Home / IAG / Determination 754605
Determination 754605
Underinsurance and removal of debris benefit after bushfire
Summary
After a bushfire destroyed her home, the insured argued she was underinsured and that removal of debris was payable above the sum insured. AFCA found the policy clear that debris is within the sum insured and the insurer not misleading, but ordered $500 non-financial loss and an apology for contacting her directly despite an authorised representative.
The policy read as a whole places removal of debris within the sum insured, and insurers do not usually give personal advice, so the onus to ensure adequate cover rests with the insured.
Issues
- Claim amount dispute primary · not upheld
“Removal of debris is payable as part of the sum insured; the policy wording is clear and the panel is not persuaded otherwise.”
- Instructions not followed secondary · upheld
“Insurer sent outcomes of additional reviews directly to the complainant rather than to her authorised representative, causing unwarranted stress.”
- Misleading conduct secondary · not upheld
“The panel is not satisfied the insurer misled the complainant about her sums insured or the online rebuild calculators.”
Subjects and remedies
home or building damagenatural disasterthird party authorityapologypay non financial loss
Text of the determination
Determination
Case number 754605
Financial firm Insurance Manufacturers of Australia Pty Ltd
Determination | Case number: «reference_id» Page 2 of 10
Case number: 754605 28 May 2021
Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) after her property, was
destroyed by a bush fire on 31 December 2019. The insurer accepted the claim. However,
there is a dispute over the ‘removal of debris’ benefit and the under insurance of the
complainant’s building and contents cover.
The insurer says it has settled the complainant her full entitlements under the policy as the
‘removal of debris’ benefit is incorporated into the property’s sum insured and is not payab le
in addition to the sum insured.
The complainant says her property was significantly underinsured. She says she was guided
by the insurer as to the appropriate level of cover for the property at inception and due to the
insurer’s advice, it has caused her property to be underinsured. Further, she says the policy
wording indicates removal of debris is payable in addition to the sum insured.
The complainant is seeking the amount the insurer would have paid for removal of debris (if
not for the state govern ment’s clean -up program) and to be settled the amount the insurer
has established the cost to rebuild the property.
1.2 Issues and key findings
Is the insurer liable for the complainant’s underinsurance?
No. An insurer does not usually provide personal advice to a consumer. The onus is on the
complainant to ensure a property is adequately insured. There is insufficient evidence to
show the insurer did provide personal advice in this matter.
Is the removal of debris benefit payable in additional to the sum insured?
No. The policy wording is clear. Removal of debris is payable as part of the sum insured.
Is the complainant entitled to compensation for non-financial loss?
The complainant is entitled to compensation for non-financial loss of $500 plus an apology as
outlined in section 2.3 of this determination.
Why is the outcome fair?
The outcome is fair because the insurer has complied with its obligations under the Insurance
Contacts Act and has clearly informed the complainant of the policy terms and
conditions. The complainant has the onus to ensure the level of cover is sufficient and meets
their needs as the advice provided by the insurer is general in nature. Further the policy
clearly sets out how it treats and settles the removal of debris.
Determination | Case number: «reference_id» Page 3 of 10
1.3 Determination
This determination is substantially in favour of the insurer. The insurer is not required to take
any further action. Within 14 days of acceptance of this determination the insurer is required
to pay the complainant compensation of $500 for non-financial loss and provide a written
apology as outlined in section 2.3 of this determination.
Determination | Case number: «reference_id» Page 4 of 10
2 Reasons for determination
2.1 Is the insurer liable for the complainant’s underinsurance ?
Complainant says insurer set the sum insured
The complainant says when the policy was initially incepted (in May 1999), the insurer asked
her a series of questions relating to the properties layout, construction material and its
location. The complainant says based on the information the insurer advised of the cost to
rebuild the property.
The complainant says at the time she assumed, in good faith, that the insurers request for
this information was to calculate the replacement cover of the property. The complainant says
she was told this by an agent of the insurer. The complainant says due the insurers advice,
her property is significantly underinsured.
At the time of the loss in December 2019 the building sum insured was $243,101 and
contents $60,775. Early estimates of the cost to rebuild were $376,644.
Complainant says the insurer has misled her and breached the Act
The complainant says since the inception of the policy the insurer’s conduct has been
misleading and has caused her to sustain a financial loss as a result.
The complainant says at the time the policy was incepted the insurer was aware that
underinsurance was a well-known issue however, it did not provide any advice or warning
relating to the underinsurance issue.
The complainant further says following the 2009 Victorian Bushfires the Bushfire Attack Level
(BAL) rating system was introduced. The complainant says as her property was built prior to
the introduction of the BAL system the costs associated with rebuilding her property would be
greatly increased.
The complainant says the insurer was aware of this for over 10 years however it did not
contact her to discuss the amount she was insured for or conduct a full review of her policy to
ensure she had adequate cover.
The complainant says as she relied on the initial conversation with the insurer to set the sum
insured amount she believed she held adequate cover. The complainant said this was
reinforced when she read the key features of the policy it refers to replacement cover. The
complainant says due to this wording she believed the cover she held was sufficient to rebuild
the property.
The complaint further submits the insurer’s request to utilise its online calculators at renewal
to estimate the rebuild costs is misleading. The complaint says when the insurer’s website
was accessed, there were two different calculators which produced two different estimates.
The complainant says this misleads and confuses the individual as to the true rebuild costs,
further it is unclear if the estimate considers all building fluctuations. The complainant
contends by the insurer providing an estimate online to a consumer it is misleading as it does
not accurately represent the true rebuild costs.
The complainant contends this conduct is not only misleading it is also in breach of section 13
of the Insurance Contracts Act 1984 ( Cth ) (the Act). Section 13 of the Act says the parties
subject to the contract of insurance are required to act towards each other with the utmost of
good faith.
Determination | Case number: «reference_id» Page 5 of 10
Insurer has not misled the complainant or breached the Act
The panel is not persuaded the insurer has misled the complainant or breached section 13 of
the Act.
An insurer does not usually provide personal advice. Usually an insurer will only provide only
provide general advice. Even if the panel accepts the insurer advised of the approximate
rebuild costs of the property in 1999, the onus to ensure this amount is adequate is on the
complainant and not the insurer.
The policy has been on foot more than nine years. The information provided shows since at
least 2014, the complainant was asked to check the sum insured amounts covers the
replacement value of the property and contents at each renewal on page two of the
Certificate of Insurance (COI).
While the COI, says a key benefit of the policy is replacement cover, it is clear the
replacement cover is subject to the sum insured amounts. This is because the insurer
requests the complainant review the sum insured earlier in the document, to ensure they
cover the replacement value.
The panel also notes the Product Disclosure Statement (PDS) instructs the individual to
ensure the sums insured are adequate and for the full replacement value and that the
replacement limit is subject to the sums insured. There is no dispute the complainant received
a copy of the PDS prior to the loss.
While the panel accepts the insurer was aware of the changes to the BAL ratings and the
potential impacts this would have on rebuild costs. The panel does not accept it was the
insurers responsibility to inform policy holders of this, or that by not informing policy holders it
was engaging in misleading conduct.
The BAL rating is an Australian Government standard that measures the potential for a home
to be exposed to a bush fire attack. The BAL is publicly available and common knowledge. It
is not only known to insurers.
The complainant was asked on multiple occasions to review the level of cover held and to
ensure it is appropriate and meets his needs. The onus to ensure the level of cover held is
appropriate and meets the individual’s needs, is on t he individual and not the insurer.
While the panel accepts the online calculators provide differing amounts for the estimated
costs to rebuild the property, the panel does not accept this is misleading conduct. The panel
accessed the insurers website and put in the required information to produce an estimate on
a rebuild. Upon completion of this quote the panel notes there are several paragraphs
advising the calculator is providing general information only and before obtaining insurance
the individual should:
calculate the actual replacement value of your home, and..
check with a Quantity Surveyor, Valuer or other suitably qualified professional for
an accurate estimate. the insurer takes no responsibility for the costs provided by
Cordell nor any liability for the accuracy of or reliance upon or use of, the costs.
When this information is considered the panel is satisfied the insurer has not misled the
complainant when providing an estimate as it actively advises the individual to obtain
accurate rebuild costs.
Determination | Case number: «reference_id» Page 6 of 10
Further as the policy has been on foot for over twenty years, the panel is persuaded the
complainant had ample opportunity to review the level of cover held and to make any
changes required. However, the complainant has elected not to do this.
Accordingly, when the panel considers the available information it is not satisfied the insurer’s
actions have been misleading or a breach of section 13 of the Act.
2.2 Is the ‘removal of debris’ benefit payable in addition to the
sum insured?
Complainant says the policy is ambiguous
The complainant says the policy wording relating to demolishing and removal of debris is
ambiguous, confusing and unclear as to whether these costs are included within the sum
insured or are payable in addition to the sum insured.
The complainant contends due to this ambi guity, the ‘Contra Proferentem’ (against the offeror
‘insurer’) rule is applicable, meaning the removal of debris benefit should be paid in addition
to the sum insured.
The complainant says due to the ambiguity of the policy section 35 of the Act assists to
provide relief as the policy does not specify a minimum amount within the policy for costs
associated with demolishing and removing of debris.
The complainant further says the insurer has changed the wording of the policy after the
issue relating the removal of debris benefit was raised to the insurer by the complainant. The
complainant says this indicates the insurer is aware the wording is ambiguous.
Insurer says policy is clear in how it settles removal of debris
The insurer says the policy is written in plain language and is clear and unambiguous. It says
on page 71 of the PDS it clearly sets out how the policy settles and treats the other benefits in
relation to the sum insured.
The insurer further says how it settles the other benefits, which the demolishing and removal
of debris is a part of, is explained on page 34 of the PDS. The insurer says in both cases the
policy clearly states the most it will pay is the sum insured except for the following benefits
which are payable in addition to the sum insured:
temporary accommodation for home owners
temporary accommodation for tenants or strata scheme owners
loss of rent for landlords
mortgagee discharge costs.
The parties have provided various version of the PDS
The panel has considered the compl ainant’s position the policy wording has changed since
the complainant raised the issue with the insurer. Upon review of the provided wordings by
the complainant it notes one is dated 2012, one is 2017 and the more recent PDS is dated
2020. Two of the PDS’ s pre-date the loss while the third is a new version which postdates the
loss.
Accordingly, the panel is not persuaded the wording within the policy was changed due to the
complainant raising the complainant with the insurer. However, the panel notes the PDS the
insurer relies on is dated 2017.
Determination | Case number: «reference_id» Page 7 of 10
Irrespective of the policy year and version, the wording does not assist the complainant’s
argument that the removal debris benefit is payable in addition to the sum insured.
Policy needs to be considered in its entirety
Having carefully reviewed the policy, the panel disagrees with the complainant’s position. The
wording on pages 34 and 71 supports the insurer’s position that the maximum payable is the
sum insured except for the four listed additional benefits.
On page 34, it highlights four ‘Other benefits’ that are payable above the sum insured. When
looking at the specific wording for the benefits themselves, there is explicit reference to the
fact the benefit is payable above the sum insured. For example, under the other benefit for
‘Loss of rent for landlords’, the policy says:
We pay this benefit on top of your Buildings sum insured
Similar wording is applied for the other three categories.
For the other benefits, no such wording is used. This includes the benefit for ‘Demolishing
and removing debris’.
Further on page 71 of the PDS under the section ‘What we pay for it states:
What we pay for – Buildings Insurance
..
The most we pay
The most we will pay for your home is the Buildings sum insured.
Other benefits
Other benefits
We may also pay some costs on top of the Buildings sum insured under 'other
benefits' for:
• Temporary accommodation for home owners – see page 45
• Loss of rent for landlords – see page 41
• Mortgagee discharge costs – see page 42.
..
This all supports the position only four of these ‘Other benefits’ are paid in addition to the sum
insured. This does not include the benefit for ‘Demolishing and removing debris’.
Therefore, the panel is not satisfied that when reading the policy, the demolishing and
removing debris benefit is payable above the sum insured.
Section 35 of the Act does not assist the complainant
Section 35 of the Act sets out a requirement for insurers to notify an insured where their cover
deviates from that set out in the standard cover. If the insurer fails to do so, an insured may
be entitled to have their claim paid by reference to this standard cover.
Determination | Case number: «reference_id» Page 8 of 10
Section 35(1) says an insurer cannot refuse to pay a claim under the benefits of standard
cover unless the insurer can demonstrate it complied with section 35(2)
The panel notes should the insurer have failed to meet its obligations under section 35, then
the complainant would be entitled to standard cover, as under the relevant legislation
(Insurance Contract Regulations), both home building and home contents are defined as
‘prescribed contracts’ and fire is considered as a ‘prescribed event.’
However, if the insurer can establish that it clearly notified the complainant in writing before
the contract was entered into of the provisions of the policy, in accordance with section 35(2),
then section 35(1) would not be enlivened to assist the complainant.
In this case the complainant has not raised any concerns relating to the receipt of the relevant
policy documents and given the complainant has raised arguments relating to the wording
contained within, the panel accepts the insurer has met the initial onus under section 35(2),
which is to inform in writing.
However, subsection (2) also deals with the insurers responsibility to clearly inform the
insured person. In this case the panel is satisfied the insurer has met this obligation under the
Act, as discussed earlier, the panel is satisfied the policy is clear in how it settles claims and
the removal of debris benefit.
Accordingly, the panel is satisfied section 35(1) of the Act is not enlivened to assist the
complainant to further relief.
Insurer followed the intent of the clean-up program
T here is no dispute the complainant’s property was cleared free of charge to either the
complainant or the insurer as part of the state government ’ s removal of debris program. The
purpose of the program was to ensure policy entitlements around removal of debris were
passed on to the policyholder to ensure they had the maximum available to put towards
rebuilding the affected property.
As discussed in this case, the removal of debris benefit forms part of the sum insured. There
is no dispute the complainant has been settled the full sum insured of the property at the time
of the loss. There is nothing to indicate the insurer deducted from this amount any costs
towards demolishing or removal of debris.
Given all this, the panel considers the insurer’s position is reasonable in all the circumstances
and consistent with both the policy and the intent of the program.
The insurer is not required to take any further action.
2.3 Is the complainant entitled to compensation for non-
financial loss?
Compensation paid in some circumstances
Non-financial loss includes claims for stress or inconvenience caused by an error of the
financial firm. The maximum amount AFCA awards for non-financial loss is $5,000.
AFCA will only award this type of compensation if there has been an unusual degree or
extent of inconvenience. We will not award compensation for loss that complainants may
incur because of pursuing a complaint.
Determination | Case number: «reference_id» Page 9 of 10
Fair the insurer compensates the complainant
The complainant says the insurer has shown a total disregard for her wellbeing and has
caused additional stress and trauma at it continued to correspond directly with her despite
providing an authority for JA to act on her behalf.
The panel has carefully reviewed the information exchanged and the insurers actions since
being notified JA was the authorised representative for the complainant. There is no dispute
the scope of the dispute evolved while on foot with AFCA.
The panel accepts for internal reporting reasons the insurer may be required to lodged new
complaints to capture the new issues. However, the panel does not accept the information
and review of the new ‘complaints’ were required or needed to be sent to the complainant
directly.
The panel accepts the complainant position that this caused the complainant considerable
additional and unwarranted stress and inconvenience, due to the insurers decision to send
the outcome of the additional reviews to the complainant directly rather than to JA.
The panel accepts the insurers conduct would have caused a degree of unusual stress and
inconvenience for the complainant when dealing with a very stressful situation. In the
circumstances the complainant is entitled to compensation for non-financial loss.
Given this, the panel considers it fair that the insurer pays the complainant $500 and provides
a written apology addressing its actions in sending the information to the complainant directly
rather than JA.
2.4 Why is the outcome fair?
The outcome is fair in all the circumstances as:
the PDS is clear in how it treats and settles the removal of debris benefit
the complainant has been settled his full entitlements under the policy, with no deduction
for clean-up costs
the information provided shows the insurer encouraged the complainant to review her level
of cover at each renewal
while the complainant finds herself severely underinsured and unable to rebuild, the onus
is on the individual to ensure the level of cover is sufficient and meets his needs.
Given the complainant did not alter her level of cover to ensure adequate cover, it would
be unfair to insist the insurer compensate the complainant further.
Due to the added stress caused by contacting the complainant rather than JA when it had
the relevant authority, it is fair the insurer pay compensation for non-financial loss plus
provide an apology.
Determination | Case number: «reference_id» Page 10 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
Determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience as a [field of expertise].
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.