Home / Zurich / Determination 751185

Determination 751185

Water damage claim declined in part due to concrete cancer exclusion; settlement offer amount disputed

FirmZurich
Decided2022-09-21
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$43,498
Non-financial loss—
Amount claimed$500,000
SourceAFCA PDF

Summary

The complainant claimed for water damage to a strata unit, which the insurer attributed to excluded concrete cancer while offering $37,824.60. AFCA found concrete cancer was the proximate cause, limited liability to subsequent damage, and ordered a 15% contingency increase to $43,498.29 plus temporary accommodation costs.

Concrete cancer is excluded under Exclusion 17, but the exclusion does not apply to subsequent damage the insured was unaware of, so the insurer must pay for that damage.

Issues

Subjects and remedies

motor vehicle collisionpay claimpay compensation

Related

All Zurich determinations · Find similar determinations

Text of the determination

Determination Case number 751185 Financial firm Zurich Australian Insurance Limited Determination | Case number: 751185 Page 1 of 9 Case number: 751185 25 August 2022 1 Determination overview 1.1 Complaint Between 31 March 2012 and 31 March 2016, the complainant held a Residential Strata Insurance policy with the financial firm (the insurer). On 8 April 2019, the complainant lodged a claim for water damage to unit 3C due to incidents in 2012 and 2015. The complainant says, unit 3C was damaged when burst pipes in 2012 and 2015 caused flooding in the unit which resulted in concrete cancer. The insurer does not dispute the 2012 and 2015 events could have potentially contributed to the damage but says the proximate cause of damage is concrete cancer which is excluded from cover under the policy terms. The insurer has offered $37,824.60 to repair the water damage to the kitchen area of unit 3C. The complainant says the water damage events have caused concrete cancer and seek $500,000 to cover the rectification repairs to unit 3C and ancillary costs. 1.2 Issues and key findings Is concrete cancer the proximate cause of the damage? Yes. The panel is satisfied the concrete cancer is the proximate cause of the damage and likely occurred gradually over time. Is the insurer entitled to limit its liability? Yes. It is fair in the circumstances that the insurer ’ s liability be limited to repair of the subsequent damage. Should the insurer increase its settlement offer? Yes. The insurer should increase its offer of settlement by 15% ($5,673.69) to $43,498.29 to cover possible contingencies. The insurer must also pay the reasonable temporary accommodation costs of the unit owner in accordance with the terms of the policy during the repair period. Why is the outcome fair? This outcome is fair as the available information supports a finding that while the events in 2012 or 2015 may have contributed to the concrete cancer it is likely the condition developed prior to the policy period. 1.3 Determination This determination is in favour of the insurer. Within 14 days of the complainant accepting this determination, the insurer is to pay the complainant $43,498.29 in settlement of the claim for damage to unit 3C in accordance with the terms of the policy. Determination | Case number: 751185 Page 2 of 9 The insurer must also pay the reasonable temporary accommodation costs of the unit owner in accordance with the terms of the policy during the repair period. Determination | Case number: 751185 Page 3 of 9 2 Reasons for determination 2.1 Is concrete cancer the proximate cause of the damage? Yes. The panel is satisfied the concrete cancer is the proximate cause of the damage and likely occurred gradually over time. Onus on complainant to establish a valid claim under the policy The onus is on the complainant to establish, on the balance of probabilities, that is more likely than not, that it suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. If the complainant can establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, an exclusion applies. The policy provides cover for physical loss or damage to the building and common contents occurring during the period of insurance. There is no dispute that a burst pipe flooded Unit 3B in 2012. There is also no dispute that in 2015 a burst pipe in unit (7B) above, caused water damage to the bathroom area of units below. The complainant ’s claim is for damage to unit 3C located between unit 3B and 3E. The complainant says the events in 2012 and 2015 have caused tiles in the kitchen and dining rooms to crack and lift. It says these events caused concrete cancer to develop in the slab. There is no dispute that the complainant has a valid claim for the flooding related damage. The insurer acknowledges that water may have flowed into unit 3C following the 2012 and 2015 events. The insurer says it has limited its liability as the corrosion of the slab has been confirmed by all the experts as concrete cancer. Further, it believes the concrete cancer was there before it was on risk (2012 to 2016). The insurer accepts the complainant may not have known of the problems in unit 3C. In these circumstances accepts liability for the subsequent damage but not the remediation and repair of the concrete cancer. Information indicates numerous water events prior to 2012. The panel notes the building is over 50 years old and has been subject to numerous water events over the years. The claims history shows 14 water related events between 2004 and October 2010 alone. A claim was lodged in November 2009 after unit 3E was flooded. At that time the complainant obtained a report from an expert building consultant, ICG, who identified water damage to the magnesite flooring and possible implications to the structural concrete slab because of this event. The report outlined: unit 3E was inspected due to a burst hot water inlet pipe that resulted in the entire unit being flooded with approximately 15mm of water  due to the age of this building the steel corrosion would be inevitable to varying degrees at the extremities of the unit  the internal floor of unit 3E has magnesite present as do all the units  magnesite will hold and trap moisture Determination | Case number: 751185 Page 4 of 9  magnesite flooring when exposed to water will greatly increase the likelihood of concrete corrosion within this slab. The panel accepts there were numerous water/burst pipe events prior to inception of the policy in 2012 Complainant ’ s reports confirm presence of concrete cancer There is no dispute that in July 2012 Unit 3B flooded after a pipe burst. Remedial work was required to remove the magnesite slab topping and repair the concrete cancer. In December 2015, Unit 3B was again flooded although the damage was confined to the bathroom. After the owner of Unit 3C noticed tiles lifting in the kitchen area in 2019 the complainant obtained a report from construction experts BCR on 11 November 2019. BCR reported:  tests performed showed that the risk of present-day corrosion to top steel reinforcement in the concrete slab due to carbonation or chloride ions was high  the slab had moisture and lower concrete cover  signs that induced reinforcement concrete corrosion had occurred  cracking, delamination and spalling of the concrete  leaking at the doorway and through the wall adjacent to the shower recess  the exposed rebar at location 3C-4 was found to be heavily corroding with a bar cross- section loss of approx. 5%  certain sections of the steel reinforcement that sits in the concrete were found to be free of any corrosion, this is because this level of concrete was higher.  water was already getting on the floors, and chlorides had already entered the reinforced steel edges in 2015 The complainant’s structural engineer SC reported on 5 April 2019: “ In regard to unit 3C, I observed tiles in the kitchen which have lifted and cracked, and what appears to be delaminated concrete under the carpet in the dining area. Unit 3C is located between units 3B and 3E, both of which have been flooded, unit 3B is currently having works undertaken to rectify corroding reinforcement and unit 3E has previously had extensive slab reinstatement works undertaken. ” “there is corrosion f rom iron chloride salts which pit the surface of bars, migrate into the bars and "dissolve" the steel which had delaminated the concrete.” The panel accepts the reports confirm corroding reinforcement to the floor slab of unit 3C from the magnesite being wet from the previous flood events. SC believes the event on 4 July 2012 and 9 December 2015 are the causation. However, the BRC report notes the magnesite issues to the units next door had contributed to the corrosion event as far back as 2009. Insurer’s expert findings show concrete cancer On 7 May 2019, the insurer ’ s expert engineer SGW inspected unit 3C in response to the SC April 2019 report. SGW noted:  structural engineers indicate that unit 3C has previously been subjected to water inundation  since the owners had purchased the property, there have not been any issues relating to water inundation, burst water pipe or the like Determination | Case number: 751185 Page 5 of 9  inspection of the unit reveals movement of the tiles in the galley kitchen area  there is a section of tiling where one tile cracked and another tile appears to have lifted slightly  there is some movement upon the concrete slab floor of the unit below the tiles observed underneath the carpet around the entrance area and near the entrance to the kitchen area  there also appears to be some movement of the concrete underneath the carpet and underlay. SGW confirmed: „ the opinion of the structural engineer inspected the site that the issue may in fact be concrete cancer as detailed in item 3 of the SC report ” SGW sought clarification from a civil engineer SWP. The report from SWP dated 6 June 2019 says: “cause of the observed movem ent within the floor tiles and concrete substrate is consistent with moisture ingress from Unit 3B, over an extended period caused concrete cancer in the concrete substrate of Unit 3C ” SWP provided a further desktop report and concluded:  the units in question are units 3C and 1E  unit 3B has had a water pipe burst event in 2012 causing uplift of floor tiles to both units  the observed movement to concrete substrate and uplifting of floor tiles within unit 3C is consistent with concrete cancer within the concrete substrate  the damage to unit 3C is consistent with concrete cancer within the concrete substrate caused by moisture ingress from the burst water pipe in unit 3B. Damage to property caused by concrete cancer The panel is satisfied that signs of concrete cancer had been found as early as 2009 in other units close to the unit 3C. The information on file shows a claims history from 2004 to October 2010 of 14 water/ burst pipe events. It is unclear exactly how many claims have been made over the fifty plus years since the building was erected. The panel accepts the complainant would have been aware of the risk of concrete cancer from at least 2009. The panel while acknowledging the events in 2012 and 2015 may have contributed to the development of the concrete cancer does not accept the information is sufficient to prove that most likely the concrete cancer was caused by either event. The panel accepts the proximate cause, that is the dominant and effective cause of the damage is concrete cancer that has developed over time and most likely prior to 2012. 2.2 Is the insurer entitled to limit its liability? Yes. It is fair in the circumstances that the insurer’s liability be limited to repair of the subsequent damage. Insurer entitled to rely on scope of works obtained for subsequent damages The terms and conditions of the policy are clear. The relevant policy terms are shown in section 3.3 of this determination Determination | Case number: 751185 Page 6 of 9 Exclusion 17, provides that the policy does not cover loss or damage caused by gradual corrosion or gradual deterioration or concrete or brick cancer. The exclusion does not apply to “ any subsequent damage to your building or common contents if you were not aware of, and a reasonable person in the circumstances could not be expected to have been aware of, the wear and tear, gradual corrosion or gradual deterioration or developing flaws ” . The insurer acknowledges the complainant would not have been aware of the concrete cancer in Unit 3C. It accepts liability for the subsequent damage. The insurer further invited the complainant to submit a scope of works (SOW) plus a report. Upon review the insurer would offer a contribution as set out below to the subsequent damage to unit 3C. The complainant has not submitted a SOW for the subsequent damages, however, it did submit a SOW for the rectification of the concrete slab. The insurer ’ s expert builder DM provided a scope of works and a report was obtained by loss adjusters ANA. ANA noted the following regarding the kitchen:  upon inspection of the above kitchen area we have found there to be 15-20 Drummy tiles, this is because of water ponding in the kitchen area  water penetrating through the grout causing the tiles to become drummy  proper repair method would be to remove the entire kitchen to replace the tiles  kitchen cabinet kick board look to be affected so therefore a kitchen replacement is warranted, the bench top will be salvaged unless it is damaged upon removal. ANA noted on inspection of the other areas of 3C:  there was no evidence of water damage any other areas of the unit,  apart from swollen kitchen joinery and drummy tiles the unit appeared in good order.  sections of the carpet had been cut previously by others  closer observation the current slab condition under the carpet looked as if there had been a form of recent remediation to sections of the slab in the form of patching which maybe evidence of other issues such as concrete cancer or similar. In the absence of further information, the panel accepts the insurer is entitled to rely on the SOW and quote obtained from DM for the subsequent damage on which to base its settlement offer. 2.3 Should the insurer increase its settlement offer? Yes. The insurer should increase its offer of settlement by 15% ($5,673.69) to $43,498.29 to cover possible contingencies and the transfer of risks associated with the cash settlement. Insurer should allow for contingencies Based on the above, the insurer offered a total settlement of $37,824.60 for the subsequent damages. The quote is dated 9 May 2022 and includes a builder’s margin of 20%. It does not however include any allowance for contingencies that may arise during the repair process or the transfer of risk to the complainant. In the panels view even though the quote is recent it would be fair to allow a 15% contingency allowance ($5,673.69) to cover these risks in the current circumstances. This would increase the settlement by to $43,498.60. The panel determines that within 14 days of the complainant’s acceptance of this determination the insurer is to pay the complainant $43,498.60 in settlement of the claim for damage to unit 3C. Determination | Case number: 751185 Page 7 of 9 Temporary accommodation also payable The policy also provides for temporary accommodation costs of unit owners including costs for accommodating pets, removal and storage of personal property. The insurers builders DM have assessed the removal of the entire kitchen to replace the tiles. It is highly likely the unit will not be fit for occupation during the repair process. As there is no indication of the likely repair period, the panel determines that subject to notification from the complainant of the commencement of repairs as per the SOW, the insurer is to pay the unit owners temporary accommodation costs in accordance with the terms of the policy. 2.4 Why is the outcome fair? This outcome is fair as the available information supports a finding that while the events in 2012 or 2015 may have contributed to the concrete cancer it is likely the condition developed prior to the policy period. The policy excludes cover for loss or damage caused by concrete cancer but not subsequent damage. The outcome is fair as it covers the subsequent damage in accordance with the terms of the policy Determination | Case number: 751185 Page 8 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes an ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive experience in general insurance. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy terms Relevant Policy Wording Under the section of the policy headed “Building and Common Contents Cover Section” it states: What you are insured against We agree to indemnify you against physical loss or damage to your building and common contents occurring during the period of insurance. Determination | Case number: 751185 Page 9 of 9 Exclusions We do not insure you against loss or damage caused by: water seeping or percolating through walls, roofs or floors or by water entering as a result of structural defects, faulty design, any gradual process or faulty workmanship in the building or water entering through an opening made for the purpose of alterations, additions, renovations or repairs. Exclusion 3 . will not apply to any subsequent damage to your building or common contents if you were not aware of, and a reasonable person in the circumstances could not be expected to have been aware of, the structural defect, faulty design, any gradual process or faulty workmanship. Exclusion 17. wear and tear, fading, chipping, scratching or marring, rust, gradual corrosion or gradual deterioration or concrete or brick cancer or developing flaws, or wet or dry rot or normal upkeep or making good. However, this Exclusion will not apply to any subsequent damage to your building or common contents if you were not aware of, and a reasonable person in the circumstances could not be expected to have been aware of, the wear and tear, gradual corrosion or gradual deterioration or developing flaws.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.