Home / Suncorp Group / Determination 750071
Determination 750071
Hail-damaged asbestos roof: repair method and cash settlement amount
Summary
The insurer offered to cash settle hail damage to an asbestos roof based on encapsulation costs, while the complainant wanted full replacement. AFCA found the offer unfair, ordered cash settlement of $56,177.99, and rejected the claim for other components.
Because the roof was already deteriorated, AFCA treated replacement as the optimal remedy and apportioned 33% of the averaged replacement quotes to the storm damage.
Issues
- Claim amount dispute primary · upheld“The insurer's offer to settle the claim based on the cost of the encapsulation repairs is not fair and reasonable to remedy the impact of the hail event under the terms of the policy.”
- Claim denial secondary · not upheld“The panel is not satisfied that the proximate cause of damage to these items was from the storm event.”
Subjects and remedies
home or building damagenatural disasterpay claim
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 750071
Financial firm AAI Limited
Determination | Case number: 750071 Page 2 of 9
Case number: 750071 23 June 2021
1 Determination overview
1.1 Complaint
The complainant holds a business insurance policy with the financial firm (insurer).
Following a storm event on 20 December 2018, the complainant lodged a claim for
hail damage to the commercial property covered by the policy.
The insurer accepted the claim and proposes to cash settle the claimed damage to
the asbestos roof based on the cost of encapsulation repairs. The complainant
disputes this is the appropriate repair method and seeks full replacement of the roof.
1.2 Issues and key findings
Is the settlement offered by the insurer fair and reasonable?
T he insurer’s offer to settle the claim based on the cost of the encapsulation repairs is
not fair and reasonable to remedy the impact of the hail event under the terms of the
policy. However, the insurer is entitled to rely upon its policy exclusions to limit its
liability regarding the claim.
How should the claim be settled?
The claim should be settled in accordance with the terms of this determination.
1.3 Determination
This determination is partially in favour of the complainant.
Within 14 days of acceptance of this determination by the complainant, the insurer is
to cash settle the complainant’s claim in accordance with the terms of this
determination.
Determination | Case number: 750071 Page 3 of 9
2 Reasons for determination
2.1 Is the settlement offered by the insurer fair and reasonable?
Liability for hail damage established
The complainant commenced cover with the insurer on 7 September 2018, when it
purchased the insured property. On 20 December 2018, a hail storm impacted the
property causing indentations on the asbestos roof sheeting, aluminium cooling fins
for the air conditioners and a broken skylight. Water ingress into the building was
otherwise attributed to maintenance issues and the internal damages have been
settled.
There is no dispute storm damage is covered by the policy and the claim has been
accepted.
Parties disagree about appropriate repair for accepted damage
The dispute concerns the appropriate repair for the damage to the asbestos roof from
the storm event. The complainant seeks full replacement of the roof, to return it to an
as new condition in accordance with the policy.
The insurer says encapsulation works are adequate for addressing the hail damage to
the roof and it has appropriately exercised its discretion to settle the cost of these
repairs. The insurer notes there is no structural damage to the roof from the event and
says replacing the roof would be for the purpose of addressing long-term deterioration
of the roof rather than the increased friability of the asbestos caused by the storm
event.
Relevant policy terms
The policy provides the insurer with a discretion to repair or replace damaged parts of
the property, or to pay the complainant the cost of repairing or replacing the building.
AFCA expects an insurer to exercise its choice of settlement fairly.
The policy states the insurer will only pay to return the property to a condition
substantially the same as, but not better or more extensive than, its condition when
new, using building materials readily available and in common use in Australia.
The policy also specifically excludes loss and damage caused by gradual
deterioration, normal upkeep of property, or existing defects or lack of maintenance to
property, unless the complainant can show he did not know about the deterioration,
defect or lack of maintenance. Further, the policy prevents a claim for repairing the
deterioration, defect or maintenance.
Evidence indicates roof in poor condition prior to storm event
The insurer obtained a roof report from DR dated 1 February 2019. DR noted small
marks from hail but found no holes or structural damage. DR said hail and debris may
Determination | Case number: 750071 Page 4 of 9
have blocked the box gutters causing them to overflow, and recommended
maintenance and monitoring. The insurer’s builder RP identified multiple water
ingress points due to aged penetration flashings, box gutter blockages from debris,
maintenance patch repairs over time, down pipes discharging onto flashings and
makeshift cladding on parapet walls. RP recommended replacement of the roof for
these reasons to comply with Australian standards.
The complainant also provided a report from roofing specialist TN, dated 5 September
2019. TN said the asbestos roofing was in very poor condition and has been
damaged from various hail storms. TN said the hail has damaged the top surface of
the asbestos making it friable and hazardous. TN also said the hail has weakened the
sheeting creating hair line cracks. TN recommended all existing roof sheeting be
removed and replaced with colorbond sheeting. TN also recommended replacement
of the gutters, internal wall cladding and parapet capping, which were described as
being in very poor condition, although TN did not say this was due to hail damage.
The insurer’s engineer DW, says the recommended lifespan of the asbestos roof
sheeting was 25 years, and estimated the building was constructed around the
1960’s, meaning the roofing had been in service for around 55 years. DW said there
is clear evidence of wear and tear to the asbestos, which can be attributed to all
weather actions, including hail over this period. DW also noted evidence of previous
patch repairs and cutting/penetration of sheeting to install ventilation ducts.
The insurer’s industrial hygienist CT, noted the roof sheeting was generally in very
poor condition and had weathered over time. CT confirmed the asbestos was friable
and may become airborne under some conditions. CT said some areas of the ceiling
cavity and mezzanine level were contaminated with asbestos due to a combination of
deteriorating sheeting, penetrations cut for exhaust ducts and improper removal of
asbestos components during previous repairs. CT also observed miscellaneous
fragments of broken sheeting across on the roof and damage to the underside of the
sheeting within the ceiling cavity. CT recommended decontamination and sealing of
all asbestos materials. CT acknowledged hail damage may have contributed some
damage to the roof sheeting, but said it was not the cause of it becoming friable. CT
said the poor and friable condition of the roof was due to weathering and deterioration
from wear and tear.
The complainant’s environmental consultant SE, noted asbestos cement roofing and
cladding deteriorates slowly over time as the upper surface is exposed to the
elements, resulting in excessive fibre loss over time. SE said asbestos roofing and
cladding in good condition can remain in place indefinitely providing appropriate
precautions are taken. This includes not drilling or cutting the asbestos products as
this may result in the release of fibres, keeping gutters and downpipes free of debris,
any broken or exposed edges should be sealed, and the structure as a whole should
be regularly inspected for maintenance. Considering these criteria, the evidence
confirms that the asbestos roof was already compromised due to the pre-existing
penetrations, breakages and maintenance issues.
Determination | Case number: 750071 Page 5 of 9
Noting the exchanged material, including several helpful photographs, the panel is of
the view that given the extent of pre-storm damage, the complainant would have
known of the deterioration in the roof’s condition.
In those circumstances the panel is satisfied that the insurer is entitled to rely upon its
exclusion for loss or damage caused by or arising from gradual deterioration or lack of
maintenance, to limit its obligations under the policy.
The complainant also seeks replacement of the steel roof sheeting, whirlybird vents
and ridge capping. Limited evidence has been provided regarding the cause of
damage to these components. There are no photos of the whirly birds and the photos
provided of the steel roof sheeting and ridge capping show a few dents on the peaks
of the ridge, and the edge of the ridge capping, unlike the asbestos which has
consistent hail pitting across the surface. The roof sheeting and ridge capping also
has established rust damage unrelated to the event. The panel is not satisfied that the
proximate cause of damage to these items was from the storm event.
Encapsulation verses roof replacement
DW noted the Australian Government Asbestos Safety and Eradication Agency
prefers removal of asbestos sheeting where possible to totally eliminate its risk but
accepts that encapsulation would protect the sheeting from mechanical damage and
increase its serviceability.
The complainant’s environmental consultant SE assessed the fibre release potential
of the asbestos at the property as low. SE says encapsulation is required as a
minimum control measure to prevent any potential release of asbestos fibres from the
roofing material, although removal of the asbestos was an optimum solution to
prevent any issues from future damage to the asbestos product.
The insurer maintains encapsulation of the asbestos is appropriate to address the
increased friability caused by the hail event, and that the need to replace the roof is
due to long term damage and maintenance issues.
The panel accepts that encapsulation repair is a minimal control measure, but that
removal of the asbestos is the optimal solution.
The experts generally agree the roof was in poor condition prior to the event and
replacing the roof is recommended. The evidence indicates the asbestos was
compromised prior to the event due to existing penetrations and deterioration.
The panel accepts that the insurer is not responsible for extending the longevity of the
complainant’s roof, addressing maintenance issues or upgrading the roof materials to
prevent potential future damage to the asbestos.
Determination | Case number: 750071 Page 6 of 9
2.2 How should the claim be settled?
RP advised it cannot warrant the encapsulation repairs due to the pre-existing
condition of the roof, including non-complaint flashings and maintenance issues .
Further, the panel is not satisfied it is fair or consistent with policy provisions that the
insurer be required to replace the roof.
Given these circumstances the panel is also satisfied that it is fair that the insurer be
entitled to cash settle the claim to finalise its obligations to the complainant.
The insurer seeks to cash settle the repairs based on RP’s encapsulation quote of
$47,794.56, provided on 4 October 2019. The insurer also offers an uplift of 10%, plus
an additional $2,000 for the damaged skylight and air conditioner fins, making a total
settlement of $54,574, for the storm damage to the roof.
Noting the panel’s view that replace ment is the optimal method of dealing with the
damaged asbestos roof, the panel is satisfied it is fair to use the replacement cost of
the roof and apportion that amount in accordance with what the panel believes is the
storm related damage.
The panel considers a fair apportionment for storm damage to be 33%, of the cost of
replacement of the roof.
The complainant provided a quote of $215,493.48, for complete replacement of the
roof but did not provide a comparison quote for encapsulation or replacement of the
skylight and air conditioner fins.
The insurer provided a quote for replacement of the roof, in the amount of
$124,979.23.
The panel has carefully reviewed both quotes and notes that both quotes are itemised
and most items on the complainant’s quote ar e at an increased cost per item,
compared to the insurer’s quote.
The complainant’s quote includes several additional items, some of which have not
been accepted by the panel and the insurer’s quote includes supervision,
administration and travelling/accommodation costs.
There is a significant difference in the amount of the two quotes and the panel is not
satisfied that there is sufficient evidence to prefer one quote over the other.
As such, the panel considers it fair that the amount of the two quotes be averaged at
$170,236.35. This would enable an accounting for both the advantages and
disadvantage of both quotes and allow the complaint to be finalised.
Determination | Case number: 750071 Page 7 of 9
Upon acceptance of this determination by the complainant, to meet its obligations to
the complainant, the insurer is to cash settle in the amount of $56,177.99, being 33%
of $170,236.35.
The insurer is not required to pay interest on this amount or to take any further action.
Determination | Case number: 750071 Page 8 of 9
3 Supporting information
3.1 Process
AFCA’s approach to this complaint
This complaint has been determined based on what is fair in all the circumstances,
having regard to legal principles, applicable industry codes or guidance, good industry
practice and previous decisions of AFCA or its predecessor schemes (which are not
binding).
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised. All the
provided information has been reviewed and considered. The parties have raised
numerous issues in their submissions to AFCA. However, commentary in this
determination is restricted to those issues considered relevant to the outcome.
A panel has determined this complaint. The panel consists of the panel chair
ombudsman, a representative with extensive experience in the insurance industry and
a representative with extensive experience in consumer claims.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on
oath, or to require third parties to give evidence. When we assess complaints, we
consider available documents, the recollections of the parties, and all relevant
circumstances. We give more weight to documents created at the time the events
occurred. If there is no relevant documentation, we will decide what is most likely to
have occurred based on the information provided to us. If there are conflicting
recollections and these are evenly weighted, we may find that a claim cannot be
established.
3.2 Relevant policy provisions
PDS page 28:
Policy Section 1: Fire and other damage
This section of the policy covers physical loss of or damage to your property from insured events
listed in this section, including but not limited to events such as fire, light ning and explosion. We
do not cover the theft or breakdown of your property under this section.
Your insurance under this policy section
Provided ‘Fire and ot her damage’ is shown under ’Sections Insured’ in the schedule , we will
insure you for loss of or damage occurring during the period of insurance to buildings ,
business contents , stock or specified items , arising from an insured event specified below
occurring at the situation .
This policy section (including the extra covers and additional benefits) does not insure:
…
Determination | Case number: 750071 Page 9 of 9
2. Maintenance or defects
Loss or damage caused by or arising out of:
a. rust or corrosion;
b. inherent or structural defects;
c. faulty design, materials or workmanship; or
d. developing flaws, gradual deterioration, normal upkeep of property , or existing defects or lack
of maintenance to property , unless you can show you did not know ab out the deterioration,
defect or lack of maintenance. You cannot claim for repairing the deterioration or defect or the
maintenance.
PDS page 45:
What we pay
1. Building(s), specified items or business contents
Reinstatement or replacement
Unless the schedule shows you are insured for ‘Indemnity’ then, when buildings , specified
items or busine ss contents are lost or destroyed we will, at our option:
a. rebuild the buildings at the situation shown on your schedule or at another site;
b. replace busi ness contents or specified items with similar property ;
c. pay you the amount shown on the proof of purchas e for specified items;
d. pay you the amount of a valuation by the Auctioneers and Valuers Association of Australia for
specified items of works of art, antiques and curios; or
e. pay the cost of rebuilding or replacing the buildings , specified items or busine ss contents .
If the buildings , specified items or busine ss contents are damaged , then we will, at our option:
a. repair or replace the buildings , specified items or busi ness contents ; or
b. pay the cost of repairing or replacing the buildings , specified items or busine ss contents .
Reinstatement or replacement is subject to the following conditions:
a. the work of rebuilding, replacing or repairing must be commenced and completed by you within
a reasonable time otherwise the amount we pay will be the indemnity value of the property .
This means we will reduce the amount we pay you to take into account age, wear, tear and
depreciation.
b. when rebuilding at another site, we will not pay more than we would pay to rebuild at the
si tuation .
c. when any property is damaged , but not destroyed, we will not pay more than the amount that
we could have been called upon to pay for if that property had been destroyed.
d. we will only pay to return the property to a condition substantially the same as, but not better
or more extensive than, its condition when new, using building materials readily available and
in common use in The Commonwealth of Australia.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.