Home / IAG / Determination 754569

Determination 754569

Declined collapsed ceiling claim attributed to wear and tear rather than storm

FirmIAG
Decided2021-03-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$17,815
Non-financial loss$750
Amount claimed$24,025
SourceAFCA PDF

Summary

The complainant's home insurer declined a claim for a collapsed ceiling, attributing it to wear and tear and gradual deterioration. AFCA found the storm an insured event, ordered cash settlement of $17,815.19, and awarded $750 for non-financial loss.

Once the complainant established a valid storm claim, the insurer had to prove an exclusion applied, and its expert evidence did not establish that.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay claimpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 754569 Financial firm Insurance Australia Limited Determination | Case number: 754569 Page 2 of 8 Case number: 754569 17 March 2021 1 Determination overview 1.1 Complaint The complainant made a claim under her home insurance policy held with the financial firm (insurer) after her ceiling collapsed. She believed this was caused by a storm event. The insurer declined the claim on the basis the complainant had not established that an insured event was responsible for the damage. Instead, it said the ceiling collapse was the result of wear and tear and gradual deterioration. 1.2 Issues and key findings Is the insurer entitled to decline the claim? The complainant has established, on balance, the damage to the property was from an insured event under the policy. The insurer has not shown exclusions apply. That means the insurer is not entitled to decline the claim, but is liable for the claim-related repairs, and the damage caused by its representatives. Is the complainant entitled to compensation for non-financial loss? The complainant is entitled to compensation of $750 for the significant degree of upset and inconvenience caused to her, in her particular circumstances, by the insurer‟s handling of the claim. 1.3 Determination This determination is in favour of the complainant. The insurer is required to pay the complainant $17,815.19 for the claim-related damage. It is also required to pay $750 as compensation for non-financial loss. Determination | Case number: 754569 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Onus on complainant to establish a valid claim The complainant has the responsibility of establishing, o n the balance of probabilities, a loss occurred as a result of an insured event covered under the policy. This is known as establishing a valid claim. If she can establish a valid claim, the burden shifts to the insurer to establish, on balance, that exclusions apply or it is otherwise entitled to decline the claim , if it seeks to do so. Subject to certain exclusions and conditions, the policy covers loss or damage as a result of any „incident‟ listed in the product disclosure statement (PDS). That includes the listed events of „ storm, flood, rainwater or wind ‟ and „l ightning or thunderbolt ‟. „Incident‟ is defined in the policy as „a single occurrence or a series of occurrences, including an accident or series of accidents, arising out of one event‟. „Storm‟ is not separately defined in the policy. Policy exclusions include gradual deterioration, and wear and tear, and „ mildew, atmospheric or climatic conditions ‟. Insurer’s evidence focusses on lack of evidence of water entry from storm The insurer engaged builders JLG to assess and determine the cause of damage. JLG attended on 11 February 2020 and noted the property was very well maintained. They identified no maintenance issues or defects. JLG also arranged for plumber SP to attend on 13 February 2020 and prepare a roof report, which in summary said:  there was damage to the plaster ceiling in two rooms, with the plaster beginning to sink and collapse throughout the area creating a large opening in the living room/kitchen and in the dining area  an inspection inside the ceiling space of the remaining sections of ceiling found that there was no sign of water ingress anywhere  the damage has not been caused by a roof leak , as the entire roof is in good condition and watertight  the most likely cause „appears to be‟ installation issues, with the glue and fixings having given way over time, causing the ceiling to collapse  recommend installing whirlybirds on the roof to remove any pressure/heat and humidity within the ceiling, which may have had a bearing on why the ceiling has collapsed the way it has. Determination | Case number: 754569 Page 4 of 8 I note JLG‟s comment s about the damage are almost exclusively a repetition of SP‟s report. I also acknowledge the complainant has said JLG did not actually inspect inside the ceiling space, and I note their attendance was after the make safe had been carried out. In terms of their conclusions as to the damage/insurer‟s liability for the claim, JLG „[ marked] this claim “UNSURE” as it appears the damages have occurred from the fixings and glue used in the installation method giving way over time ‟. The wo rding of the insurer‟s experts‟ reports indicate they were effectively looking for a roof leak and water ingress to substantiate a claim for possible storm damage, but found none. In the absence of that evidence, their (equivocal) conclusion was that the issue „appears to be‟ inadequate glue and fixings. However, neither JLG nor SP are plastering experts, whereas the complainant‟s expert (details of whose report are below) states he is a plastering contractor of 50 years‟ experience. I am not satisfied that any inadequacy in the installation, or indeed evidence of gradual deterioration, has been established. Policy allows for more than just water damage from an insured event It is important to note that damage from a storm need not simply be water damage (as the policy wording indicates, with the inclusion of the word „wind‟ in the description of that insured incident). The fact of there being a separate insured event for damage from „lightning and thunderbolt‟ also allows for the different possible impacts of other weather events. To be clear, given the specific inclusion of the insured event of „lightning and thunderbolt‟, I am satisfied it is fair to interpret the policy in such a way that the general exclusion for „mildew, atmospheric or climatic conditions‟ does not apply to lightning or thunderbolt incidents. That is because the exclusion would otherwise cancel out that insured event, leading to ambiguity, inconsistency and unfairness. Complainant’s expert concludes lightning ca used ceiling collapse The complainant arranged for a statement from experienced plastering contractor JR, who inspected the ceilings on 18 March 2020. JR reported clouts and „a generous amount of glue‟ still attached to the trusses. (Photographs provided by the complainant from just after the ceiling collapse reflect that.) His professional opinion was that there was no doubt the ceilings failed due to a lightning strike, which he noted was quite common in stormy conditions. His conclusion was essentially that the damage was likely caused by pressure build up from lightning, thunder and stormy conditions. Determination | Case number: 754569 Page 5 of 8 In response, the insurer has said: „Given the severity and voltage of a lightning strike, it is reasonable to state that a direct strike to the property would cause fire, damage electrical or potential power surges and/or shockwave damage which happens when lightning is at close range‟. However, again, as with the range of possible different types of damage from a storm event, the impact of lightening will not always be fire damage; nor will it necessarily require a direct strike. Instead, as the insurer itself acknowledges in their response, lightning can also cause „shockwave‟ damage – which might reasonably be interpreted to include damage from a build-up of pressure. My understanding is that the sudden increase in pressure and temperature from lightning produces rapid expansion of the ai r . The insurer has not addressed or refuted th at likely impact of lightning on the insured property on the day(s) during which relevant weather events were recorded. Weather information shows storms in the area at relevant time Evidence from the Bureau of Meteorology (BOM) indicates maximum wind gusts on the day of the loss and the day before were between 28km/h and 56 km/h. „ Strong winds‟ are considered to be anything over 50km/h, and I acknowledge that winds of the speeds reported are not likely to have caused structural damage, such as blowing off a roof or blowing over parts of buildings; nor was there any evidence of obvious external wind damage at the complainant‟s property (in particular, to the roof, apart from several displaced tiles). The complainant has also provided BOM storm confirmation results for the relevant dates (31 January and 1 February 2020), centred within a 50km radius around the complainant‟s own suburb. Results for both days confirm thunderstorms (lightning) were observe d, as well as „strong wind‟ (with gusts above 90km/hour) on 31 January. There is also evidence from the State Emergency Service confirming a storm event within that 2-day period. Insurer is not entitled to decline the claim Having regard to all the available evidence, I am satisfied, on balance, the complainant‟s property was damaged by an insured event, and the insurer has not shown exclusions apply. That means the insurer is not entitled to decline the claim. Complainant has completed repairs JLG provided a February 2020 scope of works and quote for $10,869.94 for the damage identified. The complainant says she has now already had the property repaired. She has provided a table of her total costs ($19,025.19), together with invoices reflecting the work undertaken individually for painting, plastering, electrical and insulation work. Determination | Case number: 754569 Page 6 of 8 She has also said the insurer‟s representatives who attended at the property broke a crystal vase and 4 cabinet knobs, although the cost/value of those losses has not been provided. JLG‟s quote is not identified as being one actionable by the complainant as a retail customer. In other words, I am not satisfied the complainant herself would have been able to have the work undertaken for $10,869 .94. That means payment of that amount would not represent a fair cash settlement of the claim. While there are significant discrepancies between aspects of JLG‟s quote and the complainant‟s in relation to plastering costs and insulation , it is not apparent that the work undertaken by the complainant‟s repairers was in excess of what was reasonably required to repair the claim-related damage. At the same time, however, the complainant has provided two separate invoices for painting, one of which refers to „other issues‟ not related to the claimed damage ($1,210). Fair that the insurer cash settle the claim In the circumstances, I consider it fair and appropriate that the insurer cash settle the complainant for the claim-related damage by paying $17,815.19 (which is the amount of her repair costs incurred, less $1,210 for the additional painting). I am also satisfied it is fair that be taken to be sufficient to include the loss of her crystal vase, and the cabinet knobs. AFCA takes a conservative approach to compensation Under the AFCA Rules, we may award compensation for non-financial loss in circumstances where a person experiences an unusual degree of physical inconvenience, time taken or interference with an expectation of enjoyment or peace of mind because of the actions of the insurer, up to a maximum award of $5,000. Complainant seeks compensation because of claim handling and health issues The complainant is seeking the maximum compensation for the way the insurer has handled the claim, including delays in attending to the make safe. She says she had to follow up the insurer when waiting for responses and communication. She has also pointed out that she is suffering from a serious medical condition which includes anxiety as a symptom, and that this has been worsened by her dealings with the insurer in the course of the claim, which have made her feel overwhelmed. She has provided medical evidence of her health issues. I accept that the fact of the damage to her property, and the stress of having to make a claim at all, will have been difficult for her, particularly given her personal circumstances. However, that in itself, is not something for which the insurer can be held responsible. Determination | Case number: 754569 Page 7 of 8 It is only if the insurer‟s actions have been unreasonable or inappropriate in the way it has dealt with her or handled the claim, that compensation would normally apply. The insurer can also not fairly be held responsible for other matters outside its control, such as the impact of Covid-19 on the time taken for repairs to be completed. The insurer has acknowledged there were initial delays with the make safe and has apologised for that. However, I am satisfied its actions in then investigating and issuing a decision on the claim, and then its first response to the complainant‟s concerns about that decision, were reasonably prompt in the circumstances. The fact, however, that the insurer was not entitled to decline the claim as it did, means the matter has been protracted when it could have been resolved sooner, and the complainant would have been spared the resulting delay and upset. On that basis, I consider it fair and appropriate in the circumstances that the insurer pay the complainant $750 compensation for this. Determination | Case number: 754569 Page 8 of 8 3 Supporting information 3.1 Process AFCA’s approach to this complaint This complaint has been determined based on what is fair in all the circumstances, having regard to the legal principles, applicable industry codes or guidance, good industry practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All of the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.