Hail-damaged asbestos roof: repair method and cash settlement amount

FirmSuncorp Group
Decided2021-07-28
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded$56,178
Non-financial loss—
Amount claimed$215,493
SourceAFCA PDF

Summary

The insurer offered to cash settle hail damage to an asbestos roof based on encapsulation costs, while the complainant wanted full replacement. AFCA found the offer unfair, ordered cash settlement of $56,177.99, and rejected the claim for other components.

Because the roof was already deteriorated, AFCA treated replacement as the optimal remedy and apportioned 33% of the averaged replacement quotes to the storm damage.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 750071 Financial firm AAI Limited Determination | Case number: 750071 Page 2 of 9 Case number: 750071 23 June 2021 1 Determination overview 1.1 Complaint The complainant holds a business insurance policy with the financial firm (insurer). Following a storm event on 20 December 2018, the complainant lodged a claim for hail damage to the commercial property covered by the policy. The insurer accepted the claim and proposes to cash settle the claimed damage to the asbestos roof based on the cost of encapsulation repairs. The complainant disputes this is the appropriate repair method and seeks full replacement of the roof. 1.2 Issues and key findings Is the settlement offered by the insurer fair and reasonable? T he insurer’s offer to settle the claim based on the cost of the encapsulation repairs is not fair and reasonable to remedy the impact of the hail event under the terms of the policy. However, the insurer is entitled to rely upon its policy exclusions to limit its liability regarding the claim. How should the claim be settled? The claim should be settled in accordance with the terms of this determination. 1.3 Determination This determination is partially in favour of the complainant. Within 14 days of acceptance of this determination by the complainant, the insurer is to cash settle the complainant’s claim in accordance with the terms of this determination. Determination | Case number: 750071 Page 3 of 9 2 Reasons for determination 2.1 Is the settlement offered by the insurer fair and reasonable? Liability for hail damage established The complainant commenced cover with the insurer on 7 September 2018, when it purchased the insured property. On 20 December 2018, a hail storm impacted the property causing indentations on the asbestos roof sheeting, aluminium cooling fins for the air conditioners and a broken skylight. Water ingress into the building was otherwise attributed to maintenance issues and the internal damages have been settled. There is no dispute storm damage is covered by the policy and the claim has been accepted. Parties disagree about appropriate repair for accepted damage The dispute concerns the appropriate repair for the damage to the asbestos roof from the storm event. The complainant seeks full replacement of the roof, to return it to an as new condition in accordance with the policy. The insurer says encapsulation works are adequate for addressing the hail damage to the roof and it has appropriately exercised its discretion to settle the cost of these repairs. The insurer notes there is no structural damage to the roof from the event and says replacing the roof would be for the purpose of addressing long-term deterioration of the roof rather than the increased friability of the asbestos caused by the storm event. Relevant policy terms The policy provides the insurer with a discretion to repair or replace damaged parts of the property, or to pay the complainant the cost of repairing or replacing the building. AFCA expects an insurer to exercise its choice of settlement fairly. The policy states the insurer will only pay to return the property to a condition substantially the same as, but not better or more extensive than, its condition when new, using building materials readily available and in common use in Australia. The policy also specifically excludes loss and damage caused by gradual deterioration, normal upkeep of property, or existing defects or lack of maintenance to property, unless the complainant can show he did not know about the deterioration, defect or lack of maintenance. Further, the policy prevents a claim for repairing the deterioration, defect or maintenance. Evidence indicates roof in poor condition prior to storm event The insurer obtained a roof report from DR dated 1 February 2019. DR noted small marks from hail but found no holes or structural damage. DR said hail and debris may Determination | Case number: 750071 Page 4 of 9 have blocked the box gutters causing them to overflow, and recommended maintenance and monitoring. The insurer’s builder RP identified multiple water ingress points due to aged penetration flashings, box gutter blockages from debris, maintenance patch repairs over time, down pipes discharging onto flashings and makeshift cladding on parapet walls. RP recommended replacement of the roof for these reasons to comply with Australian standards. The complainant also provided a report from roofing specialist TN, dated 5 September 2019. TN said the asbestos roofing was in very poor condition and has been damaged from various hail storms. TN said the hail has damaged the top surface of the asbestos making it friable and hazardous. TN also said the hail has weakened the sheeting creating hair line cracks. TN recommended all existing roof sheeting be removed and replaced with colorbond sheeting. TN also recommended replacement of the gutters, internal wall cladding and parapet capping, which were described as being in very poor condition, although TN did not say this was due to hail damage. The insurer’s engineer DW, says the recommended lifespan of the asbestos roof sheeting was 25 years, and estimated the building was constructed around the 1960’s, meaning the roofing had been in service for around 55 years. DW said there is clear evidence of wear and tear to the asbestos, which can be attributed to all weather actions, including hail over this period. DW also noted evidence of previous patch repairs and cutting/penetration of sheeting to install ventilation ducts. The insurer’s industrial hygienist CT, noted the roof sheeting was generally in very poor condition and had weathered over time. CT confirmed the asbestos was friable and may become airborne under some conditions. CT said some areas of the ceiling cavity and mezzanine level were contaminated with asbestos due to a combination of deteriorating sheeting, penetrations cut for exhaust ducts and improper removal of asbestos components during previous repairs. CT also observed miscellaneous fragments of broken sheeting across on the roof and damage to the underside of the sheeting within the ceiling cavity. CT recommended decontamination and sealing of all asbestos materials. CT acknowledged hail damage may have contributed some damage to the roof sheeting, but said it was not the cause of it becoming friable. CT said the poor and friable condition of the roof was due to weathering and deterioration from wear and tear. The complainant’s environmental consultant SE, noted asbestos cement roofing and cladding deteriorates slowly over time as the upper surface is exposed to the elements, resulting in excessive fibre loss over time. SE said asbestos roofing and cladding in good condition can remain in place indefinitely providing appropriate precautions are taken. This includes not drilling or cutting the asbestos products as this may result in the release of fibres, keeping gutters and downpipes free of debris, any broken or exposed edges should be sealed, and the structure as a whole should be regularly inspected for maintenance. Considering these criteria, the evidence confirms that the asbestos roof was already compromised due to the pre-existing penetrations, breakages and maintenance issues. Determination | Case number: 750071 Page 5 of 9 Noting the exchanged material, including several helpful photographs, the panel is of the view that given the extent of pre-storm damage, the complainant would have known of the deterioration in the roof’s condition. In those circumstances the panel is satisfied that the insurer is entitled to rely upon its exclusion for loss or damage caused by or arising from gradual deterioration or lack of maintenance, to limit its obligations under the policy. The complainant also seeks replacement of the steel roof sheeting, whirlybird vents and ridge capping. Limited evidence has been provided regarding the cause of damage to these components. There are no photos of the whirly birds and the photos provided of the steel roof sheeting and ridge capping show a few dents on the peaks of the ridge, and the edge of the ridge capping, unlike the asbestos which has consistent hail pitting across the surface. The roof sheeting and ridge capping also has established rust damage unrelated to the event. The panel is not satisfied that the proximate cause of damage to these items was from the storm event. Encapsulation verses roof replacement DW noted the Australian Government Asbestos Safety and Eradication Agency prefers removal of asbestos sheeting where possible to totally eliminate its risk but accepts that encapsulation would protect the sheeting from mechanical damage and increase its serviceability. The complainant’s environmental consultant SE assessed the fibre release potential of the asbestos at the property as low. SE says encapsulation is required as a minimum control measure to prevent any potential release of asbestos fibres from the roofing material, although removal of the asbestos was an optimum solution to prevent any issues from future damage to the asbestos product. The insurer maintains encapsulation of the asbestos is appropriate to address the increased friability caused by the hail event, and that the need to replace the roof is due to long term damage and maintenance issues. The panel accepts that encapsulation repair is a minimal control measure, but that removal of the asbestos is the optimal solution. The experts generally agree the roof was in poor condition prior to the event and replacing the roof is recommended. The evidence indicates the asbestos was compromised prior to the event due to existing penetrations and deterioration. The panel accepts that the insurer is not responsible for extending the longevity of the complainant’s roof, addressing maintenance issues or upgrading the roof materials to prevent potential future damage to the asbestos. Determination | Case number: 750071 Page 6 of 9 2.2 How should the claim be settled? RP advised it cannot warrant the encapsulation repairs due to the pre-existing condition of the roof, including non-complaint flashings and maintenance issues . Further, the panel is not satisfied it is fair or consistent with policy provisions that the insurer be required to replace the roof. Given these circumstances the panel is also satisfied that it is fair that the insurer be entitled to cash settle the claim to finalise its obligations to the complainant. The insurer seeks to cash settle the repairs based on RP’s encapsulation quote of $47,794.56, provided on 4 October 2019. The insurer also offers an uplift of 10%, plus an additional $2,000 for the damaged skylight and air conditioner fins, making a total settlement of $54,574, for the storm damage to the roof. Noting the panel’s view that replace ment is the optimal method of dealing with the damaged asbestos roof, the panel is satisfied it is fair to use the replacement cost of the roof and apportion that amount in accordance with what the panel believes is the storm related damage. The panel considers a fair apportionment for storm damage to be 33%, of the cost of replacement of the roof. The complainant provided a quote of $215,493.48, for complete replacement of the roof but did not provide a comparison quote for encapsulation or replacement of the skylight and air conditioner fins. The insurer provided a quote for replacement of the roof, in the amount of $124,979.23. The panel has carefully reviewed both quotes and notes that both quotes are itemised and most items on the complainant’s quote ar e at an increased cost per item, compared to the insurer’s quote. The complainant’s quote includes several additional items, some of which have not been accepted by the panel and the insurer’s quote includes supervision, administration and travelling/accommodation costs. There is a significant difference in the amount of the two quotes and the panel is not satisfied that there is sufficient evidence to prefer one quote over the other. As such, the panel considers it fair that the amount of the two quotes be averaged at $170,236.35. This would enable an accounting for both the advantages and disadvantage of both quotes and allow the complaint to be finalised. Determination | Case number: 750071 Page 7 of 9 Upon acceptance of this determination by the complainant, to meet its obligations to the complainant, the insurer is to cash settle in the amount of $56,177.99, being 33% of $170,236.35. The insurer is not required to pay interest on this amount or to take any further action. Determination | Case number: 750071 Page 8 of 9 3 Supporting information 3.1 Process AFCA’s approach to this complaint This complaint has been determined based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. A panel has determined this complaint. The panel consists of the panel chair ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy provisions PDS page 28: Policy Section 1: Fire and other damage This section of the policy covers physical loss of or damage to your property from insured events listed in this section, including but not limited to events such as fire, light ning and explosion. We do not cover the theft or breakdown of your property under this section. Your insurance under this policy section Provided ‘Fire and ot her damage’ is shown under ’Sections Insured’ in the schedule , we will insure you for loss of or damage occurring during the period of insurance to buildings , business contents , stock or specified items , arising from an insured event specified below occurring at the situation . This policy section (including the extra covers and additional benefits) does not insure: … Determination | Case number: 750071 Page 9 of 9 2. Maintenance or defects Loss or damage caused by or arising out of: a. rust or corrosion; b. inherent or structural defects; c. faulty design, materials or workmanship; or d. developing flaws, gradual deterioration, normal upkeep of property , or existing defects or lack of maintenance to property , unless you can show you did not know ab out the deterioration, defect or lack of maintenance. You cannot claim for repairing the deterioration or defect or the maintenance. PDS page 45: What we pay 1. Building(s), specified items or business contents Reinstatement or replacement Unless the schedule shows you are insured for ‘Indemnity’ then, when buildings , specified items or busine ss contents are lost or destroyed we will, at our option: a. rebuild the buildings at the situation shown on your schedule or at another site; b. replace busi ness contents or specified items with similar property ; c. pay you the amount shown on the proof of purchas e for specified items; d. pay you the amount of a valuation by the Auctioneers and Valuers Association of Australia for specified items of works of art, antiques and curios; or e. pay the cost of rebuilding or replacing the buildings , specified items or busine ss contents . If the buildings , specified items or busine ss contents are damaged , then we will, at our option: a. repair or replace the buildings , specified items or busi ness contents ; or b. pay the cost of repairing or replacing the buildings , specified items or busine ss contents . Reinstatement or replacement is subject to the following conditions: a. the work of rebuilding, replacing or repairing must be commenced and completed by you within a reasonable time otherwise the amount we pay will be the indemnity value of the property . This means we will reduce the amount we pay you to take into account age, wear, tear and depreciation. b. when rebuilding at another site, we will not pay more than we would pay to rebuild at the si tuation . c. when any property is damaged , but not destroyed, we will not pay more than the amount that we could have been called upon to pay for if that property had been destroyed. d. we will only pay to return the property to a condition substantially the same as, but not better or more extensive than, its condition when new, using building materials readily available and in common use in The Commonwealth of Australia.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.