evidence from AP as it does detail the extent Determination | Case number: 754806 Page 6 of 9 of his assessment of the insured building and more so, 24 years or more have passed since the time of AP’s works and attendance at the insured property. The storm has not been shown to be the dominant cause for the damage The complainant accepts there was some pre-existing movement to the building but is of the view that the evidence from her preferred consultants shows most of the claimed damage occurred because of the storm event on 10 May 2018. Therefore, she is for the insurer to settle her for 70% of the amount of a quote she obtained from building expert J which totals $84,181.27, which would equate to $58,926.88. Having considered all the information including the various expert reports and very helpful photographs, I find the reports form MC to be the more persuasive and consistent with the physical evidence (damage to and condition of the insured building). I am not satisfied it has been shown, on balance, the significant or dominant cause for the movement damage to the insured building was the May 2018 storm nor that such damage occurred within 24 hours of this storm event. I consider the available information shows the insured building has been subject to gradual ongoing earth movement due to several contributing factors for a long period of time. I accept the concrete area constructed in the neighbouring property will have increased the level of stormwater run-off that flowed through the complainant’s property. However, this is only one of the contributing factors for the resultant damage. I accept it has been established that saturation of the sub-floor foundation soils is a long term, constant and ongoing issue at the property caused by storm events, poor ventilation of the sub-floor, grading of the concrete areas at the insured property as well as run-off from the neighbouring property. The sub-floor foundation soils were found to be saturated during all inspections completed by the various consultants, even as long as 16 months after the storm event in May 2018. If it were the case that this storm was the sole cause for the saturation of the sub-floor, it is reasonable to expect this would have dried a year or more after the claimed event. I accept a t the time of the insured building’s construction there may not have been set building standards and so MC’s reference to current building standards is of no consequence. However, this does not mean the issues identified such as the depth of footings, ground levels, poor ventilation of the sub-floor have not contributed to the constant saturation of the foundation sub-soils and resultant earth movement damage over time. This is further supported by MC’s evidence relating to prev ious repairs having been completed both inside and within the sub-floor area. I accept the available evidence supports this and which shows, on balance, the insured building has been the subject of ongoing earth movement damage for some time. Accordingly, for the reasons considered above, I determine the insurer is entitled to rely on the policy exclusions to decline the claim. 2.2 Why is the outcome fair? The policy excludes cover for loss or damage caused by subsidence and/or heave, earth movement, landslip, landslide or subsidence unless such damage occurs within 24 hours and as a direct result of an event, in this case storm. The available evidence does not establish the damage to the insured building is the result of the storm event in May 2018. Rather, this storm was only one of several contributing factors for the damage to insured building. The damage has occurred due to earth movement over Determination | Case number: 754806 Page 7 of 9 an extended period of time, and as such it is fair for the insurer to be permitted to rely on the policy exclusions to decline the claim. Determination | Case number: 754806 Page 8 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness We have considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the AFCA Rules, due to the nature of the complaint. Accordingly, this complaint has not been the subject of a preliminary assessment and has proceeded directly to determination. AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this Determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Policy wording Product disclosure statement (PDS) page 6: DEFINTIONS In this policy and in the Schedule each word and phrase that is shown in Bold type has been given a special meaning. Those meanings are shown below. … Determination | Case number: 754806 Page 9 of 9 Damage/ Loss Physical Loss, Damage or Destruction. ... PDS page 11: SECTION 1 – BUILDINGS WHAT IS COVERED Your Buildings are covered against accidental Loss or Damage caused by external and visible means. WHAT’S NOT COVERED … 2. Loss or Damage caused by subsidence and/or heave, earth movement, landslip, landslide or subsidence unless such Loss or Damage occurs within 24 hours of and is a direct result of storm, rainwater, earthquake, explosion or water escaping from fixed pipes or apparatus … 4. Loss of or Damage to Your property which is caused by: a) wear and tear or gradual deterioration … c) defective design, workmanship or defective materials … f) settlement, shrinkage, expansion, warping or condensation

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.