Storm water damage to home; structural timber rot excluded as wear and tear; contents and utility claims refused
Text of the determination
Determination
Case number 752130
Financial firm AAI Limited
Determination | Case number: 752130 Page 1 of 8
Case number: 752130 6 September 2021
1 Determination overview
1.1 Complaint
The complainant held a Home and Contents policy with the Financial firm (insurer) and in
January 2020 lodged a claim after water entered her property through an upstairs balcony
causing damage to her garage. On 20 February 2020 the complainant notified the insurer of
further damage from water entering her lounge room.
The insurer completed make safe repairs and accepted liability for the internal resulting water
damage. The insurer denied liability for the structural damage including the timber rot saying
it was not caused by a storm event and was caused by wear, tear and gradual deterioration
which is excluded under its policy.
The complainant disputes the findings and says the rain events and the insurer ’ s delays
caused damage to the timber joists and mould related damage to building, contents and a
cross contamination of contents. Additionally, she seeks costs for utility expenses, additional
accommodation and compensation due to the claims handling experience.
1.2 Issues and key findings
Is the insurer liable to increase its settlement offer?
Yes. The panel considers the insurer ’ s settlement offer for the internal damage should be
increased by 25% to $21,315 as outlined in section 2.1. The panel is otherwise satisfied the
structural damage was caused by wear, tear and gradual deterioration which is excluded
under the terms of the policy and the insurer is entitled to deny the claim and any further
claim for contents, temporary accommodation and utility bills.
Is the insurer liable for the removalist costs?
Yes. It is fair it pays $3,200 for the costs incurred to move contents between the
complainant’s property and temporary accommodation.
Is the complainant entitled to compensation for non-financial loss and the
expert reports?
Yes. The complainant is entitled to compensation for non-financial loss for $2,500, payment
of the expert report from PES of $2,145 and from PS of $715.
1.3 Determination
This determination is substantially in favour of the financial firm.
Within 14 days of the complainant accepting this determination the insurer is to pay the
complainant $21,135 for damage claimed, $3,200 for removalist costs, $2,500 compensation
for non-financial loss and $2,860 for expert reports.
The insurer is otherwise entitled to refuse payment of the claim in accordance with the terms
and conditions of the policy.
Determination | Case number: 752130 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer liable to increase its settlement offer?
Complainant has the onus to establish a valid claim
When making a claim, the complainant has the onus of establishing, on the balance of
probabilities (that it is more likely than not), that a loss occurred which is covered by the
insurance policy.
If a claimable loss is established, the onus shifts to the insurer to establish, on the balance of
probabilities, the application of any condition or exclusion it relies on to reduce its liability.
The complainant seeks the following:
settlement based on her builder’s SC quotation which includes replacement of timber joists
for a sum of $128,260.
the soft furnishings need to be replaced, including couch, mattress and dining chairs
costs for relocation of contents to insured property at $1,600
compensation for non-financial loss due to the timeliness and health implications of the
mould
financial losses for utility bills.
Policy covers insured events subject to exclusions and conditions
The cover provided by the policy is set out in the product disclosure statement (PDS) and the
certificate of insurance. There is no dispute the complainant received these documents.
The policy insures the building and contents for several insured events including storm
damage subject to various conditions and exclusions. Events or incidents are defined under
the policy to mean a single event, accident or occurrence you did not expect to happen.
The complainant lodged a claim on 26 January 2021 for storm damage after water entered
through her balcony and caused damage to the garage section of her property during a storm
14 January 2020. The complainant notified the insurer of a second claim via email in
February 2020 after water entered her property through her courtyard, resulting in water
damage to the lounge room. The claim was closed and both areas of damage were
considered under the first claim.
The storm events caused internal damage
The panel is satisfied the storm events in January and February 2020 caused internal
damage to the home and need for mould remediation.
The insurer appointed builder (DW) to make safe the balcony and assess the claim. In April
2020, DW reported on the leak to the lounge room and advised wind driven rain during a
storm entered the property causing damage, the entry point was determined to be due to a
failed waterproof membrane.
T he claim notes and the complainant’s timeline show a significant delay in any action by the
insurer following these reports. In June 2020, the insurer arranged an assessment with
builder (KI) and the insurer ’ s internal assessor (BH) to determine the extent of damage.
Determination | Case number: 752130 Page 3 of 8
KI considered the balcony above the garage has issues with waterproofing with resultant
water damage to ceilings, wall linings and flooring. KI submitted a scope of works (including
the lounge related damage) for an amount of $17,051.68.
The insurer ’ s assessor BH noted DW’s first make safe failed. BH reported in July 2020 that a
second make safe was arranged that was successful. DW understood further minor water
entry occurred in this time however even though the claim was six months old, the further
leaks were mild, and water was not pouring into the property.
Mould related damage to ceiling and timber joists remediated
BH recommended (CA) attend to the mould issues at the property and remove the mould
affected ceilings to allow access to inspect joists.
CA completed mould sampling through its expert (EU). In summary CA advised the water
impact from the leaks was minimal and the mould sampling recorded low results to the
contents.
The complainant obtained a mould assessment from (PES) in October 2020. PES reported
high levels of mould in the lounge and garage areas on both surface and air particles. PES
identified wet rot to the timber joists in the lounge and garage and recommended the
remediation of building materials, including timber, plasterboard linings and soft furnishings to
lounge and garage. CA accepted the mould related damage to ceiling linings and timber joists
in lounge and garage.
A further mould assessment was completed shortly after by a mould expert NS. NS
considered the mould presented a health hazard and noted recent growth and the species
related to wood rot.
CA completed mould remediation at the property December 2020 including encapsulation to
prevent further contamination at the property. CA noted the mould retardant solution lasts for
approximately three months.
The Panel accepts the insurer notified the complainant at that time that it would cash settle
the claim due to the ongoing water leaks and limit any further temporary accommodation
costs.
Structural damage most likely due to wear, tear and gradual deterioration
BH advised the complainant had a builder attend and noted that the joists at the property
were rotted. BH queried how the builder determined this as there was no visibility of the joists
and does not believe the joists would have rotted unless the damage was occurring for a
considerable amount of time.
An engineer JH assessed the property on behalf of the insurer in December 2020 and
considered that the ‘ water ingress into the premises is due to a deficiency in the
waterproofing of the upper level balcony areas. During various high rain events, water
may pool on the balcony and seep through voids of the balcony into the substructure
below. This has caused prolonged water damage to the timber framing in the Living area
and Garage, with severe timber rot, water staining and mould growth. The wa ter ingress
and damage observed is considered to have been occurring for a number of year s.’
The complainant’s response, in April 2021, included a builder report from PSB. PSB
considered the water entry to the eastern side of the property affected the areas of timber
Determination | Case number: 752130 Page 4 of 8
framing to the terrace and deck. PSB believed that water entered the building during
heavy storms, but there was also evidence of building defects.
PS B’s findings are relative ly consistent with the insurer ’ s builders and engineer as PSB
advised water ingress occurred due to the failed waterproofing. PSB also says it may
have been exacerbated by heavy storms.
JH in response, generally agrees with PS B’s findings. However, JH noted PS B’s flood
testing mirrored effects of typical rainfall events. JH considered this proved water ingress
through the faulty and deteriorated waterproof membranes occurred. This combined with
the timber perseverative and drainage not being in accordance with the relevant
Australian Standards were the primary cause of the rotten timber joists and not the heavy
storms reported. JH further noted the dwelling also lacks adequate eave width, allowing
further seepage at the property.
In summary (JH) says water ingress continuously occurred during ongoing rainfall events
due to lack of adequate waterproofing to the deck and balcony above the garage and
lounge causing the timber joists to have deteriorated badly over time. The severity of
timber rot indicates that the rot has not occurred from a one-off, relatively recent (January
2020) event but from many rain events over a long period of time.
Insurer is entitled to limit building damage settlement
The evidence shows the water entry to the lounge and garage of the property did not occur
due to a single storm event but occurred due to the failure of the waterproof membranes to
the courtyard and balcony. It had been occurring over a significant period.
The panel is persuaded by the report from engineer JH. JH explained that for the extent of rot
to have occurred it would have taken several years and not a single event which the panel
accepts.
The complainant’s argument that there had been a drought does not assist. JH confirmed that
PS B’s flood testing was re flective of regular rainfall. Given the identified defects to the
balcony and courtyard, anytime it rained water was likely to be seeping onto the timber joists
causing rot and mould related damage.
The panel does not accept the make-safe failures or delays contributed to the damage. The
panel considers that the defects in design of the balcony were the proximate cause of
damage. The extent of rot to the point the structural integrity was affected is indicative the
damage was occurring for many years as mentioned by JH.
JH also reported it appeared previous repairs were completed to the timber joists. This further
supports JH’s position the waterproof membranes have a systemic issue that needs to be
addressed and that damage occurred gradually over time.
The complainant was on notice early in the claim that the defect to the balcony would not be
covered. It appears no attempts were made to mitigate or attend to the leaks. The panel is not
satisfied the insurer ’ s delays were the primary cause of the extensive rotting damage to the
timber structure.
In summary, the panel finds the mould and rot to the timber joists has not been caused by a
single storm event, thus a valid claim for this damage has not been established within the
terms of the policy. The panel is persuaded for the reasons outlined above that the damage
occurred over several years and damage caused in this manner is excluded (wear and tear,
gradual deterioration).
Determination | Case number: 752130 Page 5 of 8
Insurer has completed mould remediation
In December 2020, CA completed remediation and mould retardant solutions. CA reported
this had a 3-month effectiveness, but ongoing water entry and timber rot would lead to further
mould. The complainant’s reports were not arranged or received for four to five months
following this and it is likely that the mould condition worsened.
The panel notes that the timber joists were severely mould affected due to the ongoing water
entry issues at the property. Any repair to the ongoing water entry is the complainant’s
responsibility. Any further mould issues need to be addressed by the complainant.
Insurer is not liable to cover claimed for contents
The mould assessment from PES in October 2020, reported high levels of mould in the
lounge and garage areas on both surface and air particles. PES mentioned wet rot to the
timber joists in the lounge and garage and recommended the remediation of building
materials, including timber, plasterboard linings and soft furnishings to lounge and garage.
The complainant is seeking costs for all contents in the vicinity based on the report and says
the couch was moved to the temporary accommodation and potentially caused cross
contamination of mould.
The panel is persuaded the insurer ’s builder CA’s contractor (EU) conducted the most
thorough assessment of the contents at the property. CA’s mould assessor EU clearly
labelled and provided swab results for individual contents including the couch. Mould
sampling through EU of the contents noted the water impact from the leaks was minimal. The
mould sampling recorded low results to the contents.
CA had the couch tested at the temporary address of the complainant. The mould level was
reported to be low. CA noted contents items were boxed and stored and had been stored this
way for some time. Whilst dust and dirt were present none of the contents were directly
impacted by the water entry events.
While the complainant mentioned on several occasions that PES tested the lounge (referring
to the couch) the report refers to the ‘lounge’ generally for the room itself. It is unclear
whether testing to the couch occurred. A full reading of the report shows that the term lounge
was used for all swabs in the lounge room and the report does not clearly indicate it was the
‘couch’ that was tested and for this reason the report from EU is preferred.
PSB reported soft furnishings require replacement. EU’s report provides a breakdown of
contents tested. The panel finds the report from EU more comprehensive. There is a lack of
evidence provided by PSB to show the soft furnishings were in fact damaged by the water or
cross contaminated.
The panel is further persuad ed by CA’s comments that the contents themselves never
experienced water damage and therefore it is unlikely they have been affected by the claim
and the insurer is therefore not liable for the claimed contents
Insurer to increase settlement to allow for contingencies
The panel accepts the insurer ’ s scope of works provided by KI to be an accurate
representation of the damage the insurer is liable to cover under the terms of the policy.
The panel notes however the quotation only includes a 7.5% builder ’ s margin. In the panel ’ s
view a 12.5% builder ’ s margin is more realistic. Further, as the insurer is cash settling the
claim and given the nature of the damage it is fair to allow a 20% contingency on the
Determination | Case number: 752130 Page 6 of 8
settlement amount. The panel determines the insurer is to increase the settlement offer from
$17,051.68 to $21,135 to allow for a transfer of risk, any unforeseen minor damages related
to the accepted scope of works and the builder ’ s margin.
Therefore, for the building settlement, the insurer is to pay the complainant $21,135.
Insurer not liable for further temporary accommodation
In December 2020, the insurer put the complainant on notice it would no longer be paying
temporary accommodation and offered a total settlement for the claim including a further
allowance of six weeks for temporary accommodation based on its builder ’ s estimate for the
time it would take to complete repairs.
The insurer paid the complainant up until 22 January 2021 for temporary accommodation and
an additional six weeks fr om this date in advance due to the complainant’s delays in providing
expert reports.
The panel considers the insurer’s offer was fair given the finding that the ongoing damage
was not caused by an insured event. The panel determines the insurer is not liable for any
further temporary accommodation costs.
2.2 Is the Insurer liable for the removalist costs?
Insurer to increase offer to $3,200 for removalist costs
The complainant was placed in temporary accommodation in September 2020 and at this
time the complainant was advised any costs incurred would be at her expense to relocate her
contents.
The complainant was forced to move her own contents and she seeks the cost to do so. It
appears the parties had a breakdown in communication about who was required to move the
contents and (CA) attended to remove water damaged ceilings and report on any mould
damage to contents in September 2020 and report on the damage at the property.
The panel notes in its settlement letter the insurer offered to pay the complainant’s removalist
invoice of $1,600 to move the contents to temporary accommodation. The panel considers
this fair given the insurer could have arranged furnished accommodation.
The complainant seeks the cost to return the contents to the insure d’s property. The panel
considers this fair. The initial costs were necessarily incurred due to the presence of the
mould and to avoid contamination. The complainant has acted on the insurer ’ s advice in this
regard.
In the circumstances it is fair that the insurer covers the costs to return the items to the
complainant’s home. The panel determines the insurer should increase its offer for the
removalist costs to $3,200 to cover the return of the contents to the complainant’s home.
Determination | Case number: 752130 Page 7 of 8
2.3 Is the complainant entitled to compensation for non-
financial loss and the expert reports?
AFCA can award compensation for non-financial loss
Under the AFCA Rules, AFCA can award up to $5,000 compensation for non-financial loss if
a complainant suffered an unusual degree of stress, inconvenience, or delay in resolving a
claim.
Insurer to pay compensation for non-financial loss
The available information shows the insurer took a substantial amount of time between its first
reporting following the claim in January 2020 to July 2020 for any further action to occur on
the claim. That itself is a significant delay.
Following this, reports were not arranged until October 2020. It appears in this time there was
a breakdown in communication between the parties.
The complainant has clearly outlined the mental stressors and effects the claim had on her
health. The panel accepts the insurer could have assessed the claim more thoroughly at the
beginning and provided a scope of works which would have removed a large portion of the
delays.
There was the confusion about mould, removal of contents and temporary accommodation.
Again, the communication was less than satisfactory. The insurer gave the complainant no
guidance about moving the contents and left her to struggle with that. Contractors appointed
by the insurer ended up leaving the site. Again, this added to the frustration.
The panel considers the insurer ’ s claims handling has caused an unusual degree of physical
inconvenience and time taken to resolve the situation. The panel considers it is fair in the
circumstances the insurer pays $2,500 compensation for non-financial loss.
Insurer to contribute to complainant’s costs incurred in course of complaint
Under AFCA rule D3.5, AFCA can determine that a financial firm contribute to the
professional costs incurred by a complainant in the course of a complaint.
The complainant obtained a builder’s report from PSB. Whilst the report did not support the
complainant’s claim, it was of assistance in determining the likely cause of damage. The
complainant also obtained a mould assessment report from PES. The report has assisted in
determining this complaint.
Given the delays in this matter because of the claims handling, the panel considers it was fair
and reasonable for the complainant to obtain the reports from PES and PBS. PBS charged
$715 for its report. PES charged $2,145. The Panel considers it fair in the circumstances that
the insurer contributes $2,860 towards the complainant’s professional costs incurred.
Consequential costs excluded under the policy
The insurer is not liable for the utility bills claimed as these are a result of the claim itself and
not the insurer ’ s actions. The policy clearly excludes consequential losses because of the
claim itself. The panel determines the insurer is not liable for the utility bills claimed.
Determination | Case number: 752130 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive industry experience.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.