Insurer declined cover for storm-damaged boundary wall under faulty design and inherent defect exclusion
Text of the determination
Determination
Case number 753124
Financial firm AIG Australia Limited
Determination | Case number: 753124 Page 1 of 7
Case number: 753124 30 July 2021
1 Determination overview
1.1 Complaint
The complainants hold a home building and contents insurance policy (policy) with the
financial firm (insurer). On 20 January 2020, a claim was lodged for storm damage to a
section of the boundary wall (wall) that occurred during a significant storm event on 18
January 2020.
The insurer has accepted to cover damage caused by the collapse of the wall, but it has
declined to cover the cost to repair/rebuild the damaged section of the wall. The insurer says
it can deny cover for the wall because the loss is the result of inherent defects and defective
design, which is excluded from cover under the policy.
The complainants disagree and say the insurer should accept the claim and pay the repair
costs.
1.2 Issues and key findings
Is the insurer entitled to limit its liability under the claim?
No. The available information shows:
the insurer’s assessment of the wall in question and associated concerns raised are not
accurate in the circumstances
the damage to the wall is because of the significant storm event and not inherent defects
and/or faulty design.
Therefore, the insurer is to cover the complainants for the cost to repair the damaged wall.
Are the complainants entitled to professional costs?
Yes. The insurer is to reimburse the complainants for the costs incurred in engaging
engineering consultant ‘R’ to assist with addressing the insurer’s decision to decline cover for
the damage to the wall.
The insurer is not required to reimburse the complainants for costs incurred in engaging the
services of ‘LM’ or their brokers ‘AB’, who assisted with the management of the complainants’
claim under the policy.
1.3 Determination
This determination is substantially in favour of the complainants.
The insurer is to cover the damage to the wall as outlined in section 2.1 below
The insurer is to reimburse the complainants $2,094.95 for the costs incurred in engaging
R to assist with their claim within 14 days of the complainants accepting the determination
The insurer is to pay interest on the $2,094.95 in line with section 57 of the Insurance
Contracts Act 1984 (Act) from the date the payment was made by the complainants to the
date on which payment is issued under the claim.
Determination | Case number: 753124 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer entitled to limit its liability under the claim?
Policy covers accidental damage
The policy provides cover against accidental damage, meaning it covers loss or damage to
the property which is unintended and unexpected, subject to the policy exclusions.
There is no dispute the damage to the wall in question was accidental for the purpose of the
policy nor is there any dispute between the parties that a valid claim exists.
The insurer has accepted to cover $5,412.85 in resultant damage caused by the partial
collapse of the wall. However, it is seeking to decline cover for the damage to the wall in line
with the exclusions specified in the product disclosure statement (PDS).
The relevant exclusion provision relied on by the insurer is provided in section 3.2 of this
determination.
The wall is not a retaining wall rather it serves as a boundary wall
T he insurer appointed engineers ‘F’ to assess the cause and extent of the damage to the
wall. F completed its assessment and confirmed approximately 20m of the 30m wall had
collapsed. Although, F accepts the significant rainfall event has contributed to the wall’s
collapse, it says the wall was being used as a retaining wall and as such was not built to
purpose.
F maintains, given the sand (fill) placed within the gap between the swimming pool and the
wall used as a garden bed, this has placed lateral loading on the wall for which it was not
designed nor constructed. F confirms the swimming pool had its own structural support and
so will not have contributed to any lateral loading on the wall.
I note F refers to current Australian Building Standards (Standards) and the Building Code of
Australia (BCA). However, I am not persuaded by this given the wall was constructed at least
12-13 years prior and it has not been shown its construction was subject to the current
standards. Further, in referring to the Standards and Code, this information has not been
made available for consideration.
I note F’s opinion that a competent builder would have taken into consideration the purpose of
the wall and the various loading factors (such as the fill and weather events in the area) in the
design and construction of the wall. I am not of the view the fill is a significant contributing
factor, which will be discussed in further detail below, nor that the wall intended to or was
serving as a retaining wall.
Having considered the Bureau of Meteorology (BoM) weather data, it is clear that the
significant storm in question was not a re-occurring or expected event. The amount of rainfall,
247mm which on balance occurred over a two-hour period and at the most over 24hrs, could
not reasonably have been expected. This is because the median monthly rainfall shows an
average of between 31.5 to 150.2mm since 1993.
The insurer in proposing the fill is a significant factor in the walls collapse has not provide any
information that assists in establishing the amount of fill, its weight or the degree of lateral
loading this may have been applyi ng to the wall. I find the evidence from the complainant’s
appointed engineer R to be the more persuasive regarding the purpose of the wall. I accept
Determination | Case number: 753124 Page 3 of 7
his view that the amount of fill was insignificant in terms of applying lateral load to the wall
and as such there was no requirement for the wall to be constructed/altered to serve as a
retaining wall.
I accept the wall was built to purpose, that being to serve as a boundary wall between the
complainants’ and their neighbours properties. It was not required to nor was it serving as a
retaining wall for the purpose of the policy or otherwise.
Damage to the wall was, on balance, caused by the storm
The evidence shows the bottom of the wall has failed, with it falling outward from the insured
property into the neighbouring property. The images and expert views show the failure had a
cartwheel effect, as the top of the fence has fallen toward the insured property.
The parties’ experts agree that the damage is consistent with having occurred during or
shortly after the significant weather event. F accepts the rainwater will have contributed to the
partial collapse of the wall, however, says the proximate cause for the damage is inherent
defects and faulty design of the wall.
I do not accept F’s findings in this regard. This is because, in addition to matters considered
above, there is no evidence or suggestion that the walls construction or design was defective
to serve as a boundary wall. Secondly, the basis for F’s fin dings that the walls construction
was subject to inherent defects and faulty construction, relate to his opinion that the wall
should have been constructed to serve as a retaining wall, which I do not accept.
There is no evidence suggesting the wall was unsound or presented with any maintenance or
wear and tear issues prior to the storm. Rather, the information shows the wall remained
erect with the stated fill for 13 years or more without any issues. It was not until this significant
event that delivered over a month’s worth of rainfall within a short period that the loss the wall
failed. In addition to the rainfall, the information shows the downpour has caused the
swimming pool to overflow and contribute even more water into the gap between it and the
wall.
I am satisfied that the evidence establishes, on balance, it is the significant amount of rain
and pool water that has inundated the gap between the pool and the wall and caused the
significant lateral loading resulting in the collapse. As noted above, I accept R’s persuasive
evidence that the fill will have had minor role in terms of lateral loading to the wall with the
dominant cause for the damage being the significant weather (rainfall) event. As such, I do
not accept the cause for the damage to the wall is inherent defects and/or defective design of
the wall as alleged.
Damage does not fall within the exclusion
The insurer holds the onus to show, on balance, the claim falls within the policy exclusion of
faulty design and inherent defect which it has relied on to decline the claim.
For the reasons considered above, I am not satisfied the insurer has been successful in
establishing that the damage to the wall is the result of circumstances excluded under the
policy. Accordingly, I determine the insurer is to cover the damage to the wall in line with its
obligations set out under the policy.
Insurer is to pay the reasonable costs to repair the damaged wall
I note the complainant has expressed an interest in being cash settled for the cost to repair
the wall. The complainant has provided two quotes, one in the amount of $46,313.85 from
Determination | Case number: 753124 Page 4 of 7
‘TS’ and the other in the amount of $104.500 which is from a company where the complainant
is the General Manager. The insurer’s informatio n shows it sourced a quote for repairs from
‘NP’ based on the scope of works provided by F, in the amount of $79,883.61.
However, I note the quotes from the complainant include additional works in terms of
constructing a new block wall and installation of a drainage system as part of the repairs.
These works are not consistent with the construction of the wall before its partial collapse and
would reasonably be considered works to upgrade the wall, which is not covered under the
policy. Similarly, NP’s quote is based on F’s opinion t hat a retaining wall should be
constructed, which again is not consistent with the wall in question and would be an upgrade.
Therefore, considering what is fair in all the circumstances and consistent with the insurer’s
policy obligations, I determine within 14 days of the complainants accepting this
determination:
The insurer is to arrange for a suitably qualified builder to attend the insured property and
provide a repair quote to restore the damaged wall to the condition it was in prior to the
loss
The insurer is to then cash settle the complainants in line with this quote plus a 15%
contingency for any unforeseen costs and the risk the complainants assume in organising
the repairs themselves. The complainants can then, if the wish to do so, arrange for the
wall to be constructed including the proposed upgrades and drainage.
2.2 Are the complainants entitled to professional costs?
Insurer to cover complainants’ expert expenses
Under Rule D.5 of the AFCA rules, AFCA may require a financial firm to contribute up to
$5,000 for legal or other professional costs incurred by a complainant during a complaint.
The complainants are claiming $2,094.95 paid to R for his assistance and expert opinion as
an engineer. I agree the insurer must cover the cost of the complainants’ engineer.
This is because I accept R ’s investigation and opinions have had a substantial impact on the
outcome of the complaint. Given, I have found in favour of the complainants, it is fair to
accept R’s evidence has contributed to this outcome and it is fair the insurer covers the full
cost of R’s services.
The complainants are also seeking payment of $5,230.28 in complaint management fees. I
accept, given the nature of the claim and the insure r’s position, it has required commitment
and time to pursue the claim. However, I believe the insurer’s claims process as well as
AFCA’s process, are designed to be easily accessible and managed. As such, the cost to
generally manage a claim or complaint is not something the insurer is expected to cover.
Although time consuming and a requiring the commitment to pursue a favourable outcome
was needed, I am not satisfied the task of pursuing the claim was so technical or beyond the
capability of a layperson, that it required appointing professionals to manage. As noted
above, I accept the use of an engineers was reasonable given the nature of the claim.
Accordingly, in line with the AFCA Rules, I determine the insurer is to reimburse the
complainant for the cost ($2,094.95) associated with engaging R. The insurer is to pay
interest on this amount in line with section 57 of the Act, from the date the invoice was settled
to the date on which the insurer issues payment to the complainants.
Determination | Case number: 753124 Page 5 of 7
2.3 Why is the outcome fair?
The outcome is fair because the insurer holds the onus to show exclusions apply and, based
on the evidence, it has not established an exclusion applies. In this case, the evidence shows
on balance the storm is more likely to be the cause of the damage than the walls
construction. Accordingly, the insurer must accept the claim. As to the reimbursement of
professional fees, payment of R’s fees is fair because the assistance and advice provided
was of a technical nature and has had a substantial impact on the outcome of the complaint.
Determination | Case number: 753124 Page 6 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Key policy information
The cover
We will cover You if there is accidental loss of or accidental damage, which occurs during the
Period of Insurance, to the Building described in the Insurance Schedule. This means We will,
at Our option, repair, replace or pay You the reasonable cost to repair or replace the Building
to its Replacement Cost.
General exclusions
Unless otherwise stated in the Insurance Schedule, this Policy does not cover:
1. loss of or damage to Your property which is caused by:
…
Determination | Case number: 753124 Page 7 of 7
b. mechanical breakdown, electrical breakdown, faulty workmanship, inherent defect,
omission, faulty design or faulty materials.
…
3.3 Table of expert opinions
Record Key points
Financial firm’s engineer ( F )
Report
18 February 2020
The wall w as design ed as a boundary fenc e and not a ret aining
wall. This contributed to the collapse as the wall is retaining soil.
The wall has engaged piers at the northern and southern end of
the wall, but not in the middle. Only the middle failed.
The wall does not have any weep holes or drainage to relieve
hydrostatic pressure. This fails to meet the building code.
Nearby pool has its own support, so only the fill bet ween the pool
and the wall can exert pressure.
Observed d amage suggests lateral pressure was caused by
surface wat er pressure.
Complainant s ’ engineer ( R )
Report
25 August 2020
The wall was not build as a retaining wall.
The fill material was of such light weight compared to the bricks
that a retaining wall was not necessary.
247mm of rain has caused an overflow from the pool, wetted the
foundations and caused a cartwheel failure of the footing.
This is the result of a single event of rain.