Home / Suncorp Group / Determination 752130

Determination 752130

Storm water damage to home; structural timber rot excluded as wear and tear; contents and utility claims refused

FirmSuncorp Group
Decided2021-09-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$24,795
Non-financial loss$2,500
Amount claimed$128,260
SourceAFCA PDF

Summary

The complainant claimed storm water damage to her home and contents after a 2020 claim. AFCA found the structural timber rot was excluded as gradual deterioration, but increased the building settlement to $21,135, ordered removalist costs of $3,200, non-financial loss compensation of $2,500 and $2,860 towards expert reports.

Structural damage from prolonged waterproofing failure is excluded as wear, tear and gradual deterioration, though the insurer's delays and poor communication warranted compensation and increased settlement.

Issues

Subjects and remedies

health or medicalhome or building damagepay claimpay compensationpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 752130 Financial firm AAI Limited Determination | Case number: 752130 Page 1 of 8 Case number: 752130 6 September 2021 1 Determination overview 1.1 Complaint The complainant held a Home and Contents policy with the Financial firm (insurer) and in January 2020 lodged a claim after water entered her property through an upstairs balcony causing damage to her garage. On 20 February 2020 the complainant notified the insurer of further damage from water entering her lounge room. The insurer completed make safe repairs and accepted liability for the internal resulting water damage. The insurer denied liability for the structural damage including the timber rot saying it was not caused by a storm event and was caused by wear, tear and gradual deterioration which is excluded under its policy. The complainant disputes the findings and says the rain events and the insurer ’ s delays caused damage to the timber joists and mould related damage to building, contents and a cross contamination of contents. Additionally, she seeks costs for utility expenses, additional accommodation and compensation due to the claims handling experience. 1.2 Issues and key findings Is the insurer liable to increase its settlement offer? Yes. The panel considers the insurer ’ s settlement offer for the internal damage should be increased by 25% to $21,315 as outlined in section 2.1. The panel is otherwise satisfied the structural damage was caused by wear, tear and gradual deterioration which is excluded under the terms of the policy and the insurer is entitled to deny the claim and any further claim for contents, temporary accommodation and utility bills. Is the insurer liable for the removalist costs? Yes. It is fair it pays $3,200 for the costs incurred to move contents between the complainant’s property and temporary accommodation. Is the complainant entitled to compensation for non-financial loss and the expert reports? Yes. The complainant is entitled to compensation for non-financial loss for $2,500, payment of the expert report from PES of $2,145 and from PS of $715. 1.3 Determination This determination is substantially in favour of the financial firm. Within 14 days of the complainant accepting this determination the insurer is to pay the complainant $21,135 for damage claimed, $3,200 for removalist costs, $2,500 compensation for non-financial loss and $2,860 for expert reports. The insurer is otherwise entitled to refuse payment of the claim in accordance with the terms and conditions of the policy. Determination | Case number: 752130 Page 2 of 8 2 Reasons for determination 2.1 Is the insurer liable to increase its settlement offer? Complainant has the onus to establish a valid claim When making a claim, the complainant has the onus of establishing, on the balance of probabilities (that it is more likely than not), that a loss occurred which is covered by the insurance policy. If a claimable loss is established, the onus shifts to the insurer to establish, on the balance of probabilities, the application of any condition or exclusion it relies on to reduce its liability. The complainant seeks the following:  settlement based on her builder’s SC quotation which includes replacement of timber joists for a sum of $128,260.  the soft furnishings need to be replaced, including couch, mattress and dining chairs  costs for relocation of contents to insured property at $1,600  compensation for non-financial loss due to the timeliness and health implications of the mould  financial losses for utility bills. Policy covers insured events subject to exclusions and conditions The cover provided by the policy is set out in the product disclosure statement (PDS) and the certificate of insurance. There is no dispute the complainant received these documents. The policy insures the building and contents for several insured events including storm damage subject to various conditions and exclusions. Events or incidents are defined under the policy to mean a single event, accident or occurrence you did not expect to happen. The complainant lodged a claim on 26 January 2021 for storm damage after water entered through her balcony and caused damage to the garage section of her property during a storm 14 January 2020. The complainant notified the insurer of a second claim via email in February 2020 after water entered her property through her courtyard, resulting in water damage to the lounge room. The claim was closed and both areas of damage were considered under the first claim. The storm events caused internal damage The panel is satisfied the storm events in January and February 2020 caused internal damage to the home and need for mould remediation. The insurer appointed builder (DW) to make safe the balcony and assess the claim. In April 2020, DW reported on the leak to the lounge room and advised wind driven rain during a storm entered the property causing damage, the entry point was determined to be due to a failed waterproof membrane. T he claim notes and the complainant’s timeline show a significant delay in any action by the insurer following these reports. In June 2020, the insurer arranged an assessment with builder (KI) and the insurer ’ s internal assessor (BH) to determine the extent of damage. Determination | Case number: 752130 Page 3 of 8 KI considered the balcony above the garage has issues with waterproofing with resultant water damage to ceilings, wall linings and flooring. KI submitted a scope of works (including the lounge related damage) for an amount of $17,051.68. The insurer ’ s assessor BH noted DW’s first make safe failed. BH reported in July 2020 that a second make safe was arranged that was successful. DW understood further minor water entry occurred in this time however even though the claim was six months old, the further leaks were mild, and water was not pouring into the property. Mould related damage to ceiling and timber joists remediated BH recommended (CA) attend to the mould issues at the property and remove the mould affected ceilings to allow access to inspect joists. CA completed mould sampling through its expert (EU). In summary CA advised the water impact from the leaks was minimal and the mould sampling recorded low results to the contents. The complainant obtained a mould assessment from (PES) in October 2020. PES reported high levels of mould in the lounge and garage areas on both surface and air particles. PES identified wet rot to the timber joists in the lounge and garage and recommended the remediation of building materials, including timber, plasterboard linings and soft furnishings to lounge and garage. CA accepted the mould related damage to ceiling linings and timber joists in lounge and garage. A further mould assessment was completed shortly after by a mould expert NS. NS considered the mould presented a health hazard and noted recent growth and the species related to wood rot. CA completed mould remediation at the property December 2020 including encapsulation to prevent further contamination at the property. CA noted the mould retardant solution lasts for approximately three months. The Panel accepts the insurer notified the complainant at that time that it would cash settle the claim due to the ongoing water leaks and limit any further temporary accommodation costs. Structural damage most likely due to wear, tear and gradual deterioration BH advised the complainant had a builder attend and noted that the joists at the property were rotted. BH queried how the builder determined this as there was no visibility of the joists and does not believe the joists would have rotted unless the damage was occurring for a considerable amount of time. An engineer JH assessed the property on behalf of the insurer in December 2020 and considered that the ‘ water ingress into the premises is due to a deficiency in the waterproofing of the upper level balcony areas. During various high rain events, water may pool on the balcony and seep through voids of the balcony into the substructure below. This has caused prolonged water damage to the timber framing in the Living area and Garage, with severe timber rot, water staining and mould growth. The wa ter ingress and damage observed is considered to have been occurring for a number of year s.’ The complainant’s response, in April 2021, included a builder report from PSB. PSB considered the water entry to the eastern side of the property affected the areas of timber Determination | Case number: 752130 Page 4 of 8 framing to the terrace and deck. PSB believed that water entered the building during heavy storms, but there was also evidence of building defects. PS B’s findings are relative ly consistent with the insurer ’ s builders and engineer as PSB advised water ingress occurred due to the failed waterproofing. PSB also says it may have been exacerbated by heavy storms. JH in response, generally agrees with PS B’s findings. However, JH noted PS B’s flood testing mirrored effects of typical rainfall events. JH considered this proved water ingress through the faulty and deteriorated waterproof membranes occurred. This combined with the timber perseverative and drainage not being in accordance with the relevant Australian Standards were the primary cause of the rotten timber joists and not the heavy storms reported. JH further noted the dwelling also lacks adequate eave width, allowing further seepage at the property. In summary (JH) says water ingress continuously occurred during ongoing rainfall events due to lack of adequate waterproofing to the deck and balcony above the garage and lounge causing the timber joists to have deteriorated badly over time. The severity of timber rot indicates that the rot has not occurred from a one-off, relatively recent (January 2020) event but from many rain events over a long period of time. Insurer is entitled to limit building damage settlement The evidence shows the water entry to the lounge and garage of the property did not occur due to a single storm event but occurred due to the failure of the waterproof membranes to the courtyard and balcony. It had been occurring over a significant period. The panel is persuaded by the report from engineer JH. JH explained that for the extent of rot to have occurred it would have taken several years and not a single event which the panel accepts. The complainant’s argument that there had been a drought does not assist. JH confirmed that PS B’s flood testing was re flective of regular rainfall. Given the identified defects to the balcony and courtyard, anytime it rained water was likely to be seeping onto the timber joists causing rot and mould related damage. The panel does not accept the make-safe failures or delays contributed to the damage. The panel considers that the defects in design of the balcony were the proximate cause of damage. The extent of rot to the point the structural integrity was affected is indicative the damage was occurring for many years as mentioned by JH. JH also reported it appeared previous repairs were completed to the timber joists. This further supports JH’s position the waterproof membranes have a systemic issue that needs to be addressed and that damage occurred gradually over time. The complainant was on notice early in the claim that the defect to the balcony would not be covered. It appears no attempts were made to mitigate or attend to the leaks. The panel is not satisfied the insurer ’ s delays were the primary cause of the extensive rotting damage to the timber structure. In summary, the panel finds the mould and rot to the timber joists has not been caused by a single storm event, thus a valid claim for this damage has not been established within the terms of the policy. The panel is persuaded for the reasons outlined above that the damage occurred over several years and damage caused in this manner is excluded (wear and tear, gradual deterioration). Determination | Case number: 752130 Page 5 of 8 Insurer has completed mould remediation In December 2020, CA completed remediation and mould retardant solutions. CA reported this had a 3-month effectiveness, but ongoing water entry and timber rot would lead to further mould. The complainant’s reports were not arranged or received for four to five months following this and it is likely that the mould condition worsened. The panel notes that the timber joists were severely mould affected due to the ongoing water entry issues at the property. Any repair to the ongoing water entry is the complainant’s responsibility. Any further mould issues need to be addressed by the complainant. Insurer is not liable to cover claimed for contents The mould assessment from PES in October 2020, reported high levels of mould in the lounge and garage areas on both surface and air particles. PES mentioned wet rot to the timber joists in the lounge and garage and recommended the remediation of building materials, including timber, plasterboard linings and soft furnishings to lounge and garage. The complainant is seeking costs for all contents in the vicinity based on the report and says the couch was moved to the temporary accommodation and potentially caused cross contamination of mould. The panel is persuaded the insurer ’s builder CA’s contractor (EU) conducted the most thorough assessment of the contents at the property. CA’s mould assessor EU clearly labelled and provided swab results for individual contents including the couch. Mould sampling through EU of the contents noted the water impact from the leaks was minimal. The mould sampling recorded low results to the contents. CA had the couch tested at the temporary address of the complainant. The mould level was reported to be low. CA noted contents items were boxed and stored and had been stored this way for some time. Whilst dust and dirt were present none of the contents were directly impacted by the water entry events. While the complainant mentioned on several occasions that PES tested the lounge (referring to the couch) the report refers to the ‘lounge’ generally for the room itself. It is unclear whether testing to the couch occurred. A full reading of the report shows that the term lounge was used for all swabs in the lounge room and the report does not clearly indicate it was the ‘couch’ that was tested and for this reason the report from EU is preferred. PSB reported soft furnishings require replacement. EU’s report provides a breakdown of contents tested. The panel finds the report from EU more comprehensive. There is a lack of evidence provided by PSB to show the soft furnishings were in fact damaged by the water or cross contaminated. The panel is further persuad ed by CA’s comments that the contents themselves never experienced water damage and therefore it is unlikely they have been affected by the claim and the insurer is therefore not liable for the claimed contents Insurer to increase settlement to allow for contingencies The panel accepts the insurer ’ s scope of works provided by KI to be an accurate representation of the damage the insurer is liable to cover under the terms of the policy. The panel notes however the quotation only includes a 7.5% builder ’ s margin. In the panel ’ s view a 12.5% builder ’ s margin is more realistic. Further, as the insurer is cash settling the claim and given the nature of the damage it is fair to allow a 20% contingency on the Determination | Case number: 752130 Page 6 of 8 settlement amount. The panel determines the insurer is to increase the settlement offer from $17,051.68 to $21,135 to allow for a transfer of risk, any unforeseen minor damages related to the accepted scope of works and the builder ’ s margin. Therefore, for the building settlement, the insurer is to pay the complainant $21,135. Insurer not liable for further temporary accommodation In December 2020, the insurer put the complainant on notice it would no longer be paying temporary accommodation and offered a total settlement for the claim including a further allowance of six weeks for temporary accommodation based on its builder ’ s estimate for the time it would take to complete repairs. The insurer paid the complainant up until 22 January 2021 for temporary accommodation and an additional six weeks fr om this date in advance due to the complainant’s delays in providing expert reports. The panel considers the insurer’s offer was fair given the finding that the ongoing damage was not caused by an insured event. The panel determines the insurer is not liable for any further temporary accommodation costs. 2.2 Is the Insurer liable for the removalist costs? Insurer to increase offer to $3,200 for removalist costs The complainant was placed in temporary accommodation in September 2020 and at this time the complainant was advised any costs incurred would be at her expense to relocate her contents. The complainant was forced to move her own contents and she seeks the cost to do so. It appears the parties had a breakdown in communication about who was required to move the contents and (CA) attended to remove water damaged ceilings and report on any mould damage to contents in September 2020 and report on the damage at the property. The panel notes in its settlement letter the insurer offered to pay the complainant’s removalist invoice of $1,600 to move the contents to temporary accommodation. The panel considers this fair given the insurer could have arranged furnished accommodation. The complainant seeks the cost to return the contents to the insure d’s property. The panel considers this fair. The initial costs were necessarily incurred due to the presence of the mould and to avoid contamination. The complainant has acted on the insurer ’ s advice in this regard. In the circumstances it is fair that the insurer covers the costs to return the items to the complainant’s home. The panel determines the insurer should increase its offer for the removalist costs to $3,200 to cover the return of the contents to the complainant’s home. Determination | Case number: 752130 Page 7 of 8 2.3 Is the complainant entitled to compensation for non- financial loss and the expert reports? AFCA can award compensation for non-financial loss Under the AFCA Rules, AFCA can award up to $5,000 compensation for non-financial loss if a complainant suffered an unusual degree of stress, inconvenience, or delay in resolving a claim. Insurer to pay compensation for non-financial loss The available information shows the insurer took a substantial amount of time between its first reporting following the claim in January 2020 to July 2020 for any further action to occur on the claim. That itself is a significant delay. Following this, reports were not arranged until October 2020. It appears in this time there was a breakdown in communication between the parties. The complainant has clearly outlined the mental stressors and effects the claim had on her health. The panel accepts the insurer could have assessed the claim more thoroughly at the beginning and provided a scope of works which would have removed a large portion of the delays. There was the confusion about mould, removal of contents and temporary accommodation. Again, the communication was less than satisfactory. The insurer gave the complainant no guidance about moving the contents and left her to struggle with that. Contractors appointed by the insurer ended up leaving the site. Again, this added to the frustration. The panel considers the insurer ’ s claims handling has caused an unusual degree of physical inconvenience and time taken to resolve the situation. The panel considers it is fair in the circumstances the insurer pays $2,500 compensation for non-financial loss. Insurer to contribute to complainant’s costs incurred in course of complaint Under AFCA rule D3.5, AFCA can determine that a financial firm contribute to the professional costs incurred by a complainant in the course of a complaint. The complainant obtained a builder’s report from PSB. Whilst the report did not support the complainant’s claim, it was of assistance in determining the likely cause of damage. The complainant also obtained a mould assessment report from PES. The report has assisted in determining this complaint. Given the delays in this matter because of the claims handling, the panel considers it was fair and reasonable for the complainant to obtain the reports from PES and PBS. PBS charged $715 for its report. PES charged $2,145. The Panel considers it fair in the circumstances that the insurer contributes $2,860 towards the complainant’s professional costs incurred. Consequential costs excluded under the policy The insurer is not liable for the utility bills claimed as these are a result of the claim itself and not the insurer ’ s actions. The policy clearly excludes consequential losses because of the claim itself. The panel determines the insurer is not liable for the utility bills claimed. Determination | Case number: 752130 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive industry experience. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.