Home / Suncorp Group / Determination 754094
Determination 754094
Roof replacement claim declined as pre-existing structural defect
Summary
After a hail storm, the insurer accepted the home claim but refused to replace a defective roof because structural truss failure predated the storm. AFCA upheld the refusal but ordered payment of $3,060 for storm-damaged roof tiles plus statutory interest.
Cover responds only to loss caused by an insured event, and the policy expressly excludes fixing faults that existed before the loss occurred.
Issues
- Claim denial primary · not upheld“The insurer is entitled to deny cover for the cost of the roof replacement as the damage was not caused by an insured event. The policy does not cover a pre-existing fault.”
- Claim amount dispute secondary · upheld“The insurer is liable for the cost to replace 50 of the original roof tiles and ridge mortar, $3,060, plus statutory interest.”
- Product terms interpretation secondary · not upheld“I am not satisfied the policy wording is ambiguous and misleading. The policy clearly states the insurer will not fix a fault that existed before the loss.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 754094
Financial firm AAI Limited
Determination | Case number: 754094 Page 2 of 12
Case number: 754094 30 June 2021
1 Determination overview
1.1 Complaint
On 19 January 2020, the complainants lodged a claim under their home insurance policy for
damage to their home after a storm event.
The insurer accepted the claim and approved repairs. During the repair process, a structural
defect in the roof was identified and repairs ceased. The defective roof required replacing to
allow for any further repairs to the rear of the home to be completed.
The complainants requested cover for the cost to replace the defective roof. They say the
policy does not say that an unknown defect, that prevents storm damage from being repaired,
is not covered.
The insurer has declined the claim as the policy provides cover for damage caused because
of an insured event and is not intended to rectify defective parts of the home.
1.2 Issues and key findings
Is the insurer entitled to deny the claim for replacement of the roof?
The insurer is entitled to deny cover for the cost of the roof replacement as the damage was
not caused by an insured event. Instead, the roof required replacement due to a pre-existing
fault in the roof trusses caused by inadequate design. The policy does not provide cover to fix
a fault that existed before the loss occurred.
Is the policy ambiguous and misleading?
I am not satisfied the policy wording is ambiguous and misleading, therefore the insurer was
entitled to rely on the policy terms and conditions to deny the claim.
Is the insurer liable for the damaged roof tiles?
The available evidence establishes the insurer is liable for 50 damaged roof tiles and may be
liable for removal and replacement of 35 m² of pool solar heating and the skylight dome.
Why is the outcome fair?
The intention of the policy is to provide cover for damage caused by certain events, not to
rectify issues relating to structural defects, faulty design or poor workmanship. It would not be
fair if the insured was required to pay for costs to rectify damage unrelated to an insured
event.
1.3 Determination
The determination is in substantially in favour of the insurer.
Should the complainants accept this determination then within seven days of acceptance of
this determination, the insurer is required to pay the complainants $3,060 for the cost to
replace 50 of the original roof tiles and ridge mortar.
Determination | Case number: 754094 Page 3 of 12
The insurer is also required to pay statutory interest on this amount, in accordance with
section 57 of the Insurance Contracts Act (the Act). Interest is to apply from 20 August 2020
until the date of settlement.
It is not clear from the available information whether the insurer‟s cash settlement includes
payment for the removal and replacement of 35m of pool solar heating and a skylight dome. If
these two items were not included in the final cash settlement, then the insurer should include
these items in the final cash settlement and pay statutory interest as set out above.
Determination | Case number: 754094 Page 4 of 12
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim for replacement of
the roof?
Home suffered damage in an insured event
The complainants lodged a claim for damage caused by a hail storm on 19 January 2020.
The insurer accepted liability and proceeded to arrange for repairs to be completed. There is
no dispute damage was caused by an event covered by the policy.
Repairs ceased in June 2020 when the insurer removed the ceiling to complete repairs to the
open living area at the rear of the home. Structural damage to the roof trusses was identified.
The insurer submits that the structural damage required rectification before the outstanding
repairs could be completed.
Make safe repairs were completed to prevent further damage and an engineer inspection was
deemed necessary. Both the insurer and the complainants engaged engineers to provide
comment.
A summary of the expert opinion relied on by the parties is set out in supporting section 3.3
this determination.
Insure r’s expert identifies structural defects as the proximate cause
The complainants‟ engineer (M) reported the damage was caused by multiple leaks in the
roof cladding resulting in the collapse of the ceiling throughout.
M identified disintegration of the joints to the top and bottom chords of the trusses. He says
the disintegration is occurring at the most loaded joints, the most likely cause being that the
load applied to the trusses, exceeds their capacity. M also identified the failure of the nail
plates noting the nail plates had slipped from their positions no longer providing a secure
connection between the timber frame.
The insurer‟s engineer (H) disagreed with M‟s findings, concluding the damage was pre -
existing with the roof trusses being structurally inadequate. H says the damage was not
related to the storm.
H says the damage to the roof trusses is typical of issues that can occur due to inadequate
design or manufacturing. The trusses are structurally inadequate and cannot support the roof
loads at the rear of the property. This is consistent with M‟s findings.
On inspection of the roof trusses over the kitchen/living room area, H identified the failure of
every nail plate connection along the eastern wall of the rear extension and excessive
deflection of the bottom chords of the trusses. He says this is typical of damage that occurs
due to a uniform construction fault.
H notes water staining to several roof tiles but no openings in the roof were seen. He provides
images of the damage in support of this comment.
He concludes the damage to the trusses was not caused by the insured event.
The experts agree the complainants‟ roof suffers from structural damage. As to the cause of
the damage, their opinions differ.
M concludes that most probable factor causing the damage was the added weight of the
stormwater that had leaked into the ceiling. The complainants say water affected insulation
was left in the ceiling for several months before repairs to the area commenced.
Determination | Case number: 754094 Page 5 of 12
H says there were no large voids in the roof that would indicate a significant volume of water
had entered the ceiling space because of the storm. This opinion is supported by the insurer‟s
assessor.
H contends the trusses are structurally inadequate to support the roof load over its effective
span and the damage is typical of damage that can occur over an extended period.
I note make safe and remediation works were completed within days of the hail damage. The
remediation report from SR says the water ingress had come from the roof in most of the
affected rooms. SR notes wet insulation was removed from Bedroom 2 and the living area.
Based on the above, as the wet insulation was quickly removed by SR, I do not accept M‟s
findings.
The complainants recall SR did not remove all the insulation. However, I do not find this
sufficiently compelling in view of the written report from SR.
The complainants relied on another engineer who provided an opinion in October 2020. I did
not find this opinion persuasive as by the time this engineer inspected the claimed damage,
the roof trusses had been repaired.
Based on the available information I am satisfied the damage to the timber roof trusses was
not caused by the storm event.
Policy does not cover pre-existing faults
The policy provides cover for loss or damage caused by an insured event. It is not the
intention of the policy to provide cover for structural defects, design faults or damage not
caused by an insured event.
The policy wording explains how the insurer will settle a claim if it agrees to pay for loss or
damage.
There are also circumstances when the insurer will not pay a claim. Relevant to this claim, the
policy specifically states the insurer will not fix a fault that existed before the loss or damage
occurred.
Considering the damage to the roof trusses was caused by structural inadequacy which
existed prior to the storm event, I am satisfied the policy does not respond to the
complainants‟ claim for reimbursement of the costs to replace the roof.
2.2 Is the policy ambiguous and misleading?
Policy is not misleading
The complainants say they were assured by the policy wording that their claim for the
replacement roof would be covered and now they feel misled. They say, if the policy did not
intend on providing cover for structural defects whether they were known or unknown, why
does the policy wording not include the words „any‟ defects instead.
I do not agree the policy wording is misleading. The policy clearly states that the insurer will
not fix a fault that existed before the loss occurred.
If I were to consider the complainants‟ argument that essentially suggests the silence of the
policy relating to „unknown‟ defects indicates cover is provided, which I do not; the outcome
would remain the same. This is because I am satisfied the available evidence establishes the
damage was not caused by the insured event.
Determination | Case number: 754094 Page 6 of 12
The policy specifically explains how it deals with defects and provides scenarios when the
repair of a defect will be covered.
Relevant extracts are set out in supporting section 3.2 of this determination.
Relevant to this complaint, the complainants refer to two sections detailed in the „dealing with
defects‟ section.
‘If an unknown defect is the cause of the damage
If an incident covered by your policy damages the building and an unknown defect
was the cause or part of the cause, we will pay for the resulting damage. If the
unknown defective part of the building is also damaged by the same incident, we
will fix this as well.‟
The complainants say the defective trusses contributed to the cause, but the available
evidence establishes the roof trusses were not damaged by the incident.
I am satisfied the complainants cannot rely on this clause for cover.
The complainants discuss the clause below.
If undamaged defective parts of the building will not support repairs
If undamaged defective parts of the building you knew about (or should
reasonably have known about) will not support repairing the damage caused by
an incident covered by your policy, we will only pay what it would have cost us to
repair the damage had the building not been defective.
The complainants say the policy refers to instances where the insured „knew about or should
have reasonably known about‟ the defect. They acknowledge cover is not available if the
defect is known.
The insurer does not dispute that the complainants were unaware of the defective roof
trusses.
The complainants say the policy does not explain how it responds to unknown defects
therefore they expect that cover will be provided.
The policy is not misleading or ambiguous.
The unknown defective part of the building was not damaged in the storm. And the policy is
clear. The insurer will not fix a fault that existed before the storm damage occurred.
2.3 Is the insurer liable for the damaged roof tiles?
Insurer liable for 50 damaged roof tiles
The available information shows water from the hail storm entered parts of the complainants‟
home through the roof and damaged the roof.
The insurer‟s roof expert (SP) confirms hail damage to the roof. He inspected the roof in
February 2020. He said some repairs have been completed to tiles but about 50 tiles were
cracked and needed to be removed and replaced.
Determination | Case number: 754094 Page 7 of 12
Following the discovery of the damaged roof trusses, the assessor engaged another roofing
expert (XR) to comment on the condition of the roof. XR says there were two different profiles
of roof tiles that cause the tiles to sit up and allows water to travel into the roof cavity.
Reference is made to the de-laminated tiles that allow water absorption.
XR makes no comment relating to any hail damage and based on this report, the insurer
denied cover for the roof tiles saying the damage was pre-existing.
The complainants have provided no reports to re fute XR‟s comments.
However, reviewing the available information which includes photographs and the scope of
works, I accept that the roof tiles were damaged by the storm and require replacement under
the claim. I also accept 35 m² of pool solar heating and a skylight dome must be removed and
replaced.
Claim settlement may also include 35 m² pool solar heating and skylight dome
The insurer is entitled to deny cover for the cost of the roof replacement. However, it is liable
for the cost to replace 50 of the original roof tiles and ridge mortar which was damaged in the
storm.
The insurer has provided a quote for $3,060. It says the tiles were not included in the final
cash settlement. This amount plus statutory interest in accordance with section 57 of the Act,
applicable from 20 August 2020 (the date of the IDR letter) until the date of settlement, is to
be paid by the insurer.
It is not clear whether the insurer‟s cash settlement includes payment for the removal and
replacement of 35 m² pool solar heating and a skylight dome. The scope of works makes
provision for this work under “external”. If these two items were not included in the final cash
settlement, then the insurer should include these items in the final cash settlement and pay
statutory interest as set out above.
2.4 Why is the outcome fair?
The outcome is fair in all the circumstances because the insurer has properly considered the
position of the complainants and based settlement on all available evidence and its
obligations under the policy.
Determination | Case number: 754094 Page 8 of 12
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Extracts from policy wording
The relevant policy extracts are referred to in the correspondence between the parties and in
the insurer‟s Notice of Response. Both the policy documen t and the Notice have been
exchanged with the complainants.
What you are covered for – Insured Events
We cover the building for loss or damage at the insured address caused by an
insured event during the period of insurance. There are some things we do not
cover and these are shown in the „We do not cover‟ section of the following tables
on pages 16 to 25 and in the „What we do not cover - general exclusions‟ on
pages 35 to 40.
Determination | Case number: 754094 Page 9 of 12
Storm
We cover
Loss or damage to the building caused by a storm
How we settle building claims
If we agree to pay a claim for loss, theft or damage to the building, we will decide
if we will:
repair damage to the building;
rebuild the building;
pay you what it would cost us to repair or rebuild the building;
We will not:
fix a fault that existed before the loss or damage occurred.
Dealing with defects
…
If an unknown defect is the cause of the damage
If an incident covered by your policy damages the building and an unknown defect
was the cause or part of the cause, we will pay for the resulting damage. If the
unknown defective part of the building is also damaged by the same incident, we
will fix this as well.
Your responsibilities
You must:
keep the building well maintained and in good condition. For what we mean by
„well maintained and in good condition‟ see „What do we mean by that?‟ on pages
53 to 55;
Well maintained and in good condition
means the building does not have any faults or defects that might cause loss or
damage to building, loss or damage to property of oth ers or injury to people…
Insured event
means the insured events on pages 16 to 25. In addition, an insured event is
always a single event, accident or occurrence which you did not intend or expect
to happen.
Determination | Case number: 754094 Page 10 of 12
3.3 Extracts from expert reports
Record Key poi nts
Financial firm’s re storation
expert (SR )
Initial Report
23 Jan 2020
FF Roof Expert (SP)
Report
11 Feb 2020
FF Asse ssor
17 July 2020
FF Engineer report (H)
24 July 2020
Attended site 21 and 23 January 2020.
Open Living Area: Water ingress via roof and dog door, ceiling is
bowed, went up to roof space and removed wet insulation.
Hail has impacted the roof during a recent large storm and as a
result, has broken a large number of tiles right across the roof.
Due to this water has leaked t hrough the broken tile s into all the
damaged areas. Repairs have been completed to tiles. Several
tiles (50) still cracked and need to be removed and replaced. 35
m² of pool solar heating and Skylight dome must be removed and
replaced.
Reviewed complainan t s ‟ eng ineer‟s report and the area of
damage identified by the engineer and says there has been no
water ingress or minimal water ingress according t o the water
staining .
Inspected and photographed damage 22 July 2020
Inspection of the timber roof trusses showe d the gang nail plates
at the connections over the eastern external wall had failed to
every roof truss member along the length of this wall
I nspection of the kitchen/living room to t he rear extension showed
that the bottom chords to a number of the timber roof trusses had
deflected excessively
T hese roof trusses are structurally inadequate to support the roof
loads over their effective span, which is indicated by the failure of
the truss members which has occurred in a large number of
locations and has bee n caused by a combination of inadequate
design and / or manufacturing. Failure of the timber roof trusses is
a pre - existing construction issue and has not been caused by the
recent storm event because:
No large void in roof tiles seen. Indicates a signifi cant volume of
water did not enter the ceiling spac e in the storm
Damage seen is typical of damage which has occurred over an
extended period rather than bec ause of a specific storm
Previous repairs to the eaves linings on the western wall indicate
this issue occurred over an extended period
Failure of the gang nail plates occur to every timber roof truss
along the length of the rear extension which is typical of damage
which occurs due to a uniform construction fault rather than due to
storm damage whic h is more likely to only affect a localised area.
Determination | Case number: 754094 Page 11 of 12
Record Key poi nts
FF Engineer report (H)
6 October 2020
Commented on complainants‟ engineer‟s report and reiterates
opinion
In regard to Item 3 (a) in the e ngineer ‟ s report, the mode of failure
being described here is not clear, however it does appear as
though the engineer is suggesting that the mode of failure first
starts with overloading of the top chords of the trusses, with the
additional stresses then being transferred through the remaining
members of the trusses. This is not consistent with their later
assessment that “added weight of stormwater leaked through tiled
cladding and c ongregated above c eiling for some time thus
causing structural damage to the t russes”, as the additional load
from the stormwater on the ceiling linings would be applied to the
bottom chords of the trusses.
FF Engineer report (H)
10 November 2020
Reviewed complainants‟ report and question from insurer.
D eflection of the roof trusses may have been contributed to by
water ingress into the c eiling space as a res ult of the recent storm
event, however this is irrelevant from a structural point of view as
the additional deflection was occurring to structural members that
had already failed.
R equirement that the roof trusses be fully replaced wi th new
trusses is 100% the result of inadequat e design / manufacturing of
the trusses, and this requirement would have been in place prior
to the recent storm event occurring.
Complainants‟ engineer could not inspect the failed roof trusses
as they had been replaced so our opinion remains.
As for moisture content increasing within the timber trusses and
resulting in failure of the gang nail plates, no signs of water
staining or water damage were observed to the bottom chords of
the trusses or in the area around the gang nail plates to indicate
that increased moisture content in the timber members had
caused failure of the gang nail plates (see Photos 1 and 2). It is
also noted t hat timber ceiling battens had been installed to the
bottom chords of the trusses which also did not show signs of any
water staining / water damage, and therefore any water located in
the ceiling area would not have affected the truss members unless
the c eiling battens had also been heavily water affected.
F ailure of the gang nail plates has been a shear failure due to the
inadequate design / manufacturing of t he trusses and has not
been caused or accentuated by any water ingress into the ceiling
space.
N ot clear how the engineer determined that the capacity of the
gang nail plates to the roof trusses had been reduced by 30% due
to the sat uration of the timber, particularly as the engineer could
not carry out an inspection of the damaged trusses, and no w ater
staining, or water damage of the trusses was observed by our
office.
Cash settlement quotation
(JL)
6 October 2020
Original $125,834.31
Variations 1 Mould $8125.72 (Submitted to budget)
Revised $133,960.03
Invoiced to date $46,170.00
Costs incurred $51,971.2
Mark up 16% = 8,315.39
Total amount = $60,286.59
Final invoice $14,116.59
Cash settlement amount $73,673.44 exc GST
Determination | Case number: 754094 Page 12 of 12
Record Key poi nts
Complainant s’ expert (M )
Engineer Report
10 July 2020
Inspected and photographed roof 7 July 2020.
Roof trusses deformation described.
Disintegration happened at the most loaded joints. Most likely
technical cause of the damage is the load applied to the trusses
exceeded their capacity.
Considering recent storm event triggering damage to the ceiling,
m ost probable affecting f actor was added weight of stormwater
leaked through tiled cladding and congregated above ceiling for
some time thus causing structural damage to the trusses .
Damaged trusses need to be propped and might require to be
replaced.
Complainant s’ expert (RB )
Engineer Report
20 October 2020
Inspected 15 October 2020 and says likely that the saturation of
the ceiling insulation was a result of waterproofing issues to the
roof.
Saturation of the ceiling insulation likely lead to increasing load in
the ceiling ex ceeding the capacity of the bottom chord of the
trusses leading to failure.
Moisture contact of timber within trusses likely to increase.
Load capacity of gang nail plate likely to be reduced by 30% due
to saturation of timber.
Ingress of water into the ce iling space has led directly to the
failure of the roof trusses.
3.4 Other relevant material considered and relied on
Parties‟ submissions /emails and all attachments to all submissions/emails.
Parties‟ expert reports.
Photographs, scopes of work and quotes.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.