Determination 750020

Claim settlement and repair quality

FirmSuncorp Group
Decided2022-05-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$2,632
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed a home building insurance loss and sought floor replacement, alternative accommodation and stress compensation after repairs. AFCA found the insurer must pay $2,632.40 for settlement of the claim and $1,500 non-financial loss, rejecting further floor replacement.

The insurer is liable only for damage caused by its builder, not for defects in works carried out by the complainant's own contractors, and the insurer's settlement offers were fair.

Issues

Subjects and remedies

home or building damagemental healthpay compensationpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 750020 Financial firm AAI Limited Determination | Case number: 750020 Page 1 of 8 Case number: 750020 14 December 2021 1 Determination overview 1.1 Complaint The complainant holds a home building insurance policy with the financial firm (insurer). She lodged a claim for damage caused by a leak in January 2019. The insurer accepted the claim and carried out repairs. The complainant says the repairs carried out by the insurer’s builder are d efective and it is liable for replacing the floor. She seeks for the insurer to replace the floor, pay for alternative accommodation during this period, and pay compensation for stress and disruption. The insurer says the bulk of outstanding issues were ca used by the complainant’s contractors and disputes that the floor requires replacement because of its contractor’s works. It has offered to rectify minor issues for which it is liable and pay $1,760 for other minor damage it says is not attributable to the claim. The insurer offered to pay the complainant $1,500 in non- financial loss for her claims experience. 1.2 Issues and key findings Is the insurer required to increase its settlement offer? Based on the available information, the panel is satisfied the insurer has offered to settle the complainant for all damage for which it is liable. The insurer should increase its offer for the flooring rectification to $872.40 to allow for contingencies. The insurer should also honour its ex-gratia cash settlement offer of $1,760 which was not subject to acceptance and has not been withdrawn. Is the complainant entitled to any compensation? The insurer’s offer to pay $1,500 in non - financial loss due to the complainant’s claim experience is fair in all the circumstances. 1.3 Determination This determination is mostly in favour of the insurer. The insurer should pay the following:  $2,632.40 in full and final settlement of the insurance claim, and  $1,500 in non-financial loss. The insurer should pay these amounts within 21 days of receiving notification that the complainant accepts this determination. Determination | Case number: 750020 Page 2 of 8 2 Reasons for determination 2.1 Has the insurer fairly settled the claim? Complainant reported floor in unsatisfactory condition after repairs complete The complainant lodged a claim on 30 January 2019 for damage caused by an escape of liquid. The insurer accepted the claim. The insurer commenced repairs. However, a dispute arose after the complainant lost faith in the insurer’s builder (RC). An agreement was reached in June 2019 whereby the insurer would cash settle the complainant for outstanding repairs. The complainant subsequently engaged her own trades to complete work to flooring and cabinetry. In September 2019 the complainant contacted the insurer to report issues with the floor. She explained that gaps had appeared, and she was unable to walk inside her home without wearing footwear. She also expressed concerns that the floor had not been replaced in a like for like manner. Flooring specialist provided opinion on condition of floor The insurer engaged a specialist (AT) with extensive knowledge of timber flooring to provide commentary. AT attended on 11 November 2019 and examined the floor for gaps, flatness, angle against walls, finish, the potential use of inferior materials, and workmanship issues. AT found that gaps between floorboards were within tolerances. AT noted that the floor was generally flat, although some areas deviated 5mm over 2 meters (with usual tolerances being 4mm over 2m). AT noted these areas were isolated and did not affect the performance of the floor. AT also noted that some boards finished at slight angles against walls in the home. AT explained this had occurred as walls inside the home were notably out of parallel or not straight. In short, a consequence of uneven walls is that they may not line up against straight floorboards. AT said an attempt had been made to obtain a straight line from a long hallway wall, considered the most common viewing angle of the floor. AT considered the decision in line with industry practices, and that no remedial action was required. AT also noted the finish was outside of industry expectation, and this was due to the quality of sanding and use of a finish prone to bonding. AT observed perimeter expansion joints which were not covered by skirting boards, and packers exposed in an expansion gap. AT considered these issues required rectification. Lastly, AT considered the timber used was of a suitable quality against the original floor. Complainant says insurer is liable for replacing the entire floor There is no dispute that:  sanding and finishing work is below minimum industry expectations  the type of finish used is prone to edge bonding which may later result in gaps  this work was carried out by contractors engaged by the complainant. Determination | Case number: 750020 Page 3 of 8 Nor is there any dispute that the insurer is liable for rectifying packers left in expansion joints and perimeter expansion allowances. This is because its builder (RC) is responsible for these issues. However, the complainant is not satisfied with the floor’s condition and says it does not match its earlier, pre-loss condition. She says:  RC did not replace the subfloor entirely after it was damaged (as agreed)  RC did not ensure the subfloor was level prior to installing timber flooring  the timber flooring is not level because the subfloor was not levelled by RC  RC has not supplied details of the trades it used for floor repairs, therefore they most likely lacked suitable qualifications. The complainant also says that she sought to employ contractors to carry out rectification work, yet each refused to warrant any repairs due to the condition of the subfloor. It is not disputed that RW damaged the subfloor during repairs, or that to rectify the issue it agreed to replace the subfloor. Ho wever, the insurer disputes the complainant’s assertion that this did not occur. Available information does not show subfloor was in poor condition The insurer said RC replaced the damaged subfloor with new plywood substrate. An invoice was provided in support. The complainant says that the entire subfloor was not replaced. However, she has not provided any evidence of this. In contrast, the insurer has provided evidence to show the subfloor was replaced. The panel also notes AT raised no concerns the flooring may have been prepared on an uneven subfloor or that there were issues in this regard. Given this, the panel is not satisfied that RC failed to replace the subfloor, or that it was in an uneven or unsuitable condition prior to the timber flooring being installed. The panel is therefore not persuaded the subfloor is a cause or contributor to any of the claimed issues. The panel has also considered the issue of contractors refusing to warrant repairs due to the condition of the subfloor. The insurer says the contractors were presented with a photograph of the subfloor in a damaged condition, prior to RC carrying out repairs. One of the reports in support referred to an older photograph. It is not clear these contractors were aware the subfloor had been replaced since. Therefore, their evidence is not persuasive. Flooring specialist reports condition is largely within tolerance The complainant notes the policy provides new for old cover. Irrespective of the contribution of the subfloor, she says that as the floor is not in its pre-loss condition, it must be removed and replaced anew. The policy stipulates that loss or damage is repaired on a new for old basis. Under this basis, repairs require the use of new materials, regardless of age, and must be to the same standard as when new. That the insurer used new materials is not in dispute. Rather, the complainant says the floor is not to the same standard as it was before the loss. AT’s report clearly states that sanding and finishing was below minimum indus try expectations. However, this work was carried out by the complainant’s contractors. Determination | Case number: 750020 Page 4 of 8 AT notes that some areas of the floor had a slight deviation in flatness. The largest deviation was about 5mm over 2m, slightly in excess of the recommended tolerances of 4mm over 2m. It is unclear why some sections of the floor exhibit this very slight deviation. AT says that the affected areas are isolated and do not adversely affect the performance of the floor. AT says no remedial measures are considered necessary for this issue. While slightly outside recommend tolerances, AT does not say the deviation is below minimum industry expectations (as with the finish). It is clear that AT considers this minor issue does not require remediation. The policy requires repairs to be to a workmanlike standard, and to the same condition as new. It does not require the work to be the best standard. AT’s evidence does not establish the works were below workmanlike standard. If they were, it would reasonably be expected that AT would have recommend remedial works as it did for other issues. Therefore, the panel does not accept the insurer is liable for any additional works on this point. Insurer has offered settlement for all damage for which it is liable The insurer accepts that it is liable for rectifying packers left in expansion joints and perimeter expansion allowances. It has offered to carry out these repairs, or cash settle the complainant $727 based on RC’s quote. RC’s quote includes the cost of a floorer and painter as wel l as an allowance for builder margins. No comparative quote has been provided to show this amount is inadequate. The panel considers RC’s quote is a reasonable basis for cash settlement. However, the insurer should increase its cash settlement offer by 20% to allow for contingencies and the fact this is not actionable. This means the insurer should pay $872.40 in settlement of the floor. The insurer also made an ex gratia offer of $1,760 for other works identified that the complainant raised concerns about. The complainant has not provided any evidence to show this amount is unreasonable or would not address all outstanding issues. Therefore, the panel accepts the insurer should pay $2,632.40 in full and final settlement of the insurance claim. Insurer is no t responsible for complainant’s decision to accept cash settlement The complainant describes a protracted and drawn out claims experience. She was pregnant when the loss occurred and says she was forced into accepting cash settlement so repairs could be completed before the birth. Her position is the insurer should rectify issues caused by her contractors given she was left with no choice but to use them. The insurer concedes the claim did not proceed as quickly as it would have liked. It says catastrophic storms in February 2019 caused a shortage of builders and other trades, and this contributed to delays. However, it says it sought to reduce delays and was not negligent in its management of the claim. The submissions include claim notes which detail, amon g other things, the insurer’s contact with the complainant. These show:  the claim was lodged on 30 January 2019 Determination | Case number: 750020 Page 5 of 8  the insurer promptly arranged a restorer to treat mould and install fans  the complainant was offered temporary accommodation  the insurer relayed the sense of urgency to its builder  an assessment report was received by 14 February 2019  the complainant advised she would consider cash settlement on 26 March 2021  the basis for requesting cash settlement was dissatisfaction with RC and repair timeframes. The panel has reviewed copies of text messages between the complainant and RC. These do not show RC behaved inappropriately. While the messages show RC’s representative apologised if he came across as rude, the representative indicated that was not the intention. It is unclear from these messages whether RC or its representative acted inappropriately. The panel accepts the complainant was genuinely dissatisfied with the progress made by RC and this formed the basis for her request for cash settlement. The panel also acknowledges she was under a stressful situation given she had a toddler and was pregnant with twins. However, the panel is not persuaded she acted under duress to the extent she was forced to accept a cash settlement and engage a contractor who was unable to do the works property. There is no dispute the complainant made the decision to seek a cash settlement. She chose the contractor to complete the works. The complainant was in a position to assess the contractor’s qualifications and experi ence, not the insurer. The complainant did not consult the insurer when choosing the contractor. Given all this, the panel is not persuaded it is fair for the insurer to be liable for rectifying the complainant’s contractor’s works. 2.2 Is the complainant entitled to any compensation? AFCA may award compensation in certain circumstances Under our Rules, we can award up to $5,400 compensation for non-financial loss. We may award compensation if a complainant has suffered an unusual degree of physical inconvenience, time taken to resolve the situation or interference with his or her expectation of enjoyment or peace of mind due to the insurer’s handling of the claim. We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim. Insurer’s offer for non -financial loss is fair The panel has already outlined a summary of claim notes and the insurer’s contact with the complainant. As noted, the panel is satisfied the insurer did not act in a manner which left the complainant with no option but to accept a cash settlement for repairs. The panel accepts that progress was delayed. Part of the reasons was due to the increased demand for repairs and other works in relation to the February 2019 Sydney Storms. However, there does appear to have been delays caused by RC despite the insurer asking RC to prioritise this claim. It is also clear the complainant was in a stressful situation and these delays impacted her. The insurer has offered $1,500 non-financial loss compensation in recognition of her claims experience. The panel considers this offer is fair and consistent with the award it would have given for the complainant’s claims experience. Determination | Case number: 750020 Page 6 of 8 Therefore, the insurer should pay $1,500 in non-financial loss due to the complainant’s claims experience. Determination | Case number: 750020 Page 7 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience within the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 750020 Page 8 of 8 3.2 Relevant sections of the policy wording Lifetime guarantee on building repairs When we repair or rebuild the building, we guarantee the quality of materials and workmanship of that work for the lifetime of the building if we:  authorise;  arrange; and  pay the builder or repairer directly for this work. What we guarantee We guarantee the material used and standard of the workmanship to be free of defects. If a defect arises in the lifetime of the building as a result of poor quality workmanship or use of incorrect materials, then we will rectify the problem. It is a condition of our guarantee that we reserve the right to decide who will undertake the rectification work. This guarantee does not apply  to repairs you authorise or make yourself;  to loss, damage or failure of any electrical or mechanical appliances or machines;  to wear and tear consistent with normal gradual deterioration of the building (e.g. paint peeling off after its expected life cycle, wood rotting from moisture in the air or ground, roofs weathering or a hot water tank leaking after its guaranteed life);  where we agree with a repair quote and we give you, or the builder or repairer, payment for the cost of the repairs and you arrange the repairs. However, you may wish to briefly refer to any arguments from the losing party that you do not address in section 2. Consider a paragraph such as: ‘The complainant/financial firm raised the following arguments, but it is not necessary to deal with them in detail. They would not change the outcome, even if they were accepted’.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.